Está en la página 1de 9

TOTAL

50

45

40

35

30

25

20

15

10

0
0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 TOTAL=
3.85 2.25 5.35 5.45 2.7 3.4 1 5.35 5.45 2.7 3.4 5.35 5.45 5.35 5.45
5.2 5.2 2.9 2.9 2.6 2.6 3.4 3.5 3.5 5.1 5.1 3.5 3.5 2.9 2.9
m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
EJE A-B EJE A-B EJE A'-C' EJE A'-C' EJE B-C EJE B-C EJE C-D EJE C'-B' EJE C'-B' EJE C-D EJE C-D EJE B'-C' EJE B'-C' EJE C'-D' EJE C'-D' TRAMO
TRAMO TRAMO TRAMO TRAMO TRAMO TRAMO TRAMO TRAMO TRAMO TRAMO TRAMO TRAMO TRAMO TRAMO 7-9
2-3 2-3 6-7 7-9 2-3 2-3 3-4 6-7 7-9 2-3 2-3 6-7 7-9 6-7
OE.2.3.9 OE.2.3.9.1 Concreto
Losas
LOSAS DEL SEMISÓTANO(CONCRETO)
 
N° Número
Item Descripción ELEMENTOS
UND Ancho Largo
de veces
OE.2.3.9 Losas
OE.2.3.9.1 Concreto
EJE G-E TRAMO 5-6 1 1 m3 4.80 3.05
1 1 m3 3.35 3.20
EJE G-E TRAMO 1-2 2 1 m3 4.85 2.70
EJE C'-B' TRAMO 5-6 1 1 m3 1.70 4.80
EJE A'-C' TRAMO 6-7 1 1 m3 2.90 6.40
EJE A'-C' TRAMO 7-9 1 1 m3 2.90 4.90
EJE B-C TRAMO 2-3 1 1 m3 2.70 6.35
EJE B'-C' TRAMO 5-6 1 1 m3 4.00 4.80
EJE C'-B' TRAMO 6-7 1 1 m3 3.50 6.40
EJE C'-B' TRAMO 7-9 1 1 m3 3.50 4.90
EJE C-D TRAMO 2-3 1 1 m3 5.15 6.35
EJE C'-D' TRAMO 5-6 1 1 m3 3.55 4.8
EJE B'-C' TRAMO 6-7 1 1 m3 3.50 6.4
EJE B'-C' TRAMO 7-9 1 1 m3 3.50 6.4
EJE C'-D' TRAMO 6-7 1 1 m3 2.90 6.40
EJE C'-D' TRAMO 7-9 1 1 m3 2.90 4.90

LOSAS DEL SEMISÓTANO(ENCOFRADO)


 

Item Descripción ELEMENTOS
UND Ancho Largo Parcial
OE.2.3.9.2 Encofrado de Losa
EJE A-B TRAMO 1-2 1 m2 5.10 3.70 18.87
1 m2 3.35 3.20
EJE G-E TRAMO 1-2 2 m2 4.85 2.70 23.82
EJE C'-B' TRAMO 5-6 1 m2 1.70 4.80 8.16
EJE A'-C' TRAMO 6-7 1 m2 2.90 6.40 18.56
EJE A'-C' TRAMO 7-9 1 m2 2.90 4.90 14.21
EJE B-C TRAMO 2-3 1 m2 2.70 6.35 17.15
EJE B'-C' TRAMO 5-6 1 m2 4.00 4.80 19.20
EJE C'-B' TRAMO 6-7 1 m2 3.50 6.40 22.40
EJE C'-B' TRAMO 7-9 1 m2 3.50 4.90 17.15
EJE C-D TRAMO 2-3 1 m2 5.15 6.35 32.70
EJE C'-D' TRAMO 5-6 1 m2 3.55 4.8 17.04
EJE B'-C' TRAMO 6-7 1 m2 3.50 6.4 22.40
EJE B'-C' TRAMO 7-9 1 m2 3.50 6.4 22.40
EJE C'-D' TRAMO 6-7 1 m2 2.90 6.40 18.56
EJE C'-D' TRAMO 7-9 1 m2 2.90 4.90 14.21
TOTAL= 286.82
) LOSAS DEL 1ER PISO(CONCRE
 
