Está en la página 1de 146

MEMORIA DE

CALCULO ESTRUCTURAL

MEJORAMIENTO DEL SERVICIO EDUCATIVO


• PROYECTO :
EN LA I.E. 101127 EL PORVENIR

• DISTRITO : QUEROCOTO

• PROVINCIA : CHOTA

• DEPARTAMENTO : CAJAMARCA

• ING. PROYECTISTA : ING. CARLOS ALBERTO PAREDES CHUMPEN

• ASISTENTE 1 : BACH. ING. CIVIL JAVIER GUEVARA DAVILA

• ASISTENTE 2 : BACH. ING. CIVIL ANA JULIA BECERRA HERNANDEZ

MARZO DEL 2016


PREDIMENSIONAMIENTO DE
ELEMENTOS ESTRUCTURALES
PREDIMENSIONAMIENTO DE VIGAS

* VP 204(En direccion del sistema de muro portantes)

Ln = 3.57 m
B = 3.70 m
S/C (kg/m2) α
200 12
h= 250 11
500 10
h = 0.30 m 750 9
1000 8
/20
b= 0.40ℎ
0.
b = 0.19 m
b = 0.12 m
b = 0.25 m
Viga VP : b x h = 0.25 m x 0.30 m

Adoptado por aumento de rigidez:

Viga VP : b x h = 0.25 m x 0.40 m

* VP 205(En direccion del sistema de muro portantes)

Ln = 3.58 m
B = 3.81 m
S/C (kg/m2) α
200 12
h= 250 11
500 10
h = 0.30 m 750 9
1000 8
/20
b= 0.40ℎ
0.
b = 0.19 m
b = 0.12 m
b = 0.25 m
Viga VP : b x h = 0.25 m x 0.30 m
Adoptado por aumento de rigidez:
Viga VP : b x h = 0.25 m x 0.50 m
* VS 201(En direccion del sistema aporticado)

Ln = 2.95 m
B = 2.04 m
S/C (kg/m2) α
200 12
h= 250 11
500 10
h = 0.25 m 750 9
1000 8
/20
b= 0.40ℎ
0.
b = 0.10 m
b = 0.10 m
b = 0.25 m
Viga VS : b x h = 0.25 m x 0.25 m

Adoptado por aumento de rigidez:

Viga VS : b x h = 0.25 m x 0.55 m

* VS 203(En direccion del sistema aporticado)

Ln = 3.45 m
B = 0.60 m
S/C (kg/m2) α
200 12
h= 250 11
500 10
h = 0.29 m 750 9
1000 8
/20
b= 0.40ℎ
0.
b = 0.03 m
b = 0.12 m
b = 0.25 m
Viga VS : b x h = 0.25 m x 0.17 m

Adoptado por aumento de rigidez y arquitectura:

Viga VS : b x h = 0.20 m x variable


* VS 203´(En direccion del sistema aporticado)

Ln = 3.45 m
B = 1.50 m
S/C (kg/m2) α
200 12
h= 250 11
500 10
h = 0.29 m 750 9
1000 8
/20
b= 0.40ℎ
0.
b = 0.08 m
b = 0.12 m
b = 0.25 m
Viga VS : b x h = 0.25 m x 0.30 m

Adoptado por arquitectura:

Viga VS : b x h = 0.15 m x 0.20 m

* VT 202(En direccion del sistema aporticado)

Ln = 3.55 m
B = 4.33 m
S/C (kg/m2) α
200 12
h= 250 11
500 10
h = 0.30 m 750 9
1000 8
/20
b= 0.40ℎ
0.
b = 0.22 m
b = 0.12 m
b = 0.25 m
Viga VT : b x h = 0.25 m x 0.30 m

Adoptado por arquitectura:

Viga VT : b x h = 0.25 m x 0.50 m


* VV 206(En direccion del sistema aporticado)

Ln = 2.85 m
B = 1.35 m
S/C (kg/m2) α
200 12
h= 250 11
500 10
h = 0.18 m 750 9
1000 8
/20
b= 0.40ℎ
0.
b = 0.07 m
b = 0.07 m
b = 0.25 m
Viga VV : b x h = 0.25 m x 0.20 m

Adoptado por arquitectura:

Viga VV : b x h = 0.25 m x 0.20 m

PREDIMENSIONAMIENTO DE COLUMNAS

* Predimensionamiento Columna 1

- Predimensionamiento del alma

Método japonés (sin placa)

Ubicación Tipo Nº de pisos c n

Extremos C1 Todos los pisos 1.5 0.2

Cargas Incidencia Aportes L (m) b (m) h (m) Nº veces Carga P (Kg.)


Aligerado 1.73 2.16 1 300 1121.04
Acabados 1.73 2.16 1 120 448.416
Carga muerta 1 VP-204 3.57 0.25 0.4 1 2400 2142
VS-201 2.85 0.25 0.55 1 2400 1710
Columna 2.85 0.5 0.5 1 2400 3420
Carga viva 1 Techos 1.73 2.16 1 50 186.84
Total 9028.30 kg
b x d = 322.44 cm2 Asumiendo: b = 0.30cm
d = 0.11cm
Asumir: d = 0.20cm

Asumimos alma de: 0.25 m x 0.50 m ,para brindar mayor rigidez ante eventos sismicos.

- Predimensionamiento del ala

Donde:
h: Dimensión peraltada de la columna
Vs: Fuerza cortante en la base
H: Altura del muro portante
nc: Número de columnas
η: Factor de desplazamiento permisible
Ec: Módulo de eslasticidad del concreto
t: Espesor del ala

Vs=(ZUCS)*P

Se observa que la fuerza cortante no se divide entre R, pues las columnas se predimensionarán por deformación y
no por resistencia
Datos:
Z = 0.4 Zona 3
U = 1.5 Edificaciones esenciales
S = 1.4 Suelos intermedios
C= 2.5
Hn = 4.65 m Altura de la columna

Se asume peso de la estructura Pest.unitario = 1.12 T/m2


Area de la edificación = 228.66 m2
Peso total de estructura = 256099.20 Kg
Vbasal = 537808.32 Kg

H: 4.65 m
nc: 16
η: 0.007
Ec: 217,371 Kg/cm2
t: 25.00 cm
h= 48.96 cm = 50.00 cm

Asumimos ala 0.25 m x 0.50 m


Columna C1:

* Predimensionamiento Columna 2

- Predimensionamiento del alma

Método japonés (sin placa)

Ubicación Tipo Nº de pisos c n

Extremos C1 Todos los pisos 1.25 0.25

Cargas Incidencia Aportes L (m) b (m) h (m) Nº veces Carga P (Kg.)


Aligerado 3.7 1.91 1 300 2120.1
Acabados 3.7 1.91 1 120 848.04
Carga muerta 1 VP-204 3.57 0.25 0.4 1 2400 2142
VS-201 2.85 0.25 0.55 2 2400 3420
Columna 2.85 0.75 0.5 1 2400 5130
Carga viva 1 Techos 3.7 1.91 1 50 353.35
Total 14013.49 kg

b x d = 333.65 cm2 Asumiendo: b = 0.30cm


d = 0.11cm
Asumir: d = 0.20cm

Asumimos alma de: 0.25 m x 0.50 m ,para brindar mayor rigidez ante eventos sismicos.

- Predimensionamiento del ala


Donde:
h: Dimensión peraltada de la columna
Vs: Fuerza cortante en la base
H: Altura del muro portante
nc: Número de columnas
η: Factor de desplazamiento permisible
Ec: Módulo de eslasticidad del concreto
t: Espesor del ala

Vs=(ZUCS)*P

Se observa que la fuerza cortante no se divide entre R, pues las columnas se predimensionarán por deformación y
no por resistencia

Datos:
Z = 0.4 Zona 3
U = 1.5 Edificaciones esenciales
S = 1.4 Suelos intermedios
C= 2.5
Hn = 4.65 m Altura de la columna

Se asume peso de la estructura Pest.unitario = 1.12 T/m2

Area de la edificación = 228.66 m2

Peso total de estructura = 256099.20 Kg

Vbasal = 537808.32 Kg

H: 4.50 m
nc: 16
η: 0.007
Ec: 217,371 Kg/cm2
t: 25.00 cm
h= 56.35 cm = 60.00 cm

Asumimos ala 0.25 m x 0.70 m

Columna C2:
* Predimensionamiento Columna 3

- Predimensionamiento del alma

Método japonés (sin placa)

Ubicación Tipo Nº de pisos c n

Extremos C1 Todos los pisos 1.1 0.25

Cargas Incidencia Aportes L (m) b (m) h (m) Nº veces Carga P (Kg.)


Aligerado 4.02 4.33 1 300 5221.98
Acabados 4.02 4.33 1 120 2088.792
Carga muerta 1 VP-204 3.57 0.25 0.4 2 2400 4284
VS-201 2.85 0.25 0.5 2 2400 3420
Columna 2.85 0.25 0.5 1 2400 1710
Carga viva 1 Techos 4.02 4.33 1 50 870.33
Total 17595.10 kg

b x d = 368.66 cm2 Asumiendo: b = 0.30cm


d = 0.12cm
Asumir: d = 0.20cm

Asumimos alma de: 0.25 m x 0.50 m ,para brindar mayor rigidez ante eventos sismicos.
GENERALIDADES
1.1. NORMATIVA EMPLEADA

Para el diseño de la vivienda unifamiliar de 4 pisos se sigue las disposisiones de los Reglamentos
y Normas Nacionales e Internacionales descritos a continuación:

-Reglamento Nacional de Edificaciones (Perú)


-NTE E.020 “CARGAS”
-NTE E.030 “DISEÑO SISMORRESISTENTE”
-NTE E.050 “SUELOS Y CIMENTACIONES
-NTE E.060 “CONCRETO ARMADO”
-NTE E.070 “ALBAÑILERIA”

Se entiende que todos los Reglamentos y Normas están en vigencia y/o son de la última edición.

1.2. ESPECIFICACIONES DE MATERIALES EMPLEADOS

1.2.1. CONCRETO ARMADO

-Resistencia: f´c=210 kg/cm2


-Módulo de elasticidad: E=217370.65 kg/cm2
-Peso Específico:γ= 2400 Kg/m3

1.2.2. ACERO CORRUGADO (ASTM A605)

-Resistencia a la fluencia: fy= 4 200 Kg/cm2 (Gº 60)


-Módulo de elasticidad: E= 2 100 000 Kg/cm2

1.2.3. ALBAÑILERIA PORTANTE

-Ladrillo tipo IV (9x12.5x23): f'm=45 Kg/m2

1.2.4. RECUBRIMIENTOS MINIMOS

-Cimientos, zapatas conectadas= 5.00 cm (caras) , 7.5 cm (fondo)


-Columnas, Vigas= 4.00 cm
-Losas Aligeradas, Vigas chatas, Vigas de borde= 2.00cm
-Losas macizas, Escaleras,Cisterna= 2.50 cm

1.3. CARACTERISTICAS DEL TERRENO Y CONSIDERACIONES DE CIMENTACION

-Peso Específico:γ = 1900 Kg/m3


-Capacidad admisible: ´adm=
σ 1.007g/cm2
-Desplante de cimiente: DF= 1.30 m
-Cimentación considerada: Zapatas aisladas con vigas de conexion y Cimientos Corridos
ANALISIS VERTICAL
2.1. REFERENCIAS

2.1.1. ARQUITECTURA Y CONFIGURACION GEOMETRICA

E-02

A B C D E F G H I

6 5 4 3 2 1

P-01 P-01 P-01

1 V-02 V-01 V-02 V-01 V-02 V-01


1
V-04 V-04

P-02 P-02
E-04

E-03
2 2
P-04 P-04 P-04 P-04

P-03

V-03 V-01 V-01 V-01 V-01 V-01 V-01

3 6 5 4 3 2 1
3

A B C D E E-01 F G H I

E-02

J K L M N O P Q R

1 2 3 4 5 6

P-01 P-01 P-01

4 V-01 V-02 V-01 V-02 V-01 V-02 V-02


4
P-02
E-04

E-03

5 5

P-03

V-01 V-01 V-01 V-01 V-01 V-01 V-03

6 1 2 3 4 5 6
6

J K L M N E-01 O P Q R
2.1.2. ESQUEMA DE ESTRUCTURACION
A B C D E F G H I

VS - 203' (.15X.20) VS - 203' (.15X.20) VS - 203' (.15X.20) VS - 203' (.15X.20) VS - 203' (.15X.20) VS - 203' (.15X.20) VS - 203' (.15X.20)

1 C-1 VS-201(.25X.55) C-2 VS-201(.25X.55) C-2 VS-201(.25X.55) C-1 C-1 VS-201(.25X.55) C-2 VS-201(.25X.55) C-2 VS-201(.25X.55) C-2 VS-201(.25X.55) C-1 1
1.00

1.00
VP - 204 (.25x.40)

VP - 204 (.25x.40)

VP - 204 (.25x.40)

VP - 204 (.25x.40)
VP - 204 (.25x.40)

VP - 204 (.25x.40)

VP - 204 (.25x.40)

(.25x.40)

VP - 204 (.25x.40)
201(.25x.40)
AS Ø1/4"DE TEMPERATURA AS Ø1/4"DE TEMPERATURA
@ 0.25 DOBLADOS EN @ 0.25 DOBLADOS EN
AMBOS EXTREMOS A 0.25 AMBOS EXTREMOS A 0.25

VP -- 204
VP
.15

.15
1.40

1.40
2 C-3
VT- 202 (.25x.50) C-3
VT- 202 (.25x.50) VT- 202 (.25x.50) C-3 C-3
VT- 202 (.25x.50) VT- 202 (.25x.50) C-3
VT- 202 (.25x.50) VT- 202 (.25x.50) C-3
2
1.40

1.40
.15

.15
VP - 204 (.25x.40)

VP - 204 (.25x.40)

VP - 204 (.25x.40)

VP - 204 (.25x.40)
VP - 204 (.25x.40)

VP - 204 (.25x.40)

VP - 204 (.25x.40)

VP - 204 (.25x.40)

VP - 204 (.25x.40)
AS Ø1/4"DE TEMPERATURA AS Ø1/4"DE TEMPERATURA
@ 0.25 DOBLADOS EN @ 0.25 DOBLADOS EN
AMBOS EXTREMOS A 0.25 AMBOS EXTREMOS A 0.25
1.00

1.00
3 C-1 VS-201(.25X.55) C-2 VS-201(.25X.55) VS-201(.25X.55) C-1 C-1 VS-201(.25X.55) C-2 VS-201(.25X.55) C-2 VS-201(.25X.55) C-2 VS-201(.25X.55) C-1

3
VS - 203 (.15 X Var.) VS - 203 (.15 X Var.) VS - 203 (.15 X Var.) VS - 203 (.15 X Var.) VS - 203 (.15 X Var.) VS - 203 (.15 X Var.) VS - 203 (.15 X Var.)

