Análisis Granulométrico por Tamizado (MTC E 204)
Material : Mezcla Teórica de Agregados para Asfalto Certificado
Muestra : Mezcla-01 Hecho por
Cantera : Crushing y La Gloria Revisado por
Ubicación (Km.) : Planta de Asfalto Fecha : 01-May-16

Malla Especificacio
Porcentajes pasantes (%) Observaciones
Tamiz mm. nes
PIEDRAS ARENAS MAC - 2 Tamaño máximo
Agregados piedra 3/4" piedra 1/2" Arena Arena MEZCLA
CRUSHING CRUSHING Sarandeada Chancada
filler MTC

3/4" 1/2" SARANDEADA CHANCADA CEMENTO


Proporciones 100.0%
0.0% 25.0% 39.0% 29.0% 7.0% Curva Ideal
1" 25.400 100.000 100.00 100.0 100.0 100.0 100.0 100 - 100 100
3/4" 19.050 100.000 100.00 100.0 100.0 100.0 100.0 100 - 100 100
1/2" 12.700 0.873 88.20 95.8 100.0 100.0 95.4 80 - 100 90
3/8" 9.525 0.113 49.90 90.8 100.0 100.0 83.9 70 - 88 79
Nº 4 4.760 0.110 11.90 81.8 90.8 100.0 68.2 51 - 68 60
Nº 8 2.360 0.110 2.60 58.2 59.4 100.0 47.6
Nº 10 2.000 0.000 1.60 49.2 51.4 100.0 41.5 38 - 52 45
Nº 16 1.180 0.000 0.80 32.0 35.3 100.0 29.9
Nº 30 0.600 0.000 0.40 15.5 22.3 100.0 19.6
Nº 40 0.420 0.000 0.40 9.3 16.5 100.0 15.5 17 - 28 23
Nº 50 0.300 0.000 0.40 6.2 12.5 100.0 13.1
Nº 80 0.180 0.000 0.40 4.1 9.0 100.0 11.3 8 - 17 13
Nº 100 0.150 0.000 0.20 1.4 3.5 100.0 8.6
Nº 200 0.074 0.0 0.00 0.4 0.4 100.0 7.3 4 - 8 6
pasa 0.0 0.0 0.0 0.0
REPRESENTACIÓN GRÁFICA

% Q UE PASA EN PESO
CURVA GRANULOMÉTRICA

100

90

80

70

60

50

40

30

20

10

0
OBSERVACIONES :
100.000
10.000
0.100

1.000
0.010

2
1

ABERTURA (mm)
|
métrico por Tamizado (MTC E 204)

: 01-May-16

Observaciones
3/4"

difrencia
100.0
95.4
83.9
68.2
47.6
41.5

19.6
15.5
13.1
11.3
8.6
7.3

ESENTACIÓN GRÁFICA
% Q UE PASA EN PESO

CURVA GRANULOMÉTRICA
100.000
10.000
1.000

2
1

ABERTURA (mm)
PROYECTO
TRAMO
CONTRATISTA
SUPERVISIÓN

Análisis Granulométrico por Tamizado (MTC E 204)


Material Mezcla Teórica de Agregados para Asfalto Certificado
Muestra Mezcla-01 Hecho por
Cantera Crushing y La Gloria Revisado por
Ubicación (Km.)Planta de Asfalto Fecha
Malla Especifi-
Porcentajes pasantes (%) Observ
Tamiz mm. caciones
PIEDRA ARENAS Curva IV-B Tamaño máximo
Agregados piedra 3/4" piedra 1/2" Arena Arena MEZCLA
CRUSHING CRUSHING Sarandeada Chancada Instituto Asfalto

3/4" 1/2" SARANDEADA CHANCADA


Proporciones 93%
0% 25% 39.0% 29.0%
1" 25.400 100.0 100.0 100.0 100.0 curva ideal
3/4" 19.050 100.0 100.0 100.0 100.0 100.0 100 100
1/2" 12.700 0.9 88.2 95.8 100.0 95.4 80 - 100 90
3/8" 9.525 0.1 49.9 90.8 100.0 83.9 70 - 90 80
Nº 4 4.760 0.1 11.9 81.8 90.8 68.2 50 - 70 60
Nº 8 2.360 0.1 2.6 58.2 59.4 47.6 35 50 42
Nº 10 2.000 0.0 1.6 49.2 51.4 41.5
Nº 16 1.180 32.0 35.3 29.9
Nº 30 0.600 15.5 22.3 19.6 18 29 23
Nº 40 0.420 9.3 16.5 15.5
Nº 50 0.300 6.2 12.5 13.1 13 23 18
Nº 80 0.180 4.1 9.0 11.3
Nº 100 0.150 1.4 3.5 8.6 8 16 12
Nº 200 0.074 0.4 0.4 7.3 4 - 10 7
pasa
REPRESENTACIÓN GRÁFICA

