SUMINISTRO TANQUE - GRAVEDAD

HORA C (%) SUM C (%) S (%) SUM S (%) S-C SUM (S- C)
1 2 3 4 5 6 7
0-1 1 1 4.17 4.17 3.17 3.17
1. - 2 1 2 4.17 8.33 3.17 6.33
2. - 3 1 3 4.17 12.50 3.17 9.50
3. - 4 1 4 4.17 16.67 3.17 12.67
4. - 5 2 6 4.17 20.83 2.17 14.83
5. - 6 4 10 4.17 25.00 0.17 15.00
6. - 7 9.5 19.5 4.17 29.17 -5.33 9.67
7. - 8 8 27.5 4.17 33.33 -3.83 5.83
8. - 9 7 34.5 4.17 37.50 -2.83 3.00
9. - 10 4 38.5 4.17 41.67 0.17 3.17
10. - 11 3 41.5 4.17 45.83 1.17 4.33
11. - 12 5.5 47 4.17 50.00 -1.33 3.00
12. - 13 9 56 4.17 54.17 -4.83 -1.83
13. - 14 5 61 4.17 58.33 -0.83 -2.67
14. - 15 3 64 4.17 62.50 1.17 -1.50
15. - 16 2.5 66.5 4.17 66.67 1.67 0.17
16. - 17 3 69.5 4.17 70.83 1.17 1.33
17. - 18 3.5 73 4.17 75.00 0.67 2.00
18.- 19 5 78 4.17 79.17 -0.83 1.17
19. - 20 9 87 4.17 83.33 -4.83 -3.67
20. - 21 8.5 95.5 4.17 87.50 -4.33 -8.00
21. - 22 2 97.5 4.17 91.67 2.17 -5.83
22. - 23 1.5 99 4.17 95.83 2.67 -3.17
23. - 24 1 100 4.17 100.00 3.17 0.00
V (% ) V Dist
8
11.17
14.33 DATO
17.50 VALOR UNIDAD V=Q*t
20.67 QMD 2783 M3/DIA QDISEÑO
22.83 Tiempo 1 DIA
23.00 V. DEL QMD 2783 m3
17.67 V. DISTRIB 2783 m3 V. DISTRIBUCION
13.83 Vreg.= % Consumo del V del QMD= 23.00
11.00
11.17
12.33 VOLUMEN REGULACION NORMA 0330
11.00 Vreg = % consumo del V del QMD
6.17 Vreg= 0.23*2783
5.33 Vreg= 640.09 m3
6.50
8.17 VOLUMEN DE ALMACENAMIENTO NORMA 0330
9.33 V. alma (1/3) V DIST m3
10.00 V. alma (1/3) * 2783 m3
9.17 V. alma 927.67 m3
4.33
0.00 V UTIL=V DISEÑO NORMA 0330
2.17 V reg 640.09 m3
4.83 V. alma 927.67 M4
8.00 V DISEÑO 1567.76 M5

ALTO M3

Vincencio 1316 m3 antes de 0330 1/3 DEL VOLUMEN POR EL QMD


/3 DEL VOLUMEN POR EL QMD= VOLUMEN DISTRIBUIDO