Está en la página 1de 1

REQUERIM.

DE AGUA DEL CULTIVO

Estación ETo: SALINAS-GENERAL-ULPI Cultivo: CITRUS 70% ca bare


Est. de lluvia: SALINAS-GENERAL-ULPI Fecha de siembra: 1/20/1994

Mes Decada Etapa Kc ETc ETc Prec. efecReq.Riego


coef mm/día mm/dec mm/dec mm/dec

Ene 2 Inic 0.59 2.00 2.0 0.6 12.2


Ene 3 Inic 0.70 2.42 26.7 6.8 19.9
Feb 1 Inic 0.70 2.47 24.7 7.5 17.2
Feb 2 Inic 0.70 2.52 25.2 8.6 16.7
Feb 3 Inic 0.70 2.57 20.5 10.7 9.8
Mar 1 Inic 0.70 2.61 26.1 14.6 11.5
Mar 2 Inic 0.70 2.65 26.5 17.4 9.1
Mar 3 Des 0.69 2.61 28.7 13.1 15.6
Abr 1 Des 0.67 2.54 25.4 7.5 17.9
Abr 2 Des 0.65 2.47 24.7 3.7 21.0
Abr 3 Des 0.63 2.30 23.0 2.6 20.4
May 1 Des 0.61 2.12 21.2 1.0 20.2
May 2 Des 0.60 1.96 19.6 0.0 19.6
May 3 Des 0.58 1.79 19.7 0.1 19.6
Jun 1 Des 0.56 1.63 16.3 0.3 16.0
Jun 2 Med 0.54 1.49 14.9 0.3 14.5
Jun 3 Med 0.53 1.45 14.5 0.2 14.3
Jul 1 Med 0.53 1.43 14.3 0.1 14.2
Jul 2 Med 0.53 1.41 14.1 0.0 14.1
Jul 3 Med 0.53 1.40 15.4 0.0 15.4
Ago 1 Med 0.53 1.39 13.9 0.0 13.9
Ago 2 Med 0.53 1.39 13.9 0.0 13.9
Ago 3 Med 0.53 1.44 15.8 0.0 15.8
Sep 1 Med 0.53 1.49 14.9 0.0 14.9
Sep 2 Med 0.53 1.54 15.4 0.0 15.4
Sep 3 Med 0.53 1.48 14.8 0.1 14.7
Oct 1 Med 0.53 1.43 14.3 0.3 14.0
Oct 2 Fin 0.56 1.42 14.2 0.4 13.9
Oct 3 Fin 0.59 1.55 17.1 0.3 16.8
Nov 1 Fin 0.59 1.60 16.0 0.1 15.8
Nov 2 Fin 0.59 1.64 16.4 0.0 16.4
Nov 3 Fin 0.59 1.66 16.6 0.0 16.6
Dic 1 Fin 0.59 1.68 16.8 0.0 16.8
Dic 2 Fin 0.59 1.69 16.9 0.0 16.9
Dic 3 Fin 0.59 1.79 19.7 0.1 19.6
Ene 1 Fin 0.59 1.89 18.9 3.8 15.1
Ene 2 Fin 0.59 2.00 18.0 5.2 12.2

677.1 105.5 581.8

Cropwat 8.0 Bèta Page 1 20/11/18 7:15:47 PM

También podría gustarte