CURVA GRANULOMÉTRICA

100

90

80

70

60

50

40

30
5
20

10

0
10.000
0.010

0.100

1.000
20

19

16
21

18

17

15

14

13

12

11

10

ABERTURA (mm)

OBSERVACIONES :
métrico por Tamizado (MTC E 204)
Certificado
Hecho por
Revisado por
Fecha : 01-May-16

Observaciones
Tamaño máximo 3/4"

curva ideal difrencia


100 0.0
90.0 5.4
80.0 3.9
60.0 8.2
47.6

7.0 0.3

ESENTACIÓN GRÁFICA
% Q UE PASA EN PESO

ANULOMÉTRICA
100.000
10.000
1.000
16

15

14

13

12

11

10

BERTURA (mm)
PROYECTO
TRAMO
CONTRATISTA
SUPERVISIÓN

Análisis Granulométrico por Tamizado (MTC E 204)


Material Mezcla Teórica de Agregados para Asfalto Certificado
Muestra Mezcla-01 Hecho por
Cantera Crushing y La Gloria Revisado por
Ubicación (Km.)Planta de Asfalto Fecha : 01-May-16
Malla Especifi-
Porcentajes pasantes (%) Observaciones
Tamiz mm. caciones
PIEDRA ARENAS ASTM Tamaño máximo 3/4"
Agregados piedra 3/4" piedra 1/2" Arena Arena MEZCLA
CRUSHING CRUSHING Sarandeada Chancada D 3515

3/4" 1/2" SARANDEADA CHANCADA


Proporciones 93% D-5
0.0% 25% 39.0% 29.0%
1" 25.400 100.0 100.0 100.0 100.0 93.0 curva ideal difrencia
3/4" 19.050 100.0 100.0 100.0 100.0 93.0 100 100 100 -7.0
1/2" 12.700 0.9 88.2 95.8 100.0 88.4 90 - 100 95 95.0 -6.6
3/8" 9.525 0.1 49.9 90.8 100.0 76.9
Nº 4 4.760 0.1 11.9 81.8 90.8 61.2 44 - 74 59 59.0 2.2
Nº 8 2.360 0.1 2.6 58.2 59.4 40.6 28 - 58 43 43.0 -2.4
Nº 10 2.000 0.0 1.6 49.2 51.4 34.5
Nº 16 1.180 32.0 35.3 22.7
Nº 30 0.600 15.5 22.3 12.5
Nº 40 0.420 9.3 16.5 8.4
Nº 50 0.300 6.2 12.5 6.0 5 - 21 13 13.0 -7.0
Nº 80 0.180 4.1 9.0 4.2
Nº 100 0.150 1.4 3.5 1.6
Nº 200 0.074 0.4 0.4 0.3 2 - 10 6 6.0 -5.7
pasa
REPRESENTACIÓN GRÁFICA

% Q UE PASA EN PESO
CURVA GRANULOMÉTRICA

100

90

80

70

60

50

40

30

20

10

0
100.000
10.000
0.010

0.100

1.000
21

20

19

18

17

16

14

12

11

10
15

13

ABERTURA (mm)

OBSERVACIONES :

ELIMINAR FINOS
PROYECTO
TRAMO
CONTRATISTA
SUPERVISIÓN

Análisis Granulométrico por Tamizado (MTC E 204)


Material Mezcla Teórica de Agregados para Asfalto
Muestra Mezcla-01
Cantera Crushing y La Gloria
Ubicación (Km.) Planta de Asfalto

Graduación Superpave para Agregado de tamaño máximo nominal de 12.5 mm.

Puntos Zona
Tamices de
Æ de Restricción
ASTM mm Æ 0,45

Control Min.
1" 25.40 4.287
3/4" 19.00 3.762 100.0
1/2" 12.50 3.116 100.0 90.0
3/8" 9.500 2.754
no 4 4.750 2.016
no 8 2.360 1.472 49.0 23.0 34.6
no 10 2.00 1.366
n 16 o
1.180 1.077 22.3
n 30 o
0.600 0.795 16.7
n 40 o
0.420 0.677
no 50 0.300 0.582 13.7
no 80 0.177 0.459
no 100 0.150 0.426
n 200o
0.075 0.312 8.0 2.0

100

90
% que pasa

80

70

60

50

40

30

20

10

Tamaño de Tamiz a la potencia 0.45 (mm)


10

Tamaño de Tamiz a la potencia 0.45 (mm)


étrico por Tamizado (MTC E 204)
Certificado
Hecho por
Revisado por
Fecha : 01-May-16

Agregado de tamaño máximo nominal de 12.5 mm.

