01 INFRAESTRUCTURA VIAL
01.01 OBRAS PROVISIONALES
01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA 3.60X2.40 CON GIGANTOGRAFIA UND 1.00 1.00 1.00 1.00

01.01.02 OFICINA DE RESIDENCIA, SEGURIDAD Y COMEDOR M2 1.00 10.00 5.00 50.00 50.00 50.00

01.01.03 CASETA DE ALMACEN Y GUARDIANIA M2 1.00 8.00 5.00 40.00 40.00 40.00

01.01.04 VESTUARIO PARA PERSONAL M2 1.00 5.00 3.00 15.00 15.00 15.00

01.01.05 ALQUILER DE BAÑO PORTATIL / INCLUYE MANTENIMIENTO MES 4.00 4.00 4.00 4.00

01.01.06 SUMINISTRO PROVISIONAL DE AGUA Y DESAGUE MES 4.00 4.00 4.00 4.00

01.01.07 SUMINISTRO PROVISIONAL DE ENERGIA ELECTRICA MES 4.00 4.00 4.00 4.00

01.01.08 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS GLB 1.00 1.00 1.00 1.00

01.02 SEGURIDAD Y SALUD


ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD
01.02.01 SERV 1.00 1.00 1.00 1.00
Y SALUD EN EL TRABAJO

01.02.02 EQUIPOS DE PROTECCION INDIVIDUAL UND 45.00 45.00 45.00 45.00

01.02.03 EQUIPOS DE PROTECCION COLECTIVA GLB 1.00 1.00 1.00 1.00

01.02.04 SEÑALIZACION TEMPORAL DE SEGURIDAD GLB 1.00 1.00 1.00 1.00

01.02.05 CAPACITACION EN SEGURIDAD Y SALUD GLB 1.00 1.00 1.00 1.00

01.02.06 RECURSOS DE RESPUESTA DE EMERGENCIA GLB 1.00 1.00 1.00 1.00

01.02.07 AGUA DE MESA PARA CONSUMO DE PERSONAL GLB 1.00 1.00 1.00 1.00

01.02.08 SERVICIO DE SEGURO COMPLEMENTARIO DE TRABAJO DE RIESGO MES 4.00 4.00 4.00 4.00

01.02.09 SERVICIO DE REVISIOM MEDICA PARA PERSONAL OBRERO GLB 1.00 1.00 1.00 1.00

01.03 PAVIMENTACION DE VÍAS


01.03.01 TRABAJOS PRELIMINARES
01.03.01.01 LIMPIEZA DE TERRENO MANUAL M2 51,695.41 51,695.41
ASOCIACION DE VIVIENDA FEDERICO BARRETO M2 5,046.71
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 1,326.12 1,326.12
CALLE 8 DE FEBRERO M2 1.00 AREA= 448.00 448.00
CALLE EL PORVENIR ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 1,395.91 1,395.91
CALLE CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 1,876.68 1,876.68
ASENTAMIENTO HUMANO FRANCISCO BOLOGNESI 38,020.83
AV. MIGUEL GRAU ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M2 1.00 AREA= 7,032.26 7,032.26
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. MARISCAL CASTILLA M2 1.00 AREA= 784.72 784.72
AV. CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. LO ANGELES M2 1.00 AREA= 5,103.00 5,103.00
AV. MARISCAL CASTILLA ENTRE CALLE CAHUIDE Y AV. CHORILLOS M2 1.00 AREA= 1,241.98 1,241.98
AV. JORGE CHAVEZ ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M2 1.00 AREA= 3,963.79 3,963.79
PASAJE FRANCISCO BOLOGNESI ENTRE CALLE CAHUIDE Y AV. CHORILLOS M2 1.00 AREA= 764.32 764.32
CALLE MOQUEGUA ENTRE AV. MIGUEL GRAU Y CALLE UGARTE M2 1.00 AREA= 2,642.00 2,642.00
PASAJE FEDERICO BARRETO - PASAJE N°01 - A M2 1.00 AREA= 352.08 352.08
PASAJE FEDERICO BARRETO - PASAJE N°02 - B M2 1.00 AREA= 447.61 447.61
PASAJE FEDERICO BARRETO - PASAJE N°03 - C M2 1.00 AREA= 247.25 247.25
CALLE MONITOR HUASCAR ENTRE AV. CHORILLOS Y CALLE CUSCO M2 1.00 AREA= 1,142.22 1,142.22
CALLE AREQUIPA M2 1.00 AREA= 969.30 969.30
CALLE CUSCO ENTRE CALLE MONITOR HUASCAR Y AV. LOS ANGELES M2 1.00 AREA= 958.18 958.18
CALLE UGARTE ENTRE AV. CHORILLOS Y CALLE PACIFICO M2 1.00 AREA= 1,631.31 1,631.31
CALLE PACIFICO M2 1.00 AREA= 359.50 359.50
CALLE ALTO DE LA ALIANZA M2 1.00 AREA= 395.36 395.36
CALLE OLLANTA M2 1.00 AREA= 276.00 276.00
AV- LOS ANGELES ENTRE CALLE CAHUIDE Y AV. JORGE BASADRE M2 1.00 AREA= 9,709.94 9,709.94
AMPLIACION BOLOGNESI M2 4,031.57
AV. CAROLINA REPETTI M2 1.00 AREA= 1,109.08 1,109.08
CALLE JUAN SEGOVIA M2 1.00 AREA= 659.10 659.10
CALLE CIRILO CARBAJAL ENTRE AV. INDUSTRIAL Y CALLE PUENTE ARNAO M2 1.00 AREA= 523.97 523.97
CALLE MIGUEL SOTTO ENTRE AV. CAROLINA REPETTI Y CALLE JUAN
M2 1.00 AREA= 192.62 192.62
SEGOVIA
PASAJE S/N M2 1.00 AREA= 104.28 104.28
CALLE MANUEL GODINEZ M2 1.00 AREA= 396.31 396.31
CALLE CANDARAVE M2 1.00 AREA= 419.34 419.34
PLANILLA DE METRADOS

ACTIVIDAD :MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA URBANIZACION LAS FRESIAS DISTRITO DE TACNA - PROVINCIA DE TACNA - REGIÓN TACNA

PROPIETA. : MUNICIPALIDAD PROVINCIAL DE TACNA


FECHA : ENERO DEL 2018

MEDIDAS
ITEM DESCRIPCION UND CANT PARCIAL SUBTOTAL TOTAL
L A H

CALLE PUENTE ARNAO ENTRE CALLE JUAN SEGOVIA Y AV. JORGE BASADRE
M2 1.00 AREA= 626.85 626.85
GROHMANN
URBANIZACION VELEZ M2 1,013.41
CALLE PUENTE ARNAO ENTRE AV. CAROLINA REPETTI Y CALLE JUAN
M2 1.00 AREA= 613.24 613.24
SEGOVIA
CALLE CIRILO CARBAJAL ENTRE CALLE PUENTE ARNAO Y PROLO. AV.
M2 1.00 AREA= 400.17 400.17
JORGE CHAVEZ
URBANIZACION LAS MAGNOLIAS M2 785.77
PASAJE LAS ORQUIDEAS M2 1.00 AREA= 440.30 440.30
PASAJE LOS LIRIOS M2 1.00 AREA= 165.45 165.45
CALLE LAS VIOLETAS M2 1.00 AREA= 180.02 180.02
URBANIZACION SEVERO VILDOSO M2 2,797.12
PASAJE N°16 M2 1.00 AREA= 484.34 484.34
PASAJE N°17 M2 1.00 AREA= 267.95 267.95
CALLE MONITOR HUASCAR ENTRE CALLE CUSCO Y AV. JORGE BASADRE
M2 1.00 AREA= 1,338.53 1,338.53
GROHMANN
CALLE CUSCO ENTRE PROL. AV. JORGE CHAVEZ Y CALLE MONITOR
M2 1.00 AREA= 706.30 706.30
HUASCAR

01.03.01.02 TRAZO NIVELES Y REPLANTEO M2 51,695.41 51,695.41


ASOCIACION DE VIVIENDA FEDERICO BARRETO M2 5,046.71
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 1,326.12 1,326.12
CALLE 8 DE FEBRERO M2 1.00 AREA= 448.00 448.00
CALLE EL PORVENIR ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 1,395.91 1,395.91
CALLE CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 1,876.68 1,876.68
ASENTAMIENTO HUMANO FRANCISCO BOLOGNESI 38,020.83
AV. MIGUEL GRAU ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M2 1.00 AREA= 7,032.26 7,032.26
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. MARISCAL CASTILLA M2 1.00 AREA= 784.72 784.72
AV. CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. LO ANGELES M2 1.00 AREA= 5,103.00 5,103.00
AV. MARISCAL CASTILLA ENTRE CALLE CAHUIDE Y AV. CHORILLOS M2 1.00 AREA= 1,241.98 1,241.98
AV. JORGE CHAVEZ ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M2 1.00 AREA= 3,963.79 3,963.79
PASAJE FRANCISCO BOLOGNESI ENTRE CALLE CAHUIDE Y AV. CHORILLOS M2 1.00 AREA= 764.32 764.32
CALLE MOQUEGUA ENTRE AV. MIGUEL GRAU Y CALLE UGARTE M2 1.00 AREA= 2,642.00 2,642.00
PASAJE FEDERICO BARRETO - PASAJE N°01 - A M2 1.00 AREA= 352.08 352.08
PASAJE FEDERICO BARRETO - PASAJE N°02 - B M2 1.00 AREA= 447.61 447.61
PASAJE FEDERICO BARRETO - PASAJE N°03 - C M2 1.00 AREA= 247.25 247.25
CALLE MONITOR HUASCAR ENTRE AV. CHORILLOS Y CALLE CUSCO M2 1.00 AREA= 1,142.22 1,142.22
CALLE AREQUIPA M2 1.00 AREA= 969.30 969.30
CALLE CUSCO ENTRE CALLE MONITOR HUASCAR Y AV. LOS ANGELES M2 1.00 AREA= 958.18 958.18
CALLE UGARTE ENTRE AV. CHORILLOS Y CALLE PACIFICO M2 1.00 AREA= 1,631.31 1,631.31
CALLE PACIFICO M2 1.00 AREA= 359.50 359.50
CALLE ALTO DE LA ALIANZA M2 1.00 AREA= 395.36 395.36
CALLE OLLANTA M2 1.00 AREA= 276.00 276.00
AV- LOS ANGELES ENTRE CALLE CAHUIDE Y AV. JORGE BASADRE M2 1.00 AREA= 9,709.94 9,709.94
AMPLIACION BOLOGNESI M2 4,031.57
AV. CAROLINA REPETTI M2 1.00 AREA= 1,109.08 1,109.08
CALLE JUAN SEGOVIA M2 1.00 AREA= 659.10 659.10
CALLE CIRILO CARBAJAL ENTRE AV. INDUSTRIAL Y CALLE PUENTE ARNAO M2 1.00 AREA= 523.97 523.97
CALLE MIGUEL SOTTO ENTRE AV. CAROLINA REPETTI Y CALLE JUAN
M2 1.00 AREA= 192.62 192.62
SEGOVIA
PASAJE S/N M2 1.00 AREA= 104.28 104.28
CALLE MANUEL GODINEZ M2 1.00 AREA= 396.31 396.31
CALLE CANDARAVE M2 1.00 AREA= 419.34 419.34
CALLE PUENTE ARNAO ENTRE CALLE JUAN SEGOVIA Y AV. JORGE BASADRE
M2 1.00 AREA= 626.85 626.85
GROHMANN
URBANIZACION VELEZ M2 1,013.41
CALLE PUENTE ARNAO ENTRE AV. CAROLINA REPETTI Y CALLE JUAN
M2 1.00 AREA= 613.24 613.24
SEGOVIA
CALLE CIRILO CARBAJAL ENTRE CALLE PUENTE ARNAO Y PROLO. AV.
M2 1.00 AREA= 400.17 400.17
JORGE CHAVEZ
URBANIZACION LAS MAGNOLIAS M2 785.77
PASAJE LAS ORQUIDEAS M2 1.00 AREA= 440.30 440.30
PASAJE LOS LIRIOS M2 1.00 AREA= 165.45 165.45
CALLE LAS VIOLETAS M2 1.00 AREA= 180.02 180.02
URBANIZACION SEVERO VILDOSO M2 2,797.12
PASAJE N°16 M2 1.00 AREA= 484.34 484.34
PASAJE N°17 M2 1.00 AREA= 267.95 267.95
CALLE MONITOR HUASCAR ENTRE CALLE CUSCO Y AV. JORGE BASADRE
M2 1.00 AREA= 1,338.53 1,338.53
GROHMANN
CALLE CUSCO ENTRE PROL. AV. JORGE CHAVEZ Y CALLE MONITOR
M2 1.00 AREA= 706.30 706.30
HUASCAR

01.03.01.03 CONTROL TOPOGRAFICO CON EQUIPO M2 51,695.41 51,695.41


ASOCIACION DE VIVIENDA FEDERICO BARRETO M2 5,046.71
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 1,326.12 1,326.12
CALLE 8 DE FEBRERO M2 1.00 AREA= 448.00 448.00
CALLE EL PORVENIR ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 1,395.91 1,395.91
CALLE CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 1,876.68 1,876.68
PLANILLA DE METRADOS

ACTIVIDAD :MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA URBANIZACION LAS FRESIAS DISTRITO DE TACNA - PROVINCIA DE TACNA - REGIÓN TACNA

PROPIETA. : MUNICIPALIDAD PROVINCIAL DE TACNA


FECHA : ENERO DEL 2018

MEDIDAS
ITEM DESCRIPCION UND CANT PARCIAL SUBTOTAL TOTAL
L A H

ASENTAMIENTO HUMANO FRANCISCO BOLOGNESI 38,020.83


AV. MIGUEL GRAU ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M2 1.00 AREA= 7,032.26 7,032.26
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. MARISCAL CASTILLA M2 1.00 AREA= 784.72 784.72
AV. CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. LO ANGELES M2 1.00 AREA= 5,103.00 5,103.00
AV. MARISCAL CASTILLA ENTRE CALLE CAHUIDE Y AV. CHORILLOS M2 1.00 AREA= 1,241.98 1,241.98
AV. JORGE CHAVEZ ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M2 1.00 AREA= 3,963.79 3,963.79
PASAJE FRANCISCO BOLOGNESI ENTRE CALLE CAHUIDE Y AV. CHORILLOS M2 1.00 AREA= 764.32 764.32
CALLE MOQUEGUA ENTRE AV. MIGUEL GRAU Y CALLE UGARTE M2 1.00 AREA= 2,642.00 2,642.00
PASAJE FEDERICO BARRETO - PASAJE N°01 - A M2 1.00 AREA= 352.08 352.08
PASAJE FEDERICO BARRETO - PASAJE N°02 - B M2 1.00 AREA= 447.61 447.61
PASAJE FEDERICO BARRETO - PASAJE N°03 - C M2 1.00 AREA= 247.25 247.25
CALLE MONITOR HUASCAR ENTRE AV. CHORILLOS Y CALLE CUSCO M2 1.00 AREA= 1,142.22 1,142.22
CALLE AREQUIPA M2 1.00 AREA= 969.30 969.30
CALLE CUSCO ENTRE CALLE MONITOR HUASCAR Y AV. LOS ANGELES M2 1.00 AREA= 958.18 958.18
CALLE UGARTE ENTRE AV. CHORILLOS Y CALLE PACIFICO M2 1.00 AREA= 1,631.31 1,631.31
CALLE PACIFICO M2 1.00 AREA= 359.50 359.50
CALLE ALTO DE LA ALIANZA M2 1.00 AREA= 395.36 395.36
CALLE OLLANTA M2 1.00 AREA= 276.00 276.00
AV- LOS ANGELES ENTRE CALLE CAHUIDE Y AV. JORGE BASADRE M2 1.00 AREA= 9,709.94 9,709.94
AMPLIACION BOLOGNESI M2 4,031.57
AV. CAROLINA REPETTI M2 1.00 AREA= 1,109.08 1,109.08
CALLE JUAN SEGOVIA M2 1.00 AREA= 659.10 659.10
CALLE CIRILO CARBAJAL ENTRE AV. INDUSTRIAL Y CALLE PUENTE ARNAO M2 1.00 AREA= 523.97 523.97
CALLE MIGUEL SOTTO ENTRE AV. CAROLINA REPETTI Y CALLE JUAN
M2 1.00 AREA= 192.62 192.62
SEGOVIA
PASAJE S/N M2 1.00 AREA= 104.28 104.28
CALLE MANUEL GODINEZ M2 1.00 AREA= 396.31 396.31
CALLE CANDARAVE M2 1.00 AREA= 419.34 419.34
CALLE PUENTE ARNAO ENTRE CALLE JUAN SEGOVIA Y AV. JORGE BASADRE
M2 1.00 AREA= 626.85 626.85
GROHMANN
URBANIZACION VELEZ M2 1,013.41
CALLE PUENTE ARNAO ENTRE AV. CAROLINA REPETTI Y CALLE JUAN
M2 1.00 AREA= 613.24 613.24
SEGOVIA
CALLE CIRILO CARBAJAL ENTRE CALLE PUENTE ARNAO Y PROLO. AV.
M2 1.00 AREA= 400.17 400.17
JORGE CHAVEZ
URBANIZACION LAS MAGNOLIAS M2 785.77
PASAJE LAS ORQUIDEAS M2 1.00 AREA= 440.30 440.30
PASAJE LOS LIRIOS M2 1.00 AREA= 165.45 165.45
CALLE LAS VIOLETAS M2 1.00 AREA= 180.02 180.02
URBANIZACION SEVERO VILDOSO M2 2,797.12
PASAJE N°16 M2 1.00 AREA= 484.34 484.34
PASAJE N°17 M2 1.00 AREA= 267.95 267.95
CALLE MONITOR HUASCAR ENTRE CALLE CUSCO Y AV. JORGE BASADRE
M2 1.00 AREA= 1,338.53 1,338.53
GROHMANN
CALLE CUSCO ENTRE PROL. AV. JORGE CHAVEZ Y CALLE MONITOR
M2 1.00 AREA= 706.30 706.30
HUASCAR