A B C D E F G H I

J K L M N O P Q R

VS - 203' (.15X.20) VS - 203' (.15X.20) VS - 203' (.15X.20) VS - 203' (.15X.20) VS - 203' (.15X.20) VS - 203' (.15X.20) VS - 203' (.15X.20)

4 C-1 VS-201(.25X.55) C-2 VS-201(.25X.55) C-1 C-1 VS-201(.25X.55) C-2 VS-201(.25X.55) C-2 VS-201(.25X.55) C-2 VS-201(.25X.55) C-2 VS-201(.25X.55) C-1 4
1.00

1.00

AS Ø1/4"DE TEMPERATURA
@ 0.25 DOBLADOS EN
AMBOS EXTREMOS A 0.25
.15

.15
1.40

1.40

5 C-3
VT- 202 (.25x.50) VT- 202 (.25x.50) C-3 C-3
VT- 202 (.25x.50) VT- 202 (.25x.50) VT- 202 (.25x.50) VT- 202 (.25x.50) C-3
VT-.202 (.25x.50) C-3
5
1.40

1.40
.15

.15

AS Ø1/4"DE TEMPERATURA
@ 0.25 DOBLADOS EN
AMBOS EXTREMOS A 0.25
1.00

1.00

6 C-1 VS-201(.25X.55) C-2 VS-201(.25X.55) C-1 C-1 VS-201(.25X.55) C-2 VS-201(.25X.55) C-2 VS-201(.25X.55) C-2 VS-201(.25X.55) C-2 VS-201(.25X.55) C-1

6
VS - 203 (.15 X Var.) VS - 203 (.15 X Var.) VS - 203 (.15 X Var.) VS - 203 (.15 X Var.) VS - 203 (.15 X Var.) VS - 203 (.15 X Var.) VS - 203 (.15 X Var.)

J K L M N O P Q R
0,25

CA VB-01 CA

Ø1/2"
VB-01

VB-01
2,00
1,50

Ø1/2"
0,25

CA VB-01 CA

TANQUE ELEVADO
LOSA ALIGERADA, H=0.17M.
ESCALA 1/25
V

V
2,
1,
Ø1/2"

0,25
CA VB-01 CA

TANQUE ELEVADO
LOSA ALIGERADA, H=0.17M.
ESCALA 1/25

2.1.3. CONFIGURACION ESTRUCTURAL

2.1.3.1. Centro Educativo

-Altura 1er piso: h=4.50 m

-Bloque 1: Aulas 01-02


Direccion x-x: Sistema Aporticado (regular)
Direccion y-y:Sistema de Albañileria Confinada (regular)

-Bloque 2: Sala de computo


Direccion x-x: Sistema Aporticado (regular)
Direccion y-y:Sistema de Albañileria Confinada (regular)

-Bloque 3: Salon de usos multiples,Deposito y Direccion


Direccion x-x: Sistema Aporticado (regular)
Direccion y-y:Sistema de Albañileria Confinada (regular)

-Bloque 1: Comedor estudiantil


Direccion x-x: Sistema Aporticado (regular)
Direccion y-y:Sistema de Albañileria Confinada (regular)

-Vigas: -Columnas:
VP204= .25x.40 (seccion rectangular) C1= .25x.50 (seccion L)
VP205= .25x.50 (seccion rectangular) C2= .25x.50 (seccion T)
VS201= .25x.55 (seccion rectangular) C3= .50x.25 (seccion rectangular)
VT202= .25x.50 (seccion irregular)
VS203= .25x.var (seccion irregular) -Losa aligerada:
VS203'= .15x.20 (seccion rectangular) h= .20 m
VV206= .25x.20 (seccion rectangular)

2.1.3.2. Tanque Elevado

-Altura 1er nivel: h=2.05 m


-Altura 2do nivel: h=3.05 m

-Sistemas estructurales
Direccion x-x: Sistema Aporticado (regular)
Direccion y-y: Sistema Aporticado (regular)

-Vigas: -Losa aligerada:


VB= .25x.25 (seccion rectangular) h= .17 m

-Columnas:
CA= .25x.25 (seccion rectangular)
2.1.4. MODELADO ASISTIDO POR COMPUTADORA

-Para el calculo estructural de la edificacion a diseñar se utilizo el programa ETABS 2015, el cual brinda
una vision en 3 dimensiones de la estructura en general, generando sus respectivos esfuerzos en cada
uno de sus elemetos estructurales. El modelado quedo definido de la siguiente forma:

BLOQUE 1-AULAS 01 Y 02
BLOQUE 2-SALA DE COMPUTO
BLOQUE 3-SUM, DEPOSITO Y DIRECCION
BLOQUE 4-COMEDOR ESTUDIANTIL
SISTEMA APORTICADO DE TANQUE ELEVADO
2.2. ESTADOS DE CARGA

2.2.1. CARGAS MUERTAS

-Carga/m2 en techo inclinado (CM):


Acabados : 120.00 kg/m2
CM : 120.00 kg/m2

2.2.2. CARGAS VIVAS

-Carga/m2 en techo inclinado:


Techo inclinado : 50.00 kg/m2
LIVE UP : 50.00 kg/m2

2.3. COMBINACIONES DE CARGA

Para la obtencion de los maximos esfuerzos en cada uno de los elementos estructurales, se usaran las
combinaciones de carga dispuestas en NTE E.030 DISEÑO SISMORRESISTENTE del RNE:

• 1.4(DEAD+CM) + 1.7(LIVE+LIVE UP)


• 1.25(DEAD+CM) + 1.25(LIVE+LIVE UP) + SISMO XX DIN
• 1.25(DEAD+CM) + 1.25(LIVE+LIVE UP) + SISMO YY DIN
• 0.9(DEAD+CM) + SISMO XX DIN
• 0.9(DEAD+CM) + SISMO YY DIN
• ENVOLVENTE DE COMBINACIONES
ANALISIS SISMICO
3.1. PESO DE LA ESTRUCTURA

El Etabs hace el cálculo de los distintos casos de carga, pero según las Normas de Diseño Sismico se toman los
casos de carga con porcentajes de participación. En el caso de NTE E-030, se tiene los siguientes requisitos:

Carga Muerta : 100%


Carga Viva : 50%

3.2. FACTORES DE ANALISIS

El Análisis Sísmico se realiza utilizando un modelo matemático tridimensional en donde los elementos
verticales están conectados con un diafragma horizontal,el cual se suponen infinitamente rígidos en sus
planos. Además, para cada dirección, se ha considerado una excentricidad accidental de 0.05 veces la
dimensión del edificio en la dirección perpendicular a la acción de la fuerza. Los parámetros sísmicos
que estipula la Norma de Diseño Sismorresistente (NTE E.030) considerados para el Análisis en el Edificio
son los siguientes:

CLASIFICACION
FACTOR NOMENCLATURA VALOR JUSTIFICACION
CATEGORIA/TIPO
Zona Sísmica 1:
ZONA Z 3 0.4
Cajamarca
USO U A 1.5 Colegio
S2 1.2
SUELO S Arcilla Gravosa
Tp 0.6
Sistema viga-col
Rx Aporticada 8
COEFICIENTE DE de C.A.
REDUCCION Muros de corte de
Ry Albañileria Confinada 3
Mamposteria

3.3. ANALISIS SISMICO ESTATICO

Para el método de Fuerzas Horizontales Equivalentes definimos cuatro casos de carga, ya que la
excentricidad de las fuerzas aplicadas puede ser positivas o negativas, para cada dirección de análisis
se tendrán dos casos.
La distribución de las fuerzas en los entrepisos y el valor de “K” se pueden apreciar en la siguiente forma:

= ∑( .(V-Fa)
)
3.4. ANALISIS SISMICO DINAMICO

Para el Análisis Dinámico de la Estructura se utiliza un Espectro de respuesta según la NTE - E.030, para
comparar la fuerza cortante mínima en la base y compararlos con los resultados de un análisis estático
Todo esto para cada dirección de la Edificación en planta (X e Y)

ESPECTRO DE DISEÑO PARA SISMO XX NTE E.030

T Sa C
0.01 0.2250 2.50
0.02 0.2250 2.50
0.03 0.2250 2.50
0.04 0.2250 2.50
0.05 0.2250 2.50
0.06 0.2250 2.50
0.07 0.2250 2.50 Sa
0.08 0.2250 2.50 0.2500
0.09 0.2250 2.50
0.1 0.2250 2.50 0.2000
0.2 0.2250 2.50
0.3 0.2250 2.50 0.1500
0.4 0.2250 2.50
0.5 0.2250 2.50 0.1000
0.6 0.2250 2.50
0.7 0.1929 2.14 0.0500
0.8 0.1688 1.88
0.9 0.1500 1.67 0.0000
1 0.1350 1.50 0 2 4 6 8 10 12
2 0.0675 0.75
3 0.0450 0.50
4 0.0338 0.38
5 0.0270 0.30
6 0.0225 0.25
7 0.0193 0.21
8 0.0169 0.19
9 0.0150 0.17
10 0.0135 0.15

ZUS/R 0.09
ESPECTRO DE DISEÑO PARA SISMO YY NTE E.030

T Sa C
0.01 0.6000 2.50
0.02 0.6000 2.50
0.03 0.6000 2.50
0.04 0.6000 2.50
0.05 0.6000 2.50
0.06 0.6000 2.50
0.07 0.6000 2.50 Sa
0.08 0.6000 2.50 0.2500
0.09 0.6000 2.50
0.1 0.6000 2.50 0.2000
0.2 0.6000 2.50
0.3 0.6000 2.50 0.1500
0.4 0.6000 2.50
0.5 0.6000 2.50 0.1000
0.6 0.6000 2.50
0.7 0.5143 2.14 0.0500
0.8 0.4500 1.88
0.9 0.4000 1.67 0.0000
1 0.3600 1.50 0 2 4 6 8 10 12
2 0.1800 0.75
3 0.1200 0.50
4 0.0900 0.38
5 0.0720 0.30
6 0.0600 0.25
7 0.0514 0.21
8 0.0450 0.19
9 0.0400 0.17
10 0.0360 0.15

ZUS/R 0.24
EVALUACION
4.1. CONTROL DE FUERZA CORTANTE PARA DISEÑO DE ELEMENTOS ESTRUCTURALES

La respuesta maxima dinamica esperada para el coratante basal se calculo utilizand el criterio de combinacion
cuadratica completa para los modos de vibracion calculado (3 por nivel)
De acuerdo a la norma vigente, el cortante dinamico no debe de ser menor al 85% del cortante estatico
para edificios regulares y 90% para edificios irregulares.De acuerdo a esto se comparan los resultados
obtenidos.

4.1.1. Bloque 1-Aulas

Resumen de valores obtenidos


Centro Educativo
Descripcion
Tn
Peso total de la edificacion 109.25
Aceleracion XX Analisis Estatico 0.225
Aceleracion YY Analisis Estatico 0.6
Cortante XX en la base Analisis Estatico 24.58
Cortante YY en la base Analisis Estatico 65.55
Cortante XX en la base la 80% Analisis Estatico 20.893
Cortante YY en la base la 80% Analisis Estatico 55.7175
Cortante en XX Analisis Dinamico 20.89 OK
Cortante en YY Analisis Dinamico 59.37 OK
Factor de escalar en XX 11.71
Factor de escalar en YY 9.81
4.1.2. Bloque 2-Sala de Computo

Resumen de valores obtenidos


Centro Educativo
Descripcion
Tn
Peso total de la edificacion 96.89
Aceleracion XX Analisis Estatico 0.225
Aceleracion YY Analisis Estatico 0.6
Cortante XX en la base Analisis Estatico 21.8
Cortante YY en la base Analisis Estatico 58.13
Cortante XX en la base la 80% Analisis Estatico 18.53
Cortante YY en la base la 80% Analisis Estatico 49.41
Cortante en XX Analisis Dinamico 19.46 OK
Cortante en YY Analisis Dinamico 52.24 OK
Factor de escalar en XX 9.81
Factor de escalar en YY 9.81
4.1.3. Bloque 3-SUM,Deposito y Direccion

Resumen de valores obtenidos


Centro Educativo
Descripcion
Tn
Peso total de la edificacion 132.81
Aceleracion XX Analisis Estatico 0.225
Aceleracion YY Analisis Estatico 0.6
Cortante XX en la base Analisis Estatico 29.88
Cortante YY en la base Analisis Estatico 79.69
Cortante XX en la base la 80% Analisis Estatico 25.398
Cortante YY en la base la 80% Analisis Estatico 67.7365
Cortante en XX Analisis Dinamico 25.4 OK
Cortante en YY Analisis Dinamico 72.7 OK
Factor de escalar en XX 11.72
Factor de escalar en YY 9.81
4.1.4. Bloque 4-Comedor Estudiantil

Resumen de valores obtenidos


Centro Educativo
Descripcion
Tn
Peso total de la edificacion 65.69
Aceleracion XX Analisis Estatico 0.225
Aceleracion YY Analisis Estatico 0.6
Cortante XX en la base Analisis Estatico 14.78
Cortante YY en la base Analisis Estatico 39.41
Cortante XX en la base la 80% Analisis Estatico 12.563
Cortante YY en la base la 80% Analisis Estatico 33.4985
Cortante en XX Analisis Dinamico 13.42 OK
Cortante en YY Analisis Dinamico 35.53 OK
Factor de escalar en XX 11.71
Factor de escalar en YY 9.81
4.1.5. Sistema Aporticado de Tanque Elevado

Resumen de valores obtenidos


Centro Educativo
Descripcion
Tn
Peso total de la edificacion 6.33
Aceleracion XX Analisis Estatico 0.225
Aceleracion YY Analisis Estatico 0.225
Cortante XX en la base Analisis Estatico 1.43
Cortante YY en la base Analisis Estatico 1.43
Cortante XX en la base la 80% Analisis Estatico 1.2155
Cortante YY en la base la 80% Analisis Estatico 1.2155
Cortante en XX Analisis Dinamico 1.22 OK
Cortante en YY Analisis Dinamico 1.22 OK
Factor de escalar en XX 10.12
Factor de escalar en YY 10.12
4.2.CONTROL DE DESPLAZAMIENTOS LATERALES

De acuerdo a la Norma NTE. E030, para el control de los desplazamientos laterales, los resultados deberan ser
multiplicados por el valor de 0.75R para calcular los máximos desplazamientos laterales de la estructura.
Se tomaron los desplazamientos de los centros de masa y del eje mas alejado.
Los resultados se muestran en cada tabla, para cada analisis.

