Documentos de Académico
Documentos de Profesional
Documentos de Cultura
PONTONES
METRADO
ITEM PARTIDAS UND KM KM KM KM KM KM TOTAL
119+260 122+343 131+980 137+604 137+803 143+243.6
1100 PONTONES
1001.B DESVIO PARA PONTONES m 323.00 90.00 50.00 - - 93.00 556.00
202.B DEMOLICION DE ESTRUCTURAS m3 185.00 112.50 100.56 - - 105.00 503.06
601.C EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN m3 2,386.00 656.99 649.18 749.03 1,691.94 1,461.65 7,594.79
601.D EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS BAJO AGUA m3 1,022.57 281.57 278.22 321.01 725.12 626.42 3,254.91
603.B ENCAUZAMIENTO PARA PUENTES Y PONTONES m3 400.80 250.00 260.00 1,304.25 351.94 260.00 2,826.99
605.A RELLENOS PARA ESTRUCTURAS m3 1,498.42 818.59 1,655.59 919.77 1,713.32 1,733.74 8,339.41
230.A MATERIAL DE CANTERA PARA RELLENO m3 1,498.42 818.59 1,655.59 919.77 1,713.32 1,733.74 8,339.41
610.C1 CONCRETO CLASE C (F'C = 280 KG/CM2) m3 70.18 48.66 46.65 55.63 71.18 84.42 376.72
610.D1 CONCRETO CLASE D (F'C = 210 KG/CM2) m3 117.30 70.19 66.81 118.36 214.74 52.00 639.40
610.D3 CONCRETO CLASE D (F'C = 210 KG/CM2) BAJO AGUA m3 175.95 105.29 100.21 177.53 322.11 78.01 959.10
610.H CONCRETO CLASE H (F'C = 100 KG/CM2) m3 17.07 10.61 9.76 - 30.19 - 67.63
610.J CONCRETO CLASE J (F'C = 175 KG/CM2 + 30% PG) m3 - - - 376.64 - 97.76 474.40
612.A ENCOFRADO Y DESENCOFRADO m2 425.30 265.18 261.79 385.75 780.85 372.40 2,491.28
612.B ENCOFRADO Y DESENCOFRADO BAJO AGUA m2 271.10 164.14 162.96 245.16 505.21 234.26 1,582.84
612.C ENCOFRADO Y DESENCOFRADO CARA VISTA m2 129.33 102.39 102.39 114.86 121.14 150.39 720.47
615 ACERO DE REFUERZO FY= 4200 KG/CM2 kg 29,922.57 20,278.71 19,988.46 23,345.19 37,609.65 24,524.55 155,669.13
700.A TRANSPORTE DE MATERIAL GRANULAR PARA D<= 1KM m3k - - - - - - 7,957.13
700.B TRANSPORTE DE MATERIAL GRANULAR PARA D> 1KM m3k - - - - - - 92,315.40
700.E TRANSPORTE DE DESECHOS Y EXCEDENTES A DME PARA D<= 1KM m3k - - - - - - 7,417.35
700.F TRANSPORTE DE DESECHOS Y EXCEDENTES A DME PARA D> 1KM m3k - - - - - - 13,405.90
1110 VARIOS
624.B TUBO DE PVC-SAP, D=3" m 76.30 70.00 54.50 61.72 70.00 70.00 402.52
690.B BARANDA METALICA TIPO II m 23.10 21.00 16.30 18.24 21.00 21.00 120.64
1110.A JUNTA DE DILATACION PARA PONTONES m 15.80 16.24 14.00 14.90 21.84 19.04 101.82
1110.B APOYO DE NEOPRENO PARA PONTONES m 16.00 17.60 15.40 15.40 15.40 20.40 100.20
1110.C FALSO PUENTE PARA PONTONES m 10.45 9.40 7.00 8.00 9.40 9.40 53.65
1006.I ENCOFRADO DE SOSTENIMIENTO m2 81.00 - - - - - 81.00
1120 OBRAS DE PROTECCION
601.C EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN m3 667.25 - - 733.89 511.30 - 1,912.44
605.A RELLENOS PARA ESTRUCTURAS m3 74.33 - - 707.15 246.20 - 1,027.68
650.H GEOTEXTIL NO TEJIDO CLASE 2 m2 655.50 - - 1,139.00 416.50 - 2,211.00
660.A GAVION TIPO CAJA m3 483.00 - - 603.00 220.50 - 1,306.50
660.C GAVION TIPO COLCHON H= 0.50M m2 345.00 - - 670.00 245.00 - 1,260.00
Transporte de material
Distancia de
Demolición Excavación Ubicación Acceso Material Momento de excedente a DME
Progresiva C.G. Total transporte
estructuras a eliminar % transporte (m3km)
(km) (km) (m3)
(m3) (m3) (m3km)
(km) (km) (km) (m3) D <= 1 km D > 1 km
119+260.00 119.26 185.00 3,408.58 3,593.58 121.70 0.20 2.64 100% 3,593.58 9,055.82 3,162.35 5,893.50
122+343.00 122.34 112.50 938.56 1,051.06 124.50 0.26 2.42 100% 1,051.06 2,414.28 924.93 1,489.30
131+980.00 131.98 100.56 927.40 1,027.96 132.14 0.23 0.39 100% 1,027.96 277.55 277.55 -
137+604.00 137.60 - 1,070.04 1,070.04 137.50 0.20 0.30 100% 1,070.04 196.89 196.89 -
137+803.00 137.80 - 2,417.06 2,417.06 137.50 0.20 0.50 100% 2,417.06 925.73 925.73 -
143+243.60 143.24 105.00 2,088.07 2,193.07 146.84 0.15 3.75 100% 2,193.07 7,952.96 1,929.90 6,023.10