Está en la página 1de 11

“UNIVERSIDAD PERUANA LOS ANDES”

-FACULTAD DE INGENIERIA CIVIL-

INDICE
1. UBICACION......................................................................................................................2

2. PARAMETROS BASICOS...................................................................................................3

2. CALCULO DE AREA.......................................................................................................3

2.1. METODO DE PESADAS...........................................................................................3

2.2. METODO GEOMETRICO Y SIMPSON...................................................................3

3. CARACTERISTICAS DE LA CUENCA..........................................................................4

3.1. COEFICIENTE DE GRAVELIUS............................................................................4

3.2. FACTOR DE FORMA................................................................................................4

4. CURVA HIPSOMETRICA................................................................................................5

4.1. CURVA DE ALTITUDES..........................................................................................6

5. ELEVACION MEDIA.......................................................................................................6

6. CLASIFICACION DE CORRIENTES..............................................................................7

6.1. PATRON DE DRENAJE TRILLIS/PINNADO.........................................................7

7. DENSIDAD........................................................................................................................8

7.1. DENSIDAD DE CORRIENTE...................................................................................8

7.2. DENSIDAD DE DRENAJE........................................................................................8

8. PENDIENTE DE CAUSE..................................................................................................8

8.1. PENDIENTE MEDIA PONDERADA.......................................................................9

RECURSOS HIDRICOS – DELIMITACION DE CUENCA


1
“UNIVERSIDAD PERUANA LOS ANDES”
-FACULTAD DE INGENIERIA CIVIL-

PARAMETROS MORFOLOGICOS
CUENCA EL MANTARO M-25
1. UBICACION

RECURSOS HIDRICOS – DELIMITACION DE CUENCA


2
“UNIVERSIDAD PERUANA LOS ANDES”
-FACULTAD DE INGENIERIA CIVIL-

2. PARAMETROS BASICOS

1.PARAMETROS BASICOS:  
AREA DE LA CUENCA (A): 117.691 km2
PERIMETRO DE LA CUENCA (P): 52.568 km
LONGITUD DE LA CUENCA (L): 19.025 km
LONGITUD DEL CAUCE PRINCIPAL (Lp): 22,651 km
COTA INICIAL DE LA CAUCE PRINCIPAL 4200 m.s.n.m.
COTA FINAL DE LA CAUCE PRINCIPAL 685.212 m.s.n.m.
LONGITUD TOTAL DE LA CAUCES (Lt): 835.231 km
ANCHO DE LA CUENCA(W): 11.141 km

2. CALCULO DE AREA

2.1. METODO DE PESADAS

peso muestra de 10*10


peso del plano total: 2,052gr. 1,752gr
unidades:

AREA TOTAL POR PESO: 117.123 Km2

2.2. METODO GEOMETRICO Y SIMPSON

N° AREA GEOMETRICO Km2


A 3
B 9
C 0.6
D 49.5
E 12

RECURSOS HIDRICOS – DELIMITACION DE CUENCA


3
“UNIVERSIDAD PERUANA LOS ANDES”
-FACULTAD DE INGENIERIA CIVIL-

N° AREA SIIMPSON Km2


F 8.1
G 4.23

H
3.27
I 7.11
J 0.789
K 2.98
L 1.12
M 1.52
N 0.84
O 8.45
P 5.24

AREA TOTAL: 114.894 Km2

3. CARACTERISTICAS DE LA CUENCA

3.1. COEFICIENTE DE GRAVELIUS

P 52.568  
Kc=0.28∗
√ A
Kc=0.28∗
√ 117.691  
=¿0.187

3.2. FACTOR DE

FORMA

A 117.691  
Kc= Kc= = 0.325
Lb 2 19.025  2

RECURSOS HIDRICOS – DELIMITACION DE CUENCA


4
“UNIVERSIDAD PERUANA LOS ANDES”
-FACULTAD DE INGENIERIA CIVIL-

4. CURVA HIPSOMETRICA

  COTAS AREA km2


AREAS
AREA AREAS
Q
PROMEDI ENTRE AREA AREAS Q
N° MIN MAX QUEDA
O CURVA COMUN EN % QUEDA
N
S N EN %
SOBRE
3423.91
1 3358.816 3391.366   0.000 117.120 0.000 100
7
3532.28
2 3450.000 3491.141 0.543 0.543 116.577 0.464 99.536
1
3608.68
3 3534.312 3571.496 0.642 1.186 115.935 0.548 98.988
0
3704.42
4 3621.588 3663.005 1.186 2.371 114.749 1.012 97.976
3
3791.14
5 3709.934 3750.542 1.235 3.606 113.514 1.054 96.921
9
3879.99
6 3800.000 3839.997 4.248 7.854 109.266 3.627 93.294
4
3968.38
7 3882.103 3925.245 29.984 37.838 79.282 25.601 67.693
7
4054.50
8 3968.499 4011.500 25.094 62.932 54.189 21.426 46.267
1
4142.32
9 4055.582 4098.953 14.078 77.010 40.110 12.020 34.247
4
4229.66
10 4142.714 4186.191 10.472 87.482 29.638 8.941 25.306
8
4315.82
11 4230.434 4273.127 7.657 95.139 21.982 6.537 18.768
0
4403.30
12 4317.564 4360.437 8.249 103.388 13.732 7.043 11.725
9
4489.30
13 4406.203 4447.754 7.508 110.896 6.224 6.411 5.314
5
4575.12
14 4491.380 4533.252 4.940 115.836 1.284 4.218 1.097
4
4665.23
15 4578.913 4622.074 1.284 117.120 0.000 1.097 0.000
6
CURVA HIPSOMETRICA
117.120 100.000
4800.000
4600.000
4400.000
4200.000
ELEVACION