Donde:
∆i/he = Desplazamiento relativo de entrepiso
∆iX/heX (máx.) = 0.0070 (máximo permisible Concreto Armado, NTE E.030 – 3.8)
∆iY/heY (máx.) = 0.0050 (máximo permisible Alba
ñilería confinada, NTE E.030 – 3.8)

4.2.1. Bloque 1- Aulas 01 y 02

DESPLAZAMIENTO RELATIVO DE ENTREPISO DEL CENTRO DE MASA


NIVEL DIRECCION X-X DIRECCION Y-Y
∆ix/he 0.75R(∆ix/he) OBS. ∆iy/he 0.75R(∆iY/he) OBS.
1ERO 0.000077 0.00046 OK 0.000283 0.00064 OK

4.2.2. Bloque 2- Sala de computo

DESPLAZAMIENTO RELATIVO DE ENTREPISO DEL CENTRO DE MASA


NIVEL DIRECCION X-X DIRECCION Y-Y
∆ix/he 0.75R(∆ix/he) OBS. ∆iy/he 0.75R(∆iY/he) OBS.
1ERO 0.000077 0.00015 OK 0.00027 0.00061 OK
4.2.3. Bloque 3- SUM,Deposito y Direccion

DESPLAZAMIENTO RELATIVO DE ENTREPISO DEL CENTRO DE MASA


NIVEL DIRECCION X-X DIRECCION Y-Y
∆ix/he 0.75R(∆ix/he) OBS. ∆iy/he 0.75R(∆iY/he) OBS.
1ERO 0.000078 0.00047 OK 0.000351 0.00079 OK

4.2.4. Bloque 4- Comedor Estudiantil

DESPLAZAMIENTO RELATIVO DE ENTREPISO DEL CENTRO DE MASA


NIVEL DIRECCION X-X DIRECCION Y-Y
∆ix/he 0.75R(∆ix/he) OBS. ∆iy/he 0.75R(∆iY/he) OBS.
1ERO 0.000098 0.00059 OK 0.000256 0.00058 OK

4.2.5.Sistema aporticado de Tanque Elevado

DESPLAZAMIENTO RELATIVO DE ENTREPISO DEL CENTRO DE MASA


NIVEL DIRECCION X-X DIRECCION Y-Y
∆ix/he 0.75R(∆ix/he) OBS. ∆iy/he 0.75R(∆iY/he) OBS.
1ERO 0.000451 0.00271 OK 0.000442 0.00265 OK
RESULTADOS
5.1.DIAGRAMA DE ESFUERZOS EN ELEMENTOS ESTRUCTURALES

5.1.1. Bloque 1-Aulas 01 y 02

DIAGRAMAS DE FUERZAS CORTANTES

DIAGRAMAS DE MOMENTOS FLECTORES


5.1.2. Bloque 2-Sala de computo

DIAGRAMAS DE FUERZAS CORTANTES

DIAGRAMAS DE MOMENTOS FLECTORES


5.1.3. Bloque 3-SUM, Deposito y Direccion

DIAGRAMAS DE FUERZAS CORTANTES

DIAGRAMAS DE MOMENTOS FLECTORES


5.1.4. Bloque 4-Comedor Estudiantil

DIAGRAMAS DE FUERZAS CORTANTES

DIAGRAMAS DE MOMENTOS FLECTORES


5.1.4. Sistema aporticado de Tanque Elevado

DIAGRAMAS DE FUERZAS CORTANTES

DIAGRAMAS DE MOMENTOS FLECTORES


5.2. ACERO DE REFUERZO EN ESTRUCTURA

5.2.1. Bloque 1- Aulas 01 y 02

CANTIDAD DE ACERO POR ELEMENTO PROPUESTO POR EL PROGRAMA ETABS 2015

5.2.2. Bloque 2- Sala de computo

CANTIDAD DE ACERO POR ELEMENTO PROPUESTO POR EL PROGRAMA ETABS 2015


5.2.3. Bloque 3- SUM, Deposito y Direccion

CANTIDAD DE ACERO POR ELEMENTO PROPUESTO POR EL PROGRAMA ETABS 2015

5.2.4. Bloque 4- Comedor estudiantil

CANTIDAD DE ACERO POR ELEMENTO PROPUESTO POR EL PROGRAMA ETABS 2015


5.2.5. Sistema Aporticado de Tanque Elevado

CANTIDAD DE ACERO POR ELEMENTO PROPUESTO POR EL PROGRAMA ETABS 2015


DISEÑO DE ELEMENTOS
ESTRUCTURALES
DISEÑO DE CIMENTACION
CENTRO EDUCATIVO
DISEÑO DE ZAPATA AISLADA Z1

DATOS:

σt = 1.07 kg/cm2
Ko = 2200.00 T/m3
S/C = 50.00 kg/m2
f´c = 210.00 kg/cm2
fy = 4200.00 kg/cm2
NPT= 0.15 m
NFZ = 1.05 m (-)

Col 01
Cargas Direccion Longitudinal Direccion Transversal Col 01: 0.50 m x 0.50 m
PD = -6.16 T MD = -0.60 T.m MD = -0.26 T.m bw = 0.25 m
PL = -0.31 T ML = 0.01 T.m ML = -0.01 T.m
MSX = 1.18 T.m MSY = 0.04 T.m
PSX = 0.79 T PSy = 3.74 T

1) ESFUERZO NETO DEL TERRENO

σnt = σt-S/C-γprom*hf
σnt = 8.25 T/m2

σnt = 1.3*σt-S/C-γprom*hf
σnt = 11.46 T/m2

2) DIMENSIONAMIENTO EN PLANTA

A = Ps = 6.47 T = 0.78 m2
σn 8.25 T/m2

Aumentamos 25.00%

A = 0.98 m2

A = B x L

B = 1.75*L

L = 0.75 m

B = 1.31 m

B x L = 1.60 m x 1.60 m
3) PRESIONES DEL TERRENO

a.Cargas de gravedad

-0.59 T.m
-0.27 T.m
-6.47 T

= ± ±

σmax = 1.27 T/m2 (OK)

σmin = 2.06 T/m2 (OK)

b.Cargas de gravedad y sismo longitudinal horario

0.59 T.m
-0.27 T.m
-5.68 T

= ± ±

σmax = 2.70 T/m2 (OK)

σmin = 3.48 T/m2 (OK)

c.Cargas de gravedad y sismo longitudinal antihorario

-1.77 T.m
-0.27 T.m
-7.26 T

= ± ±

σmax = -0.15 T/m2 (OK)

σmin = 0.63 T/m2 (OK)

d.Cargas de gravedad y sismo transversal horario

-0.59 T.m
-0.22 T.m
-2.73 T
= ± ±

σmax = -0.13 T/m2 (OK)

σmin = 0.53 T/m2 (OK)

e.Cargas de gravedad y sismo transversal antihorario

-0.59 T.m
-0.31 T.m
-10.21 T

= ± ±

σmin = 2.68 T/m2 (OK)

σmax = 4.41 T/m2 (OK)

Dimensionesfinales : BxL = 1.60 m x 1.60 m

4) CARGAS Y ESFUERZOS ULTIMOS

a.Cargas de gravedad

σ = 1.55 * σmax = 6.83 T/m2

b.Cargas de gravedad y sismo longitudinal horario

σ = 1.25 * σmax = 5.51 T/m2

c.Cargas de gravedad y sismo transversal antihorario

σ = 1.25 * σmax = 5.51 T/m2

d.Presiones últimas

La combinacion de diseño es cargas de gravedad y sismo longitudinal horario

Pu1 = -7.29 T
MLU1 = 0.44 T.m
MTU1 = -0.33 T.m
0.44 T.m
-0.33 T.m
-7.29 T

= ± ±

σmax = 3.02 T/m2

σmin = 3.99 T/m2

5) DIMENSIONAMIENTO EN ALTURA


+ 30
= 2.2 × ×( )

Kc = 1.71 kg/cm3


Lv≤ 1.88

E = 15000*√f´c = 217370.65 kg/cm2


Lv = 0.55 m
Η ≥ 7.09 cm


Lv≤

Η ≥ 27.44 cm

De los anteriores criterios tomamos el mayor valor, por lo tanto:

Η ≥ 27.44 cm

= 50.00 cm

6) VERIFICACION POR CORTE

⇒ Vud ≤ Ø Vn

⇒ Vud=Wu*x

d = 44.37 cm
x = 10.51 cm
Wu = 4.82 T/m
Vud = 0.51 T
ØVn= ∅0.53 . .

Vc = 54.51 T
ØVc = 46.33 T

⇒ Vud ≤ Ø Vn (OK)

7) VERIFICACION POR PUNZONAMIENTO

 Vup Vpc

Vup=Pu-uAo

Col 01: 0.50 m x 0.50 m


Pu = 7.29 T
d = 43.73 cm
Ao = 0.88 m2
bo = 3.75 m

Vup = 4.64 T

1.1
∅ = ∅ × 0.53 + × × ×
( / )

∅Vpc = 329.18 T

Vup Vpc OK

8) DISEÑO POR FLEXION

• Acero Minimo ɸ (pulg) As (cm2)


3/8´´ 0.71
1/2´´ 1.27
AS min= 0.0018 d
5/8´´ 1.98
d= 43.73 cm 3/4´´ 2.85
B= 1.60 m 1´´ 5.07
Asmin = 12.59 cm2

S = 15.02 cm

Usar: 1 φ 5/8´´ @ 15.00 cm


• Acero Longitudinal

Wu = 4.82 T/m
x = 54.88 cm
d = 43.73 cm
B = 159.98 cm
Mu = 0.73 T.m
As = 0.22 cm2 comparando con Astemp → As = 12.59 cm2

Por lo tanto As = 12.59 cm2

As = 12.59 cm2
S = 15.00 cm

Usar: 1 φ 5/8'' @ 15.00 cm

• Acero Transversal

Mu=

d2= 41.19 cm
x= 54.88 cm
Wu = σu X L = 4.82 T/m

Mu = 0.73 T.m
L = 159.75 cm
d = 41.19 T.m
As = 4.51 cm2
Asmin = 11.84 cm2 Uso: As = 11.84 cm2

Usando ∅ 1/2´´ s= 17.13 cm

Usar: 1  5/8" @ 15.00 cm


9) VERIFICACION POR APLASTAMIENTO

<

⇒ faplastamiento = Pu = 2.92 kg/cm2


Acol

Acol = 0.10 < 1/3


Az

fuap = 0.71 f´c


fuap = 149.10 kg/cm2 (OK)
DISEÑO DE ZAPATA AISLADA Z2

DATOS:

σt = 1.07 kg/cm2
Ko = 2200.00 T/m3
S/C = 50.00 kg/m2
f´c = 210.00 kg/cm2
fy = 4200.00 kg/cm2
NPT = 0.15 m
NFZ = 1.00 m (-)

Col 02
Cargas Direccion Longitudinal Direccion Transversal Col 02: 0.75 m x 0.50 m
PD = -9.78 T MD = -1.02 T.m MD = 0.10 T.m
PL = -0.66 T ML = 0.05 T.m ML = 0.00 T.m
MSX = 0.05 T.m MSY = 3.89 T.m
PSX = 0.16 T PSy = 1.05 T

1) ESFUERZO NETO DEL TERRENO

σnt = σt-S/C-γprom*hf
σnt = 8.35 T/m2

σnt = 1.3*σt-S/C-γprom*hf
σnt = 11.56 T/m2

2) DIMENSIONAMIENTO EN PLANTA

A = Ps = 10.44 T = 1.25 m2
σn 8.35 T/m2

Aumentamos 110.00%

A = 2.62 m2

L= + B= −

L = 1.50 m
B = 1.75 m

B x L = 1.80 m x 2.00 m
3) PRESIONES DEL TERRENO

a.Cargas de gravedad

-0.97 T.m
0.11 T.m
-10.44 T

= ± ±

σmax = 2.19 T/m2 (OK)


σmin = 3.60 T/m2 (OK)

b.Cargas de gravedad y sismo longitudinal horario

-0.92 T.m
0.11 T.m
-10.28 T

= ± ±

σmax = 2.19 T/m2 (OK)


σmin = 3.52 T/m2 (OK)

c.Cargas de gravedad y sismo longitudinal antihorario

-1.01 T.m
0.11 T.m
-10.59 T

= ± ±

σmin = 2.20 T/m2 (OK)


σmax = 3.69 T/m2 (OK)

d.Cargas de gravedad y sismo transversal horario

-0.97 T.m
4.00 T.m
-9.38 T
= ± ±

σmax = 5.50 T/m2 (OK)


σmin = -0.29 T/m2 (OK)

e.Cargas de gravedad y sismo transversal antihorario

-0.97 T.m
-3.78 T.m
-11.49 T

= ± ±

σmax = -1.12 T/m2 (OK)


σmin = 7.50 T/m2 (OK)

Dimensiones finales : BxL = 1.80 m x 2.00 m

4) CARGAS Y ESFUERZOS ULTIMOS

a.Cargas de gravedad

σ = 1.55 * σmax = 11.62 T/m2

b.Cargas de gravedad y sismo longitudinal antihorario

σ = 1.25 * σmax = 9.37 T/m2

c.Cargas de gravedad y sismo transversal horario

σ = 1.25 * σmax = 9.37 T/m2

d.Presiones últimas

La combinacion de diseño es cargas de gravedad y sismo longitudinal antihorario

Pu1 = -13.20 T
MLU1 = -1.26 T.m
MTU1 = 0.14 T.m

-1.26 T.m
0.14 T.m
-13.20 T
= ± ±

σmin = 2.75 T/m2


σmax = 4.59 T/m2

5) DIMENSIONAMIENTO EN ALTURA


+ 30
= 2.2 × ×( )

Kc = 1.65 kg/cm3


Lv≤ 1.88

E = 15000*√f´c = 217370.65 kg/cm2


Lv = 0.75 m
Η ≥ 10.62 cm


Lv≤

Η ≥ 37.49 cm

De los anteriores criterios tomamos el mayor valor, por lo tanto:

Η ≥ 37.49 cm

= 50.00 cm

6) VERIFICACION POR CORTE

⇒ Vud ≤ Ø Vn

⇒ Vud=Wu*x

d = 44.37 cm
x = 20.67 cm
Wu = 8.26 T/m
Vud = 1.71 T

ØVn= ∅0.53 . .