Zona Fórmula

Tolerancia
de
Restricción de

Max. Mezcla
100.0
93.0
88.4
76.9
61.2 [6]
34.6 40.6 [6]
34.5
28.3 22.7
20.7 12.5 [4]
8.4
13.7 6.0 [3]
4.2
1.6
0.3 [2]
LA GLORIA (arena procesada),Cantera Crushing Lurin( piedra cha

LABORATORIO DE SUELOS, CONCRETO Y A

CALCULO DE PESOS POR MALLA - DISEÑO MA

% Asfalto 4.00 4.50 5.00 5.50 6.00 6.50 % Asfalto


Mat Mat
Malla Malla
1/2" 0.0 0.0 0.0 0.0 0.0 0.0 1/2"
3/8" 0.0 0.0 0.0 0.0 0.0 0.0 3/8"
CEMENTO

CEMENTO
#4 0.0 0.0 0.0 0.0 0.0 0.0 #4
# 10 0.0 0.0 0.0 0.0 0.0 0.0 # 10
< #10 84.0 83.6 83.1 82.7 82.3 81.8 < #10
SUB TOTAL 84.0 83.6 83.1 82.7 82.3 81.8 SUB TOTAL
1/2" 0.0 0.0 0.0 0.0 0.0 0.0 1/2"
3/8" 0.0 0.0 0.0 0.0 0.0 0.0 3/8"
Chancada

Chancada
#4 32.0 31.8 31.7 31.5 31.3 31.2 #4
Arena

Arena
# 10 137.1 136.4 135.7 135.0 134.3 133.5 # 10
< #10 178.9 177.9 177.0 176.1 175.1 174.2 < #10
SUB TOTAL 348.0 346.2 344.4 342.6 340.8 338.9 SUB TOTAL
3/4" 0.0 0.0 0.0 0.0 0.0 0.0 3/4"
1/2" 0.0 0.0 0.0 0.0 0.0 0.0 1/2"
Sarandeada

Sarandeada
3/8" 0.0 0.0 0.0 0.0 0.0 0.0 3/8"

Arena
Arena

#4 85.2 84.7 84.3 83.8 83.4 83.0 #4


# 10 152.6 151.8 151.0 150.2 149.4 148.6 # 10
< #10 230.3 229.1 227.9 226.7 225.5 224.3 < #10
SUB TOTAL 468.0 465.6 463.1 460.7 458.3 455.8 SUB TOTAL

3/4"
0.0 0.0 0.0 0.0 0.0 0.0 3/4"
35.4 35.2 35.0 34.8 34.7 34.5
CRUSHING

CRUSHING
1/2" 1/2"
piedra 1/2"

piedra 1/2"

3/8" 114.9 114.3 113.7 113.1 112.5 111.9 3/8"


#4 114.0 113.4 112.8 112.2 111.6 111.0 #4
# 10 27.9 27.8 27.6 27.5 27.3 27.2 # 10
< #10 7.8 7.8 7.7 7.7 7.6 7.6 < #10
SUB TOTAL 300.0 298.4 296.9 295.3 293.8 292.2 SUB TOTAL
3/4" 0.0 0.0 0.0 0.0 0.0 0.0 3/4"
1/2" 0.0 0.0 0.0 0.0 0.0 0.0 1/2"
CRUSHING

CRUSHING
piedra 3/4"

piedra 3/4"

3/8" 0.0 0.0 0.0 0.0 0.0 0.0 3/8"


#4 0.0 0.0 0.0 0.0 0.0 0.0 #4
# 10 0.0 0.0 0.0 0.0 0.0 0.0 # 10
< #10 0.0 0.0 0.0 0.0 0.0 0.0 < #10

SUB TOTAL 0.0 0.0 0.0 0.0 0.0 0.0 SUB TOTAL
1200.0 1193.8 1187.5 1181.3 1175.0 1168.8 TOTAL AGREGADOS
PEN 85-100 50.0 56.3 62.5 68.8 75.0 81.3 PEN 60 - 70
QUIMIBOND 0.0 0.0 0.0 0.0 0.0 0.0 CAL - FILLER
TOTAL MUESTRA 1250.0 1250.0 1250.0 1250.0 1250.0 1250.0 TOTAL MUESTRA

