UF4-CAP-02.

1 DRENAJE TRANSVERS
BOX UF4
ACCESO

ADICIONALES
DRENAJE TRANSVERSAL
BOX UF4

ADICIONALES
pag
ACTA MODIFICACION DE OBRA No.01 AL CONTRATO CIVIL DE OBRA No. 03

OBJETO DEL CONTRATO:


EJECUCION DE ALCANTARILLAS Y CABEZALES, PARA LA TRANSVERSAL DEL SISGA

ORTIZ CONSTRUCCIONES Y PROYECTOS


CONTRATANTE:
SUCURSAL COLOMBIA
CONTRATISTA: CONSTRUCCIONES ACHC S.A.S
VALOR INICIAL : $ 203,170,216.00
VALOR ANTICIPO GIRADO: $ 50,501,375.00
FECHA DE INICIO: 12/19/2016
FECHA PRESENTE:

CONDICIONES ACTUALIZADAS SEGÚN ACTA


ITEM CONDICIONES ORIGINALES DEL CONTRATO O ACTUALIZADAS MODIFICACIONES
DE MODIFICACION No. 01

PRESTO GIO DESCRIPCION ITEM UND CANT. VR UNITA VR TOTAL CANT. VR TOTAL CANT.
EST-045 01.01.006 EXCAVACIONES VARIAS SIN CLASIFICAR M3 870.00 $ 18,900.00 $ 16,443,000.00 - 168.45 -$ 3,183,705.00 701.55
EXP-008 01.01.016 DEMOLICION ESTRUCTURAS EN CONCRETO M3 20.00 $ 29,500.00 $ 590,000.00 + 180.57 $ 5,326,815.00 200.57
EST-012 01.01.036 CONCRETO 14 MPA PARA SOLADO M3 12.00 $ 289,394.00 $ 3,472,728.00 + 3.79 $ 1,096,803.26 15.79
EST-019 01.01.057 RELLENO CON GRAVILLA M3 20.00 $ 68,563.00 $ 1,371,260.00 + 61.08 $ 4,187,828.04 81.08
EST-013 01.01.005 ACERO DE REFUERZO 60.000 PSI KG 6,000.00 $ 2,950.00 $ 17,700,000.00 - 1,400.00 -$ 4,130,000.00 4,600.00
EST-041 01.01.010 CONCRETO 28 MPA PARA BOX Y CABEZALES M3 66.00 $ 489,499.00 $ 32,306,934.00 - 48.61 -$ 23,794,546.39 17.39
RELLENO CON MATERIAL SELECCIONADO PROVENIENTE DE
SB-B-007 01.01.014 M3 780.00 $ 76,700.00 $ 59,826,000.00 - 460.15 -$ 35,293,505.00 319.85
CANTERA

EST-235 01.01.040 TUBERIA EN CONCRETO REFORZADO DE 0.90 M (36") CLASE I ML 94.50 $ 65,450.00 $ 6,185,025.00 + 14.00 $ 916,300.00 108.50