N° Número
Espesor TOTAL Item Descripción ELEMENTOS de veces
OE.2.3.9 Losas
OE.2.3.9.1 Concreto
0.05 0.73 EJE A-B TRAMO 2-3 1 1
0.05 EJE A-B TRAMO 2-3 1 1
0.05 1.19 EJE A'-C' TRAMO 6-7 1 1
0.05 0.41 EJE A'-C' TRAMO 7-9 1 1
0.05 0.93 EJE B-C TRAMO 2-3 1 1
0.05 0.71 EJE B-C TRAMO 2-3 1 1
0.05 0.86 EJE C-D TRAMO 3-4 1 1
0.05 0.96 EJE C'-B' TRAMO 6-7 1 1
0.05 1.12 EJE C'-B' TRAMO 7-9 1 1
0.05 0.86 EJE C-D TRAMO 2-3 1 1
0.05 1.64 EJE C-D TRAMO 2-3 1 1
0.05 0.85 EJE B'-C' TRAMO 6-7 1 1
0.05 1.12 EJE B'-C' TRAMO 7-9 1 1
0.05 1.12 EJE C'-D' TRAMO 6-7 1 1
0.05 0.93 EJE C'-D' TRAMO 7-9 1 1
0.05 0.71
TOTAL= 14.13

LOSAS DEL 1ER PISO(ENCOFRAD


 

Item Descripción ELEMENTOS
UND

OE.2.3.9.2 Encofrado de Losa


EJE A-B TRAMO 2-3 1 m2
EJE A-B TRAMO 2-3 1 m2
EJE A'-C' TRAMO 6-7 1 m2
EJE A'-C' TRAMO 7-9 1 m2
EJE B-C TRAMO 2-3 1 m2
EJE B-C TRAMO 2-3 1 m2
EJE C-D TRAMO 3-4 1 m2
EJE C'-B' TRAMO 6-7 1 m2
EJE C'-B' TRAMO 7-9 1 m2
EJE C-D TRAMO 2-3 1 m2
EJE C-D TRAMO 2-3 1 m2
EJE B'-C' TRAMO 6-7 1 m2
EJE B'-C' TRAMO 7-9 1 m2
EJE C'-D' TRAMO 6-7 1 m2
EJE C'-D' TRAMO 7-9 1 m2
LOSAS: TOTAL DE CONCRETO M3
 

AZOTEA 1ER NIVEL 2,3,4 Y 5

15.6 11.02 44.07

LOSAS: TOTAL DE ENCOFRADO M2


 

AZOTEA 1ER NIVEL 2,3,4 Y 5

312.04 220.33 881.32


R PISO(CONCRETO) LOSAS DE
 
UND Ancho Largo Espesor TOTAL Item

OE.2.3.9 Losas
OE.2.3.9.1 Concreto
m3 5.20 3.85 0.05 1.00
m3 5.20 2.25 0.05 0.59
m3 2.90 5.35 0.05 0.78
m3 2.90 5.45 0.05 0.79
m3 2.60 2.70 0.05 0.35
m3 2.60 3.40 0.05 0.44
m3 3.40 1.00 0.05 0.17
m3 3.50 5.35 0.05 0.94
m3 3.50 5.45 0.05 0.95
m3 5.10 2.70 0.05 0.69
m3 5.10 3.4 0.05 0.87
m3 3.50 5.35 0.05 0.94
m3 3.50 5.45 0.05 0.95
m3 2.90 5.35 0.05 0.78
m3 2.90 5.45 0.05 0.79
TOTAL= 11.02