Vc = 61.36 T
ØVc = 52.16 T
⇒ Vud ≤ Ø Vn (OK)

7) VERIFICACION POR PUNZONAMIENTO

 Vup Vpc

Vup=Pu-uAo

Col 02: 0.75 m x 0.50 m


Pu = -13.20 T
d = 43.73 cm
Ao = 1.11 m2
bo = 4.25 m

Vup = 8.10 T

1.1
∅ = ∅ × 0.53 + × × ×
( / )

∅Vpc = 498.97 T

Vup Vpc OK

8) DISEÑO POR FLEXION

• Acero Minimo ɸ (pulg) As (cm2)


3/8´´ 0.71
AS min= 0.0018 d 1/2´´ 1.27
5/8´´ 1.98
d= 43.73 cm 3/4´´ 2.85
B= 1.80 m 1´´ 5.07
Asmin = 14.17 cm2

S = 16.13 cm

Usar: 1 φ 5/8´´ @ 15.00 cm

• Acero Longitudinal

Wu = 4.94 T/m
x = 74.98 cm
d = 43.73 cm
B = 180.08 cm
Mu = 1.39 T.m
As = 0.84 cm2 comparando con Astemp → As = 14.17 cm2
Por lo tanto As = 14.17 cm2
As = 14.17 cm2
S = 15.00 cm

Usar: 1 φ 5/8´´ @ 15.00 cm

• Acero Transversal

Mu=

d2= 41.19 cm
x= 74.98 cm
Wu = σu X L = 5.49 T/m

Mu = 1.54 T.m
L = 199.95 cm
d = 41.19 T.m
As = 4.51 cm2
Asmin = 0.99 cm2 Uso: As = 4.51 cm2

Usando ∅ 5/8" s= 15.00 cm

Usar: 1  5/8" @ 15.00 cm

9) VERIFICACION POR APLASTAMIENTO

<

⇒ faplastamiento = Pu = -3.52 kg/cm2


Acol

Acol = 0.10 < 1/3


Az

fuap = 0.71 f´c


fuap = 149.10 kg/cm2 (OK)
DISEÑO DE ZAPATA AISLADA Z3

DATOS:

σt = 1.07 kg/cm2
Ko = 2200.00 T/m3
S/C = 50.00 kg/m2
f´c = 210.00 kg/cm2
fy = 4200.00 kg/cm2
NPT = 0.15 m
NFZ = 0.85 m (-)

Col 02
Cargas Direccion Longitudinal Direccion Transversal Col 02: 0.75 m x 0.50 m
PD = -15.56 T MD = 0.00 T.m MD = 0.09 T.m
PL = -1.40 T ML = 0.00 T.m ML = 0.01 T.m
MSX = 0.44 T.m MSY = 0.00 T.m
PSX = 0.00 T PSy = 0.32 T

1) ESFUERZO NETO DEL TERRENO

σnt = σt-S/C-γprom*hf
σnt = 8.65 T/m2

σnt = 1.3*σt-S/C-γprom*hf
σnt = 11.86 T/m2

2) DIMENSIONAMIENTO EN PLANTA

A = Ps = 16.96 T = 1.96 m2
σn 8.65 T/m2

Aumentamos 110.00%

A = 4.12 m2

L= + B= −

L = 1.90 m
B = 2.15 m

B x L = 1.90 m x 1.20 m
3) PRESIONES DEL TERRENO

a.Cargas de gravedad

0.00 T.m
0.11 T.m
-16.96 T

= ± ±

σmax = 7.58 T/m2 (OK)


σmin = 7.29 T/m2 (OK)

b.Cargas de gravedad y sismo longitudinal horario

0.44 T.m
0.11 T.m
-16.96 T

= ± ±

σmax = 8.55 T/m2 (OK)


σmin = 6.32 T/m2 (OK)

c.Cargas de gravedad y sismo longitudinal antihorario

-0.44 T.m
0.11 T.m
-16.96 T

= ± ±

σmin = 6.62 T/m2 (OK)


σmax = 8.25 T/m2 (OK)

d.Cargas de gravedad y sismo transversal horario

0.00 T.m
0.11 T.m
-16.64 T

= ± ±
σmax = 7.44 T/m2 (OK)
σmin = 7.15 T/m2 (OK)

e.Cargas de gravedad y sismo transversal antihorario

0.00 T.m
0.11 T.m
######

= ± ±

σmax = 7.72 T/m2 (OK)


σmin = 7.43 T/m2 (OK)

Dimensiones finales : BxL = 1.90 m x 1.20 m

4) CARGAS Y ESFUERZOS ULTIMOS

a.Cargas de gravedad

σ = 1.55 * σmax = 13.25 T/m2

b.Cargas de gravedad y sismo longitudinal antihorario

σ = 1.25 * σmax = 10.68 T/m2

c.Cargas de gravedad y sismo transversal horario

σ = 1.25 * σmax = 10.68 T/m2

d.Presiones últimas

La combinacion de diseño es cargas de gravedad y sismo longitudinal antihorario

Pu1 = -21.20 T
MLU1 = -0.44 T.m
MTU1 = 0.14 T.m

-0.44 T.m
0.14 T.m
######

= ± ±
σmin = 8.51 T/m2
σmax = 10.08 T/m2

5) DIMENSIONAMIENTO EN ALTURA


+ 30
= 2.2 × ×( )

Kc = 1.62 kg/cm3


Lv≤ 1.88

E = 15000*√f´c = 217370.65 kg/cm2


Lv = 0.35 m
Η ≥ 3.83 cm


Lv≤

Η ≥ 17.50 cm

De los anteriores criterios tomamos el mayor valor, por lo tanto:

Η ≥ 17.50 cm

= 50.00 cm

6) VERIFICACION POR CORTE

⇒ Vud ≤ Ø Vn

⇒ Vud=Wu*x

d = 44.37 cm
x = 25.68 cm
Wu = 19.15 T/m
Vud = 4.92 T

ØVn= ∅0.53 . .

Vc = 64.77 T
ØVc = 55.05 T

⇒ Vud ≤ Ø Vn (OK)
7) VERIFICACION POR PUNZONAMIENTO

 Vup Vpc

Vup=Pu-uAo

Col 02: 0.75 m x 0.50 m


Pu = -21.20 T
d = 43.73 cm
Ao = 1.11 m2
bo = 4.25 m

Vup = 9.99 T

1.1
∅ = ∅ × 0.53 + × × ×
( / )

∅Vpc = 498.97 T

Vup Vpc OK

8) DISEÑO POR FLEXION

• Acero Minimo ɸ (pulg) As (cm2)


3/8´´ 0.71
AS min= 0.0018 d 1/2´´ 1.27
5/8´´ 1.98
d= 43.73 cm 3/4´´ 2.85
B= 1.90 m 1´´ 5.07
Asmin = 14.96 cm2

S = 16.13 cm

Usar: 1 φ 5/8´´ @ 15.00 cm

• Acero Longitudinal

Wu = 16.18 T/m
x = 35.00 cm
d = 43.73 cm
B = 190.08 cm
Mu = 0.99 T.m
As = 0.84 cm2 comparando con Astemp → As = 14.96 cm2

Por lo tanto As = 14.96 cm2


As = 14.96 cm2
S = 15.00 cm

Usar: 1 φ 5/8´´ @ 15.00 cm

• Acero Transversal

Mu=

d2= 41.19 cm
x= 35.00 cm
Wu = σu X L = 10.22 T/m

Mu = 0.63 T.m
L = 120.00 cm
d = 41.19 T.m
As = 4.51 cm2
Asmin = 0.41 cm2 Uso: As = 4.51 cm2

Usando ∅ 5/8" s= 15.00 cm

Usar: 1  5/8" @ 15.00 cm

9) VERIFICACION POR APLASTAMIENTO

<

⇒ faplastamiento = Pu = -5.65 kg/cm2


Acol

Acol = 0.16 < 1/3


Az

fuap = 0.71 f´c


fuap = 149.10 kg/cm2 (OK)
DISEÑO DE ZAPATA AISLADA Z4

DATOS:

σt = 1.07 kg/cm2
Ko = 2200.00 T/m3
S/C = 50.00 kg/m2
f´c = 210.00 kg/cm2
fy = 4200.00 kg/cm2
NPT= 0.15 m
NFZ = 0.90 m (-)

Col 01
Cargas Direccion Longitudinal Direccion Transversal Col 01: 0.50 m x 0.50 m
PD = -7.17 T MD = 0.49 T.m MD = -0.24 T.m bw = 0.25 m
PL = -0.42 T ML = 0.05 T.m ML = -0.01 T.m
MSX = 0.03 T.m MSY = 3.55 T.m
PSX = 0.69 T PSy = 4.20 T

1) ESFUERZO NETO DEL TERRENO

σnt = σt-S/C-γprom*hf
σnt = 8.55 T/m2

σnt = 1.3*σt-S/C-γprom*hf
σnt = 11.76 T/m2

2) DIMENSIONAMIENTO EN PLANTA

A = Ps = 7.58 T = 0.89 m2
σn 8.55 T/m2

Aumentamos 25.00%

A = 1.11 m2

A = B x L

B = 1.75*L

L = 0.80 m

B = 1.39 m

B x L = 1.80 m x 1.20 m
3) PRESIONES DEL TERRENO

a.Cargas de gravedad

0.54 T.m
-0.25 T.m
-7.58 T

= ± ±

σmax = 4.38 T/m2 (OK)

σmin = 5.15 T/m2 (OK)

b.Cargas de gravedad y sismo longitudinal horario

0.57 T.m
-0.25 T.m
-6.90 T

= ± ±

σmax = 4.13 T/m2 (OK)

σmin = 4.90 T/m2 (OK)

c.Cargas de gravedad y sismo longitudinal antihorario

0.51 T.m
-0.25 T.m
-8.27 T

= ± ±

σmax = 4.62 T/m2 (OK)

σmin = 5.39 T/m2 (OK)

d.Cargas de gravedad y sismo transversal horario

0.54 T.m
3.30 T.m
-3.39 T
= ± ±

σmax = 7.91 T/m2 (OK)

σmin = -2.27 T/m2 (OK)

e.Cargas de gravedad y sismo transversal antihorario

0.54 T.m
-3.80 T.m
######

= ± ±

σmin = 0.85 T/m2 (OK)

σmax = -1.65 T/m2 (OK)

Dimensiones finales : BxL = 1.80 m x 1.20 m

4) CARGAS Y ESFUERZOS ULTIMOS

a.Cargas de gravedad

σ = 1.55 * σmax = 12.25 T/m2

b.Cargas de gravedad y sismo longitudinal horario

σ = 1.25 * σmax = 9.88 T/m2

c.Cargas de gravedad y sismo transversal antihorario

σ = 1.25 * σmax = 9.88 T/m2

d.Presiones últimas

La combinacion de diseño es cargas de gravedad y sismo longitudinal horario

Pu1 = -8.79 T
MLU1 = 0.71 T.m
MTU1 = -0.31 T.m
0.71 T.m
-0.31 T.m
-8.79 T

= ± ±

σmax = 5.23 T/m2

σmin = 6.19 T/m2

5) DIMENSIONAMIENTO EN ALTURA

⇒ + 30
= 2.2 × ×( )

Kc = 1.65 kg/cm3


Lv≤ 1.88

E = 15000*√f´c = 217370.65 kg/cm2


Lv = 0.35 m
Η ≥ 3.85 cm


Lv≤

Η ≥ 17.50 cm

De los anteriores criterios tomamos el mayor valor, por lo tanto:

Η ≥ 17.50 cm

= 50.00 cm

6) VERIFICACION POR CORTE

⇒ Vud ≤ Ø Vn

⇒ Vud=Wu*x

d = 44.37 cm
x = 20.63 cm
Wu = 9.41 T/m
Vud = 1.94 T
ØVn= ∅0.53 . .

Vc = 61.33 T
ØVc = 52.13 T

⇒ Vud ≤ Ø Vn (OK)

7) VERIFICACION POR PUNZONAMIENTO

 Vup Vpc

Vup=Pu-uAo

Col 01: 0.50 m x 0.50 m


Pu = 8.79 T
d = 43.73 cm
Ao = 0.88 m2
bo = 3.75 m

Vup = 4.20 T

1.1
∅ = ∅ × 0.53 + × × ×
( / )

∅Vpc = 329.18 T

Vup Vpc OK

8) DISEÑO POR FLEXION

• Acero Minimo ɸ (pulg) As (cm2)


3/8´´ 0.71
1/2´´ 1.27
AS min= 0.0018 d
5/8´´ 1.98
d= 43.73 cm 3/4´´ 2.85
B= 1.80 m 1´´ 5.07
Asmin = 14.17 cm2

S = 15.02 cm

Usar: 1 φ 5/8´´ @ 15.00 cm


• Acero Longitudinal

Wu = 9.41 T/m
x = 35.00 cm
d = 43.73 cm
B = 180.00 cm
Mu = 0.58 T.m
As = 0.22 cm2 comparando con Astemp → As = 14.17 cm2

Por lo tanto As = 14.17 cm2

As = 14.17 cm2
S = 15.00 cm

Usar: 1 φ 5/8'' @ 15.00 cm

• Acero Transversal

Mu=

d2= 41.19 cm
x= 35.00 cm
Wu = σu X L = 6.27 T/m

Mu = 0.38 T.m
L = 120.00 cm
d = 41.19 T.m
As = 4.51 cm2
Asmin = 8.90 cm2 Uso: As = 8.90 cm2

Usando ∅ 1/2´´ s= 17.13 cm

Usar: 1  5/8" @ 15.00 cm


9) VERIFICACION POR APLASTAMIENTO

<

⇒ faplastamiento = Pu = 3.52 kg/cm2


Acol

Acol = 0.12 < 1/3


Az

fuap = 0.71 f´c


fuap = 149.10 kg/cm2 (OK)
DISEÑO DE VIGA DE CONEXIÓN 1

DATOS:

σt = 1.70 kg/cm2
Ko = 2200.00 T/m3
S/C = 50.00 kg/m2
f´c = 210.00 kg/cm2
fy = 4200.00 kg/cm2
NPT = 0.15 m
NFZ = 1.05 m (-)

Tomando el eje 3 entre ejes G-H,por ser el más crítico.