01.03.02 MOVIMIENTO DE TIERRAS


01.03.02.01 CORTE DE TERRENO CON MAQUINARIA M3 20,678.16
VIAS ASFALTADAS - NUEVO 20,678.16
ASOCIACION DE VIVIENDA FEDERICO BARRETO 2,018.69
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M3 1.00 VOL= 530.45 530.45
CALLE 8 DE FEBRERO M3 1.00 VOL= 179.20 179.20
CALLE EL PORVENIR ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M3 1.00 VOL= 558.37 558.37
CALLE CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M3 1.00 VOL= 750.67 750.67
ASENTAMIENTO HUMANO FRANCISCO BOLOGNESI 15,208.33
AV. MIGUEL GRAU ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M3 1.00 VOL= 2,812.90 2,812.90
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. MARISCAL CASTILLA M3 1.00 VOL= 313.89 313.89
AV. CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. LO ANGELES M3 1.00 VOL= 2,041.20 2,041.20
AV. MARISCAL CASTILLA ENTRE CALLE CAHUIDE Y AV. CHORILLOS M3 1.00 VOL= 496.79 496.79
AV. JORGE CHAVEZ ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M3 1.00 VOL= 1,585.52 1,585.52
PASAJE FRANCISCO BOLOGNESI ENTRE CALLE CAHUIDE Y AV. CHORILLOS M3 1.00 VOL= 305.73 305.73
CALLE MOQUEGUA ENTRE AV. MIGUEL GRAU Y CALLE UGARTE M3 1.00 VOL= 1,056.80 1,056.80
PASAJE FEDERICO BARRETO - PASAJE N°01 - A M3 1.00 VOL= 140.83 140.83
PASAJE FEDERICO BARRETO - PASAJE N°02 - B M3 1.00 VOL= 179.04 179.04
PASAJE FEDERICO BARRETO - PASAJE N°03 - C M3 1.00 VOL= 98.90 98.90
CALLE MONITOR HUASCAR ENTRE AV. CHORILLOS Y CALLE CUSCO M3 1.00 VOL= 456.89 456.89
CALLE AREQUIPA M3 1.00 VOL= 387.72 387.72
CALLE CUSCO ENTRE CALLE MONITOR HUASCAR Y AV. LOS ANGELES M3 1.00 VOL= 383.27 383.27
CALLE UGARTE ENTRE AV. CHORILLOS Y CALLE PACIFICO M3 1.00 VOL= 652.52 652.52
CALLE PACIFICO M3 1.00 VOL= 143.80 143.80
CALLE ALTO DE LA ALIANZA M3 1.00 VOL= 158.14 158.14
CALLE OLLANTA M3 1.00 VOL= 110.40 110.40
AV- LOS ANGELES ENTRE CALLE CAHUIDE Y AV. JORGE BASADRE M3 1.00 VOL= 3,883.98 3,883.98
AMPLIACION BOLOGNESI 1,612.63
AV. CAROLINA REPETTI M3 1.00 VOL= 443.63 443.63
PLANILLA DE METRADOS

ACTIVIDAD :MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA URBANIZACION LAS FRESIAS DISTRITO DE TACNA - PROVINCIA DE TACNA - REGIÓN TACNA

PROPIETA. : MUNICIPALIDAD PROVINCIAL DE TACNA


FECHA : ENERO DEL 2018

MEDIDAS
ITEM DESCRIPCION UND CANT PARCIAL SUBTOTAL TOTAL
L A H

CALLE JUAN SEGOVIA M3 1.00 VOL= 263.64 263.64


CALLE CIRILO CARBAJAL ENTRE AV. INDUSTRIAL Y CALLE PUENTE ARNAO M3 1.00 VOL= 209.59 209.59
CALLE MIGUEL SOTTO ENTRE AV. CAROLINA REPETTI Y CALLE JUAN
M3 1.00 VOL= 77.05 77.05
SEGOVIA
PASAJE S/N M3 1.00 VOL= 41.71 41.71
CALLE MANUEL GODINEZ M3 1.00 VOL= 158.52 158.52
CALLE CANDARAVE M3 1.00 VOL= 167.74 167.74
CALLE PUENTE ARNAO ENTRE CALLE JUAN SEGOVIA Y AV. JORGE BASADRE
M3 1.00 VOL= 250.74 250.74
GROHMANN
URBANIZACION VELEZ 405.36
CALLE PUENTE ARNAO ENTRE AV. CAROLINA REPETTI Y CALLE JUAN
M3 1.00 VOL= 245.30 245.30
SEGOVIA
CALLE CIRILO CARBAJAL ENTRE CALLE PUENTE ARNAO Y PROLO. AV.
M3 1.00 VOL= 160.07 160.07
JORGE CHAVEZ
URBANIZACION LAS MAGNOLIAS 1,433.15
PASAJE LAS ORQUIDEAS M3 1.00 VOL= 176.12 176.12
PASAJE LOS LIRIOS M3 1.00 VOL= 66.18 66.18
CALLE LAS VIOLETAS M3 1.00 VOL= 72.01 72.01
URBANIZACION SEVERO VILDOSO
PASAJE N°16 M3 1.00 VOL= 193.74 193.74
PASAJE N°17 M3 1.00 VOL= 107.18 107.18
CALLE MONITOR HUASCAR ENTRE CALLE CUSCO Y AV. JORGE BASADRE
M3 1.00 VOL= 535.41 535.41
GROHMANN
CALLE CUSCO ENTRE PROL. AV. JORGE CHAVEZ Y CALLE MONITOR
M3 1.00 VOL= 282.52 282.52
HUASCAR

01.03.02.02 ACARREO DE MATERIAL EXCEDENTE C/MAQUINARIA M3 25,847.70


VIAS ASFALTADAS - NUEVO 25,847.70
CORTE DE TERRENO EN VÍA M2 1.00 VOL= 20,678.16 20,678.16
Factor de Esponjamiento 25% M2 0.25 VOL= 20,678.16 5,169.54

01.03.02.03 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA M3 25,847.70


VIAS ASFALTADAS - NUEVO 25,847.70
CORTE DE TERRENO EN VÍA M2 1.00 VOL= 20,678.16 20,678.16
Factor de Esponjamiento 25% M2 0.25 VOL= 20,678.16 5,169.54

01.03.02.04 PERFILADO Y COMPACTADO DE LA SUBRASANTE C/MAQUINARIA M2 51,695.41


VIAS ASFALTADAS - NUEVO 51,695.41
ASOCIACION DE VIVIENDA FEDERICO BARRETO M2 5,046.71
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 1,326.12 1,326.12
CALLE 8 DE FEBRERO M2 1.00 AREA= 448.00 448.00
CALLE EL PORVENIR ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 1,395.91 1,395.91
CALLE CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 1,876.68 1,876.68
ASENTAMIENTO HUMANO FRANCISCO BOLOGNESI M2 38,020.83
AV. MIGUEL GRAU ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M2 1.00 AREA= 7,032.26 7,032.26
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. MARISCAL CASTILLA M2 1.00 AREA= 784.72 784.72
AV. CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. LO ANGELES M2 1.00 AREA= 5,103.00 5,103.00
AV. MARISCAL CASTILLA ENTRE CALLE CAHUIDE Y AV. CHORILLOS M2 1.00 AREA= 1,241.98 1,241.98
AV. JORGE CHAVEZ ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M2 1.00 AREA= 3,963.79 3,963.79
PASAJE FRANCISCO BOLOGNESI ENTRE CALLE CAHUIDE Y AV. CHORILLOS M2 1.00 AREA= 764.32 764.32
CALLE MOQUEGUA ENTRE AV. MIGUEL GRAU Y CALLE UGARTE M2 1.00 AREA= 2,642.00 2,642.00
PASAJE FEDERICO BARRETO - PASAJE N°01 - A M2 1.00 AREA= 352.08 352.08
PASAJE FEDERICO BARRETO - PASAJE N°02 - B M2 1.00 AREA= 447.61 447.61
PASAJE FEDERICO BARRETO - PASAJE N°03 - C M2 1.00 AREA= 247.25 247.25
CALLE MONITOR HUASCAR ENTRE AV. CHORILLOS Y CALLE CUSCO M2 1.00 AREA= 1,142.22 1,142.22
CALLE AREQUIPA M2 1.00 AREA= 969.30 969.30
CALLE CUSCO ENTRE CALLE MONITOR HUASCAR Y AV. LOS ANGELES M2 1.00 AREA= 958.18 958.18
CALLE UGARTE ENTRE AV. CHORILLOS Y CALLE PACIFICO M2 1.00 AREA= 1,631.31 1,631.31
CALLE PACIFICO M2 1.00 AREA= 359.50 359.50
CALLE ALTO DE LA ALIANZA M2 1.00 AREA= 395.36 395.36
CALLE OLLANTA M2 1.00 AREA= 276.00 276.00
AV- LOS ANGELES ENTRE CALLE CAHUIDE Y AV. JORGE BASADRE M2 1.00 AREA= 9,709.94 9,709.94
AMPLIACION BOLOGNESI M2 4,031.57
AV. CAROLINA REPETTI M2 1.00 AREA= 1,109.08 1,109.08
CALLE JUAN SEGOVIA M2 1.00 AREA= 659.10 659.10
CALLE CIRILO CARBAJAL ENTRE AV. INDUSTRIAL Y CALLE PUENTE ARNAO M2 1.00 AREA= 523.97 523.97
CALLE MIGUEL SOTTO ENTRE AV. CAROLINA REPETTI Y CALLE JUAN
M2 1.00 AREA= 192.62 192.62
SEGOVIA
PASAJE S/N M2 1.00 AREA= 104.28 104.28
CALLE MANUEL GODINEZ M2 1.00 AREA= 396.31 396.31
CALLE CANDARAVE M2 1.00 AREA= 419.34 419.34
CALLE PUENTE ARNAO ENTRE CALLE JUAN SEGOVIA Y AV. JORGE BASADRE
M2 1.00 AREA= 626.85 626.85
GROHMANN
URBANIZACION VELEZ M2 1,013.41
CALLE PUENTE ARNAO ENTRE AV. CAROLINA REPETTI Y CALLE JUAN
M2 1.00 AREA= 613.24 613.24
SEGOVIA
PLANILLA DE METRADOS

ACTIVIDAD :MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA URBANIZACION LAS FRESIAS DISTRITO DE TACNA - PROVINCIA DE TACNA - REGIÓN TACNA

PROPIETA. : MUNICIPALIDAD PROVINCIAL DE TACNA


FECHA : ENERO DEL 2018

MEDIDAS
ITEM DESCRIPCION UND CANT PARCIAL SUBTOTAL TOTAL
L A H

CALLE CIRILO CARBAJAL ENTRE CALLE PUENTE ARNAO Y PROLO. AV.


M2 1.00 AREA= 400.17 400.17
JORGE CHAVEZ
URBANIZACION LAS MAGNOLIAS M2 785.77
PASAJE LAS ORQUIDEAS M2 1.00 AREA= 440.30 440.30
PASAJE LOS LIRIOS M2 1.00 AREA= 165.45 165.45
CALLE LAS VIOLETAS M2 1.00 AREA= 180.02 180.02
URBANIZACION SEVERO VILDOSO M2 2,797.12
PASAJE N°16 M2 1.00 AREA= 484.34 484.34
PASAJE N°17 M2 1.00 AREA= 267.95 267.95
CALLE MONITOR HUASCAR ENTRE CALLE CUSCO Y AV. JORGE BASADRE
M2 1.00 AREA= 1,338.53 1,338.53
GROHMANN
CALLE CUSCO ENTRE PROL. AV. JORGE CHAVEZ Y CALLE MONITOR
M2 1.00 AREA= 706.30 706.30
HUASCAR

01.03.02.05 SUB-BASE GRANULAR E=0.25 M C/EQUIPO M3 51,695.41


VIAS ASFALTADAS - NUEVO 51,695.41
ASOCIACION DE VIVIENDA FEDERICO BARRETO M2 5,046.71
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 1,326.12 1,326.12
CALLE 8 DE FEBRERO M2 1.00 AREA= 448.00 448.00
CALLE EL PORVENIR ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 1,395.91 1,395.91
CALLE CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 1,876.68 1,876.68
ASENTAMIENTO HUMANO FRANCISCO BOLOGNESI M2 38,020.83
AV. MIGUEL GRAU ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M2 1.00 AREA= 7,032.26 7,032.26
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. MARISCAL CASTILLA M2 1.00 AREA= 784.72 784.72
AV. CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. LO ANGELES M2 1.00 AREA= 5,103.00 5,103.00
AV. MARISCAL CASTILLA ENTRE CALLE CAHUIDE Y AV. CHORILLOS M2 1.00 AREA= 1,241.98 1,241.98
AV. JORGE CHAVEZ ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M2 1.00 AREA= 3,963.79 3,963.79
PASAJE FRANCISCO BOLOGNESI ENTRE CALLE CAHUIDE Y AV. CHORILLOS M2 1.00 AREA= 764.32 764.32
CALLE MOQUEGUA ENTRE AV. MIGUEL GRAU Y CALLE UGARTE M2 1.00 AREA= 2,642.00 2,642.00
PASAJE FEDERICO BARRETO - PASAJE N°01 - A M2 1.00 AREA= 352.08 352.08
PASAJE FEDERICO BARRETO - PASAJE N°02 - B M2 1.00 AREA= 447.61 447.61
PASAJE FEDERICO BARRETO - PASAJE N°03 - C M2 1.00 AREA= 247.25 247.25
CALLE MONITOR HUASCAR ENTRE AV. CHORILLOS Y CALLE CUSCO M2 1.00 AREA= 1,142.22 1,142.22
CALLE AREQUIPA M2 1.00 AREA= 969.30 969.30
CALLE CUSCO ENTRE CALLE MONITOR HUASCAR Y AV. LOS ANGELES M2 1.00 AREA= 958.18 958.18
CALLE UGARTE ENTRE AV. CHORILLOS Y CALLE PACIFICO M2 1.00 AREA= 1,631.31 1,631.31
CALLE PACIFICO M2 1.00 AREA= 359.50 359.50
CALLE ALTO DE LA ALIANZA M2 1.00 AREA= 395.36 395.36
CALLE OLLANTA M2 1.00 AREA= 276.00 276.00
AV- LOS ANGELES ENTRE CALLE CAHUIDE Y AV. JORGE BASADRE M2 1.00 AREA= 9,709.94 9,709.94
AMPLIACION BOLOGNESI M2 4,031.57
AV. CAROLINA REPETTI M2 1.00 AREA= 1,109.08 1,109.08
CALLE JUAN SEGOVIA M2 1.00 AREA= 659.10 659.10
CALLE CIRILO CARBAJAL ENTRE AV. INDUSTRIAL Y CALLE PUENTE ARNAO M2 1.00 AREA= 523.97 523.97
CALLE MIGUEL SOTTO ENTRE AV. CAROLINA REPETTI Y CALLE JUAN
M2 1.00 AREA= 192.62 192.62
SEGOVIA
PASAJE S/N M2 1.00 AREA= 104.28 104.28
CALLE MANUEL GODINEZ M2 1.00 AREA= 396.31 396.31
CALLE CANDARAVE M2 1.00 AREA= 419.34 419.34
CALLE PUENTE ARNAO ENTRE CALLE JUAN SEGOVIA Y AV. JORGE BASADRE
M2 1.00 AREA= 626.85 626.85
GROHMANN
URBANIZACION VELEZ M2 1,013.41
CALLE PUENTE ARNAO ENTRE AV. CAROLINA REPETTI Y CALLE JUAN
M2 1.00 AREA= 613.24 613.24
SEGOVIA
CALLE CIRILO CARBAJAL ENTRE CALLE PUENTE ARNAO Y PROLO. AV.
M2 1.00 AREA= 400.17 400.17
JORGE CHAVEZ
URBANIZACION LAS MAGNOLIAS M2 785.77
PASAJE LAS ORQUIDEAS M2 1.00 AREA= 440.30 440.30
PASAJE LOS LIRIOS M2 1.00 AREA= 165.45 165.45
CALLE LAS VIOLETAS M2 1.00 AREA= 180.02 180.02
URBANIZACION SEVERO VILDOSO M2 2,797.12
PASAJE N°16 M2 1.00 AREA= 484.34 484.34
PASAJE N°17 M2 1.00 AREA= 267.95 267.95
CALLE MONITOR HUASCAR ENTRE CALLE CUSCO Y AV. JORGE BASADRE
M2 1.00 AREA= 1,338.53 1,338.53
GROHMANN
CALLE CUSCO ENTRE PROL. AV. JORGE CHAVEZ Y CALLE MONITOR
M2 1.00 AREA= 706.30 706.30
HUASCAR