4000.000
3800.000
3600.000
3400.000
RECURSOS HIDRICOS – DELIMITACION DE CUENCA
3200.000
0.000 20.000 40.000 60.000 80.000 100.000 120.000 140.000 5
KM2
“UNIVERSIDAD PERUANA LOS ANDES”
-FACULTAD DE INGENIERIA CIVIL-

4.1. CURVA DE ALTITUDES

CURVA DE ALTITUDES
4622.074 1.097
4.218
4447.754 6.411
7.043
4273.127 6.537
8.941
ELEVACION

4098.953 12.020
21.426
3925.245 25.601
3.627
3750.542 1.054
1.012
3571.496 0.548
0.464
3391.366 0.000
0.000 5.000 10.000 15.000 20.000 25.000 30.000
AREA EN %

5. ELEVACION MEDIA

AREA ALTURA sumatoria a∗e


PROMEDI
ENTRE MEDIA A*E Em¿
O sumatoria a
CURVAS m
3391.3665      
3491.1407 0.543 3441.254 1869.865
474719 .3281
3571.4957 0.642 3531.318 2267.677 Em¿ = 4053.259
117 . 120
3663.0055 1.186 3617.251 4288.356
3750.5416 1.235 3706.774 4577.591 m.s.n.m
3839.9968 4.248 3795.269 16122.857

RECURSOS HIDRICOS – DELIMITACION DE CUENCA


6
“UNIVERSIDAD PERUANA LOS ANDES”
-FACULTAD DE INGENIERIA CIVIL-

3925.2449 29.984 3882.621 116416.526


4011.5002 25.094 3968.373 99581.144
4098.9526 14.078 4055.226 57090.117
4186.1909 10.472 4142.572 43381.730
4273.127 7.657 4229.659 32384.561
4360.4368 8.249 4316.782 35610.456
4447.7539 7.508 4404.095 33067.492
4533.2522 4.940 4490.503 22181.758
4622.0745 1.284 4577.663 5879.199
117.120 474719.328

6. CLASIFICACION DE CORRIENTES

6.1. PATRON DE DRENAJE TRILLIS/PINNADO

SUMATORI
N Rb (RAZON
ORDE A DE
CAUCE DE
N LONGITUDE
S BIFURCACIO
S KM
N)
  1 807 433.202 2.522
  2 320 119.428 2.270
  3 141 46.555 2.712 =RB
  4 52 21.464 2.167
  5 24 8.328 0.828
  6 29 7.569  
1373 636.546

RECURSOS HIDRICOS – DELIMITACION DE CUENCA


7
“UNIVERSIDAD PERUANA LOS ANDES”
-FACULTAD DE INGENIERIA CIVIL-

7. DENSIDAD

7.1. DENSIDAD DE CORRIENTE

Nc 1373
Dc= A Dc=117.691 = 11.666 /Km2

7.2. DENSIDAD DE

DRENAJE
sumatoria de( Li) 636.546
Dd= Dc=117.691   = 5.408 /Km
A

8. PENDIENTE DE CAUSE

RECURSOS HIDRICOS – DELIMITACION DE CUENCA


8
“UNIVERSIDAD PERUANA LOS ANDES”
-FACULTAD DE INGENIERIA CIVIL-

Cfi−Cin 1560−480
Sm¿ ∗100 Sm¿ ∗100=4 . 699 %
distancia 22980

8.1. PENDIENTE MEDIA PONDERADA

LONGITUD
23,001242
REAL
km
CAUCE:

LONGITUD
20,89556
RECTA
km
CAUCE:

RECURSOS HIDRICOS – DELIMITACION DE CUENCA


9
“UNIVERSIDAD PERUANA LOS ANDES”
-FACULTAD DE INGENIERIA CIVIL-

PROGRESIV
ALTURA AREA
A
0+00 592.982 5232.455
5+00 1500.000 9250.000
10+00 2200.000 14000.000
15+00 3400.000 18250.000
20+00 3900.000 4.975
20+0,001242 4110.517  
46737.430 m2

Bmayor+ 592.982
46737 .430=( )∗20
2

B(mayor)¿4080.761m.s.n.m.

RECURSOS HIDRICOS – DELIMITACION DE CUENCA


10
“UNIVERSIDAD PERUANA LOS ANDES”
-FACULTAD DE INGENIERIA CIVIL-

ANEXOS

1. PLANO DE LA CUENCA MANTARO

RECURSOS HIDRICOS – DELIMITACION DE CUENCA


11

También podría gustarte