TRANSPORTE DE MATERIAL PROVENIENTE DE LA


TRANS-001 01.01.017 M3-KM 21,970.00 $ 755.00 $ 16,587,350.00 - 11,989.73 -$ 9,052,246.15 9,980.27
EXCAVACIÓN A ZODME
MO-001 AA.05.01 AYUDANTE DIA 256.00 $ 36,340.00 $ 9,303,040.00 - 68.75 -$ 2,498,375.00 187.25
MO-002 AA.05.01 OFICIAL DIA 256.00 $ 71,100.00 $ 18,201,600.00 - 254.50 -$ 18,094,950.00 1.50
ADICIONALES
PE-001 AA.05.01 PORTE MATERIAL DESDE BOGOTA UD 0.00 $ 450,000.00 $ 0.00 + 1.00 $ 450,000.00 1.00
PE-002 AA.05.02 BULTO 50 KG CEMENTO UD 0.00 $ 17,647.00 $ 0.00 + 13.00 $ 229,411.00 13.00
PE-003 AA.02.03 ALQUILER CAMPA ACOPIO UD 0.00 $ 150,000.00 $ 0.00 + 2.00 $ 300,000.00 2.00
REPARACION ACUEDUCTO ALCANTARILLA 188 ACCESORIOS Y
PE-004 01.01.990 UD 0.00 $ 121,300.00 $ 0.00 + 1.00 $ 121,300.00 1.00
MANO DE OBRA
PE-006 AA.05.01 RETROEXCAVADORA MIXTA CON BALDE H 0.00 $ 80,000.00 $ 0.00 + 13.00 $ 1,040,000.00 13.00
PE-007 AA.05.01 VOLQUETA SIMPLE (7M3) H 0.00 $ 60,000.00 $ 0.00 + 19.00 $ 1,140,000.00 19.00
PE-008 Err:504 BASE GRANULAR M3 0.00 $ 47,600.00 $ 0.00 + 91.00 $ 4,331,600.00 91.00
PE-009 Err:504 SUBBASE GRANULAR M3 0.00 $ 47,600.00 $ 0.00 + 126.00 $ 5,997,600.00 126.00
PE-010 Err:504 ARENA M3 0.00 $ 53,550.00 $ 0.00 + 7.00 $ 374,850.00 7.00
PE-011 Err:504 GRAVA 3/4" M3 0.00 $ 53,550.00 $ 0.00 + 7.00 $ 374,850.00 7.00
PE-012 Err:504 CONCRETO 28 MPA CEMEX M3 0.00 $ 434,090.58 $ 0.00 + 18.00 $ 7,813,630.44 18.00
PE-013 01.01.990 TUBERIA PARA PASANTES UN 0.00 $ 31,000.00 $ 0.00 + 1.00 $ 31,000.00 1.00
PE-014 01.01.005 SUMINISTRO DE ACERO DE REFUERZO 60.000 PSI KG 0.00 $ 1,948.00 $ 0.00 + 800.00 $ 1,558,400.00 800.00

COSTO DIRECTO $ 181,986,937.00 -$ 60,756,939.80


ADMINISTRACION 4% $ 7,279,477.48
IMPREVISTO 3% $ 5,459,608.11
UTILIDAD 4% $ 7,279,477.48
SUB-TOTAL $ 202,005,500.07
IVA/UTILIDAD 19% 16% $ 1,164,716.40
VALOR TOTAL $ 203,170,216.47
Ajuste al peso ($ 0.47)
VALOR TOTAL $ 203,170,216.00

Para constancia de lo anterior se firma la presente Acta de Modificacion de Obra No. 01 en la Ciudad de XXXXXX, el día XX del mes de XXXXXX de 2017.
ACTA MODIFICACION DE OBRA No.01 AL CONTRATO CIVIL DE OBRA No. 03

OBJETO DEL CONTRATO:


EJECUCION DE ALCANTARILLAS Y CABEZALES, PARA LA TRANSVERSAL DEL SISGA

LUIS ALBERTO MAYA ORTIZ XXXXXXXXXXXXXXX


C.C No.7.537.848 de Bogotá D.C C.C No.XXXXXXXXXXXXXXXX de Bogotá D.C
Representante Legal Representante Legal
CONSTRUCCIONES ACHC S.A.S XXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
NES ACTUALIZADAS SEGÚN ACTA
DE MODIFICACION No. 01

VR TOTAL
$ 13,259,295.00
$ 5,916,815.00
$ 4,569,531.26
$ 5,559,088.04
$ 13,570,000.00
$ 8,512,387.61

$ 24,532,495.00

$ 7,101,325.00

$ 7,535,103.85

$ 6,804,665.00
$ 106,650.00

$ 450,000.00
$ 229,411.00
$ 300,000.00
$ 121,300.00

$ 1,040,000.00
$ 1,140,000.00
$ 4,331,600.00
$ 5,997,600.00
$ 374,850.00
$ 374,850.00
$ 7,813,630.44
$ 31,000.00
$ 1,558,400.00

$ 121,229,997.20
$ 4,849,199.89
$ 3,636,899.92
$ 4,849,199.89
$ 134,565,296.89
$ 921,347.98
$ 135,486,644.87
($ 0.85)
$ 135,486,644.02