01.03.02.06 BASE GRANULAR E=0.15 M C/EQUIPO M3 51,695.41


VIAS ASFALTADAS - NUEVO 51,695.41
ASOCIACION DE VIVIENDA FEDERICO BARRETO M2 5,046.71
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 1,326.12 1,326.12
CALLE 8 DE FEBRERO M2 1.00 AREA= 448.00 448.00
CALLE EL PORVENIR ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 1,395.91 1,395.91
CALLE CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 1,876.68 1,876.68
ASENTAMIENTO HUMANO FRANCISCO BOLOGNESI M2 38,020.83
AV. MIGUEL GRAU ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M2 1.00 AREA= 7,032.26 7,032.26
PLANILLA DE METRADOS

ACTIVIDAD :MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA URBANIZACION LAS FRESIAS DISTRITO DE TACNA - PROVINCIA DE TACNA - REGIÓN TACNA

PROPIETA. : MUNICIPALIDAD PROVINCIAL DE TACNA


FECHA : ENERO DEL 2018

MEDIDAS
ITEM DESCRIPCION UND CANT PARCIAL SUBTOTAL TOTAL
L A H

PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. MARISCAL CASTILLA M2 1.00 AREA= 784.72 784.72
AV. CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. LO ANGELES M2 1.00 AREA= 5,103.00 5,103.00
AV. MARISCAL CASTILLA ENTRE CALLE CAHUIDE Y AV. CHORILLOS M2 1.00 AREA= 1,241.98 1,241.98
AV. JORGE CHAVEZ ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M2 1.00 AREA= 3,963.79 3,963.79
PASAJE FRANCISCO BOLOGNESI ENTRE CALLE CAHUIDE Y AV. CHORILLOS M2 1.00 AREA= 764.32 764.32
CALLE MOQUEGUA ENTRE AV. MIGUEL GRAU Y CALLE UGARTE M2 1.00 AREA= 2,642.00 2,642.00
PASAJE FEDERICO BARRETO - PASAJE N°01 - A M2 1.00 AREA= 352.08 352.08
PASAJE FEDERICO BARRETO - PASAJE N°02 - B M2 1.00 AREA= 447.61 447.61
PASAJE FEDERICO BARRETO - PASAJE N°03 - C M2 1.00 AREA= 247.25 247.25
CALLE MONITOR HUASCAR ENTRE AV. CHORILLOS Y CALLE CUSCO M2 1.00 AREA= 1,142.22 1,142.22
CALLE AREQUIPA M2 1.00 AREA= 969.30 969.30
CALLE CUSCO ENTRE CALLE MONITOR HUASCAR Y AV. LOS ANGELES M2 1.00 AREA= 958.18 958.18
CALLE UGARTE ENTRE AV. CHORILLOS Y CALLE PACIFICO M2 1.00 AREA= 1,631.31 1,631.31
CALLE PACIFICO M2 1.00 AREA= 359.50 359.50
CALLE ALTO DE LA ALIANZA M2 1.00 AREA= 395.36 395.36
CALLE OLLANTA M2 1.00 AREA= 276.00 276.00
AV- LOS ANGELES ENTRE CALLE CAHUIDE Y AV. JORGE BASADRE M2 1.00 AREA= 9,709.94 9,709.94
AMPLIACION BOLOGNESI M2 4,031.57
AV. CAROLINA REPETTI M2 1.00 AREA= 1,109.08 1,109.08
CALLE JUAN SEGOVIA M2 1.00 AREA= 659.10 659.10
CALLE CIRILO CARBAJAL ENTRE AV. INDUSTRIAL Y CALLE PUENTE ARNAO M2 1.00 AREA= 523.97 523.97
CALLE MIGUEL SOTTO ENTRE AV. CAROLINA REPETTI Y CALLE JUAN
M2 1.00 AREA= 192.62 192.62
SEGOVIA
PASAJE S/N M2 1.00 AREA= 104.28 104.28
CALLE MANUEL GODINEZ M2 1.00 AREA= 396.31 396.31
CALLE CANDARAVE M2 1.00 AREA= 419.34 419.34
CALLE PUENTE ARNAO ENTRE CALLE JUAN SEGOVIA Y AV. JORGE BASADRE
M2 1.00 AREA= 626.85 626.85
GROHMANN
URBANIZACION VELEZ M2 1,013.41
CALLE PUENTE ARNAO ENTRE AV. CAROLINA REPETTI Y CALLE JUAN
M2 1.00 AREA= 613.24 613.24
SEGOVIA
CALLE CIRILO CARBAJAL ENTRE CALLE PUENTE ARNAO Y PROLO. AV.
M2 1.00 AREA= 400.17 400.17
JORGE CHAVEZ
URBANIZACION LAS MAGNOLIAS M2 785.77
PASAJE LAS ORQUIDEAS M2 1.00 AREA= 440.30 440.30
PASAJE LOS LIRIOS M2 1.00 AREA= 165.45 165.45
CALLE LAS VIOLETAS M2 1.00 AREA= 180.02 180.02
URBANIZACION SEVERO VILDOSO M2 2,797.12
PASAJE N°16 M2 1.00 AREA= 484.34 484.34
PASAJE N°17 M2 1.00 AREA= 267.95 267.95
CALLE MONITOR HUASCAR ENTRE CALLE CUSCO Y AV. JORGE BASADRE
M2 1.00 AREA= 1,338.53 1,338.53
GROHMANN
CALLE CUSCO ENTRE PROL. AV. JORGE CHAVEZ Y CALLE MONITOR
M2 1.00 AREA= 706.30 706.30
HUASCAR

01.03.03 PAVIMENTO FLEXIBLE


01.03.03.01 IMPRIMACION ASFALTICA C/EQUIPO M2 51,695.41
VIAS ASFALTADAS - NUEVO 51,695.41
ASOCIACION DE VIVIENDA FEDERICO BARRETO M2 5,046.71
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 1,326.12 1,326.12
CALLE 8 DE FEBRERO M2 1.00 AREA= 448.00 448.00
CALLE EL PORVENIR ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 1,395.91 1,395.91
CALLE CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 1,876.68 1,876.68
ASENTAMIENTO HUMANO FRANCISCO BOLOGNESI M2 38,020.83
AV. MIGUEL GRAU ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M2 1.00 AREA= 7,032.26 7,032.26
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. MARISCAL CASTILLA M2 1.00 AREA= 784.72 784.72
AV. CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. LO ANGELES M2 1.00 AREA= 5,103.00 5,103.00
AV. MARISCAL CASTILLA ENTRE CALLE CAHUIDE Y AV. CHORILLOS M2 1.00 AREA= 1,241.98 1,241.98
AV. JORGE CHAVEZ ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M2 1.00 AREA= 3,963.79 3,963.79
PASAJE FRANCISCO BOLOGNESI ENTRE CALLE CAHUIDE Y AV. CHORILLOS M2 1.00 AREA= 764.32 764.32
CALLE MOQUEGUA ENTRE AV. MIGUEL GRAU Y CALLE UGARTE M2 1.00 AREA= 2,642.00 2,642.00
PASAJE FEDERICO BARRETO - PASAJE N°01 - A M2 1.00 AREA= 352.08 352.08
PASAJE FEDERICO BARRETO - PASAJE N°02 - B M2 1.00 AREA= 447.61 447.61
PASAJE FEDERICO BARRETO - PASAJE N°03 - C M2 1.00 AREA= 247.25 247.25
CALLE MONITOR HUASCAR ENTRE AV. CHORILLOS Y CALLE CUSCO M2 1.00 AREA= 1,142.22 1,142.22
CALLE AREQUIPA M2 1.00 AREA= 969.30 969.30
CALLE CUSCO ENTRE CALLE MONITOR HUASCAR Y AV. LOS ANGELES M2 1.00 AREA= 958.18 958.18
CALLE UGARTE ENTRE AV. CHORILLOS Y CALLE PACIFICO M2 1.00 AREA= 1,631.31 1,631.31
CALLE PACIFICO M2 1.00 AREA= 359.50 359.50
CALLE ALTO DE LA ALIANZA M2 1.00 AREA= 395.36 395.36
CALLE OLLANTA M2 1.00 AREA= 276.00 276.00
AV- LOS ANGELES ENTRE CALLE CAHUIDE Y AV. JORGE BASADRE M2 1.00 AREA= 9,709.94 9,709.94
AMPLIACION BOLOGNESI M2 4,031.57
AV. CAROLINA REPETTI M2 1.00 AREA= 1,109.08 1,109.08
CALLE JUAN SEGOVIA M2 1.00 AREA= 659.10 659.10
CALLE CIRILO CARBAJAL ENTRE AV. INDUSTRIAL Y CALLE PUENTE ARNAO M2 1.00 AREA= 523.97 523.97
PLANILLA DE METRADOS

ACTIVIDAD :MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA URBANIZACION LAS FRESIAS DISTRITO DE TACNA - PROVINCIA DE TACNA - REGIÓN TACNA

PROPIETA. : MUNICIPALIDAD PROVINCIAL DE TACNA


FECHA : ENERO DEL 2018

MEDIDAS
ITEM DESCRIPCION UND CANT PARCIAL SUBTOTAL TOTAL
L A H

CALLE MIGUEL SOTTO ENTRE AV. CAROLINA REPETTI Y CALLE JUAN


M2 1.00 AREA= 192.62 192.62
SEGOVIA
PASAJE S/N M2 1.00 AREA= 104.28 104.28
CALLE MANUEL GODINEZ M2 1.00 AREA= 396.31 396.31
CALLE CANDARAVE M2 1.00 AREA= 419.34 419.34
CALLE PUENTE ARNAO ENTRE CALLE JUAN SEGOVIA Y AV. JORGE BASADRE
M2 1.00 AREA= 626.85 626.85
GROHMANN
URBANIZACION VELEZ M2 1,013.41
CALLE PUENTE ARNAO ENTRE AV. CAROLINA REPETTI Y CALLE JUAN
M2 1.00 AREA= 613.24 613.24
SEGOVIA
CALLE CIRILO CARBAJAL ENTRE CALLE PUENTE ARNAO Y PROLO. AV.
M2 1.00 AREA= 400.17 400.17
JORGE CHAVEZ
URBANIZACION LAS MAGNOLIAS M2 785.77
PASAJE LAS ORQUIDEAS M2 1.00 AREA= 440.30 440.30
PASAJE LOS LIRIOS M2 1.00 AREA= 165.45 165.45
CALLE LAS VIOLETAS M2 1.00 AREA= 180.02 180.02
URBANIZACION SEVERO VILDOSO M2 2,797.12
PASAJE N°16 M2 1.00 AREA= 484.34 484.34
PASAJE N°17 M2 1.00 AREA= 267.95 267.95
CALLE MONITOR HUASCAR ENTRE CALLE CUSCO Y AV. JORGE BASADRE
M2 1.00 AREA= 1,338.53 1,338.53
GROHMANN
CALLE CUSCO ENTRE PROL. AV. JORGE CHAVEZ Y CALLE MONITOR
M2 1.00 AREA= 706.30 706.30
HUASCAR

01.03.04 VARIOS
01.03.04.01 REUBICACION DE POSTES DE CAC INCL UNIDAD DE ALUMBRADO PUBLICO JGO 18.00
REUBICACION POSTE CAC 18.00
AV. HUMBOLDT ENTRE PSJE N° 01 Y CALLE N° 20 JGO 1.00 1.00
AV. HUMBOLDT ENTRE CALLE N° 20 Y AV. TARAPACA JGO 2.00 2.00
PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (DERECHA) JGO 2.00 2.00
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (IZQUIERDA) JGO 4.00 4.00
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (IZQUIERDA) JGO 3.00 3.00
PSJE N° 02 ENTRE CALLE N° 20 Y AV. TARAPACA (DERECHA) JGO 1.00 1.00
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (DERECHA) JGO 1.00 1.00

CALLE N° 20 ENTRE AV. HUMBOLDT Y PSJE N° 01 (DERECHA) JGO 1.00 1.00


CALLE N° 20 ENTRE AV. PSJE N° 01 Y PSJE N° 02 (DERECHA) JGO 2.00 2.00
AV. TARAPACA ENTRE PSJE N° 01 Y PSJE N° 02 JGO 1.00 1.00

01.03.04.02 REUBICACION DE GRIFO CONTRA INCENDIO TIPO POSTE DE 2 BOCAS UND 1.00
REUBICACION GRIFO CONTRA INCENDIO 1.00
PSJE N° 02 CRUCE CON CALLE N° 20 UND 1.00 1.00

01.03.04.03 NIVELACION DE BUZONES EN GENERAL UND 5.00


NIVELACION BUZON 5.00
PSJE N° 01 UND 2.00 2.00
PSJE N° 01 UND 1.00 1.00
CALLE N° 20 UND 2.00 2.00

01.04 PAVIMENTACION DE BERMAS


01.04.01 TRABAJOS PRELIMINARES
01.04.01.01 LIMPIEZA DE TERRENO MANUAL M2 13,221.97
BERMAS 13,221.97
ASOCIACION DE VIVIENDA FEDERICO BARRETO M2 1,218.57
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 462.60 462.60
CALLE EL PORVENIR ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 395.07 395.07
CALLE CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 360.90 360.90
ASENTAMIENTO HUMANO FRANCISCO BOLOGNESI M2 10,807.24
AV. MIGUEL GRAU ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M2 1.00 AREA= 1,694.52 1,694.52
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. MARISCAL CASTILLA M2 1.00 AREA= 222.09 222.09
AV. CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. LO ANGELES M2 1.00 AREA= 1,620.00 1,620.00
AV. MARISCAL CASTILLA ENTRE CALLE CAHUIDE Y AV. CHORILLOS M2 1.00 AREA= 406.32 406.32
AV. JORGE CHAVEZ ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M2 1.00 AREA= 1,204.80 1,204.80
PASAJE FRANCISCO BOLOGNESI ENTRE CALLE CAHUIDE Y AV. CHORILLOS M2 1.00 AREA= 400.17 400.17
CALLE MOQUEGUA ENTRE AV. MIGUEL GRAU Y CALLE UGARTE M2 1.00 AREA= 1,012.26 1,012.26
PASAJE FEDERICO BARRETO - PASAJE N°02 - B M2 1.00 AREA= 203.46 203.46
CALLE AREQUIPA M2 1.00 AREA= 437.28 437.28
CALLE CUSCO ENTRE CALLE MONITOR HUASCAR Y AV. LOS ANGELES M2 1.00 AREA= 449.85 449.85
CALLE UGARTE ENTRE AV. CHORILLOS Y CALLE PACIFICO M2 1.00 AREA= 738.15 738.15
CALLE PACIFICO M2 1.00 AREA= 162.18 162.18
CALLE ALTO DE LA ALIANZA M2 1.00 AREA= 168.00 168.00
AV- LOS ANGELES ENTRE CALLE CAHUIDE Y AV. JORGE BASADRE M2 1.00 AREA= 2,088.16 2,088.16
AMPLIACION BOLOGNESI M2 482.91
AV. CAROLINA REPETTI M2 1.00 AREA= 482.91 482.91
URBANIZACION SEVERO VILDOSO M2 713.25
PLANILLA DE METRADOS

ACTIVIDAD :MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA URBANIZACION LAS FRESIAS DISTRITO DE TACNA - PROVINCIA DE TACNA - REGIÓN TACNA