Col 02
Cargas Direccion Longitudinal Direccion Transversal Col 02: 0.50 m x 0.75 m
PD = -9.79 T MD = -0.85 T.m MD = 0.01 T.m bw = 0.25 m
PL = -0.61 T ML = 0.02 T.m ML = 0.00 T.m
MSX = 0.00 T.m MSY = 4.17 T.m
PSX = 0.01 T PSy = 3.68 T

Col 02
Cargas Direccion Longitudinal Direccion Transversal Col 02: 0.50 m x 0.75 m
PD = -9.78 T MD = -1.02 T.m MD = 0.10 T.m bw = 0.25 m
PL = -0.66 T ML = 0.05 T.m ML = 0.00 T.m
MSX = 0.05 T.m MSX = 3.89 T.m
PSX = 0.16 T PSy = 1.05 T

Eje 3
-0.83 T.m -0.97 T.m

0.01 T.m -10.40 T 0.11 T.m -10.44 T

R1 -9.91 T R2 -10.93 T

3.70 m
1) ESFUERZO NETO DEL TERRENO

σnt = σt-S/C-γprom*hf
σnt = 14.55 T/m2

σnt = 1.3*σt-S/C-γprom*hf
σnt = 19.65 T/m2
2) DIMENSIONAMIENTO EN PLANTA

h = L = 3.70 T = 0.53 m
7 7.00

⇒ b ≥ h/2
b ≥ 0.26 m

⇒ b ≥ P1
31L
b ≥ 0.09 m

⇒ b = T+0.05
b = 0.80 m

Por lo tanto b = 0.25 m


h = 0.50 m

3) DISEÑO POR FLEXION

´
6300
⇒ = ∗ 0.85 ∗ ∗
6300 +

ρb = 0.0217

⇒ ρmax = 0.5ρb = 0.0108

⇒ ρmin = 14 = 0.0033
fy

• Acero Negativo

d = 45.95 cm
b = 25.00 cm
Mu = 0.97 T.m
As = 0.56 cm2 ɸ (pulg) As (cm2)
3/8´´ 0.71
1/2´´ 1.27
AS min= 0.0018 d
5/8´´ 1.98
d= 45.95 cm 3/4´´ 2.85
B= 25.00 cm 1´´ 5.07
Asmin = 3.79 cm2
Usar: 3 φ 5/8´´ ,As= 5.94 cm2

• Acero positivo

As = 1/2(As-)
As = 0.28 cm2

As < Asmin

Por lo tanto As = 3.79 cm2

As = 3.79 cm2

Usar: 3 φ 5/8´´ ,As= 5.94 cm2

• Acero por viga peraltada

Usar: 2 φ 1/2" ,As= 2.54 cm2

4) VERIFICACION POR CORTE

⇒ Vud ≤ Ø Vn

Vud = 0.16 T

ØVn= ∅0.53 . .

Vc = 8.82 T
ØVc = 7.50 T

⇒ Vud ≤ Ø Vn OK

• Acero Transversal

d2= 45.95 cm

⇒ Smáx ≤ d/2
Smáx ≤ 22.98 cm

⇒ Smáx ≤ 60.00 cm

Avmin= 0.2 ∗ ´
∗ Avmin≥ 3.5 ∗

Smin = 68.16 cm

Por lo tanto s= 25.00 cm

USO:
Estribos 3/8" 1@ 0.05, 3@ 0.10, 3@ 0.15, a/c rto @ 0.20 m a/c
DISEÑO DE VIGA DE CONEXIÓN 2

DATOS:

σt = 1.70 kg/cm2
Ko = 2200.00 T/m3
S/C = 50.00 kg/m2
f´c = 210.00 kg/cm2
fy = 4200.00 kg/cm2
NPT = 0.15 m
NFZ = 1.15 m (-)

Tomando el eje G entre ejes 2-3,por ser el más crítico.

Col 02
Cargas Direccion Longitudinal Direccion Transversal Col 02: 0.50 m x 0.75 m
PD = -9.79 T MD = -0.85 T.m MD = 0.01 T.m bw = 0.25 m
PL = -0.61 T ML = 0.02 T.m ML = 0.00 T.m
MSX = 0.00 T.m MSY = 4.17 T.m
PSX = 0.01 T PSy = 3.68 T

Col 03
Cargas Direccion Longitudinal Direccion Transversal Col 02: 0.50 m x 0.25 m
PD = -15.56 T MD = 0.00 T.m MD = 0.09 T.m
PL = -1.40 T ML = 0.00 T.m ML = 0.01 T.m
MSX = 0.44 T.m MSX = 0.00 T.m
PSX = 0.00 T PSy = 0.32 T

Eje 3
-0.83 T.m 0.00 T.m

0.01 T.m -10.40 T 0.11 T.m -16.96 T

R1 -10.21 T R2 -17.16 T

4.32 m
1) ESFUERZO NETO DEL TERRENO

σnt = σt-S/C-γprom*hf
σnt = 14.35 T/m2

σnt = 1.3*σt-S/C-γprom*hf
σnt = 19.45 T/m2
2) DIMENSIONAMIENTO EN PLANTA

h = L = 4.32 T = 0.62 m
7 7.00

⇒ b ≥ h/2
b ≥ 0.31 m
⇒ b ≥ P1
31L
b ≥ 0.13 m
⇒ b = T+0.05
b = 0.80 m

Por lo tanto b = 0.30 m


h = 0.60 m

3) DISEÑO POR FLEXION

´
6300
⇒ = ∗ 0.85 ∗ ∗
6300 +

ρb = 0.0217

⇒ ρmax = 0.5ρb = 0.0108

⇒ ρmin = 14 = 0.0033
fy
• Acero Negativo

d = 54.81 cm
b = 30.00 cm
Mu = 0.83 T.m
As = 0.40 cm2 ɸ (pulg) As (cm2)
3/8´´ 0.71
1/2´´ 1.27
AS min= 0.0018 d
5/8´´ 1.98
d= 54.81 cm 3/4´´ 2.85
B= 30.00 cm 1´´ 5.07
Asmin = 5.43 cm2

Usar: 4 φ 5/8´´ ,As= 7.92 cm2


• Acero positivo

As = 1/2(As-)
As = 0.20 cm2

As < Asmin

Por lo tanto As = 5.43 cm2

As = 5.43 cm2

Usar: 4 φ 5/8´´ ,As= 7.92 cm2

• Acero por viga peraltada

Usar: 2 φ 1/2" ,As= 2.54 cm2

4) VERIFICACION POR CORTE

⇒ Vud ≤ Ø Vn

Vud = 0.16 T

ØVn= ∅0.53 . .

Vc = 12.63 T
ØVc = 10.73 T

⇒ Vud ≤ Ø Vn OK

• Acero Transversal

d2= 54.81 cm

⇒ Smáx ≤ d/2
Smáx ≤ 27.40 cm

⇒ Smáx ≤ 60.00 cm

Avmin= 0.2 ∗ ´
∗ Avmin≥ 3.5 ∗

Smin = 56.80 cm

Por lo tanto s= 30.00 cm

USO:
Estribos 3/8" 1@ 0.05, 3@ 0.10, 3@ 0.15, a/c rto @ 0.20 m a/c
DISEÑO DE COLUMNAS
CENTRO EDUCATIVO
DISEÑO DE COLUMNA C-1

DATOS:

H = 4.65 m
Concreto armado = 2400.00 kg/m3
f´c = 210.00 kg/cm2
fy = 4200.00 kg/cm2
rec = 4.00 cm

1) DIMENSIONES DE LA COLUMNA

Del predimensionamiento

Columna C1 : b x h = 0.50 m x 0.50 m


bw = 0.25 m

2) DISEÑO POR FLEXION

Utilizando el Programa ETABS 2015 para diseñar la estructura hemos obtenido la cantidad
de acero requerida y que se definira a continuación

ɸ (pulg) As (cm2)
3/8´´ 0.71
AS min= ρmin.(b−bw).h
1/2´´ 1.27
As min = 12.50 cm2 5/8´´ 1.98
3/4´´ 2.85
2.1) COLUMNA C1 1´´ 5.07

2.1.1) ACERO POR FLEXION

As = 18.76 cm2
Asmin = 12.50 cm2 Uso: As = 18.76 cm2

Usar: 4 φ 1/2´´ + 8 φ 5/8´´ ( As= 20.92 cm2 )

3) DISEÑO POR CORTE

H/6 = 77.50 cm
Lo b o h (mayor) = 50.00 cm Lo = 80.00 cm
50.00 cm

8Øvlm = 10.16 cm
s1 b/2 o h/2 (mayor) = 25.00 cm s1 = 10.00 cm
10.00 cm
16Øvlm = 20.32 cm
48Øve = 45.60 cm s2 = 20.00 cm
s2
b o h (mayor) = 50.00 m
0.30 cm

Usar: estribos φ 3/8'' 1 @ 0.05, 6 @ 0.10, Rto @ 0.25 m

4) DETALLE DEL REFUERZO


DISEÑO DE COLUMNA C-2

DATOS:

H = 4.65 m
Concreto armado = 2400.00 kg/m3
f´c = 210.00 kg/cm2
fy = 4200.00 kg/cm2
rec = 4.00 cm

1) DIMENSIONES DE LA COLUMNA

Del predimensionamiento

Columna C2 : b x h = 0.75 m x 0.50 m


bw = 0.25 m

2) DISEÑO POR FLEXION

Utilizando el Programa ETABS 2015 para diseñar la estructura hemos obtenido la cantidad
de acero requerida y que se definira a continuación

ɸ (pulg) As (cm2)
3/8´´ 0.71
AS min= ρmin.(b−bw).h
1/2´´ 1.27
As min = 25.00 cm2 5/8´´ 1.98
3/4´´ 2.85
2.1) COLUMNA C2 1´´ 5.07

2.1.1) ACERO POR FLEXION

As = 25.00 cm2
Asmin = 25.00 cm2 Uso: As = 25.00 cm2

Usar: 6 φ 1/2´´ + 10 φ 5/8´´ ( As= 27.42 cm2 )

3) DISEÑO POR CORTE

H/6 = 77.50 cm
Lo b o h (mayor) = 75.00 cm Lo = 80.00 cm
50.00 cm

8Øvlm = 10.16 cm
s1 b/2 o h/2 (mayor) = 37.50 cm s1 = 10.00 cm
10.00 cm
16Øvlm = 20.32 cm
48Øve = 45.60 cm s2 = 20.00 cm
s2
b o h (mayor) = 75.00 m
0.30 cm

Usar: estribos φ 3/8'' 1 @ 0.05, 6 @ 0.10, Rto @ 0.25 m

4) DETALLE DEL REFUERZO


DISEÑO DE COLUMNA C-3

DATOS:

H = 4.65 m
Concreto armado = 2400.00 kg/m3
f´c = 210.00 kg/cm2
fy = 4200.00 kg/cm2
rec = 4.00 cm

1) DIMENSIONES DE LA COLUMNA

Del predimensionamiento

Columna C3 : b x h = 0.25 m x 0.50 m

2) DISEÑO POR FLEXION

Utilizando el Programa ETABS 2015 para diseñar la estructura hemos obtenido la cantidad
de acero requerida y que se definira a continuación

ɸ (pulg) As (cm2)
3/8´´ 0.71
AS min= ρmin.(b).h
1/2´´ 1.27
As min = 12.50 cm2 5/8´´ 1.98
3/4´´ 2.85
2.1) COLUMNA C2 1´´ 5.07

2.1.1) ACERO POR FLEXION

As = 12.50 cm2
Asmin = 12.50 cm2 Uso: As = 12.50 cm2

Usar: 4 φ 1/2´´ + 4 φ 5/8´´ ( As= 13.00 cm2 )

3) DISEÑO POR CORTE

H/6 = 77.50 cm
Lo b o h (mayor) = 50.00 cm Lo = 80.00 cm
50.00 cm

8Øvlm = 10.16 cm
s1 b/2 o h/2 (mayor) = 25.00 cm s1 = 10.00 cm
10.00 cm
16Øvlm = 20.32 cm
48Øve = 45.60 cm s2 = 20.00 cm
s2
b o h (mayor) = 50.00 m
0.30 cm

Usar: estribos φ 3/8'' 1 @ 0.05, 6 @ 0.10, Rto @ 0.25 m

4) DETALLE DEL REFUERZO


DISEÑO DE VIGAS
CENTRO EDUCATIVO
DISEÑO DE VIGA PRINCIPAL VP-204 (0.25x0.40)

DATOS:

Ln = 3.58 m S/C (kg/m2) α


B = 3.70 m 200 12
S/C = 50.00 kg/m2 250 11
luz entre ejes = 4.32 m 500 10
acabados = 120.00 kg/m2 750 9
concreto armado= 2400.00 kg/m3 1000 8
f´c = 210.00 kg/cm2
fy = 4200.00 kg/cm2
rec = 4.00 cm

Del predimensionamiento:

Viga VP : b x h = 0.25 m x 0.40 m

1) DISEÑO POR FLEXION

Utilizando el Programa ETABS 2015 para diseñar la estructura hemos obtenido la cantidad
de acero requerida y que se definira a continuacion

ρb= 0.85β

ρb = 0.021675

AS max= 0.75ρb.bw.d
ɸ (pulg) As (cm2)
As max = 16.26 cm2 3/8´´ 0.71
1/2´´ 1.27
5/8´´ 1.98
AS min= 0.70 . .ℎ
3/4´´ 2.85
As min = 2.42 cm2 1´´ 5.07

d= ℎ − − φ − φ /2
d = 33.78 cm
1.1) VIGA VP-204 PRIMER PISO

1.1.1) APOYO 2

As = 3.95 cm2
Asmin = 2.42 cm2 Uso: As = 3.95 cm2

Usar: 2 φ 5/8´´ ( As= 3.96 cm2 )

1.1.2) CENTRO 1-2

As = 3.97 cm2
As min = 2.42 cm2 Uso: As = 3.97 cm2

Usar: 2 φ 5/8´´ ( As= 3.96 cm2 )

1.1.3) APOYO 1

As = 6.48 cm2
As min = 2.42 cm2 Uso: As = 6.48 cm2

Usar: 2 φ 5/8´´ + 2 φ 1/2´´ ( As= 6.50 cm2 )

2) DISEÑO POR CORTE

Ae = 0.71 cm2
t = 0.25 m
l = 4.32 m
Vu = 25.00 T

Vc= 0.53 . .
Vc = 6.49 T
Vud=
Vud = 25.00 T
Vn=
ɸ
Vn = 29.41 T
Vn > Vc (SI requiere estribos)

Vs= −

Vs = 22.93 T

1.06 × × = 12.97 T

2.12 × × = 25.94 T

1.06 × × < Vs < 2.12 × ×

• Espaciamiento de Estribos

. .
s min=

Smin = 8.79 cm

.
s max=
.

s max = 68.16 cm
s max = 60.00 cm
s max = d/2 = 16.89 cm

Usar: 1 φ 3/8 @ 10.00 cm


• Optimización de Espaciamientos

De las siguientes ecuaciones:


Xo= ×

Xo = 3.37 m

. .
Vs =

Vs = 2x 0.71 x 4200.00 kg/cm2 x 33.78 cm


Sx

Vs = 201463.92
Sx

X=Xo−

X = 3.37 m - 201463.92 x 3.37 m x 0.85


( 25000.00 kg - 5513.20 kg ) Sx

X = 3.37 m - 29.59 m
Sx

X = 336.73 - 2959.10 ( cm )
Sx

Sx(cm) X(cm) ∆X # Estribos


10.00 cm 40.82 98.64 cm 10
15.00 cm 139.46 49.32 cm 2
20.00 cm 188.78

Usar: estribos φ 3/8 2 @ 0.05, 10 @ 0.10, 2 @ 0.15, Rto @ 0.20 m


• Separación de estribos por criterios sismicos

d/4 = 8.45 cm
S1 ≤ 8 Øblm = 12.72 cm S1 = 8.00 cm
24Øe = 15.12 cm
30 cm = 30.00 cm

