Ti 10: 30 Am Work area Oil and Gas Station, 1000 m² with up to 100 people
me
Task being assessed Welding & Cutting in pipeline by using Electrical Welding Machine and grinder
New
What How risk
is Who might might Existing Risk Action/ Action/
rating monitored monitored by
the be people risk rating Additional controls (Resi by whom? when?
haza harmed? be control
dual)
rd? harmed measures
? L C R L C R
Fire 10 Welders, High Training of 5 4 Site Daily (Before
Qualified and Dedicated
hazard 5 Helpers temperature workers persons shall be designated Supervisor start of the
(Welding 10 workers , flames, involved to direct the operations. Or Welder work)
& Cutting 2 arcs, hot PTW
Certified welders
Pipe
Operation supervisors work pieces
isolation Welding Mask
s in the Up to 4 could catch
gas test Use of Flame-Resistant
life visitors per fire and burn toolbox talk personal protective
pipeline day someone site 2 equipment
with 20" resulting in barricades
4
0
1 4
inside of burn, Shelter and suitable fireproof
and warning
canvas are built when hot
the scarring and signs work nearby live facilities to
station) possibly inspection prevent fire or spark
death to the work
site, Combustible materials are
kept to a minimum to
equipments
minimize the risk of fire
hazards. All combustible
waste is kept in lidded
Risk assessment form
bins/containers.
The fire extinguisher should
be prepared at work site
(Powder).
Fire watcher should be
presented during hot work.
Use the fire blanket if needed
First aider and fully stocked
first aid kit to be available at
site.
Electricit Worker and Electrical PTW 5 All person referred to the 2 Site Daily, before
y other Shock isolation pipe work shall have attended the Supervisor start of the work
safety training and got the
(Welding coordinator Burn and gas test safety passport with
Machine, in the fire toolbox competent ability to their job
Grinder, working Sign and barricades shall be
Wires area set for the workplace
and Check cables and the device
by electrician before daily
cables) work
2 Proper PPE shall be provided
4 2 4
0 Fire extinguishers and fire
watchers must be in the place
Operate the device following
the specification of
manufacture
Cable management
Ensure proper color code
electrical equipment tag is
provided for updated
inspections
First aider and fully stocked
Risk assessment form
first aid kit to be available at
site
Additional personal multi gas
detectors to be used
Ensure all welding machines
are grounded/earthing by use
of proper earth cable and
copper rod.
New risk
How
What Existing rating Action/ Action/
might
is Who might risk Risk rating Additional controls (Residual monitored by monitored by
people
the be control whom? when?
be )
haza harmed? measure
harme
rd? s L C R L C R
d?
Mechanic The grinder Personal PTW 4 2 Site Before or
al Hazard All person referred to the work
worker injury Toolbox shall have attended the safety
supervisor during the
(cuts and training and got the safety Or Forman work period
(Grinder bruises) passport with competent ability
Machine to their job