PROPIETA. : MUNICIPALIDAD PROVINCIAL DE TACNA


FECHA : ENERO DEL 2018

MEDIDAS
ITEM DESCRIPCION UND CANT PARCIAL SUBTOTAL TOTAL
L A H

CALLE MONITOR HUASCAR ENTRE CALLE CUSCO Y AV. JORGE BASADRE


M2 1.00 AREA= 713.25 713.25
GROHMANN

01.04.01.02 TRAZO NIVELES Y REPLANTEO M2 13,221.97


BERMAS 13,221.97
ASOCIACION DE VIVIENDA FEDERICO BARRETO M2 1,218.57
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 462.60 462.60
CALLE EL PORVENIR ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 395.07 395.07
CALLE CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 360.90 360.90
ASENTAMIENTO HUMANO FRANCISCO BOLOGNESI M2 10,807.24
AV. MIGUEL GRAU ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M2 1.00 AREA= 1,694.52 1,694.52
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. MARISCAL CASTILLA M2 1.00 AREA= 222.09 222.09
AV. CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. LO ANGELES M2 1.00 AREA= 1,620.00 1,620.00
AV. MARISCAL CASTILLA ENTRE CALLE CAHUIDE Y AV. CHORILLOS M2 1.00 AREA= 406.32 406.32
AV. JORGE CHAVEZ ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M2 1.00 AREA= 1,204.80 1,204.80
PASAJE FRANCISCO BOLOGNESI ENTRE CALLE CAHUIDE Y AV. CHORILLOS M2 1.00 AREA= 400.17 400.17
CALLE MOQUEGUA ENTRE AV. MIGUEL GRAU Y CALLE UGARTE M2 1.00 AREA= 1,012.26 1,012.26
PASAJE FEDERICO BARRETO - PASAJE N°02 - B M2 1.00 AREA= 203.46 203.46
CALLE AREQUIPA M2 1.00 AREA= 437.28 437.28
CALLE CUSCO ENTRE CALLE MONITOR HUASCAR Y AV. LOS ANGELES M2 1.00 AREA= 449.85 449.85
CALLE UGARTE ENTRE AV. CHORILLOS Y CALLE PACIFICO M2 1.00 AREA= 738.15 738.15
CALLE PACIFICO M2 1.00 AREA= 162.18 162.18
CALLE ALTO DE LA ALIANZA M2 1.00 AREA= 168.00 168.00
AV- LOS ANGELES ENTRE CALLE CAHUIDE Y AV. JORGE BASADRE M2 1.00 AREA= 2,088.16 2,088.16
AMPLIACION BOLOGNESI M2 482.91
AV. CAROLINA REPETTI M2 1.00 AREA= 482.91 482.91
URBANIZACION SEVERO VILDOSO M2 713.25
CALLE MONITOR HUASCAR ENTRE CALLE CUSCO Y AV. JORGE BASADRE
M2 1.00 AREA= 713.25 713.25
GROHMANN

01.04.01.03 CONTROL TOPOGRAFICO CON EQUIPO M2 13,221.97


BERMAS 13,221.97
ASOCIACION DE VIVIENDA FEDERICO BARRETO M2 1,218.57
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 462.60 462.60
CALLE EL PORVENIR ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 395.07 395.07
CALLE CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 360.90 360.90
ASENTAMIENTO HUMANO FRANCISCO BOLOGNESI M2 10,807.24
AV. MIGUEL GRAU ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M2 1.00 AREA= 1,694.52 1,694.52
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. MARISCAL CASTILLA M2 1.00 AREA= 222.09 222.09
AV. CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. LO ANGELES M2 1.00 AREA= 1,620.00 1,620.00
AV. MARISCAL CASTILLA ENTRE CALLE CAHUIDE Y AV. CHORILLOS M2 1.00 AREA= 406.32 406.32
AV. JORGE CHAVEZ ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M2 1.00 AREA= 1,204.80 1,204.80
PASAJE FRANCISCO BOLOGNESI ENTRE CALLE CAHUIDE Y AV. CHORILLOS M2 1.00 AREA= 400.17 400.17
CALLE MOQUEGUA ENTRE AV. MIGUEL GRAU Y CALLE UGARTE M2 1.00 AREA= 1,012.26 1,012.26
PASAJE FEDERICO BARRETO - PASAJE N°02 - B M2 1.00 AREA= 203.46 203.46
CALLE AREQUIPA M2 1.00 AREA= 437.28 437.28
CALLE CUSCO ENTRE CALLE MONITOR HUASCAR Y AV. LOS ANGELES M2 1.00 AREA= 449.85 449.85
CALLE UGARTE ENTRE AV. CHORILLOS Y CALLE PACIFICO M2 1.00 AREA= 738.15 738.15
CALLE PACIFICO M2 1.00 AREA= 162.18 162.18
CALLE ALTO DE LA ALIANZA M2 1.00 AREA= 168.00 168.00
AV- LOS ANGELES ENTRE CALLE CAHUIDE Y AV. JORGE BASADRE M2 1.00 AREA= 2,088.16 2,088.16
AMPLIACION BOLOGNESI M2 482.91
AV. CAROLINA REPETTI M2 1.00 AREA= 482.91 482.91
URBANIZACION SEVERO VILDOSO M2 713.25
CALLE MONITOR HUASCAR ENTRE CALLE CUSCO Y AV. JORGE BASADRE
M2 1.00 AREA= 713.25 713.25
GROHMANN

01.04.02 MOVIMIENTO DE TIERRAS


01.04.02.01 CORTE DE TERRENO CON MAQUINARIA M3 5,288.79
BERMAS 5,288.79
ASOCIACION DE VIVIENDA FEDERICO BARRETO M3 487.43
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M3 1.00 VOL= 185.04 185.04
CALLE EL PORVENIR ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M3 1.00 VOL= 158.03 158.03
CALLE CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M3 1.00 VOL= 144.36 144.36
ASENTAMIENTO HUMANO FRANCISCO BOLOGNESI M3 4,322.90
AV. MIGUEL GRAU ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M3 1.00 VOL= 677.81 677.81
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. MARISCAL CASTILLA M3 1.00 VOL= 88.84 88.84
AV. CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. LO ANGELES M3 1.00 VOL= 648.00 648.00
AV. MARISCAL CASTILLA ENTRE CALLE CAHUIDE Y AV. CHORILLOS M3 1.00 VOL= 162.53 162.53
AV. JORGE CHAVEZ ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M3 1.00 VOL= 481.92 481.92
PASAJE FRANCISCO BOLOGNESI ENTRE CALLE CAHUIDE Y AV. CHORILLOS M3 1.00 VOL= 160.07 160.07
CALLE MOQUEGUA ENTRE AV. MIGUEL GRAU Y CALLE UGARTE M3 1.00 VOL= 404.90 404.90
PASAJE FEDERICO BARRETO - PASAJE N°02 - B M3 1.00 VOL= 81.38 81.38
CALLE AREQUIPA M3 1.00 VOL= 174.91 174.91
CALLE CUSCO ENTRE CALLE MONITOR HUASCAR Y AV. LOS ANGELES M3 1.00 VOL= 179.94 179.94
PLANILLA DE METRADOS

ACTIVIDAD :MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA URBANIZACION LAS FRESIAS DISTRITO DE TACNA - PROVINCIA DE TACNA - REGIÓN TACNA

PROPIETA. : MUNICIPALIDAD PROVINCIAL DE TACNA


FECHA : ENERO DEL 2018

MEDIDAS
ITEM DESCRIPCION UND CANT PARCIAL SUBTOTAL TOTAL
L A H

CALLE UGARTE ENTRE AV. CHORILLOS Y CALLE PACIFICO M3 1.00 VOL= 295.26 295.26
CALLE PACIFICO M3 1.00 VOL= 64.87 64.87
CALLE ALTO DE LA ALIANZA M3 1.00 VOL= 67.20 67.20
AV- LOS ANGELES ENTRE CALLE CAHUIDE Y AV. JORGE BASADRE M3 1.00 VOL= 835.26 835.26
AMPLIACION BOLOGNESI M3 193.16
AV. CAROLINA REPETTI M3 1.00 VOL= 193.16 193.16
URBANIZACION SEVERO VILDOSO M3 285.30
CALLE MONITOR HUASCAR ENTRE CALLE CUSCO Y AV. JORGE BASADRE
M3 1.00 VOL= 285.30 285.30
GROHMANN

01.04.02.02 ACARREO DE MATERIAL EXCEDENTE C/MAQUINARIA M3 6,610.99


BERMAS 6,610.99
CORTE DE TERRENO EN BERMAS M2 1.00 VOL= 5,288.79 5,288.79
Factor de Esponjamiento 25% M2 0.25 VOL= 5,288.79 1,322.20

01.04.02.03 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA M3 6,610.99


BERMAS 6,610.99
CORTE DE TERRENO EN BERMAS M2 1.00 VOL= 5,288.79 5,288.79
Factor de Esponjamiento 25% M2 0.25 VOL= 5,288.79 1,322.20

01.04.02.04 PERFILADO Y COMPACTADO DE LA SUBRASANTE C/MAQUINARIA M2 13,221.97


BERMAS 13,221.97
ASOCIACION DE VIVIENDA FEDERICO BARRETO M2 1,218.57
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 462.60 462.60
CALLE EL PORVENIR ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 395.07 395.07
CALLE CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 360.90 360.90
ASENTAMIENTO HUMANO FRANCISCO BOLOGNESI M2 10,807.24
AV. MIGUEL GRAU ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M2 1.00 AREA= 1,694.52 1,694.52
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. MARISCAL CASTILLA M2 1.00 AREA= 222.09 222.09
AV. CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. LO ANGELES M2 1.00 AREA= 1,620.00 1,620.00
AV. MARISCAL CASTILLA ENTRE CALLE CAHUIDE Y AV. CHORILLOS M2 1.00 AREA= 406.32 406.32
AV. JORGE CHAVEZ ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M2 1.00 AREA= 1,204.80 1,204.80
PASAJE FRANCISCO BOLOGNESI ENTRE CALLE CAHUIDE Y AV. CHORILLOS M2 1.00 AREA= 400.17 400.17
CALLE MOQUEGUA ENTRE AV. MIGUEL GRAU Y CALLE UGARTE M2 1.00 AREA= 1,012.26 1,012.26
PASAJE FEDERICO BARRETO - PASAJE N°02 - B M2 1.00 AREA= 203.46 203.46
CALLE AREQUIPA M2 1.00 AREA= 437.28 437.28
CALLE CUSCO ENTRE CALLE MONITOR HUASCAR Y AV. LOS ANGELES M2 1.00 AREA= 449.85 449.85
CALLE UGARTE ENTRE AV. CHORILLOS Y CALLE PACIFICO M2 1.00 AREA= 738.15 738.15
CALLE PACIFICO M2 1.00 AREA= 162.18 162.18
CALLE ALTO DE LA ALIANZA M2 1.00 AREA= 168.00 168.00
AV- LOS ANGELES ENTRE CALLE CAHUIDE Y AV. JORGE BASADRE M2 1.00 AREA= 2,088.16 2,088.16
AMPLIACION BOLOGNESI M2 482.91
AV. CAROLINA REPETTI M2 1.00 AREA= 482.91 482.91
URBANIZACION SEVERO VILDOSO M2 713.25
CALLE MONITOR HUASCAR ENTRE CALLE CUSCO Y AV. JORGE BASADRE
M2 1.00 AREA= 713.25 713.25
GROHMANN

01.04.02.05 SUB-BASE GRANULAR E=0.25 M C/EQUIPO M2 13,221.97


BERMAS 13,221.97
ASOCIACION DE VIVIENDA FEDERICO BARRETO M2 1,218.57
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 462.60 462.60
CALLE EL PORVENIR ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 395.07 395.07
CALLE CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 360.90 360.90
ASENTAMIENTO HUMANO FRANCISCO BOLOGNESI M2 10,807.24
AV. MIGUEL GRAU ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M2 1.00 AREA= 1,694.52 1,694.52
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. MARISCAL CASTILLA M2 1.00 AREA= 222.09 222.09
AV. CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. LO ANGELES M2 1.00 AREA= 1,620.00 1,620.00
AV. MARISCAL CASTILLA ENTRE CALLE CAHUIDE Y AV. CHORILLOS M2 1.00 AREA= 406.32 406.32
AV. JORGE CHAVEZ ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M2 1.00 AREA= 1,204.80 1,204.80
PASAJE FRANCISCO BOLOGNESI ENTRE CALLE CAHUIDE Y AV. CHORILLOS M2 1.00 AREA= 400.17 400.17
CALLE MOQUEGUA ENTRE AV. MIGUEL GRAU Y CALLE UGARTE M2 1.00 AREA= 1,012.26 1,012.26
PASAJE FEDERICO BARRETO - PASAJE N°02 - B M2 1.00 AREA= 203.46 203.46
CALLE AREQUIPA M2 1.00 AREA= 437.28 437.28
CALLE CUSCO ENTRE CALLE MONITOR HUASCAR Y AV. LOS ANGELES M2 1.00 AREA= 449.85 449.85
CALLE UGARTE ENTRE AV. CHORILLOS Y CALLE PACIFICO M2 1.00 AREA= 738.15 738.15
CALLE PACIFICO M2 1.00 AREA= 162.18 162.18
CALLE ALTO DE LA ALIANZA M2 1.00 AREA= 168.00 168.00
AV- LOS ANGELES ENTRE CALLE CAHUIDE Y AV. JORGE BASADRE M2 1.00 AREA= 2,088.16 2,088.16
AMPLIACION BOLOGNESI M2 482.91
AV. CAROLINA REPETTI M2 1.00 AREA= 482.91 482.91
URBANIZACION SEVERO VILDOSO M2 713.25
CALLE MONITOR HUASCAR ENTRE CALLE CUSCO Y AV. JORGE BASADRE
M2 1.00 AREA= 713.25 713.25
GROHMANN

01.04.02.06 BASE GRANULAR E=0.15 M C/EQUIPO M3 13,221.97


PLANILLA DE METRADOS

ACTIVIDAD :MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA URBANIZACION LAS FRESIAS DISTRITO DE TACNA - PROVINCIA DE TACNA - REGIÓN TACNA

PROPIETA. : MUNICIPALIDAD PROVINCIAL DE TACNA


FECHA : ENERO DEL 2018

MEDIDAS
ITEM DESCRIPCION UND CANT PARCIAL SUBTOTAL TOTAL
L A H

BERMAS 13,221.97
ASOCIACION DE VIVIENDA FEDERICO BARRETO M2 1,218.57
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 462.60 462.60
CALLE EL PORVENIR ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 395.07 395.07
CALLE CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 360.90 360.90
ASENTAMIENTO HUMANO FRANCISCO BOLOGNESI M2 10,807.24
AV. MIGUEL GRAU ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M2 1.00 AREA= 1,694.52 1,694.52
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. MARISCAL CASTILLA M2 1.00 AREA= 222.09 222.09
AV. CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. LO ANGELES M2 1.00 AREA= 1,620.00 1,620.00
AV. MARISCAL CASTILLA ENTRE CALLE CAHUIDE Y AV. CHORILLOS M2 1.00 AREA= 406.32 406.32
AV. JORGE CHAVEZ ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M2 1.00 AREA= 1,204.80 1,204.80
PASAJE FRANCISCO BOLOGNESI ENTRE CALLE CAHUIDE Y AV. CHORILLOS M2 1.00 AREA= 400.17 400.17
CALLE MOQUEGUA ENTRE AV. MIGUEL GRAU Y CALLE UGARTE M2 1.00 AREA= 1,012.26 1,012.26
PASAJE FEDERICO BARRETO - PASAJE N°02 - B M2 1.00 AREA= 203.46 203.46
CALLE AREQUIPA M2 1.00 AREA= 437.28 437.28
CALLE CUSCO ENTRE CALLE MONITOR HUASCAR Y AV. LOS ANGELES M2 1.00 AREA= 449.85 449.85
CALLE UGARTE ENTRE AV. CHORILLOS Y CALLE PACIFICO M2 1.00 AREA= 738.15 738.15
CALLE PACIFICO M2 1.00 AREA= 162.18 162.18
CALLE ALTO DE LA ALIANZA M2 1.00 AREA= 168.00 168.00
AV- LOS ANGELES ENTRE CALLE CAHUIDE Y AV. JORGE BASADRE M2 1.00 AREA= 2,088.16 2,088.16
AMPLIACION BOLOGNESI M2 482.91
AV. CAROLINA REPETTI M2 1.00 AREA= 482.91 482.91
URBANIZACION SEVERO VILDOSO M2 713.25
CALLE MONITOR HUASCAR ENTRE CALLE CUSCO Y AV. JORGE BASADRE
M2 1.00 AREA= 713.25 713.25
GROHMANN

01.04.03 PAVIMENTO FLEXIBLE


01.04.03.01 IMPRIMACION ASFALTICA C/EQUIPO M2 13,221.97
BERMAS 13,221.97
ASOCIACION DE VIVIENDA FEDERICO BARRETO M2 1,218.57
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 462.60 462.60
CALLE EL PORVENIR ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 395.07 395.07
CALLE CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 360.90 360.90
ASENTAMIENTO HUMANO FRANCISCO BOLOGNESI M2 10,807.24
AV. MIGUEL GRAU ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M2 1.00 AREA= 1,694.52 1,694.52
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. MARISCAL CASTILLA M2 1.00 AREA= 222.09 222.09
AV. CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. LO ANGELES M2 1.00 AREA= 1,620.00 1,620.00
AV. MARISCAL CASTILLA ENTRE CALLE CAHUIDE Y AV. CHORILLOS M2 1.00 AREA= 406.32 406.32
AV. JORGE CHAVEZ ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M2 1.00 AREA= 1,204.80 1,204.80
PASAJE FRANCISCO BOLOGNESI ENTRE CALLE CAHUIDE Y AV. CHORILLOS M2 1.00 AREA= 400.17 400.17
CALLE MOQUEGUA ENTRE AV. MIGUEL GRAU Y CALLE UGARTE M2 1.00 AREA= 1,012.26 1,012.26
PASAJE FEDERICO BARRETO - PASAJE N°02 - B M2 1.00 AREA= 203.46 203.46
CALLE AREQUIPA M2 1.00 AREA= 437.28 437.28
CALLE CUSCO ENTRE CALLE MONITOR HUASCAR Y AV. LOS ANGELES M2 1.00 AREA= 449.85 449.85
CALLE UGARTE ENTRE AV. CHORILLOS Y CALLE PACIFICO M2 1.00 AREA= 738.15 738.15
CALLE PACIFICO M2 1.00 AREA= 162.18 162.18
CALLE ALTO DE LA ALIANZA M2 1.00 AREA= 168.00 168.00
AV- LOS ANGELES ENTRE CALLE CAHUIDE Y AV. JORGE BASADRE M2 1.00 AREA= 2,088.16 2,088.16
AMPLIACION BOLOGNESI M2 482.91
AV. CAROLINA REPETTI M2 1.00 AREA= 482.91 482.91
URBANIZACION SEVERO VILDOSO M2 713.25
CALLE MONITOR HUASCAR ENTRE CALLE CUSCO Y AV. JORGE BASADRE
M2 1.00 AREA= 713.25 713.25
GROHMANN