Numero de estribos de confinamiento = 7.82 cm

S2 ≤ d/2 = 16.89 cm

Usar: estribos φ 3/8 1 @ 0.05, 8 @ 0.10, Rto @ 0.15

Se eligió el criterio de optimizacion de espaciamientos,siendo el refuerzo por corte el siguiente

Usar: estribos φ 3/8 2 @ 0.05, 10 @ 0.10, 2 @ 0.15, Rto @ 0.20 m

3) DETALLE DEL REFUERZO


DISEÑO DE VIGA PRINCIPAL VP-205 (0.25x0.50)

DATOS:

Ln = 3.58 m S/C (kg/m2) α


B = 3.81 m 200 12
S/C = 50.00 kg/m2 250 11
luz entre ejes = 4.32 m 500 10
acabados = 120.00 kg/m2 750 9
concreto armado= 2400.00 kg/m3 1000 8
f´c = 210.00 kg/cm2
fy = 4200.00 kg/cm2
rec = 4.00 cm

Del predimensionamiento:

Viga VP : b x h = 0.25 m x 0.50 m

1) DISEÑO POR FLEXION

Utilizando el Programa ETABS 2015 para diseñar la estructura hemos obtenido la cantidad
de acero requerida y que se definira a continuacion

ρb= 0.85β

ρb = 0.021675

AS max= 0.75ρb.bw.d
ɸ (pulg) As (cm2)
As max = 20.32 cm2 3/8´´ 0.71
1/2´´ 1.27
5/8´´ 1.98
AS min= 0.70 . .ℎ
3/4´´ 2.85
As min = 3.02 cm2 1´´ 5.07

d= ℎ − − φ − φ /2
d = 43.78 cm
1.1) VIGA VP-205 PRIMER PISO

1.1.1) APOYO 2

As = 5.84 cm2
Asmin = 3.02 cm2 Uso: As = 5.84 cm2

Usar: 3 φ 5/8´´ ( As= 5.94 cm2 )

1.1.2) CENTRO 1-2

As = 5.93 cm2
As min = 3.02 cm2 Uso: As = 5.93 cm2

Usar: 3 φ 5/8´´ ( As= 5.94 cm2 )

1.1.3) APOYO 1

As = 8.47 cm2
As min = 3.02 cm2 Uso: As = 8.47 cm2

Usar: 3 φ 5/8´´ + 2 φ 1/2´´ ( As= 8.48 cm2 )

2) DISEÑO POR CORTE

Ae = 0.71 cm2
t = 0.25 m
l = 4.32 m
Vu = 28.00 T

Vc= 0.53 . .
Vc = 8.41 T
Vud=
Vud = 28.00 T
Vn=
ɸ
Vn = 32.94 T
Vn > Vc (SI requiere estribos)

Vs= −

Vs = 24.53 T

1.06 × × = 16.81 T

2.12 × × = 33.62 T

1.06 × × < Vs < 2.12 × ×

• Espaciamiento de Estribos

. .
s min=

Smin = 10.64 cm

.
s max=
.

s max = 68.16 cm
s max = 60.00 cm
s max = d/2 = 21.89 cm

Usar: 1 φ 3/8 @ 15.00 cm


• Optimización de Espaciamientos

De las siguientes ecuaciones:


Xo= ×

Xo = 3.22 m

. .
Vs =

Vs = 2x 0.71 x 4200.00 kg/cm2 x 43.78 cm


Sx

Vs = 261103.92
Sx

X=Xo−

X = 3.22 m - 261103.92 x 3.22 m x 0.85


( 28000.00 kg - 7145.30 kg ) Sx

X = 3.22 m - 34.24 m
Sx

X = 321.76 - 3424.19 ( cm )
Sx

Sx(cm) X(cm) ∆X # Estribos


10.00 cm 5.00 88.48 cm 10
15.00 cm 93.48 57.07 cm 4
20.00 cm 150.55

Usar: estribos φ 3/8 2 @ 0.05, 10 @ 0.10, 4 @ 0.15, Rto @ 0.20 m


• Separación de estribos por criterios sismicos

d/4 = #######
S1 ≤ 8 Øblm = 12.72 cm S1 = 10.00 cm
24Øe = 15.12 cm
30 cm = 30.00 cm

Numero de estribos de confinamiento = 8.26 cm

S2 ≤ d/2 = 21.89 cm

Usar: estribos φ 3/8 1 @ 0.05, 9@ 0.10, Rto @ 0.15

Se eligió el criterio de optimizacion de espaciamientos,siendo el refuerzo por corte el siguiente

Usar: estribos φ 3/8 2 @ 0.05, 10 @ 0.10, 4 @ 0.15, Rto @ 0.20 m

3) DETALLE DEL REFUERZO


DISEÑO DE VIGA PRINCIPAL VS-201 (0.25x0.55)

DATOS:

Ln = 2.95 m S/C (kg/m2) α


B = 2.04 m 200 12
S/C = 50.00 kg/m2 250 11
luz entre ejes = 3.70 m 500 10
acabados = 120.00 kg/m2 750 9
concreto armado= 2400.00 kg/m3 1000 8
f´c = 210.00 kg/cm2
fy = 4200.00 kg/cm2
rec = 4.00 cm

Del predimensionamiento:

Viga VP : b x h = 0.25 m x 0.55 m

1) DISEÑO POR FLEXION

Utilizando el Programa ETABS 2015 para diseñar la estructura hemos obtenido la cantidad
de acero requerida y que se definira a continuacion

ρb= 0.85β

ρb = 0.021675

AS max= 0.75ρb.bw.d
ɸ (pulg) As (cm2)
As max = 22.35 cm2 3/8´´ 0.71
1/2´´ 1.27
5/8´´ 1.98
AS min= 0.70 . .ℎ
3/4´´ 2.85
As min = 3.32 cm2 1´´ 5.07

d= ℎ − − φ − φ /2
d = 48.78 cm
1.1) VIGA VS-201 PRIMER PISO

1.1.1) APOYO 2

As = 5.87 cm2
Asmin = 3.32 cm2 Uso: As = 5.87 cm2

Usar: 3 φ 5/8´´ ( As= 5.94 cm2 )

1.1.2) CENTRO 1-2

As = 5.92 cm2
As min = 3.32 cm2 Uso: As = 5.92 cm2

Usar: 3 φ 5/8´´ ( As= 5.94 cm2 )

1.1.3) APOYO 1

As = 5.86 cm2
As min = 3.32 cm2 Uso: As = 5.86 cm2

Usar: 3 φ 5/8´´ ( As= 5.94 cm2 )

2) DISEÑO POR CORTE

Ae = 0.71 cm2

t = 0.25 m
l = 3.70 m
Vu = 29.55 T
Vc= 0.53 . .
Vc = 9.37 T
Vud=
Vud = 29.55 T
Vn=
ɸ
Vn = 34.76 T
Vn > Vc (SI requiere estribos)

Vs= −

Vs = 25.40 T

1.06 × × = 18.73 T

2.12 × × = 37.47 T

1.06 × × < Vs < 2.12 × ×

• Espaciamiento de Estribos

. .
s min=

Smin = 11.45 cm

.
s max=
.

s max = 68.16 cm
s max = 60.00 cm
s max = d/2 = 24.39 cm

Usar: 1 φ 3/8 @ 15.00 cm


• Optimización de Espaciamientos

De las siguientes ecuaciones:


Xo= ×

Xo = 2.70 m

. .
Vs =

Vs = 2x 0.71 x 4200.00 kg/cm2 x 48.78 cm


Sx

Vs = 290923.92
Sx

X=Xo−

X = 2.70 m - 290923.92 x 2.70 m x 0.85


( 29550.00 kg - 7961.34 kg ) Sx

X = 2.70 m - 30.96 m
Sx

X = 270.31 - 3096.30 ( cm )
Sx

Sx(cm) X(cm) ∆X # Estribos


10.00 cm 5.00 58.90 cm 5
15.00 cm 63.90 51.60 cm 4
20.00 cm 115.50

Usar: estribos φ 3/8 2 @ 0.05, 5 @ 0.10, 4 @ 0.15, Rto @ 0.20 m


• Separación de estribos por criterios sismicos

d/4 = #######
S1 ≤ 8 Øblm = 12.72 cm S1 = 10.00 cm
24Øe = 15.12 cm
30 cm = 30.00 cm

Numero de estribos de confinamiento = 9.26 cm

S2 ≤ d/2 = 24.39 cm

Usar: estribos φ 3/8 1 @ 0.05, 8@ 0.10, Rto @ 0.15

Se eligió el criterio de optimizacion de espaciamientos,siendo el refuerzo por corte el siguiente

Usar: estribos φ 3/8 2 @ 0.05, 5 @ 0.10, 4 @ 0.15, Rto @ 0.20 m

3) DETALLE DEL REFUERZO


DISEÑO DE VIGA PRINCIPAL VS-203 (0.20xVariable)

DATOS:

Ln = 3.45 m S/C (kg/m2) α


B = 0.60 m 200 12
S/C = 50.00 kg/m2 250 11
luz entre ejes = 3.83 m 500 10
acabados = 120.00 kg/m2 750 9
concreto armado= 2400.00 kg/m3 1000 8
f´c = 210.00 kg/cm2
fy = 4200.00 kg/cm2
rec = 4.00 cm

Del predimensionamiento:

Viga VP : b x h = 0.25 m x 0.17 m

1) DISEÑO POR FLEXION

Utilizando el Programa ETABS 2015 para diseñar la estructura hemos obtenido la cantidad
de acero requerida y que se definira a continuacion

ρb= 0.85β

ρb = 0.021675

AS max= 0.75ρb.bw.d
ɸ (pulg) As (cm2)
As max = 6.91 cm2 3/8´´ 0.71
1/2´´ 1.27
5/8´´ 1.98
AS min= 0.70 . .ℎ
3/4´´ 2.85
As min = 1.03 cm2 1´´ 5.07

d= ℎ − − φ − φ /2
d = 10.78 cm
1.1) VIGA VS-203 PRIMER PISO

1.1.1) APOYO Q

As = 1.89 cm2
Asmin = 1.03 cm2 Uso: As = 1.89 cm2

Usar: 2 φ 1/2´´ ( As= 2.54 cm2 )

1.1.2) CENTRO Q-R

As = 2.53 cm2
As min = 1.03 cm2 Uso: As = 2.53 cm2

Usar: 2 φ 1/2´´ ( As= 2.54 cm2 )

1.1.3) APOYO R

As = 2.49 cm2
As min = 1.03 cm2 Uso: As = 2.49 cm2

Usar: 2 φ 1/2´´ ( As= 2.54 cm2 )

2) DISEÑO POR CORTE

Ae = 0.71 cm2

t = 0.25 m
l = 3.83 m
Vu = 5.00 T
Vc= 0.53 . .
Vc = 2.07 T
Vud=
Vud = 5.00 T
Vn=
ɸ
Vn = 5.88 T
Vn > Vc (SI requiere estribos)

Vs= −

Vs = 3.81 T

1.06 × × = 4.14 T

2.12 × × = 8.28 T

1.06 × × < Vs < 2.12 × ×

• Espaciamiento de Estribos

. .
s min=

Smin = 16.86 cm

.
s max=
.

s max = 68.16 cm
s max = 60.00 cm
s max = d/2 = 5.39 cm

Usar: 1 φ 3/8 @ 10.00 cm


• Optimización de Espaciamientos

De las siguientes ecuaciones:


Xo= ×

Xo = 2.48 m

. .
Vs =

Vs = 2x 0.71 x 4200.00 kg/cm2 x 10.78 cm


Sx

Vs = 64291.92
Sx

X=Xo−

X = 2.48 m - 64291.92 x 2.48 m x 0.85


( 5000.00 kg - 1759.39 kg ) Sx

X = 2.48 m - 41.86 m
Sx

X = 248.23 - 4186.05 ( cm )
Sx

Sx(cm) X(cm) ∆X # Estribos


10.00 cm 5.00 33.93 cm 2
20.00 cm 38.93

Usar: estribos φ 3/8 1 @ 0.05, 2 @ 0.10, Rto @ 0.20 m


• Separación de estribos por criterios sismicos

d/4 = 2.70 cm
S1 ≤ 8 Øblm = 12.72 cm S1 = 10.00 cm
24Øe = 15.12 cm
30 cm = 30.00 cm

Numero de estribos de confinamiento = 7.66 cm

S2 ≤ d/2 = 5.39 cm

Usar: estribos φ 3/8 1 @ 0.05, 8@ 0.10, Rto @ 0.15

Se eligió el criterio de optimizacion de espaciamientos,siendo el refuerzo por corte el siguiente

Usar: estribos φ 3/8 1 @ 0.05, 2 @ 0.10, Rto @ 0.20 m

3) DETALLE DEL REFUERZO


DISEÑO DE VIGA PRINCIPAL VP-203´ (0.15x0.20)

DATOS:

Ln = 3.45 m S/C (kg/m2) α


B = 1.50 m 200 12
S/C = 50.00 kg/m2 250 11
luz entre ejes = 3.73 m 500 10
acabados = 120.00 kg/m2 750 9
concreto armado= 2400.00 kg/m3 1000 8
f´c = 210.00 kg/cm2
fy = 4200.00 kg/cm2
rec = 4.00 cm

Del predimensionamiento:

Viga VP : b x h = 0.25 m x 0.50 m

1) DISEÑO POR FLEXION

Utilizando el Programa ETABS 2015 para diseñar la estructura hemos obtenido la cantidad
de acero requerida y que se definira a continuacion

ρb= 0.85β

ρb = 0.021675

AS max= 0.75ρb.bw.d
ɸ (pulg) As (cm2)
As max = 20.32 cm2 3/8´´ 0.71
1/2´´ 1.27
5/8´´ 1.98
AS min= 0.70 . .ℎ
3/4´´ 2.85
As min = 3.02 cm2 1´´ 5.07

d= ℎ − − φ − φ /2
d = 43.78 cm
1.1) VIGA VP-203´ PRIMER PISO

1.1.1) APOYO Q

As = 2.49 cm2
Asmin = 3.02 cm2 Uso: As = 3.02 cm2

Usar: 2 φ 1/2" ( As= 2.54 cm2 )

1.1.2) CENTRO Q-R

As = 2.53 cm2
As min = 3.02 cm2 Uso: As = 3.02 cm2

Usar: 2 φ 1/2" ( As= 2.54 cm2 )

