Keywords: Repair work, generator stator winding, insulation damaged and partial rewind
Abstract:
Generator failures due to insulation breakdown on stator windings may cause severe damages to the equipment
and expensive losses. Stator winding insulation of generator is prone to partial discharge as a result of voids within
insulation and air gaps adjacent to insulation under high voltage stress. In this case, numbers of the stator bars had
crack in the overhang section just outside of the core caused by flashover as a result of overvoltage condition. A
difficult decision has been determined to repair the stator on site rather than to replace it with new equipment. The
repair work of damaged stator winding which caused by partial discharge require numbers of specific techniques,
methods, and proper procedures especially when the stator winding is a vacuum pressure impregnation (VPI)
treated generator winding. An extensive partial repair can be carried out if the damage only occurred on several
numbers of coils.
This paper describes experience gained during repair work activities on a 5 MW global vacuum pressure
impregnation (VPI) type generator winding in Tenau Diesel Power Plant, Kupang, Indonesia. The stator windings
have suffered partial discharge cause by unwanted overvoltage which causes severe damage on its several coils. It
was found that insulation breakdown occurred in numbers of diamond coils on separated stator windings. On-site
installation and partial repair works have been carefully performed in order to meet its original design and values.
Partial rewinding of VPI stators, which the entire stator is impregnated with an epoxy resin, needs specific
techniques, steps and procedures. Series test activities have also been carried out to determine its condition. The
repair work activity was completed in 5 months and more than 3500 operating hours ago, and is still running
without any problems.
INTRODUCTION
In July 2008, the Caterpillar D3616TA diesel engine has
The generator restoration was done in Tenau Diesel Power experienced several problems in its engine side. Mainly, the
Station in Kupang, Indonesia. The Power Station has 10 problems were caused by failure on cylinder heads and
diesel engines with various types of diesel engine types and crankshaft that generated excessive vibration on the engine.
manufacturers. One of the engines is 5 MW Caterpillar Diesel Diesel engine reparation has been carried out approximately
engine D3616TA s/n. 1PD00423 with KATO Synchronous four months and during that period, its generator part was
Generator Type AA 27185001 with natural cooled stator kept in good condition. The reparation has been completely
windings. This diesel generator set is operated routinely as done and the diesel engine was ready to be operated in early
main engine to supply Kupang power distribution system base January 2009.
load. The peak load of Kupang distribution system reaches 27
MW and the total power generated capacity is around 28 MW. In January 2009, the diesel engine was put back into
If there is a disturbance occurred on one of the generating operation. After two hours operation, suddenly, there was an
machines, hence, it will lead directly to electricity shutdown. short circuit breakdown on generator winding. The short
1
AESIEAP Conference of the Electric Power Supply Industry October 25-28, 2010
From the above inspection findings, it is still difficult to find Figure 2 Strange materials inside generator
out the true cause of winding failure. The partial discharge / Based on the winding inspection and investigation, it was
flashover on stator winding may be generated by insulation considered that a total rewind was necessary. The winding
failure, aging of winding insulation system, corrosion and insulation had been degraded by the flashover and taking into
material deterioration by foreign materials. The other account that the generator is a vacuum pressure impregnation
potential cause of the failure is caused by overvoltage on (VPI) treated generator winding. The options to conduct
stator winding. winding repair are discusses on the next paragraph.
2
AESIEAP Conference of the Electric Power Supply Industry October 25-28, 2010
REPAIR WORK OPTIONS problems. Furthermore, this option consequently has higher
risk on the success rate of partial rewind work.
PLN researched the alternatives. One option was to consider Due to the cost and operational consideration, and also
the failure as a total loss of the generator winding and install operational pressures, it was decided to apply on-site partial
new generator winding. Another option was to do partial rewind which involved replacing with new original coils,
rewind for the generator. Based on technical experiences, reparation on damaged coils, and the application of resin to
evaluation and analysis, it is still possible to repair the stator the affected areas and then returning the machine into
winding. There are three options to consider: services.
1. One option was to consider the failure as a total loss of
the generator stator winding and make plan to purchase PARTIAL REPAIR OF STATOR WINDING
and install new complete set of stator winding
2. The second option was to do stator winding repair for the PLN, along with its generator service partner, Garuda
generator in authorized workshop. The damage of the Maintenance Facility (GMF), proceed to repair the existing
stator winding still can be repaired by replacing with new stator winding. Initial electrical test were done by PLN to
coil parts. However, the process of rewinding and determine the baseline condition of the stator winding. In
installation of the new coils would leave the unit in a particular, the cooper winding resistance measurement was
forced outage stage for several months carefully performed in order to compare it to factory values
and assure consistency of measurement values with the final
3. The most cost effective and conservative approach would
values.
be to proceed with on-site partial rewind for the
generator. The damage of the stator winding till can be
repaired by replacing with new coils.
3
AESIEAP Conference of the Electric Power Supply Industry October 25-28, 2010
k. Applied the epoxy / resin onto these lamination For the coil that was damaged in the lamination, layer
l. Repair all damaged finger plate or replaced restripping should be done upto the deepest layer. Each of the
m. Re assembly the compression bolt acc to the torque layer should be clean up, apply re-taping insulation with mica
required. glass tape and spray insulation varnish onto separated
n. Test the core looseness after compression bolts has been lamination sheet. All the winding failure area were ground out
tighten, found loose on the lamination is indicate loose on and cleaned up, and coated with a penetrating insulating
compression bolts varnish. The re-winding activities should maintain the same
o. Test and analysis the core repair result characteristics as the original.
p. Any unsatisfactory result must be repaired.
q. Clean up and spray paint coating In repairing the Vacuum Pressured Impregnation (VPI)
r. Core ready to refitting coils winding, it has been developed two interesting improved
techniques to do partial rewinding on that particular stator
winding type. For PLN engineers, this technique was a new
method and also a break-through in doing partial repair of
stator winding.
Figure 5 removing damaged stator wedges 2. In these partial rewinding activities, there were 3 types of
coils: new original coils, old coils and old coils that were
There are four new methods that have been learned from damaged / cracked as a result of removing the broken coil
previous result and kept as standard procedures: parts. The multilayer crack and void that might occur on
the diamond coil indentation should be fixed and
1. For a totally damaged stator coil, the damaged material reinsulated on site due to time constraint. HIPOT testing
have to be replaced with new and original winding coil in are conducted for each reinsulated coils with certain
order to ensure quality of the stator winding restoration. specific voltage level refer to the IEEE standard
2. In case of damaged insulation layer surface of the stator
winding, a partial re-insulation has to be carried out to
restore the conditions and lamination coil performance.
3. The more effective method to conduct testing to detect
position of damaged coil
4. Prove the high voltage test on half-baked varnish can be
done with good results.
4
AESIEAP Conference of the Electric Power Supply Industry October 25-28, 2010
5
AESIEAP Conference of the Electric Power Supply Industry October 25-28, 2010