ISO(ENCOFRADO) LOSAS DEL 2D


 
Ancho Largo Parcial Item
OE.2.3.9.2 Encofrado de Losa
5.20 3.85 20.02
5.20 2.25 11.70
2.90 5.35 15.52
2.90 5.45 15.81
2.60 2.70 7.02
2.60 3.40 8.84
3.40 1.00 3.40
3.50 5.35 18.73
3.50 5.45 19.08
5.10 2.70 13.77
5.10 3.4 17.34
3.50 5.35 18.73
3.50 5.45 19.08
2.90 5.35 15.52
2.90 5.45 15.81
TOTAL= 220.33
CRETO M3

TOTAL

70.69

OFRADO M2

TOTAL

1413.69
LOSAS DEL 2DO,3ER,4TO Y 5TO PISO (CONCRETO)
 
N° Número
Descripción ELEMENTOS
UND Ancho Largo
de veces
E.2.3.9 Losas
E.2.3.9.1 Concreto
EJE A-B TRAMO 2-3 1 1 m3 5.20 3.85
EJE A-B TRAMO 2-3 1 1 m3 5.20 2.25
EJE A'-C' TRAMO 6-7 1 1 m3 2.90 5.35
EJE A'-C' TRAMO 7-9 1 1 m3 2.90 5.45
EJE B-C TRAMO 2-3 1 1 m3 2.60 2.70
EJE B-C TRAMO 2-3 1 1 m3 2.60 3.40
EJE C-D TRAMO 3-4 1 1 m3 3.40 1.00
EJE C'-B' TRAMO 6-7 1 1 m3 3.50 5.35
EJE C'-B' TRAMO 7-9 1 1 m3 3.50 5.45
EJE C-D TRAMO 2-3 1 1 m3 5.10 2.70
EJE C-D TRAMO 2-3 1 1 m3 5.10 3.4
EJE B'-C' TRAMO 6-7 1 1 m3 3.50 5.35
EJE B'-C' TRAMO 7-9 1 1 m3 3.50 5.45
EJE C'-D' TRAMO 6-7 1 1 m3 2.90 5.35
EJE C'-D' TRAMO 7-9 1 1 m3 2.90 5.45

LOSAS DEL 2DO,3ER,4TO Y 5TO(ENCOFRADO)


 

Descripción ELEMENTOS
UND Ancho Largo Parcial
E.2.3.9.2 Encofrado de Losa
EJE A-B TRAMO 2-3 1 m2 5.20 3.85 80.08
EJE A-B TRAMO 2-3 1 m2 5.20 2.25 46.80
EJE A'-C' TRAMO 6-7 1 m2 2.90 5.35 62.06
EJE A'-C' TRAMO 7-9 1 m2 2.90 5.45 63.22
EJE B-C TRAMO 2-3 1 m2 2.60 2.70 28.08
EJE B-C TRAMO 2-3 1 m2 2.60 3.40 35.36
EJE C-D TRAMO 3-4 1 m2 3.40 1.00 13.60
EJE C'-B' TRAMO 6-7 1 m2 3.50 5.35 74.90
EJE C'-B' TRAMO 7-9 1 m2 3.50 5.45 76.30
EJE C-D TRAMO 2-3 1 m2 5.10 2.70 55.08
EJE C-D TRAMO 2-3 1 m2 5.10 3.4 69.36
EJE B'-C' TRAMO 6-7 1 m2 3.50 5.35 74.90
EJE B'-C' TRAMO 7-9 1 m2 3.50 5.45 76.30
EJE C'-D' TRAMO 6-7 1 m2 2.90 5.35 62.06
EJE C'-D' TRAMO 7-9 1 m2 2.90 5.45 63.22
TOTAL= 881.32
CRETO)
Espesor TOTAL

0.05 4.00
0.05 2.34
0.05 3.10
0.05 3.16
0.05 1.40
0.05 1.77
0.05 0.68
0.05 3.75
0.05 3.82
0.05 2.75
0.05 3.47
0.05 3.75
0.05 3.82
0.05 3.10
0.05 3.16
TOTAL= 44.07