01.04.03.02 CARPETA ASFALTICA E=2" EN FRIO M2 13,221.97


BERMAS 13,221.97
ASOCIACION DE VIVIENDA FEDERICO BARRETO M2 1,218.57
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 462.60 462.60
CALLE EL PORVENIR ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 395.07 395.07
CALLE CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 360.90 360.90
ASENTAMIENTO HUMANO FRANCISCO BOLOGNESI M2 10,807.24
AV. MIGUEL GRAU ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M2 1.00 AREA= 1,694.52 1,694.52
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. MARISCAL CASTILLA M2 1.00 AREA= 222.09 222.09
AV. CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. LO ANGELES M2 1.00 AREA= 1,620.00 1,620.00
AV. MARISCAL CASTILLA ENTRE CALLE CAHUIDE Y AV. CHORILLOS M2 1.00 AREA= 406.32 406.32
AV. JORGE CHAVEZ ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M2 1.00 AREA= 1,204.80 1,204.80
PASAJE FRANCISCO BOLOGNESI ENTRE CALLE CAHUIDE Y AV. CHORILLOS M2 1.00 AREA= 400.17 400.17
CALLE MOQUEGUA ENTRE AV. MIGUEL GRAU Y CALLE UGARTE M2 1.00 AREA= 1,012.26 1,012.26
PASAJE FEDERICO BARRETO - PASAJE N°02 - B M2 1.00 AREA= 203.46 203.46
CALLE AREQUIPA M2 1.00 AREA= 437.28 437.28
CALLE CUSCO ENTRE CALLE MONITOR HUASCAR Y AV. LOS ANGELES M2 1.00 AREA= 449.85 449.85
CALLE UGARTE ENTRE AV. CHORILLOS Y CALLE PACIFICO M2 1.00 AREA= 738.15 738.15
CALLE PACIFICO M2 1.00 AREA= 162.18 162.18
CALLE ALTO DE LA ALIANZA M2 1.00 AREA= 168.00 168.00
AV- LOS ANGELES ENTRE CALLE CAHUIDE Y AV. JORGE BASADRE M2 1.00 AREA= 2,088.16 2,088.16
PLANILLA DE METRADOS

ACTIVIDAD :MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA URBANIZACION LAS FRESIAS DISTRITO DE TACNA - PROVINCIA DE TACNA - REGIÓN TACNA

PROPIETA. : MUNICIPALIDAD PROVINCIAL DE TACNA


FECHA : ENERO DEL 2018

MEDIDAS
ITEM DESCRIPCION UND CANT PARCIAL SUBTOTAL TOTAL
L A H

AMPLIACION BOLOGNESI M2 482.91


AV. CAROLINA REPETTI M2 1.00 AREA= 482.91 482.91
URBANIZACION SEVERO VILDOSO M2 713.25
CALLE MONITOR HUASCAR ENTRE CALLE CUSCO Y AV. JORGE BASADRE
M2 1.00 AREA= 713.25 713.25
GROHMANN

02 INFRAESTRUCTURA PEATONAL
02.01 TRABAJOS PRELIMINARES
02.01.01 LIMPIEZA DE TERRENO MANUAL M2 12,931.33
VEREDAS 12,463.28
ASOCIACION DE VIVIENDA FEDERICO BARRETO M2 1,102.86
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 370.08 370.08
CALLE 8 DE FEBRERO M2 1.00 AREA= 128.00 128.00
CALLE EL PORVENIR ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 316.06 316.06
CALLE CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 1.00 AREA= 288.72 288.72
ASENTAMIENTO HUMANO FRANCISCO BOLOGNESI M2 8,297.64
AV. MIGUEL GRAU ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M2 1.00 AREA= 1,016.71 1,016.71
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. MARISCAL CASTILLA M2 1.00 AREA= 177.67 177.67
AV. CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. LO ANGELES M2 1.00 AREA= 972.00 972.00
AV. MARISCAL CASTILLA ENTRE CALLE CAHUIDE Y AV. CHORILLOS M2 1.00 AREA= 325.06 325.06
AV. JORGE CHAVEZ ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M2 1.00 AREA= 963.84 963.84
PASAJE FRANCISCO BOLOGNESI ENTRE CALLE CAHUIDE Y AV. CHORILLOS M2 1.00 AREA= 320.14 320.14
CALLE MOQUEGUA ENTRE AV. MIGUEL GRAU Y CALLE UGARTE M2 1.00 AREA= 809.81 809.81
PASAJE FEDERICO BARRETO - PASAJE N°01 - A M2 1.00 AREA= 113.88 113.88
PASAJE FEDERICO BARRETO - PASAJE N°02 - B M2 1.00 AREA= 162.77 162.77
PASAJE FEDERICO BARRETO - PASAJE N°03 - C M2 1.00 AREA= 124.56 124.56
CALLE MONITOR HUASCAR ENTRE AV. CHORILLOS Y CALLE CUSCO M2 1.00 AREA= 398.45 398.45
CALLE AREQUIPA M2 1.00 AREA= 349.82 349.82
CALLE CUSCO ENTRE CALLE MONITOR HUASCAR Y AV. LOS ANGELES M2 1.00 AREA= 359.88 359.88
CALLE UGARTE ENTRE AV. CHORILLOS Y CALLE PACIFICO M2 1.00 AREA= 590.52 590.52
CALLE PACIFICO M2 1.00 AREA= 129.74 129.74
CALLE ALTO DE LA ALIANZA M2 1.00 AREA= 134.40 134.40
CALLE OLLANTA M2 1.00 AREA= 95.50 95.50
AV- LOS ANGELES ENTRE CALLE CAHUIDE Y AV. JORGE BASADRE M2 1.00 AREA= 1,252.90 1,252.90
AMPLIACION BOLOGNESI M2 1,426.77
AV. CAROLINA REPETTI M2 1.00 AREA= 386.33 386.33
CALLE JUAN SEGOVIA M2 1.00 AREA= 221.92 221.92
CALLE CIRILO CARBAJAL ENTRE AV. INDUSTRIAL Y CALLE PUENTE ARNAO M2 1.00 AREA= 180.06 180.06
CALLE MIGUEL SOTTO ENTRE AV. CAROLINA REPETTI Y CALLE JUAN
M2 1.00 AREA= 102.46 102.46
SEGOVIA
PASAJE S/N M2 1.00 AREA= 69.52 69.52
CALLE MANUEL GODINEZ M2 1.00 AREA= 139.30 139.30
CALLE CANDARAVE M2 1.00 AREA= 139.78 139.78
CALLE PUENTE ARNAO ENTRE CALLE JUAN SEGOVIA Y AV. JORGE BASADRE
M2 1.00 AREA= 187.40 187.40
GROHMANN
URBANIZACION VELEZ M2 323.80
CALLE PUENTE ARNAO ENTRE AV. CAROLINA REPETTI Y CALLE JUAN
M2 1.00 AREA= 183.88 183.88
SEGOVIA
CALLE CIRILO CARBAJAL ENTRE CALLE PUENTE ARNAO Y PROLO. AV.
M2 1.00 AREA= 139.92 139.92
JORGE CHAVEZ
URBANIZACION LAS MAGNOLIAS M2 258.96
PASAJE LAS ORQUIDEAS M2 1.00 AREA= 158.38 158.38
PASAJE LOS LIRIOS M2 1.00 AREA= 100.58 100.58
URBANIZACION SEVERO VILDOSO M2 1,053.25
PASAJE N°16 M2 1.00 AREA= 144.58 144.58
PASAJE N°17 M2 1.00 AREA= 104.26 104.26
CALLE MONITOR HUASCAR ENTRE CALLE CUSCO Y AV. JORGE BASADRE
M2 1.00 AREA= 570.60 570.60
GROHMANN
CALLE CUSCO ENTRE PROL. AV. JORGE CHAVEZ Y CALLE MONITOR
M2 1.00 AREA= 233.81 233.81
HUASCAR

MARTILLOS 382.01
M1 M2 1.00 AREA= 19.53 19.53
M2 M2 1.00 AREA= 19.65 19.65
M3 M2 1.00 AREA= 21.81 21.81
M4 M2 1.00 AREA= 21.49 21.49
M5 M2 1.00 AREA= 23.22 23.22
M6 M2 1.00 AREA= 4.05 4.05
M7 M2 1.00 AREA= 11.44 11.44
M8 M2 1.00 AREA= 11.50 11.50
M9 M2 1.00 AREA= 24.05 24.05
M10 M2 1.00 AREA= 12.18 12.18
M11 M2 1.00 AREA= 12.75 12.75
M12 M2 1.00 AREA= 23.98 23.98
M13 M2 1.00 AREA= 14.02 14.02
M14 M2 1.00 AREA= 18.66 18.66
PLANILLA DE METRADOS

ACTIVIDAD :MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA URBANIZACION LAS FRESIAS DISTRITO DE TACNA - PROVINCIA DE TACNA - REGIÓN TACNA

PROPIETA. : MUNICIPALIDAD PROVINCIAL DE TACNA


FECHA : ENERO DEL 2018

MEDIDAS
ITEM DESCRIPCION UND CANT PARCIAL SUBTOTAL TOTAL
L A H

M15 M2 1.00 AREA= 25.64 25.64


M16 M2 1.00 AREA= 12.50 12.50
M17 M2 1.00 AREA= 15.69 15.69
M18 M2 1.00 AREA= 18.26 18.26
M19 M2 1.00 AREA= 17.84 17.84
M20 M2 1.00 AREA= 14.73 14.73
M21 M2 1.00 AREA= 9.59 9.59
M22 M2 1.00 AREA= 9.70 9.70
M23 M2 1.00 AREA= 5.84 5.84
M24 M2 1.00 AREA= 13.89 13.89
M25 M2 1.00 AREA= 14.00 14.00
M26 M2 1.00 AREA= 16.10 16.10
M27 M2 1.00 AREA= 18.19 18.19
M28 M2 1.00 AREA= 20.29 20.29
M29 M2 1.00 AREA= 14.02 14.02
M30 M2 1.00 AREA= 18.66 18.66
M31 M2 1.00 AREA= 25.64 25.64
M32 M2 1.00 AREA= 12.50 12.50
M33 M2 1.00 AREA= 11.44 11.44
M34 M2 1.00 AREA= 11.50 11.50
M35 M2 1.00 AREA= 24.05 24.05
M36 M2 1.00 AREA= 12.18 12.18
M37 M2 1.00 AREA= 12.75 12.75
M38 M2 1.00 AREA= 5.84 5.84

RAMPAS PEATONAL TIPO 01 42.84


M1 M2 2.00 AREA= 1.26 2.52
M2 M2 2.00 AREA= 1.26 2.52
M3 M2 2.00 AREA= 1.26 2.52
M4 M2 2.00 AREA= 1.26 2.52
M5 M2 2.00 AREA= 1.26 2.52
M6 M2 1.00 AREA= 1.26 1.26
M7 M2 1.00 AREA= 1.26 1.26
M8 M2 1.00 AREA= 1.26 1.26
M9 M2 1.00 AREA= 1.26 1.26
M10 M2 1.00 AREA= 1.26 1.26
M11 M2 1.00 AREA= 1.26 1.26
M12 M2 1.00 AREA= 1.26 1.26
M13 M2 1.00 AREA= 1.26 1.26
M14 M2 2.00 AREA= 1.26 2.52
M15 M2 2.00 AREA= 1.26 2.52
M16 M2 1.00 AREA= 1.26 1.26
M17 M2 2.00 AREA= 1.26 2.52
M18 M2 2.00 AREA= 1.26 2.52
M19 M2 2.00 AREA= 1.26 2.52
M20 M2 1.00 AREA= 1.26 1.26
M21 M2 1.00 AREA= 1.26 1.26
M22 M2 1.00 AREA= 1.26 1.26
M23 M2 1.00 AREA= 1.26 1.26
M24 M2 1.00 AREA= 1.26 1.26

INTERCAMBIO PEATONAL (RAMPA TIPO 02) 43.20


ASOCIACION DE VIVIENDA FEDERICO BARRETO M2
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 2.00
CALLE 8 DE FEBRERO M2 1.00
CALLE EL PORVENIR ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 2.00
CALLE CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL M2 2.00
ASENTAMIENTO HUMANO FRANCISCO BOLOGNESI M2
AV. MIGUEL GRAU ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M2 2.00
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. MARISCAL CASTILLA M2 2.00
AV. CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. LO ANGELES M2 2.00
AV. MARISCAL CASTILLA ENTRE CALLE CAHUIDE Y AV. CHORILLOS M2 2.00
AV. JORGE CHAVEZ ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI M2 2.00
PASAJE FRANCISCO BOLOGNESI ENTRE CALLE CAHUIDE Y AV. CHORILLOS M2 2.00
CALLE MOQUEGUA ENTRE AV. MIGUEL GRAU Y CALLE UGARTE M2 2.00
PASAJE FEDERICO BARRETO - PASAJE N°01 - A M2 2.00
PASAJE FEDERICO BARRETO - PASAJE N°02 - B M2 2.00
PASAJE FEDERICO BARRETO - PASAJE N°03 - C M2 2.00
CALLE MONITOR HUASCAR ENTRE AV. CHORILLOS Y CALLE CUSCO M2 2.00
CALLE AREQUIPA M2 2.00 AREA= 4.32 8.64
CALLE CUSCO ENTRE CALLE MONITOR HUASCAR Y AV. LOS ANGELES M2 1.00 AREA= 4.32 4.32
CALLE UGARTE ENTRE AV. CHORILLOS Y CALLE PACIFICO M2 2.00 AREA= 4.32 8.64
CALLE PACIFICO M2 2.00 AREA= 4.32 8.64
PLANILLA DE METRADOS

ACTIVIDAD :MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA URBANIZACION LAS FRESIAS DISTRITO DE TACNA - PROVINCIA DE TACNA - REGIÓN TACNA

PROPIETA. : MUNICIPALIDAD PROVINCIAL DE TACNA


FECHA : ENERO DEL 2018

MEDIDAS
ITEM DESCRIPCION UND CANT PARCIAL SUBTOTAL TOTAL
L A H

CALLE ALTO DE LA ALIANZA M2 1.00 AREA= 4.32 4.32


CALLE OLLANTA M2 1.00 AREA= 4.32 4.32
AV- LOS ANGELES ENTRE CALLE CAHUIDE Y AV. JORGE BASADRE M2 1.00 AREA= 4.32 4.32
AMPLIACION BOLOGNESI M2 -
AV. CAROLINA REPETTI M2 1.00 AREA= AREA= AREA= AREA=
CALLE JUAN SEGOVIA M2 2.00 AREA= 4.32 8.64
CALLE CIRILO CARBAJAL ENTRE AV. INDUSTRIAL Y CALLE PUENTE ARNAO M2 2.00 AREA= 4.32 8.64
CALLE MIGUEL SOTTO ENTRE AV. CAROLINA REPETTI Y CALLE JUAN
M2 2.00 AREA= 4.32 8.64
SEGOVIA
PASAJE S/N M2 1.00 -
CALLE MANUEL GODINEZ M2 1.00 AREA= AREA= AREA= AREA=
CALLE CANDARAVE M2 1.00 AREA= 4.32 4.32
CALLE PUENTE ARNAO ENTRE CALLE JUAN SEGOVIA Y AV. JORGE BASADRE
M2 1.00 AREA= 4.32 4.32
GROHMANN
URBANIZACION VELEZ M2 AREA= 4.32 -
CALLE PUENTE ARNAO ENTRE AV. CAROLINA REPETTI Y CALLE JUAN
M2 2.00 -
SEGOVIA
CALLE CIRILO CARBAJAL ENTRE CALLE PUENTE ARNAO Y PROLO. AV.
M2 2.00 AREA= AREA= AREA= AREA=
JORGE CHAVEZ
URBANIZACION LAS MAGNOLIAS M2 AREA= 4.32 -
PASAJE LAS ORQUIDEAS M2 2.00 AREA= 4.32 8.64
PASAJE LOS LIRIOS M2 1.00 AREA= 4.32 4.32
URBANIZACION SEVERO VILDOSO M2 -
PASAJE N°16 M2 1.00 AREA= AREA= AREA= AREA=
PASAJE N°17 M2 1.00 AREA= 4.32 4.32
CALLE MONITOR HUASCAR ENTRE CALLE CUSCO Y AV. JORGE BASADRE
M2 2.00 AREA= 4.32 8.64
GROHMANN
CALLE CUSCO ENTRE PROL. AV. JORGE CHAVEZ Y CALLE MONITOR
M2 2.00 AREA= 4.32 8.64
HUASCAR