1.1.3) APOYO R

As = 2.50 cm2
As min = 3.02 cm2 Uso: As = 3.02 cm2

Usar: 2 φ 1/2" ( As= 2.54 cm2 )

2) DISEÑO POR CORTE

Ae = 0.71 cm2
t = 0.25 m
l = 3.73 m
Vu = 28.00 T

Vc= 0.53 . .
Vc = 8.41 T
Vud=
Vud = 28.00 T
Vn=
ɸ
Vn = 32.94 T
Vn > Vc (SI requiere estribos)

Vs= −

Vs = 24.53 T

1.06 × × = 16.81 T

2.12 × × = 33.62 T

1.06 × × < Vs < 2.12 × ×

• Espaciamiento de Estribos

. .
s min=

Smin = 10.64 cm

.
s max=
.

s max = 68.16 cm
s max = 60.00 cm
s max = d/2 = 21.89 cm

Usar: 1 φ 3/8 @ 15.00 cm


• Optimización de Espaciamientos

De las siguientes ecuaciones:


Xo= ×

Xo = 2.78 m

. .
Vs =

Vs = 2x 0.71 x 4200.00 kg/cm2 x 43.78 cm


Sx

Vs = 261103.92
Sx

X=Xo−

X = 2.78 m - 261103.92 x 2.78 m x 0.85


( 28000.00 kg - 7145.30 kg ) Sx

X = 2.78 m - 29.57 m
Sx

X = 277.81 - 2956.54 ( cm )
Sx

Sx(cm) X(cm) ∆X # Estribos


10.00 cm 5.00 124.99 cm 1
20.00 cm 129.99

Usar: estribos φ 3/8 1 @ 0.05, 2 @ 0.10, Rto @ 0.20 m


• Separación de estribos por criterios sismicos

d/4 = 10.95 cm
S1 ≤ 8 Øblm = 12.72 cm S1 = 10.00 cm
24Øe = 15.12 cm
30 cm = 30.00 cm

Numero de estribos de confinamiento = 8.26 cm

S2 ≤ d/2 = 21.89 cm

Usar: estribos φ 3/8 1 @ 0.05, 9@ 0.10, Rto @ 0.15

Se eligió el criterio de optimizacion de espaciamientos,siendo el refuerzo por corte el siguiente

Usar: estribos φ 3/8 1 @ 0.05, 2 @ 0.10, Rto @ 0.20 m

3) DETALLE DEL REFUERZO


DISEÑO DE VIGA PRINCIPAL VT-202 (0.25x0.50)

DATOS:

Ln = 3.55 m S/C (kg/m2) α


B = 4.33 m 200 12
S/C = 50.00 kg/m2 250 11
luz entre ejes = 3.83 m 500 10
acabados = 120.00 kg/m2 750 9
concreto armado= 2400.00 kg/m3 1000 8
f´c = 210.00 kg/cm2
fy = 4200.00 kg/cm2
rec = 4.00 cm

Del predimensionamiento:

Viga VP : b x h = 0.25 m x 0.50 m

1) DISEÑO POR FLEXION

Utilizando el Programa ETABS 2015 para diseñar la estructura hemos obtenido la cantidad
de acero requerida y que se definira a continuacion

ρb= 0.85β

ρb = 0.021675

AS max= 0.75ρb.bw.d
ɸ (pulg) As (cm2)
As max = 20.32 cm2 3/8´´ 0.71
1/2´´ 1.27
5/8´´ 1.98
AS min= 0.70 . .ℎ
3/4´´ 2.85
As min = 3.02 cm2 1´´ 5.07

d= ℎ − − φ − φ /2
d = 43.78 cm
1.1) VIGA VT-202 PRIMER PISO

1.1.1) APOYO E

As = 12.65 cm2
Asmin = 3.02 cm2 Uso: As = 12.65 cm2

Usar: 10 φ 1/2´´ ( As= 12.70 cm2 )

1.1.2) CENTRO E-F

As = 11.76 cm2
As min = 3.02 cm2 Uso: As = 11.76 cm2

Usar: 6 φ 5/8´´ ( As= 11.88 cm2 )

1.1.3) APOYO F

As = 11.39 cm2
As min = 3.02 cm2 Uso: As = 11.39 cm2

Usar: 9 φ 1/2´´ ( As= 11.43 cm2 )

1.1.4) CENTRO F-G

As = 11.65 cm2
As min = 3.02 cm2 Uso: As = 11.65 cm2

Usar: 6 φ 5/8´´ ( As= 11.88 cm2 )

1.1.5) APOYO G

As = 17.70 cm2
As min = 3.02 cm2 Uso: As = 17.70 cm2

Usar: 14 φ 1/2´´ ( As= 17.78 cm2 )

1.1.6) CENTRO G-H

As = 11.66 cm2
As min = 3.02 cm2 Uso: As = 11.66 cm2

Usar: 6 φ 5/8´´ ( As= 11.88 cm2 )


1.1.7) APOYO H

As = 16.49 cm2
As min = 3.02 cm2 Uso: As = 16.49 cm2

Usar: 13 φ 1/2´´ ( As= 16.51 cm2 )

1.1.8) CENTRO H-I

As = 11.79 cm2
As min = 3.02 cm2 Uso: As = 11.79 cm2

Usar: 6 φ 5/8´´ ( As= 11.88 cm2 )

1.1.9) APOYO I

As = 17.02 cm2
As min = 3.02 cm2 Uso: As = 17.02 cm2

Usar: 14 φ 1/2´´ ( As= 17.78 cm2 )

2) DISEÑO POR CORTE

Ae = 0.71 cm2

t = 0.25 m
l = 3.83 m
Vu = 27.00 T

Vc= 0.53 . .
Vc = 8.41 T
Vud=
Vud = 27.00 T
Vn=
ɸ
Vn = 31.76 T
Vn > Vc (SI requiere estribos)

Vs= −

Vs = 23.36 T

1.06 × × = 16.81 T

2.12 × × = 33.62 T

1.06 × × < Vs < 2.12 × ×

• Espaciamiento de Estribos

. .
s min=

Smin = 11.18 cm

.
s max=
.

s max = 68.16 cm
s max = 60.00 cm
s max = d/2 = 21.89 cm

Usar: 1 φ 3/8 @ 15.00 cm

• Optimización de Espaciamientos

De las siguientes ecuaciones:


Xo= ×

Xo = 2.82 m

. .
Vs =

Vs = 2x 0.71 x 4200.00 kg/cm2 x 43.78 cm


Sx
Vs = 261103.92
Sx

X=Xo−

X = 2.82 m - 261103.92 x 2.82 m x 0.85


( 27000.00 kg - 7145.30 kg ) Sx

X = 2.82 m - 31.48 m
Sx

X = 281.64 - 3148.24 ( cm )
Sx

Sx(cm) X(cm) ∆X # Estribos


10.00 cm 5.00 66.76 cm 10
15.00 cm 71.76 52.47 cm 4
20.00 cm 124.23

Usar: estribos φ 3/8 2 @ 0.05, 10 @ 0.10, 4 @ 0.15, Rto @ 0.20 m

• Separación de estribos por criterios sismicos

d/4 = 10.95 cm
S1 ≤ 8 Øblm = 12.72 cm S1 = 10.00 cm
24Øe = 15.12 cm
30 cm = 30.00 cm

Numero de estribos de confinamiento = 8.26 cm

S2 ≤ d/2 = 21.89 cm

Usar: estribos φ 3/8 1 @ 0.05, 9@ 0.10, Rto @ 0.15


Se eligió el criterio de optimizacion de espaciamientos,siendo el refuerzo por corte el siguiente

Usar: estribos φ 3/8 2 @ 0.05, 10 @ 0.10, 4 @ 0.15, Rto @ 0.20 m

3) DETALLE DEL REFUERZO


DISEÑO DE VIGA PRINCIPAL VV-206 (0.25x0.20)

DATOS:

Ln = 2.85 m S/C (kg/m2) α


B = 1.35 m 200 12
S/C = 50.00 kg/m2 250 11
luz entre ejes = 3.83 m 500 10
acabados = 120.00 kg/m2 750 9
concreto armado= 2400.00 kg/m3 1000 8
f´c = 210.00 kg/cm2
fy = 4200.00 kg/cm2
rec = 4.00 cm

Del predimensionamiento:

Viga VP : b x h = 0.25 m x 0.20 m

1) DISEÑO POR FLEXION

Utilizando el Programa ETABS 2015 para diseñar la estructura hemos obtenido la cantidad
de acero requerida y que se definira a continuacion

ρb= 0.85β

ρb = 0.021675

AS max= 0.75ρb.bw.d
ɸ (pulg) As (cm2)
As max = 8.13 cm2 3/8´´ 0.71
1/2´´ 1.27
5/8´´ 1.98
AS min= 0.70 . .ℎ
3/4´´ 2.85
As min = 1.21 cm2 1´´ 5.07

d= ℎ − − φ − φ /2
d = 13.78 cm
1.1) VIGA VV-206 PRIMER PISO

1.1.1) APOYO Q

As = 2.49 cm2
Asmin = 1.21 cm2 Uso: As = 2.49 cm2

Usar: 2 φ 1/2´´ ( As= 2.54 cm2 )

1.1.2) CENTRO Q-R

As = 2.53 cm2
As min = 1.21 cm2 Uso: As = 2.53 cm2

Usar: 2 φ 1/2´´ ( As= 2.54 cm2 )

1.1.3) APOYO R

As = 2.22 cm2
As min = 1.21 cm2 Uso: As = 2.22 cm2

Usar: 2 φ 1/2´´ ( As= 2.54 cm2 )

2) DISEÑO POR CORTE

Ae = 0.71 cm2

t = 0.25 m
l = 3.83 m
Vu = 25.00 T
Vc= 0.53 . .
Vc = 2.65 T
Vud=
Vud = 25.00 T
Vn=
ɸ
Vn = 29.41 T
Vn > Vc (SI requiere estribos)

Vs= −

Vs = 26.77 T

1.06 × × = 5.29 T

2.12 × × = 10.58 T

1.06 × × < Vs < 2.12 × ×

• Espaciamiento de Estribos

. .
s min=

Smin = 3.07 cm

.
s max=
.

s max = 68.16 cm
s max = 60.00 cm
s max = d/2 = 6.89 cm

Usar: 1 φ 3/8 @ 5.00 cm


• Optimización de Espaciamientos

De las siguientes ecuaciones:


Xo= ×

Xo = 3.49 m

. .
Vs =

Vs = 2x 0.71 x 4200.00 kg/cm2 x 13.78 cm


Sx

Vs = 82183.92
Sx

X=Xo−

X = 3.49 m - 82183.92 x 3.49 m x 0.85


( 25000.00 kg - 2249.02 kg ) Sx

X = 3.49 m - 10.70 m
Sx

X = 348.54 - 1070.20 ( cm )
Sx

Sx(cm) X(cm) ∆X # Estribos


10.00 cm 241.53 53.51 cm 3
20.00 cm 295.04

Usar: estribos φ 1/4 2 @ 0.05, 4 @ 0.10, Rto @ 0.20 m


• Separación de estribos por criterios sismicos

d/4 = 3.45 cm
S1 ≤ 8 Øblm = 12.72 cm S1 = 10.00 cm
24Øe = 15.12 cm
30 cm = 30.00 cm

Numero de estribos de confinamiento = 2.26 cm

S2 ≤ d/2 = 6.89 cm

Usar: estribos φ 3/8 1 @ 0.05, 3 @ 0.10, Rto @ 0.15

Se eligió el criterio de optimizacion de espaciamientos,siendo el refuerzo por corte el siguiente

Usar: estribos φ 1/4 2 @ 0.05, 4 @ 0.10, Rto @ 0.20 m

3) DETALLE DEL REFUERZO


DISEÑO DE LOSA ALIGERADA
CENTRO EDUCATIVO
DISEÑO DE LOSA ALIGERADA

DATOS:

Concreto armado = 2400.00 kg/m3


f´c = 210.00 kg/cm2
fy = 4200.00 kg/cm2
rec = 2.50 cm
Ln = 3.08 m

1) PREDIMENSIONAMIENTO

h= (Losa con 1 extremo continuo)


.
h = 0.17 m h = 0.20 m

2) METRADO DE CARGAS

Carga Muerta
Peso propio = 300.00 kg/m2 x 0.40 m = 120.00 kg/m
Acabados = 120.00 kg/m2 x 0.40 m = 48.00 kg/m
C.M = 168.00 kg/m

Carga Viva
S/C = 50.00 kg/m2 x 0.40 m = 20.00 kg/m
C.V. = 20.00 kg/m

Carga última

C.U. losa= 1.4 + 1.