Arena
s

29.0
na

Chancada
re
Arena
Sarandeada natural 39.0
piedra piedra 3/4" CRUSHING 0.0
piedra piedra 1/2" CRUSHING 25.0
Total 100.0
urin( piedra chancada,arena chancada). 01-05-2016

OS, CONCRETO Y ASFALTO

MALLA - DISEÑO MARSHALL


OPTIMO
4.00 4.50 5.00 5.50 6.00 6.50
Peso Acumulado (gr)
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
84.0 83.6 83.1 82.7 82.3 81.8
84.0 83.6 83.1 82.7 82.3 81.8
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
32.0 31.8 31.7 31.5 31.3 31.2
169.1 168.2 167.4 166.5 165.6 164.7
348.0 346.2 344.4 342.6 340.8 338.9
348.0 346.2 344.4 342.6 340.8 338.9
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
85.2 84.7 84.3 83.8 83.4 83.0
237.7 236.5 235.3 234.0 232.8 231.6
468.0 465.6 463.1 460.7 458.3 455.8
468.0 465.6 463.1 460.7 458.3 455.8
0.0 0.0 0.0 0.0 0.0 0.0
35.4 35.2 35.0 34.8 34.7 34.5
150.3 149.5 148.7 148.0 147.2 146.4
264.3 262.9 261.5 260.2 258.8 257.4
292.2 290.7 289.2 287.6 286.1 284.6
300.0 298.4 296.9 295.3 293.8 292.2
300.0 298.4 296.9 295.3 293.8 292.2
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
1200.0 1193.8 1187.5 1181.3 1175.0 1168.8
50.0 56.3 62.5 68.8 75.0 81.3
0.0 0.0 0.0 0.0 0.0 0.0
1250.0 1250.0 1250.0 1250.0 1250.0 1250.0
DISEÑO : MAC-AC-001
REFERENCIA : MEZCLA ASFALTICA EN CALIENTE
FECHA : 24-11-2015

VACIOS
PESO UNITARIO
Peso Unitario Kg.

2.54 9

Vacíos %
8
2.53

7
2.52
6
2.51
5
2.5
4

2.49 3

2.48 2

2.47
1

0
2.46
4 4.5 5 5.5
4 4.5 5 5.5 6 6.5 7 % de C.A.
% de C.A.

FLUJO ESTABILIDAD
Estabilidad Kg.

5 1700
Flujo mm

1600
4

1500

3
1400

2
1300

1 1200

0 1100
4 4.5 5 5.5
4 4.5 5 5.5 6 6.5 7
% de C.A. % de C.A.
1400

2
1300

1 1200

1100
0
4 4.5 5 5.5
4 4.5 5 5.5 6 6.5 7
% de C.A. % de C.A.
DETERMINACION DEL OPTIMO CONTENIDO DE ASFALTO

VACIOS
V.M.A.

22
V.M.A. %

20

18

16

14

12

10
4.5 5 5.5 6 6.5 7
% de C.A. 4 0 4.5 5 5.5 6 6.5 7
% de C.A.

RESUMEN DE R
ESTABILIDAD
GOLPES POR LADO
CEMENTO ASFALTICO
PESO UNITARIO
VACIOS
V.M.A.
VACIOS LLENOS CON C.A.
FLUJO
ESTABILIDAD
Finos / Ligante
INDICE DE COMPACTIBILIDAD
ESTABILIDAD RETENIDA

4.5 5 5.5 6 6.5 7


% de C.A.
DOSIFICACION
Grava Chancada - Cantera Dorita
Arena Chancada - Cantera Dorita
4.5 5 5.5 6 6.5 7
Arena Procesada - Cantera La Gloria
% de C.A.
Asfalto Convencional Pen 60/70
Mejorador de Adherencia Quimibond 3000
NIDO DE ASFALTO
Vacíos LL en o s C.A . %

VACIOS LLENOS C.A.

100

90

80

70

60

50

40

30
6 6.5 7 4 4.5 5 5.5 6 6.5 7
% de C.A.