02.01.02 TRAZO NIVELES Y REPLANTEO M2 1,846.62


VEREDAS 1,372.45
AV. HUMBOLDT ENTRE PSJE N° 01 Y CALLE N° 20 M2 1.00 AREA= 53.14 53.14
AV. HUMBOLDT ENTRE CALLE N° 20 Y AV. TARAPACA M2 1.00 AREA= 147.26 147.26
PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (DERECHA) M2 1.00 AREA= 27.39 27.39
PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (IZQUIERDA) M2 1.00 AREA= 37.66 37.66
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (DERECHA) M2 1.00 AREA= 91.38 91.38
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (IZQUIERDA) M2 1.00 AREA= 91.78 91.78
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (DERECHA) M2 1.00 AREA= 67.69 67.69
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (IZQUIERDA) M2 1.00 AREA= 67.14 67.14
FONDO DE PSJE N° 02 M2 1.00 AREA= 6.74 6.74
PSJE N° 02 ENTRE CALLE N° 20 Y AV. TARAPACA (DERECHA) M2 1.00 AREA= 100.12 100.12
PSJE N° 02 ENTRE CALLE N° 20 Y AV. TARAPACA (IZQUIERDA) M2 1.00 AREA= 100.77 100.77
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (DERECHA) M2 1.00 AREA= 69.31 69.31
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y CALLE N° 02 (IZQUIERDA) M2 1.00 AREA= 15.96 15.96
PSJE N° 01 ENTRE CALLE N° 02 Y CALLE N° 20 (IZQUIERDA) M2 1.00 AREA= 40.74 40.74
PSJE N° 01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (DERECHA) M2 1.00 AREA= 55.45 55.45
PSJE N° 01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (IZQUIERDA) M2 1.00 AREA= 54.78 54.78
FONDO DE PSEJE N° 01 M2 1.00 AREA= 4.43 4.43

PSJE N° 01 ENTRE AV. HUMBOLDT Y PSJE N° 01 (DERECHA) M2 1.00 AREA= 14.94 14.94
PSJE N° 01 ENTRE AV. HUMBOLDT Y PSJE N° 01 (IZQUIERDA) M2 1.00 AREA= 14.02 14.02
CALLE N° 20 ENTRE AV. HUMBOLDT Y PSJE N° 01 (DERECHA) M2 1.00 AREA= 31.88 31.88
CALLE N° 20 ENTRE AV. HUMBOLDT Y PSJE N° 01 (IZQUIERDA) M2 1.00 AREA= 31.62 31.62
CALLE N° 20 ENTRE AV. PSJE N° 01 Y PSJE N° 02 (DERECHA) M2 1.00 AREA= 33.39 33.39
CALLE N° 20 ENTRE AV. PSJE N° 01 Y PSJE N° 02 (IZQUIERDA) M2 1.00 AREA= 34.58 34.58
CALLE N° 20 ENTRE AV. PSJE N° 02 Y PSJE N° 01 (DERECHA) M2 1.00 AREA= 37.24 37.24
CALLE N° 20 ENTRE AV. PSJE N° 02 Y PSJE N° 01 (IZQUIERDA) M2 1.00 AREA= 44.01 44.01
CALLE N° 20 CON PSJE N° 01 M2 1.00 AREA= 11.32 11.32
AV. TARAPACA ENTRE AV. HUMBOLTD Y PSJE N° 01 M2 1.00 AREA= 29.50 29.50
AV. TARAPACA ENTRE PSJE N° 01 Y PSJE N° 02 M2 1.00 AREA= 40.48 40.48
AV. TARAPACA CRUCE CON PSJE N° 02 M2 1.00 AREA= 17.73 17.73

MARTILLOS 382.01
M1 M2 1.00 AREA= 19.53 19.53
M2 M2 1.00 AREA= 19.65 19.65
M3 M2 1.00 AREA= 21.81 21.81
PLANILLA DE METRADOS

ACTIVIDAD :MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA URBANIZACION LAS FRESIAS DISTRITO DE TACNA - PROVINCIA DE TACNA - REGIÓN TACNA

PROPIETA. : MUNICIPALIDAD PROVINCIAL DE TACNA


FECHA : ENERO DEL 2018

MEDIDAS
ITEM DESCRIPCION UND CANT PARCIAL SUBTOTAL TOTAL
L A H

M4 M2 1.00 AREA= 21.49 21.49


M5 M2 1.00 AREA= 23.22 23.22
M6 M2 1.00 AREA= 4.05 4.05
M7 M2 1.00 AREA= 11.44 11.44
M8 M2 1.00 AREA= 11.50 11.50
M9 M2 1.00 AREA= 24.05 24.05
M10 M2 1.00 AREA= 12.18 12.18
M11 M2 1.00 AREA= 12.75 12.75
M12 M2 1.00 AREA= 23.98 23.98
M13 M2 1.00 AREA= 14.02 14.02
M14 M2 1.00 AREA= 18.66 18.66
M15 M2 1.00 AREA= 25.64 25.64
M16 M2 1.00 AREA= 12.50 12.50
M17 M2 1.00 AREA= 15.69 15.69
M18 M2 1.00 AREA= 18.26 18.26
M19 M2 1.00 AREA= 17.84 17.84
M20 M2 1.00 AREA= 14.73 14.73
M21 M2 1.00 AREA= 9.59 9.59
M22 M2 1.00 AREA= 9.70 9.70
M23 M2 1.00 AREA= 5.84 5.84
M24 M2 1.00 AREA= 13.89 13.89

RAMPAS PEATONAL TIPO 01 40.32


M1 M2 2.00 AREA= 1.26 2.52
M2 M2 2.00 AREA= 1.26 2.52
M3 M2 2.00 AREA= 1.26 2.52
M4 M2 2.00 AREA= 1.26 2.52
M5 M2 2.00 AREA= 1.26 2.52
M6 M2 - AREA= 1.26 -
M7 M2 1.00 AREA= 1.26 1.26
M8 M2 1.00 AREA= 1.26 1.26
M9 M2 1.00 AREA= 1.26 1.26
M10 M2 1.00 AREA= 1.26 1.26
M11 M2 1.00 AREA= 1.26 1.26
M12 M2 1.00 AREA= 1.26 1.26
M13 M2 1.00 AREA= 1.26 1.26
M14 M2 2.00 AREA= 1.26 2.52
M15 M2 2.00 AREA= 1.26 2.52
M16 M2 1.00 AREA= 1.26 1.26
M17 M2 2.00 AREA= 1.26 2.52
M18 M2 2.00 AREA= 1.26 2.52
M19 M2 2.00 AREA= 1.26 2.52
M20 M2 1.00 AREA= 1.26 1.26
M21 M2 1.00 AREA= 1.26 1.26
M22 M2 1.00 AREA= 1.26 1.26
M23 M2 - AREA= 1.26 -
M24 M2 1.00 AREA= 1.26 1.26

INTERCAMBIO PEATONAL (RAMPA TIPO 02) 51.84


PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (DERECHA) M2 2.00 AREA= 4.32 8.64
PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (IZQUIERDA) M2 1.00 AREA= 4.32 4.32
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (DERECHA) M2 2.00 AREA= 4.32 8.64
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (IZQUIERDA) M2 2.00 AREA= 4.32 8.64
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (DERECHA) M2 1.00 AREA= 4.32 4.32
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (IZQUIERDA) M2 1.00 AREA= 4.32 4.32
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (IZQUIERDA) M2 1.00 AREA= 4.32 4.32
PSJE N°01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (DERECHA) M2 1.00 AREA= 4.32 4.32
PSJE N°01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (IZQUIERDA) M2 1.00 AREA= 4.32 4.32

02.02 DEMOLICIONES Y ELIMINACION DE MATERIAL EXCEDENTE


02.02.01 DEMOLICION DE VEREDAS Y RAMPAS DE CONCRETO SIMPLE C/MARTILLO M2 594.07
VEREDAS 465.89
AV. HUMBOLDT ENTRE PSJE N° 01 ENTRE CALLE N° 20 M2 1.00 AREA= 34.05 34.05
AV. HUMBOLDT ENTRE CALLE N° 20 Y AV. TARAPACA M2 1.00 AREA= 16.25 16.25
PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (IZQUIERDA) M2 1.00 AREA= 40.79 40.79
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (DERECHA) M2 1.00 AREA= 23.16 23.16
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (IZQUIERDA) M2 1.00 AREA= 53.18 53.18
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (DERECHA) M2 1.00 AREA= 21.18 21.18
PSJE N° 02 ENTRE CALLE N° 20 Y AV. TARAPACA (DERECHA) M2 1.00 AREA= 30.84 30.84
PSJE N° 02 ENTRE CALLE N° 20 Y AV. TARAPACA (IZQUIERDA) M2 1.00 AREA= 29.49 29.49
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (DERECHA) M2 1.00 AREA= 7.46 7.46
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y CALLE N° 02 (IZQUIERDA) M2 1.00 AREA= 3.99 3.99
PSJE N° 01 ENTRE CALLE N° 02 Y CALLE N° 20 (IZQUIERDA) M2 1.00 AREA= 5.60 5.60
PSJE N° 01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (DERECHA) M2 1.00 AREA= 16.09 16.09
PLANILLA DE METRADOS

ACTIVIDAD :MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA URBANIZACION LAS FRESIAS DISTRITO DE TACNA - PROVINCIA DE TACNA - REGIÓN TACNA

PROPIETA. : MUNICIPALIDAD PROVINCIAL DE TACNA


FECHA : ENERO DEL 2018

MEDIDAS
ITEM DESCRIPCION UND CANT PARCIAL SUBTOTAL TOTAL
L A H

PSJE N° 01 ENTRE AV. HUMBOLDT Y PSJE N° 01 (IZQUIERDA) M2 1.00 AREA= 17.73 17.73
CALLE N° 20 ENTRE AV. PSJE N° 01 Y PSJE N° 02 (DERECHA) M2 1.00 AREA= 82.56 82.56
CALLE N° 20 ENTRE AV. PSJE N° 02 Y PSJE N° 01 (DERECHA) M2 1.00 AREA= 47.88 47.88
AV. TARAPACA ENTRE AV. HUMBOLTD Y PSJE N° 01 M2 1.00 AREA= 11.49 11.49
AV. TARAPACA ENTRE PSJE N° 01 Y PSJE N° 02 M2 1.00 AREA= 10.52 10.52
AV. TARAPACA CRUCE CON PSJE N° 02 M2 1.00 AREA= 13.63 13.63

RAMPAS 128.18
AV. HUMBOLDT ENTRE PSJE N° 01 ENTRE CALLE N° 20 (BERMA DE
M2 1.00 AREA= 100.58 100.58
CONCRETO)
AV. HUMBOLDT ENTRE PSJE N° 01 ENTRE CALLE N° 20 M2 1.00 AREA= 4.21 4.21
PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (IZQUIERDA) M2 1.00 AREA= 1.79 1.79
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (DERECHA) M2 1.00 AREA= 3.38 3.38

CALLE N° 20 ENTRE AV. PSJE N° 01 Y PSJE N° 02 (DERECHA) M2 1.00 AREA= 5.32 5.32
AV. TARAPACA ENTRE AV. HUMBOLTD Y PSJE N° 01 M2 1.00 AREA= 3.34 3.34
AV. TARAPACA CRUCE CON PSJE N° 02 M2 1.00 AREA= 9.56 9.56

02.02.02 ACARREO DE MATERIAL EXCEDENTE C/MAQUINARIA M3 111.39 111.39


DEMOLICION DE VEREDAS Y RAMPAS M3 1.00 AREA= 594.07 0.15 89.11
Factor de Esponjamiento: 1.25 M3 0.25 VOL= 89.11 22.28

02.02.03 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQ.15M3 M3 111.39 111.39


DEMOLICION DE VEREDAS M3 1.00 AREA= 594.07 0.15 89.11
Factor de Esponjamiento: 1.25 M3 0.25 VOL= 89.11 22.28

02.03 MOVIMIENTO DE TIERRAS


02.03.01 CORTE DE TERRENO C/CARGADOR MULTIPROPOSITO M3 247.44
VEREDAS 247.44
Ver Tabla de Corte y Rellenos M3 1.00 VOL= 247.44 247.44

02.03.02 RELLENO Y COMPACTACION CON MATERIAL DE PRESTAMO M3 55.02


VEREDAS 55.02
Ver Tabla de Corte y Rellenos M3 1.00 VOL= 55.02 55.02

02.03.03 ACARREO DE MATERIAL EXCEDENTE C/MAQUINARIA M3 240.53 240.53


CORTE DE TERRENO M3 1.00 VOL= 247.44 247.44
RELLENO DE TERRENO M3 -1.00 VOL= 55.02 -55.02
Factor de Esponjamiento: 1.25 M3 0.25 VOL= 192.42 48.11

02.03.04 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQ.15M3 M3 240.53 240.53


CORTE DE TERRENO M3 1.00 VOL= 247.44 247.44
RELLENO DE TERRENO M3 -1.00 VOL= 55.02 -55.02
Factor de Esponjamiento: 1.25 M3 0.25 VOL= 192.42 48.11

02.03.05 NIVELACION Y APISONADO DE TERRENO C/EQUIPO LIVIANO M2 1,846.62


VEREDAS 1,372.45
AV. HUMBOLDT ENTRE PSJE N° 01 Y CALLE N° 20 M2 1.00 AREA= 53.14 53.14
AV. HUMBOLDT ENTRE CALLE N° 20 Y AV. TARAPACA M2 1.00 AREA= 147.26 147.26
PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (DERECHA) M2 1.00 AREA= 27.39 27.39
PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (IZQUIERDA) M2 1.00 AREA= 37.66 37.66
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (DERECHA) M2 1.00 AREA= 91.38 91.38
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (IZQUIERDA) M2 1.00 AREA= 91.78 91.78
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (DERECHA) M2 1.00 AREA= 67.69 67.69
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (IZQUIERDA) M2 1.00 AREA= 67.14 67.14
FONDO DE PSJE N° 02 M2 1.00 AREA= 6.74 6.74
PSJE N° 02 ENTRE CALLE N° 20 Y AV. TARAPACA (DERECHA) M2 1.00 AREA= 100.12 100.12
PSJE N° 02 ENTRE CALLE N° 20 Y AV. TARAPACA (IZQUIERDA) M2 1.00 AREA= 100.77 100.77
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (DERECHA) M2 1.00 AREA= 69.31 69.31
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y CALLE N° 02 (IZQUIERDA) M2 1.00 AREA= 15.96 15.96
PSJE N° 01 ENTRE CALLE N° 02 Y CALLE N° 20 (IZQUIERDA) M2 1.00 AREA= 40.74 40.74
PSJE N° 01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (DERECHA) M2 1.00 AREA= 55.45 55.45
PSJE N° 01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (IZQUIERDA) M2 1.00 AREA= 54.78 54.78
FONDO DE PSEJE N° 01 M2 1.00 AREA= 4.43 4.43

PSJE N° 01 ENTRE AV. HUMBOLDT Y PSJE N° 01 (DERECHA) M2 1.00 AREA= 14.94 14.94
PSJE N° 01 ENTRE AV. HUMBOLDT Y PSJE N° 01 (IZQUIERDA) M2 1.00 AREA= 14.02 14.02
CALLE N° 20 ENTRE AV. HUMBOLDT Y PSJE N° 01 (DERECHA) M2 1.00 AREA= 31.88 31.88
CALLE N° 20 ENTRE AV. HUMBOLDT Y PSJE N° 01 (IZQUIERDA) M2 1.00 AREA= 31.62 31.62
CALLE N° 20 ENTRE AV. PSJE N° 01 Y PSJE N° 02 (DERECHA) M2 1.00 AREA= 33.39 33.39
CALLE N° 20 ENTRE AV. PSJE N° 01 Y PSJE N° 02 (IZQUIERDA) M2 1.00 AREA= 34.58 34.58
CALLE N° 20 ENTRE AV. PSJE N° 02 Y PSJE N° 01 (DERECHA) M2 1.00 AREA= 37.24 37.24
CALLE N° 20 ENTRE AV. PSJE N° 02 Y PSJE N° 01 (IZQUIERDA) M2 1.00 AREA= 44.01 44.01
CALLE N° 20 CON PSJE N° 01 M2 1.00 AREA= 11.32 11.32
PLANILLA DE METRADOS

ACTIVIDAD :MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA URBANIZACION LAS FRESIAS DISTRITO DE TACNA - PROVINCIA DE TACNA - REGIÓN TACNA