C.U. losa = 269.20 kg/m


C.U. losa = 0.27 T/m

3) DIAGRAMA DE MOMENTOS
3) DISEÑO POR FLEXION

ASmin(+)= 2. AS min(−)
ɸ (pulg) As (cm2)
As max = 0.74 cm2 3/8´´ 0.71
1/2´´ 1.27
AS min(-) = 0.70 . . 5/8´´ 1.98
3/4´´ 2.85
As min = 0.37 cm2 1´´ 5.07

d= ℎ − − φ − φ /2

d = 15.28 cm

3.1) Apoyos 3

Mu = 279.00 kg.m
b = 10.00 cm
d = 15.28 cm Uso: As = 0.50 cm2
As = 0.50 cm2
Usar: 1 φ 1/2´´ ( As= 0.50 cm2 )

3.2) Apoyos 2

Mu = 560.00 kg.m
b = 10.00 cm
d = 15.28 cm Uso: As = 1.06 cm2
As = 1.06 cm2
##
Usar: 1 φ 1/2´´ ( As= 1.27 cm2 )

3.3) Apoyo 1

Mu = 282.00 kg.m
b = 10.00 cm
d = 15.28 cm Uso: As = 0.51 cm2
As = 0.51 cm2
Usar: 1 φ 1/2´´ ( As= 0.51 cm2 )
3.4) Refuerzo por temperatura

Ast= 0.0018 . ℎ
Ast = 0.90 cm2
s = 78.89 cm
Usar: 1 φ 1/4" @ 0.25 m

3) VERIFICION POR CORTE

Vu≤ØVc

Vu = 688.16 kg

ØVc = 0. .
ØVc = 997.53 kg

Vu≤ØVc (Si cumple la condicion, la losa aligerada absorve los esfuerzos por corte)
No se requiere ensanchar la vigueta
DISEÑO DE CIMENTACION
TANQUE ELEVADO
DISEÑO DE ZAPATA COMBINADA(CA)

DATOS:
σt = 1.07 kg/cm2
Ko = 2200.00 T/m3
S/C = 200.00 kg/m2
f´c = 210.00 kg/cm2
fy = 4200.00 kg/cm2
NPT= 0.15 m
NFZ = 1.20 m (-)

Col 01´
Cargas Direccion Longitudinal Direccion Transversal Col 01´: 0.25 m x 0.25 m
PD = -1.39 T MD = 0.01 T.m MD = 0.01 T.m
PL = -0.04 T ML = 0.00 T.m ML = 0.00 T.m
MSX = 0.38 T.m MSX = 0.00 T.m
PSX = 1.15 T PSy = 1.16 T
Col 02´
Cargas Direccion Longitudinal Direccion Transversal Col 02´: 0.25 m x 0.25 m
PD = -1.39 T MD = 0.01 T.m MD = -0.01 T.m
PL = -0.04 T ML = 0.00 T.m ML = 0.00 T.m
MSX = 0.38 T.m MSX = 0.00 T.m
PSX = 1.15 T PSy = 1.16 T

1) ESFUERZO NETO DEL TERRENO

σnt = σt-S/C-γprom*hf
σnt = 7.80 T/m2

σnt = 1.3*σt-S/C-γprom*hf
σnt = 11.01 T/m2

2) DIMENSIONAMIENTO EN PLANTA

a.Cargas de gravedad

0.00 T.m 0.00 T.m


0.01 T.m -0.01 T.m
-1.43 T -1.43 T
0.38 m 1.75 m 0.38 m

∗ XR = 0.87 m

∗ XG = 0.88 m
∗ e = XR-XG = 0.00 m

∗ AZ = P = -2.04 T = 0.26 m2
σ 7.80 T/m2

A = 0.26 m2

L = 2.50 m B= 1.00 m

= ± ±

σmax = 0.61 T/m2

σmin = 1.15 T/m2

b.Cargas de gravedad y sismo longitudinal horario

0.38 T.m 0.38 T.m


0.01 T.m -0.01 T.m
-0.28 T -0.28 T
0.38 m 1.75 m 0.38 m

∗ XR = -0.49 m

∗ XG = 0.88 m

∗ e = XR-XG = -1.37 m

= ± ±

σmax = 0.95 T/m2

σmin = 0.95 T/m2

c.Cargas de gravedad y sismo longitudinal antihorario

-0.37 T/m -0.37 T/m


0.01 T.m -0.01 T.m
-2.58 T -2.58 T
0.38 m 1.75 m 0.38 m

∗ XR = 1.02 m
∗ XG = 0.88 m

∗ e = XR-XG = 0.14 m

L = 2.80 m
B= 1.00 m

= ± ±

σmax = 0.80 T/m2

σmin = 1.27 T/m2

d.Cargas de gravedad y sismo transversal horario

0.00 T/m 0.00 T/m


0.01 -0.01 T.m
-0.27 T -0.27 T
0.38 m 1.75 m 0.38 m

∗ XR = 0.87 m

∗ XG = 0.88 m

∗ e = XR-XG = -0.01 m

L = 2.80 m

B= 1.00 m

= ± ±

σmax = 0.12 T/m2

σmin = -0.18 T/m2

e.Cargas de gravedad y sismo transversal antihorario

0.00 T/m 0.00 T/m


0.01 -0.01
-2.59 T -2.58 T
0.38 m 1.75 m 0.38 m
∗ XR = 0.87 m

∗ XG = 0.88 m

∗ e = XR-XG = 0.00 m

L = 2.80 m

B= 1.00 m

= ± ±

σmax = 1.59 T/m2


σmin = -1.85 T/m2

3) CARGAS Y ESFUERZOS ULTIMOS

a.Cargas de gravedad

σ = 1.55 * σmax = 2.46 T/m2

b.Cargas de gravedad y sismo longitudinal antihorario

σ = 1.25 * σmax = 1.99 T/m2

c.Cargas de gravedad y sismo transversal antihorario

σ = 1.25 * σmax = 1.99 T/m2

d.Presiones últimas

La combinacion de diseño es cargas de gravedad y sismo transversal antihorario

Pu1 = -2.95 T
MLU1 = 0.01 T.m
MTU1 = 0.01 T.m

Pu2 = -0.63 T
MLU2 = 0.01 T.m
MTU2 = -0.01 T.m
0.01 T/m 0.01 T/m
0.01 -0.01
-2.95 T -0.63 T
0.38 m 1.75 m 0.38 m

∗ XR = 0.31 m

∗ XG = 0.88 m

∗ e = XR-XG = -0.57 m

L = 2.80 m

B= 1.00 m

= ± ±

σmax = 2.84 T/m2

σmin = -0.28 T/m2

4) DIMENSIONAMIENTO EN ALTURA

4.1) CRITERIO DE RIGIDEZ

⇒ + 30
= 2.2 × ×( )

Kc = 2.04 kg/cm3


Lm≤ 1.75

E = 15000*√f´c = 217370.65 kg/cm2


Η ≥ 14.13 cm

4.2) CRITERIO DE LONGITUD DE DESARROLLO

Ld≤ 0.08 ∗ ∗
´

Ld = 58.89 cm
Ld≤ 0.004 ∗ ∗

Ld = 42.67 cm

´ ´´
H≥ + + +recubrimiento

H ≥ 50.00 cm

De los criterios de rigidez y longitud de desarrollo tomamos la mayor altura, por lo tanto:

Η ≥ 50.00 cm

Η = 50.00 cm

5) DIAGRAMAS DE CORTANTE Y MOMENTOS

Wu = σu X B = 2.84 T/m

6) DISEÑO POR CORTE

t = 0.25 m
l = 1.25 m
Vu = 0.10 T
d = 43.73 cm

Vc= 0.53 . .

Vc = 33.59 T
ØVc = 28.55 T

( / )
Vud=
Vud = 0.06 T
Vn=
ɸ
Vn = 0.06 T
Vn < Vc (NO requiere estribos)

• Espaciamiento de Estribos

.
s max=
.

s max = 17.04 cm
s max = 60.00 cm
s max = d/2 = 21.87 cm

Usar:  1/2" @ 0.15 m

7) VERIFICACION POR PUNZONAMIENTO

Analizando la columna con mayor carga

 Vup Vpc

Vup=Pu-uAo

Col 02: 0.25 m x 0.25 m


Pu = -2.95 T
d = 43.73 cm
Ao = 0.47 m2
bo = 2.75 m

Vup = 4.29 T

1.1
∅ = ∅ × 0.53 + × × ×
( / )

∅Vpc = 241.38 T

Vup Vpc …OK


8) DISEÑO POR FLEXION

• Acero Longitudinal ɸ (pulg) As (cm2)


3/8´´ 0.71
1/2´´ 1.27
AS min= 0.0018 d
5/8´´ 1.98
d= 43.73 cm 3/4´´ 2.85
B= 1.00 m 1´´ 5.07
Asmin = 7.87 cm2

S = 25.15 cm

Usar: 1 φ 1/2" @ 15.00 cm

• Acero positivo

Mu = 0.80 T.m
B = 1.00 m
d = 43.73 cm
As = 0.25 cm2

As < Asmin

As1 = 7.87 cm2


S = 25.15 cm

Usar: 1 φ 1/2" @ 15.00 cm

• Acero Transversal

Mu=

d2= 41.19 cm
x= 37.50 cm
Wu = σu X B = 2.84 T/m

Mu= 0.20 T.m


As = 0.96 cm2
Asmin = 7.41 cm2 Uso: As = 7.41 cm2

Usando ∅ 1/2´´ s= 19.95 cm

USO:  1/2´´ @ 15.00 cm


DISEÑO DE COLUMNAS
TANQUE ELEVADO
DISEÑO DE COLUMNA CA

DATOS:

H = 3.05 m
Concreto armado = 2400.00 kg/m3
f´c = 210.00 kg/cm2
fy = 4200.00 kg/cm2
rec = 4.00 cm

1) DIMENSIONES DE LA COLUMNA

Del predimensionamiento

Columna C1 : b x h = 0.25 m x 0.25 m

2) DISEÑO POR FLEXION

Utilizando el Programa ETABS 2015 para diseñar la estructura hemos obtenido la cantidad
de acero requerida y que se definira a continuación

ɸ (pulg) As (cm2)
3/8´´ 0.71
AS min= ρmin.(b).h
1/2´´ 1.27
As min = 6.25 cm2 5/8´´ 1.98
3/4´´ 2.85
2.1) COLUMNA C1 1´´ 5.07

2.1.1) ACERO POR FLEXION

As = 6.25 cm2
Asmin = 6.25 cm2 Uso: As = 6.25 cm2

Usar: 4 φ 5/8´´ ( As= 7.92 cm2 )

3) DISEÑO POR CORTE

H/6 = 50.83 cm
Lo b o h (mayor) = 25.00 cm Lo = 55.00 cm
50.00 cm

8Øvlm = 10.16 cm
s1 b/2 o h/2 (mayor) = 12.50 cm s1 = 10.00 cm
10.00 cm
16Øvlm = 20.32 cm
48Øve = 45.60 cm s2 = 20.00 cm
s2
b o h (mayor) = 25.00 m
0.30 cm

Usar: estribos φ 3/8'' 1 @ 0.05, 5 @ 0.10, Rto @ 0.20 m

4) DETALLE DEL REFUERZO


DISEÑO DE VIGAS
TANQUE ELEVADO
DISEÑO DE VIGA DE TANQUE ELEVADO

DATOS:

Ln = 1.50 m S/C (kg/m2) α


B = 0.83 m 200 12
S/C = 50.00 kg/m2 250 11
luz entre ejes = 1.65 m 500 10
acabados = 120.00 kg/m2 750 9
concreto armado = 2400.00 kg/m3 1000 8
f´c = 210.00 kg/cm2
fy = 4200.00 kg/cm2
rec = 4.00 cm

Del predimensionamiento:

Viga VP : b x h = 0.25 m x 0.25 m

1) DISEÑO POR FLEXION

Utilizando el Programa ETABS 2015 para diseñar la estructura hemos obtenido la cantidad
de acero requerida y que se definira a continuacion

ρb= 0.85β

ρb = 0.021675

AS max= 0.75ρb.bw.d
ɸ (pulg) As (cm2)
As max = 10.16 cm2 3/8´´ 0.71
1/2´´ 1.27
5/8´´ 1.98
AS min= 0.70 . .ℎ
3/4´´ 2.85
As min = 1.51 cm2 1´´ 5.07

d= ℎ − − φ − φ /2
d = 18.78 cm
1.1) VIGA TANQUE ELEVADO

1.1.1) APOYO 1

As = 0.86 cm2
Asmin = 1.51 cm2 Uso: As = 1.51 cm2

Usar: 2 φ 1/2" ( As= 2.54 cm2 )

1.1.2) CENTRO 1-2

As = 0.29 cm2
As min = 1.51 cm2 Uso: As = 1.51 cm2

Usar: 2 φ 1/2´´ ( As= 2.54 cm2 )

1.1.3) APOYO 2

As = 0.60 cm2
As min = 1.51 cm2 Uso: As = 1.51 cm2

Usar: 2 φ 1/2´´ ( As= 2.54 cm2 )

2) DISEÑO POR CORTE

Ae = 0.71 cm2

t = 0.25 m
l = 1.65 m
Vu = 15.00 T

Vc= 0.53 . .
Vc = 3.61 T
Vud=
Vud = 15.00 T
Vn=
ɸ
Vn = 17.65 T
Vn > Vc (SI requiere estribos)

Vs= −

Vs = 14.04 T

1.06 × × = 7.21 T

2.12 × × = 14.42 T

1.06 × × < Vs < 2.12 × ×

• Espaciamiento de Estribos

. .
s min=

Smin = 7.98 cm

.
s max=
.

s max = 68.16 cm
s max = 60.00 cm
s max = d/2 = 9.39 cm

Usar: 1 φ 3/8 @ 10.00 cm

• Optimización de Espaciamientos

De las siguientes ecuaciones:


Xo= ×

Xo = 1.31 m

. .
Vs =
Vs = 2x 0.71 x 4200.00 kg/cm2 x 18.78 cm
Sx

Vs = 112003.92
Sx

X=Xo−

X = 1.31 m - 112003.92 x 1.31 m x 0.85


( 15000.00 kg - 3065.07 kg ) Sx

X = 1.31 m - 10.47 m
Sx

X = 131.28 - 1047.24 ( cm )
Sx

Sx(cm) X(cm) ∆X # Estribos


10.00 cm 26.56 52.36 cm 5
20.00 cm 78.92

Usar: estribos φ 3/8 1 @ 0.05, 5 @ 0.10, Rto @ 0.20 m

3) DETALLE DEL REFUERZO


DISEÑO DE LOSA ALIGERADA
TANQUE ELEVADO
DISEÑO DE LOSA ALIGERADA

DATOS:

Concreto armado = 2400.00 kg/m3


f´c = 210.00 kg/cm2
fy = 4200.00 kg/cm2
rec = 2.50 cm
Ln = 1.50 m

1) PREDIMENSIONAMIENTO

h= (Losa con 1 extremo continuo)


.
h = 0.08 m h = 0.20 m

2) METRADO DE CARGAS

Carga Muerta
Peso propio = 300.00 kg/m2 x 0.40 m = 120.00 kg/m
Acabados = 120.00 kg/m2 x 0.40 m = 48.00 kg/m
Peso tanque = 440.00 kg/m2 x 0.40 m = 176.00 kg/m
C.M = 344.00 kg/m

Carga Viva
S/C = 50.00 kg/m2 x 0.40 m = 20.00 kg/m
C.V. = 20.00 kg/m

Carga última

C.U. losa= 1.4 + 1.

C.U. losa = 515.60 kg/m


C.U. losa = 0.52 T/m

3) DIAGRAMA DE MOMENTOS
3) DISEÑO POR FLEXION

ASmin(+)= 2. AS min(−)
ɸ (pulg) As (cm2)
As max = 0.74 cm2 3/8´´ 0.71
1/2´´ 1.27
AS min(-) = 0.70 . . 5/8´´ 1.98
3/4´´ 2.85
As min = 0.37 cm2 1´´ 5.07

d= ℎ − − φ − φ /2

d = 15.28 cm

3.1) Claro 12

Mu = 200.00 kg.m
b = 10.00 cm
d = 15.28 cm Uso: As = 0.50 cm2
As = 0.50 cm2
Usar: 1 φ 1/2´´ ( As= 1.27 cm2 )

3.4) Refuerzo por temperatura

Ast= 0.0018 . ℎ
Ast = 0.90 cm2
s = 78.89 cm
Usar: 1 φ 1/2" @ 0.25 m

3) VERIFICION POR CORTE

Vu≤ØVc

Vu = 688.16 kg

ØVc = 0. .
ØVc = 997.53 kg

Vu≤ØVc (Si cumple la condicion, la losa aligerada absorve los esfuerzos por corte)
No se requiere ensanchar la vigueta