RESUMEN DE RESULTADOS
-0.20% OPTIMO % C.A. 0.20% ESPECIFICACION
75 75 75 75
5.30 5.60 5.90 (+/- 0.2%)
2.340 2.519 2.341
4.6 4.4 3.7 3 - 5
14.6 17.3 15.1 Mìn 14
69.0 74.6 74.9
3.4 3.05 3.9 2 - 4
1082 1504 1068 Mïn. 815
1.11 0.6 - 1.3 8
81.1 Mïn. 5 2.0
6.5 Mín. 75
42.0 %
43.0 %
15.0 %
5.60 %
0.5 %

%
1.05 0.09 0.12 0.12 0.10 0.07 0.01
2.432
4.0 4.5 5 5.5 6.0 0.0
C.A. 2.498 2.481 2.462 2.442 2.423
ASFALTO ABSORBIDO 0.09 0.12 0.12 0.10 0.07
C.A. 4.0 4.5 5 5.5 6.0
PESO UNITARIO 2.488 2.509 2.519 2.516 2.500
VACIOS 7.2 5.7 4.6 3.8 3.1
V.M.A. 17.4 17.1 17.2 17.8 18.7
V.LL.C.A. 58.6 66.8 73.3 78.5 83.4
FLUJO 2.40 2.60 3.00 3.30 3.60
ESTABILIDAD 1478 1525 1515 1425 1315
P. UNIT. V.LL.C.C.A.
5.60 2.519 5.60 74.6
5.60 2.15 5.60 0 RICE ASTM D-2041 VS % C.A. MAC-01
5.60 2.519 5.60 74.63
0 2.519 0 74.63
2.550
peso espicifico

VACIOS FLUJO
5.60 4.4 5.60 3.05
2.530
5.60 0.0 5.60 0
5.60 4.4 5.60 3.05
2.510
0 4.4 0 3.05
V.M.A. ESTABILIDAD 2.490 f(x) = − 0.0378 x + 2.6691
5.60 17.3 5.60 1504
5.60 0 5.60 0 2.470
5.60 17.3 5.60 1504
0 17.3 0 1504 2.450

2.430
5.60
5.60 2.410
5.60 4.5 4.7 4.9 5.1 5.3 5.5 5.7 5.9 6.1 6.3 6.5 6.7 6.9

5.60 % asfalto

14
3.6 RICE RICE ASTM D-2041 VS % C.A. MAC-01
2.563
1.7
7
ASFALTO

6.5
f(x) = − 26.4350453172208 x + 70.5619335347438
RICE ASTM D-2041 VS % C.A. MAC-01

7
1.05

% ASFALTO
6.5
f(x) = − 26.4350453172208 x + 70.5619335347438

5.5

4.5

4
2.410 2.430 2.450 2.470 2.490 2.510

Pu
% C.A. MAC-01

5.9 6.1 6.3 6.5 6.7 6.9 7.1 7.3 7.5

% asfalto

C.A. MAC-01

+ 70.5619335347438
C.A. MAC-01

+ 70.5619335347438 0.0

0.0

0.0

0.0

-23.2090 0.0

5.60 -66.799

63.1710

0 2.490 2.510 2.530 2.550

Pu
v

ASFALTO ABSORBIDO 0.09 0.12 0.12 0.10 0.07


C.A. 4.0 4.5 5 5.5 6.0 6.5
PESO UNITARIO 2.488 2.509 2.519 2.516 2.500 2.485
VACIOS 7.2 5.7 4.6 3.8 3.1 2.8
VMA 17.4 17.1 17.2 17.8 18.7 19.1
VFA 58.6 66.8 73.3 78.5 83.4 87.5
FLUJO 9.45 10.24 11.81 12.99 14.17 15.72
ESTABILIDAD 7.43 10.15 11.50 12.13 11.04 9.11
0.1 0.1 0.1 0.1 0.1 0.1

VACIOS PESO U

PESO UNITARIO
8.0 2.530
% VACIOS

7.0 2.520
6.0
2.510
5.0
2.500
4.0
2.490
3.0
2.480
2.0

1.0 2.470

0.0 2.460
3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 3.5 4.0 4.5 5
% ASFALTO %

VMA V
23.0 90.0
22.0
21.0 85.0
VMA

VFA

20.0 80.0
19.0
18.0 75.0
17.0
70.0
16.0
15.0 65.0
14.0
13.0 60.0
12.0
55.0
11.0
10.0 50.0
3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 3.5 4.0 4.5 5

% ASFALTO %

FLUJO ESTAB
ESTABILIDAD (KN)
FLUJO (0.01")

16.00 15.00

15.00 14.00
13.00
14.00
12.00
13.00
FLUJO ESTAB

ESTABILIDAD (KN)
FLUJO (0.01")
16.00 15.00

15.00 14.00
13.00
14.00
12.00
13.00
11.00
12.00 10.00

11.00 9.00
8.00
10.00
7.00
9.00
6.00
8.00 5.00
3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 3.5 4.0 4.5 5

% ASFALTO %
PESO UNITARIO

3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0


% ASFALTO

VFA

3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0

% ASFALTO

ESTABILIDAD
ESTABILIDAD

3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0

% ASFALTO

También podría gustarte