PROPIETA. : MUNICIPALIDAD PROVINCIAL DE TACNA


FECHA : ENERO DEL 2018

MEDIDAS
ITEM DESCRIPCION UND CANT PARCIAL SUBTOTAL TOTAL
L A H

AV. TARAPACA ENTRE AV. HUMBOLTD Y PSJE N° 01 M2 1.00 AREA= 29.50 29.50
AV. TARAPACA ENTRE PSJE N° 01 Y PSJE N° 02 M2 1.00 AREA= 40.48 40.48
AV. TARAPACA CRUCE CON PSJE N° 02 M2 1.00 AREA= 17.73 17.73

MARTILLOS 382.01
M1 M2 1.00 AREA= 19.53 19.53
M2 M2 1.00 AREA= 19.65 19.65
M3 M2 1.00 AREA= 21.81 21.81
M4 M2 1.00 AREA= 21.49 21.49
M5 M2 1.00 AREA= 23.22 23.22
M6 M2 1.00 AREA= 4.05 4.05
M7 M2 1.00 AREA= 11.44 11.44
M8 M2 1.00 AREA= 11.50 11.50
M9 M2 1.00 AREA= 24.05 24.05
M10 M2 1.00 AREA= 12.18 12.18
M11 M2 1.00 AREA= 12.75 12.75
M12 M2 1.00 AREA= 23.98 23.98
M13 M2 1.00 AREA= 14.02 14.02
M14 M2 1.00 AREA= 18.66 18.66
M15 M2 1.00 AREA= 25.64 25.64
M16 M2 1.00 AREA= 12.50 12.50
M17 M2 1.00 AREA= 15.69 15.69
M18 M2 1.00 AREA= 18.26 18.26
M19 M2 1.00 AREA= 17.84 17.84
M20 M2 1.00 AREA= 14.73 14.73
M21 M2 1.00 AREA= 9.59 9.59
M22 M2 1.00 AREA= 9.70 9.70
M23 M2 1.00 AREA= 5.84 5.84
M24 M2 1.00 AREA= 13.89 13.89

RAMPAS PEATONAL TIPO 01 40.32


M1 M2 2.00 AREA= 1.26 2.52
M2 M2 2.00 AREA= 1.26 2.52
M3 M2 2.00 AREA= 1.26 2.52
M4 M2 2.00 AREA= 1.26 2.52
M5 M2 2.00 AREA= 1.26 2.52
M6 M2 - AREA= 1.26 -
M7 M2 1.00 AREA= 1.26 1.26
M8 M2 1.00 AREA= 1.26 1.26
M9 M2 1.00 AREA= 1.26 1.26
M10 M2 1.00 AREA= 1.26 1.26
M11 M2 1.00 AREA= 1.26 1.26
M12 M2 1.00 AREA= 1.26 1.26
M13 M2 1.00 AREA= 1.26 1.26
M14 M2 2.00 AREA= 1.26 2.52
M15 M2 2.00 AREA= 1.26 2.52
M16 M2 1.00 AREA= 1.26 1.26
M17 M2 2.00 AREA= 1.26 2.52
M18 M2 2.00 AREA= 1.26 2.52
M19 M2 2.00 AREA= 1.26 2.52
M20 M2 1.00 AREA= 1.26 1.26
M21 M2 1.00 AREA= 1.26 1.26
M22 M2 1.00 AREA= 1.26 1.26
M23 M2 - AREA= 1.26 -
M24 M2 1.00 AREA= 1.26 1.26

INTERCAMBIO PEATONAL (RAMPA TIPO 02) 51.84


PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (DERECHA) M2 2.00 AREA= 4.32 8.64
PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (IZQUIERDA) M2 1.00 AREA= 4.32 4.32
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (DERECHA) M2 2.00 AREA= 4.32 8.64
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (IZQUIERDA) M2 2.00 AREA= 4.32 8.64
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (DERECHA) M2 1.00 AREA= 4.32 4.32
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (IZQUIERDA) M2 1.00 AREA= 4.32 4.32
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (IZQUIERDA) M2 1.00 AREA= 4.32 4.32
PSJE N°01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (DERECHA) M2 1.00 AREA= 4.32 4.32
PSJE N°01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (IZQUIERDA) M2 1.00 AREA= 4.32 4.32

02.03.06 TERRAPLEN PARA VEREDAS E=0.10 M M2 1,846.62


VEREDAS 1,372.45
AV. HUMBOLDT ENTRE PSJE N° 01 Y CALLE N° 20 M2 1.00 AREA= 53.14 53.14
AV. HUMBOLDT ENTRE CALLE N° 20 Y AV. TARAPACA M2 1.00 AREA= 147.26 147.26
PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (DERECHA) M2 1.00 AREA= 27.39 27.39
PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (IZQUIERDA) M2 1.00 AREA= 37.66 37.66
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (DERECHA) M2 1.00 AREA= 91.38 91.38
PLANILLA DE METRADOS

ACTIVIDAD :MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA URBANIZACION LAS FRESIAS DISTRITO DE TACNA - PROVINCIA DE TACNA - REGIÓN TACNA

PROPIETA. : MUNICIPALIDAD PROVINCIAL DE TACNA


FECHA : ENERO DEL 2018

MEDIDAS
ITEM DESCRIPCION UND CANT PARCIAL SUBTOTAL TOTAL
L A H

PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (IZQUIERDA) M2 1.00 AREA= 91.78 91.78
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (DERECHA) M2 1.00 AREA= 67.69 67.69
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (IZQUIERDA) M2 1.00 AREA= 67.14 67.14
FONDO DE PSJE N° 02 M2 1.00 AREA= 6.74 6.74
PSJE N° 02 ENTRE CALLE N° 20 Y AV. TARAPACA (DERECHA) M2 1.00 AREA= 100.12 100.12
PSJE N° 02 ENTRE CALLE N° 20 Y AV. TARAPACA (IZQUIERDA) M2 1.00 AREA= 100.77 100.77
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (DERECHA) M2 1.00 AREA= 69.31 69.31
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y CALLE N° 02 (IZQUIERDA) M2 1.00 AREA= 15.96 15.96
PSJE N° 01 ENTRE CALLE N° 02 Y CALLE N° 20 (IZQUIERDA) M2 1.00 AREA= 40.74 40.74
PSJE N° 01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (DERECHA) M2 1.00 AREA= 55.45 55.45
PSJE N° 01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (IZQUIERDA) M2 1.00 AREA= 54.78 54.78
FONDO DE PSEJE N° 01 M2 1.00 AREA= 4.43 4.43

PSJE N° 01 ENTRE AV. HUMBOLDT Y PSJE N° 01 (DERECHA) M2 1.00 AREA= 14.94 14.94
PSJE N° 01 ENTRE AV. HUMBOLDT Y PSJE N° 01 (IZQUIERDA) M2 1.00 AREA= 14.02 14.02
CALLE N° 20 ENTRE AV. HUMBOLDT Y PSJE N° 01 (DERECHA) M2 1.00 AREA= 31.88 31.88
CALLE N° 20 ENTRE AV. HUMBOLDT Y PSJE N° 01 (IZQUIERDA) M2 1.00 AREA= 31.62 31.62
CALLE N° 20 ENTRE AV. PSJE N° 01 Y PSJE N° 02 (DERECHA) M2 1.00 AREA= 33.39 33.39
CALLE N° 20 ENTRE AV. PSJE N° 01 Y PSJE N° 02 (IZQUIERDA) M2 1.00 AREA= 34.58 34.58
CALLE N° 20 ENTRE AV. PSJE N° 02 Y PSJE N° 01 (DERECHA) M2 1.00 AREA= 37.24 37.24
CALLE N° 20 ENTRE AV. PSJE N° 02 Y PSJE N° 01 (IZQUIERDA) M2 1.00 AREA= 44.01 44.01
CALLE N° 20 CON PSJE N° 01 M2 1.00 AREA= 11.32 11.32
AV. TARAPACA ENTRE AV. HUMBOLTD Y PSJE N° 01 M2 1.00 AREA= 29.50 29.50
AV. TARAPACA ENTRE PSJE N° 01 Y PSJE N° 02 M2 1.00 AREA= 40.48 40.48
AV. TARAPACA CRUCE CON PSJE N° 02 M2 1.00 AREA= 17.73 17.73

MARTILLOS 382.01
M1 M2 1.00 AREA= 19.53 19.53
M2 M2 1.00 AREA= 19.65 19.65
M3 M2 1.00 AREA= 21.81 21.81
M4 M2 1.00 AREA= 21.49 21.49
M5 M2 1.00 AREA= 23.22 23.22
M6 M2 1.00 AREA= 4.05 4.05
M7 M2 1.00 AREA= 11.44 11.44
M8 M2 1.00 AREA= 11.50 11.50
M9 M2 1.00 AREA= 24.05 24.05
M10 M2 1.00 AREA= 12.18 12.18
M11 M2 1.00 AREA= 12.75 12.75
M12 M2 1.00 AREA= 23.98 23.98
M13 M2 1.00 AREA= 14.02 14.02
M14 M2 1.00 AREA= 18.66 18.66
M15 M2 1.00 AREA= 25.64 25.64
M16 M2 1.00 AREA= 12.50 12.50
M17 M2 1.00 AREA= 15.69 15.69
M18 M2 1.00 AREA= 18.26 18.26
M19 M2 1.00 AREA= 17.84 17.84
M20 M2 1.00 AREA= 14.73 14.73
M21 M2 1.00 AREA= 9.59 9.59
M22 M2 1.00 AREA= 9.70 9.70
M23 M2 1.00 AREA= 5.84 5.84
M24 M2 1.00 AREA= 13.89 13.89

RAMPAS PEATONAL TIPO 01 40.32


M1 M2 2.00 AREA= 1.26 2.52
M2 M2 2.00 AREA= 1.26 2.52
M3 M2 2.00 AREA= 1.26 2.52
M4 M2 2.00 AREA= 1.26 2.52
M5 M2 2.00 AREA= 1.26 2.52
M6 M2 - AREA= 1.26 -
M7 M2 1.00 AREA= 1.26 1.26
M8 M2 1.00 AREA= 1.26 1.26
M9 M2 1.00 AREA= 1.26 1.26
M10 M2 1.00 AREA= 1.26 1.26
M11 M2 1.00 AREA= 1.26 1.26
M12 M2 1.00 AREA= 1.26 1.26
M13 M2 1.00 AREA= 1.26 1.26
M14 M2 2.00 AREA= 1.26 2.52
M15 M2 2.00 AREA= 1.26 2.52
M16 M2 1.00 AREA= 1.26 1.26
M17 M2 2.00 AREA= 1.26 2.52
M18 M2 2.00 AREA= 1.26 2.52
M19 M2 2.00 AREA= 1.26 2.52
M20 M2 1.00 AREA= 1.26 1.26
M21 M2 1.00 AREA= 1.26 1.26
PLANILLA DE METRADOS

ACTIVIDAD :MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA URBANIZACION LAS FRESIAS DISTRITO DE TACNA - PROVINCIA DE TACNA - REGIÓN TACNA

PROPIETA. : MUNICIPALIDAD PROVINCIAL DE TACNA


FECHA : ENERO DEL 2018

MEDIDAS
ITEM DESCRIPCION UND CANT PARCIAL SUBTOTAL TOTAL
L A H

M22 M2 1.00 AREA= 1.26 1.26


M23 M2 - AREA= 1.26 -
M24 M2 1.00 AREA= 1.26 1.26

INTERCAMBIO PEATONAL (RAMPA TIPO 02) 51.84


PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (DERECHA) M2 2.00 AREA= 4.32 8.64
PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (IZQUIERDA) M2 1.00 AREA= 4.32 4.32
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (DERECHA) M2 2.00 AREA= 4.32 8.64
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (IZQUIERDA) M2 2.00 AREA= 4.32 8.64
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (DERECHA) M2 1.00 AREA= 4.32 4.32
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (IZQUIERDA) M2 1.00 AREA= 4.32 4.32
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (IZQUIERDA) M2 1.00 AREA= 4.32 4.32
PSJE N°01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (DERECHA) M2 1.00 AREA= 4.32 4.32
PSJE N°01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (IZQUIERDA) M2 1.00 AREA= 4.32 4.32

02.04 OBRAS DE CONCRETO SIMPLE


02.04.01 SARDINEL SUMERGIDO: CONCRETO F'C=175 KG/CM2 M3 39.70
VEREDAS LONGITUDINAL (SARDINEL SUMERGIDO) 16.50
AV. HUMBOLDT ENTRE PSJE N° 01 Y CALLE N° 20 M3 1.00 29.17 Sección= 0.015 0.44
AV. HUMBOLDT ENTRE CALLE N° 20 Y AV. TARAPACA M3 1.00 82.01 Sección= 0.015 1.23
PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (DERECHA) M3 1.00 22.82 Sección= 0.015 0.34
PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (IZQUIERDA) M3 1.00 31.38 Sección= 0.015 0.47
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (DERECHA) M3 1.00 76.15 Sección= 0.015 1.14
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (IZQUIERDA) M3 1.00 76.48 Sección= 0.015 1.15
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (DERECHA) M3 1.00 56.32 Sección= 0.015 0.84
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (IZQUIERDA) M3 1.00 56.04 Sección= 0.015 0.84
PSJE N° 02 FONDO M3 1.00 5.61 Sección= 0.015 0.08
PSJE N° 02 ENTRE CALLE N° 20 Y AV. TARAPACA (DERECHA) M3 1.00 83.40 Sección= 0.015 1.25
PSJE N° 02 ENTRE CALLE N° 20 Y AV. TARAPACA (IZQUIERDA) M3 1.00 84.61 Sección= 0.015 1.27
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (DERECHA) M3 1.00 57.70 Sección= 0.015 0.87
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y CALLE N° 02 (IZQUIERDA) M3 1.00 13.31 Sección= 0.015 0.20
PSJE N° 01 ENTRE CALLE N° 02 Y CALLE N° 20 (IZQUIERDA) M3 1.00 34.02 Sección= 0.015 0.51
PSJE N° 01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (DERECHA) M3 1.00 46.18 Sección= 0.015 0.69
PSJE N° 01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (IZQUIERDA) M3 1.00 45.57 Sección= 0.015 0.68
PSJE N° 01 FONDO M3 1.00 3.72 Sección= 0.015 0.06
PSJE N° 01 ENTRE AV. HUMBOLDT Y PSJE N° 01 (DERECHA) M3 1.00 23.36 Sección= 0.015 0.35
PSJE N° 01 ENTRE AV. HUMBOLDT Y PSJE N° 01 (IZQUIERDA) M3 1.00 26.57 Sección= 0.015 0.40
CALLE N° 20 ENTRE AV. HUMBOLDT Y PSJE N° 01 (DERECHA) M3 1.00 26.57 Sección= 0.015 0.40
CALLE N° 20 ENTRE AV. HUMBOLDT Y PSJE N° 01 (IZQUIERDA) M3 1.00 26.35 Sección= 0.015 0.40
CALLE N° 20 ENTRE PSJE N° 01 Y PSJE N° 02 (DERECHA) M3 1.00 27.82 Sección= 0.015 0.42
CALLE N° 20 ENTRE PSJE N° 01 Y PSJE N° 02 (IZQUIERDA) M3 1.00 28.82 Sección= 0.015 0.43
CALLE N° 20 ENTRE PSJE N° 02 Y PSJE N° 01 (DERECHA) M3 1.00 30.71 Sección= 0.015 0.46
CALLE N° 20 ENTRE PSJE N° 02 Y PSJE N° 01 (IZQUIERDA) M3 1.00 36.67 Sección= 0.015 0.55
CALLE N° 20 CRUCE CON PSJE N° 01 M3 1.00 9.39 Sección= 0.015 0.14
AV. TARAPACA ENTRE AV. HUMBOLDT Y PSJE N° 01 M3 1.00 19.70 Sección= 0.015 0.30
AV. TARAPACA ENTRE PSJE N° 01 Y PSJE N° 02 M3 1.00 27.03 Sección= 0.015 0.41
AV. TARAPACA ENTRE PSJE N° 02 Y FIN DE INTERVENCION M3 1.00 11.82 Sección= 0.015 0.18

VEREDAS TRANVERSAL 14.02


AV. HUMBOLDT ENTRE PSJE N° 01 Y CALLE N° 20 M3 20.00 1.80 Sección= 0.015 0.54
AV. HUMBOLDT ENTRE CALLE N° 20 Y AV. TARAPACA M3 56.00 1.80 Sección= 0.015 1.51
PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (DERECHA) M3 16.00 1.20 Sección= 0.015 0.29
PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (IZQUIERDA) M3 22.00 1.20 Sección= 0.015 0.40
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (DERECHA) M3 52.00 1.20 Sección= 0.015 0.94
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (IZQUIERDA) M3 52.00 1.20 Sección= 0.015 0.94
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (DERECHA) M3 38.00 1.20 Sección= 0.015 0.68
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (IZQUIERDA) M3 38.00 1.20 Sección= 0.015 0.68
PSJE N° 02 FONDO M3 4.00 1.20 Sección= 0.015 0.07
PSJE N° 02 ENTRE CALLE N° 20 Y AV. TARAPACA (DERECHA) M3 56.00 1.20 Sección= 0.015 1.01
PSJE N° 02 ENTRE CALLE N° 20 Y AV. TARAPACA (IZQUIERDA) M3 56.00 1.20 Sección= 0.015 1.01
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (DERECHA) M3 38.00 1.20 Sección= 0.015 0.68
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y CALLE N° 02 (IZQUIERDA) M3 10.00 1.20 Sección= 0.015 0.18
PSJE N° 01 ENTRE CALLE N° 02 Y CALLE N° 20 (IZQUIERDA) M3 22.00 1.20 Sección= 0.015 0.40
PSJE N° 01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (DERECHA) M3 30.00 1.20 Sección= 0.015 0.54
PSJE N° 01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (IZQUIERDA) M3 30.00 1.20 Sección= 0.015 0.54
PSJE N° 01 FONDO M3 4.00 1.20 Sección= 0.015 0.07
PSJE N° 01 ENTRE AV. HUMBOLDT Y PSJE N° 01 (DERECHA) M3 16.00 0.60 Sección= 0.015 0.14
PSJE N° 01 ENTRE AV. HUMBOLDT Y PSJE N° 01 (IZQUIERDA) M3 18.00 0.60 Sección= 0.015 0.16
CALLE N° 20 ENTRE AV. HUMBOLDT Y PSJE N° 01 (DERECHA) M3 18.00 1.20 Sección= 0.015 0.32
CALLE N° 20 ENTRE AV. HUMBOLDT Y PSJE N° 01 (IZQUIERDA) M3 18.00 1.20 Sección= 0.015 0.32
CALLE N° 20 ENTRE PSJE N° 01 Y PSJE N° 02 (DERECHA) M3 20.00 1.20 Sección= 0.015 0.36
CALLE N° 20 ENTRE PSJE N° 01 Y PSJE N° 02 (IZQUIERDA) M3 20.00 1.20 Sección= 0.015 0.36
CALLE N° 20 ENTRE PSJE N° 02 Y PSJE N° 01 (DERECHA) M3 22.00 1.20 Sección= 0.015 0.40
CALLE N° 20 ENTRE PSJE N° 02 Y PSJE N° 01 (IZQUIERDA) M3 24.00 1.20 Sección= 0.015 0.43
CALLE N° 20 CRUCE CON PSJE N° 01 M3 8.00 1.20 Sección= 0.015 0.14
PLANILLA DE METRADOS

ACTIVIDAD :MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA URBANIZACION LAS FRESIAS DISTRITO DE TACNA - PROVINCIA DE TACNA - REGIÓN TACNA

PROPIETA. : MUNICIPALIDAD PROVINCIAL DE TACNA


FECHA : ENERO DEL 2018

MEDIDAS
ITEM DESCRIPCION UND CANT PARCIAL SUBTOTAL TOTAL
L A H

AV. TARAPACA ENTRE AV. HUMBOLDT Y PSJE N° 01 M3 14.00 1.50 Sección= 0.015 0.32
AV. TARAPACA ENTRE PSJE N° 01 Y PSJE N° 02 M3 18.00 1.50 Sección= 0.015 0.41
AV. TARAPACA ENTRE PSJE N° 02 Y FIN DE INTERVENCION M3 8.00 1.50 Sección= 0.015 0.18

MARTILLO 7.71
M1 M3 1.00 25.43 Sección= 0.015 0.38
M2 M3 1.00 25.83 Sección= 0.015 0.39
M3 M3 1.00 24.85 Sección= 0.015 0.37
M4 M3 1.00 24.54 Sección= 0.015 0.37
M5 M3 1.00 23.62 Sección= 0.015 0.35
M6 M3 1.00 11.15 Sección= 0.015 0.17
M7 M3 1.00 19.08 Sección= 0.015 0.29
M8 M3 1.00 19.21 Sección= 0.015 0.29
M9 M3 1.00 24.86 Sección= 0.015 0.37
M10 M3 1.00 19.50 Sección= 0.015 0.29
M11 M3 1.00 18.74 Sección= 0.015 0.28
M12 M3 1.00 24.76 Sección= 0.015 0.37
M13 M3 1.00 21.25 Sección= 0.015 0.32
M14 M3 1.00 23.31 Sección= 0.015 0.35
M15 M3 1.00 24.36 Sección= 0.015 0.37
M16 M3 1.00 20.67 Sección= 0.015 0.31
M17 M3 1.00 24.81 Sección= 0.015 0.37
M18 M3 1.00 24.46 Sección= 0.015 0.37
M19 M3 1.00 22.91 Sección= 0.015 0.34
M20 M3 1.00 21.43 Sección= 0.015 0.32
M21 M3 1.00 17.72 Sección= 0.015 0.27
M22 M3 1.00 18.32 Sección= 0.015 0.27
M23 M3 1.00 11.67 Sección= 0.015 0.18
M24 M3 1.00 21.29 Sección= 0.015 0.32

INTERCAMBIO PEATONAL LONGITUDINAL 0.63


PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (DERECHA) M3 2.00 3.60 Sección= 0.015 0.11
PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (IZQUIERDA) M3 1.00 3.60 Sección= 0.015 0.05
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (DERECHA) M3 2.00 3.60 Sección= 0.015 0.11
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (IZQUIERDA) M3 2.00 3.60 Sección= 0.015 0.11
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (DERECHA) M3 1.00 3.60 Sección= 0.015 0.05
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (IZQUIERDA) M3 1.00 3.60 Sección= 0.015 0.05
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (IZQUIERDA) M3 1.00 3.60 Sección= 0.015 0.05
PSJE N°01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (DERECHA) M3 1.00 3.60 Sección= 0.015 0.05
PSJE N°01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (IZQUIERDA) M3 1.00 3.60 Sección= 0.015 0.05

INTERCAMBIO PEATONAL TRANSVERSAL 0.84


PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (DERECHA) M3 8.00 1.20 Sección= 0.015 0.14
PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (IZQUIERDA) M3 4.00 1.20 Sección= 0.015 0.07
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (DERECHA) M3 8.00 1.20 Sección= 0.015 0.14
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (IZQUIERDA) M3 8.00 1.20 Sección= 0.015 0.14
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (DERECHA) M3 4.00 1.20 Sección= 0.015 0.07
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (IZQUIERDA) M3 4.00 1.20 Sección= 0.015 0.07
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (IZQUIERDA) M3 4.00 1.20 Sección= 0.015 0.07
PSJE N°01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (DERECHA) M3 4.00 1.20 Sección= 0.015 0.07
PSJE N°01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (IZQUIERDA) M3 4.00 1.20 Sección= 0.015 0.07

02.04.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA VEREDAS M2 331.20


VEREDAS 219.82
AV. HUMBOLDT ENTRE PSJE N° 01 Y CALLE N° 20 M2 1.00 29.17 0.20 5.83
AV. HUMBOLDT ENTRE CALLE N° 20 Y AV. TARAPACA M2 1.00 82.01 0.20 16.40
PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (DERECHA) M2 1.00 22.82 0.20 4.56
PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (IZQUIERDA) M2 1.00 31.38 0.20 6.28
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (DERECHA) M2 1.00 76.15 0.20 15.23
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (IZQUIERDA) M2 1.00 76.48 0.20 15.30
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (DERECHA) M2 1.00 56.32 0.20 11.26
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (IZQUIERDA) M2 1.00 56.04 0.20 11.21
PSJE N° 02 FONDO M2 1.00 5.61 0.20 1.12
PSJE N° 02 ENTRE CALLE N° 20 Y AV. TARAPACA (DERECHA) M2 1.00 83.40 0.20 16.68
PSJE N° 02 ENTRE CALLE N° 20 Y AV. TARAPACA (IZQUIERDA) M2 1.00 84.61 0.20 16.92
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (DERECHA) M2 1.00 57.70 0.20 11.54
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y CALLE N° 02 (IZQUIERDA) M2 1.00 13.31 0.20 2.66
PSJE N° 01 ENTRE CALLE N° 02 Y CALLE N° 20 (IZQUIERDA) M2 1.00 34.02 0.20 6.80
PSJE N° 01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (DERECHA) M2 1.00 46.18 0.20 9.24
PSJE N° 01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (IZQUIERDA) M2 1.00 45.57 0.20 9.11
PSJE N° 01 FONDO M2 1.00 3.72 0.20 0.74
PSJE N° 01 ENTRE AV. HUMBOLDT Y PSJE N° 01 (DERECHA) M2 1.00 23.36 0.20 4.67
PSJE N° 01 ENTRE AV. HUMBOLDT Y PSJE N° 01 (IZQUIERDA) M2 1.00 26.57 0.20 5.31
CALLE N° 20 ENTRE AV. HUMBOLDT Y PSJE N° 01 (DERECHA) M2 1.00 26.57 0.20 5.31
PLANILLA DE METRADOS

ACTIVIDAD :MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA URBANIZACION LAS FRESIAS DISTRITO DE TACNA - PROVINCIA DE TACNA - REGIÓN TACNA

PROPIETA. : MUNICIPALIDAD PROVINCIAL DE TACNA


FECHA : ENERO DEL 2018

MEDIDAS
ITEM DESCRIPCION UND CANT PARCIAL SUBTOTAL TOTAL
L A H

CALLE N° 20 ENTRE AV. HUMBOLDT Y PSJE N° 01 (IZQUIERDA) M2 1.00 26.35 0.20 5.27
CALLE N° 20 ENTRE PSJE N° 01 Y PSJE N° 02 (DERECHA) M2 1.00 27.82 0.20 5.56
CALLE N° 20 ENTRE PSJE N° 01 Y PSJE N° 02 (IZQUIERDA) M2 1.00 28.82 0.20 5.76
CALLE N° 20 ENTRE PSJE N° 02 Y PSJE N° 01 (DERECHA) M2 1.00 30.71 0.20 6.14
CALLE N° 20 ENTRE PSJE N° 02 Y PSJE N° 01 (IZQUIERDA) M2 1.00 36.67 0.20 7.33
CALLE N° 20 CRUCE CON PSJE N° 01 M2 1.00 9.39 0.20 1.88
AV. TARAPACA ENTRE AV. HUMBOLDT Y PSJE N° 01 M2 1.00 19.70 0.20 3.94
AV. TARAPACA ENTRE PSJE N° 01 Y PSJE N° 02 M2 1.00 27.03 0.20 5.41
AV. TARAPACA ENTRE PSJE N° 02 Y FIN DE INTERVENCION M2 1.00 11.82 0.20 2.36

MARTILLOS 102.74
M1 M2 1.00 25.43 0.20 5.09
M2 M2 1.00 25.83 0.20 5.17
M3 M2 1.00 24.85 0.20 4.97
M4 M2 1.00 24.54 0.20 4.91
M5 M2 1.00 23.62 0.20 4.72
M6 M2 1.00 11.15 0.20 2.23
M7 M2 1.00 19.08 0.20 3.82
M8 M2 1.00 19.21 0.20 3.84
M9 M2 1.00 24.86 0.20 4.97
M10 M2 1.00 19.50 0.20 3.90
M11 M2 1.00 18.74 0.20 3.75
M12 M2 1.00 24.76 0.20 4.95
M13 M2 1.00 21.25 0.20 4.25
M14 M2 1.00 23.31 0.20 4.66
M15 M2 1.00 24.36 0.20 4.87
M16 M2 1.00 20.67 0.20 4.13
M17 M2 1.00 24.81 0.20 4.96
M18 M2 1.00 24.46 0.20 4.89
M19 M2 1.00 22.91 0.20 4.58
M20 M2 1.00 21.43 0.20 4.29
M21 M2 1.00 17.72 0.20 3.54
M22 M2 1.00 18.32 0.20 3.66
M23 M2 1.00 11.67 0.20 2.33
M24 M2 1.00 21.29 0.20 4.26

INTERCAMBIO PEATONAL 8.64


PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (DERECHA) M2 2.00 3.60 0.20 1.44
PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (IZQUIERDA) M2 1.00 3.60 0.20 0.72
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (DERECHA) M2 2.00 3.60 0.20 1.44
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (IZQUIERDA) M2 2.00 3.60 0.20 1.44
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (DERECHA) M2 1.00 3.60 0.20 0.72
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (IZQUIERDA) M2 1.00 3.60 0.20 0.72
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (IZQUIERDA) M2 1.00 3.60 0.20 0.72
PSJE N°01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (DERECHA) M2 1.00 3.60 0.20 0.72
PSJE N°01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (IZQUIERDA) M2 1.00 3.60 0.20 0.72

02.04.03 VEREDA DE PIEDRA LAVADA F'C=175 KG/CM2 E=4" M2 1,372.45


VEREDAS 1,372.45
AV. HUMBOLDT ENTRE PSJE N° 01 Y CALLE N° 20 M2 1.00 AREA= 53.14 53.14
AV. HUMBOLDT ENTRE CALLE N° 20 Y AV. TARAPACA M2 1.00 AREA= 147.26 147.26
PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (DERECHA) M2 1.00 AREA= 27.39 27.39
PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (IZQUIERDA) M2 1.00 AREA= 37.66 37.66
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (DERECHA) M2 1.00 AREA= 91.38 91.38
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (IZQUIERDA) M2 1.00 AREA= 91.78 91.78
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (DERECHA) M2 1.00 AREA= 67.69 67.69
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (IZQUIERDA) M2 1.00 AREA= 67.14 67.14
FONDO DE PSJE N° 02 M2 1.00 AREA= 6.74 6.74
PSJE N° 02 ENTRE CALLE N° 20 Y AV. TARAPACA (DERECHA) M2 1.00 AREA= 100.12 100.12
PSJE N° 02 ENTRE CALLE N° 20 Y AV. TARAPACA (IZQUIERDA) M2 1.00 AREA= 100.77 100.77
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (DERECHA) M2 1.00 AREA= 69.31 69.31
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y CALLE N° 02 (IZQUIERDA) M2 1.00 AREA= 15.96 15.96
PSJE N° 01 ENTRE CALLE N° 02 Y CALLE N° 20 (IZQUIERDA) M2 1.00 AREA= 40.74 40.74
PSJE N° 01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (DERECHA) M2 1.00 AREA= 55.45 55.45
PSJE N° 01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (IZQUIERDA) M2 1.00 AREA= 54.78 54.78
FONDO DE PSEJE N° 01 M2 1.00 AREA= 4.43 4.43

PSJE N° 01 ENTRE AV. HUMBOLDT Y PSJE N° 01 (DERECHA) M2 1.00 AREA= 14.94 14.94
PSJE N° 01 ENTRE AV. HUMBOLDT Y PSJE N° 01 (IZQUIERDA) M2 1.00 AREA= 14.02 14.02
CALLE N° 20 ENTRE AV. HUMBOLDT Y PSJE N° 01 (DERECHA) M2 1.00 AREA= 31.88 31.88
CALLE N° 20 ENTRE AV. HUMBOLDT Y PSJE N° 01 (IZQUIERDA) M2 1.00 AREA= 31.62 31.62
CALLE N° 20 ENTRE AV. PSJE N° 01 Y PSJE N° 02 (DERECHA) M2 1.00 AREA= 33.39 33.39
CALLE N° 20 ENTRE AV. PSJE N° 01 Y PSJE N° 02 (IZQUIERDA) M2 1.00 AREA= 34.58 34.58
CALLE N° 20 ENTRE AV. PSJE N° 02 Y PSJE N° 01 (DERECHA) M2 1.00 AREA= 37.24 37.24
PLANILLA DE METRADOS

ACTIVIDAD :MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA URBANIZACION LAS FRESIAS DISTRITO DE TACNA - PROVINCIA DE TACNA - REGIÓN TACNA

PROPIETA. : MUNICIPALIDAD PROVINCIAL DE TACNA


FECHA : ENERO DEL 2018

MEDIDAS
ITEM DESCRIPCION UND CANT PARCIAL SUBTOTAL TOTAL
L A H

CALLE N° 20 ENTRE AV. PSJE N° 02 Y PSJE N° 01 (IZQUIERDA) M2 1.00 AREA= 44.01 44.01
CALLE N° 20 CON PSJE N° 01 M2 1.00 AREA= 11.32 11.32
AV. TARAPACA ENTRE AV. HUMBOLTD Y PSJE N° 01 M2 1.00 AREA= 29.50 29.50
AV. TARAPACA ENTRE PSJE N° 01 Y PSJE N° 02 M2 1.00 AREA= 40.48 40.48
AV. TARAPACA CRUCE CON PSJE N° 02 M2 1.00 AREA= 17.73 17.73

02.04.04 MARTILLO DE PIEDRA LAVADA F'C=175KG/CM2 E=4" M2 382.01


MARTILLOS 382.01
M1 M2 1.00 AREA= 19.53 19.53
M2 M2 1.00 AREA= 19.65 19.65
M3 M2 1.00 AREA= 21.81 21.81
M4 M2 1.00 AREA= 21.49 21.49
M5 M2 1.00 AREA= 23.22 23.22
M6 M2 1.00 AREA= 4.05 4.05
M7 M2 1.00 AREA= 11.44 11.44
M8 M2 1.00 AREA= 11.50 11.50
M9 M2 1.00 AREA= 24.05 24.05
M10 M2 1.00 AREA= 12.18 12.18
M11 M2 1.00 AREA= 12.75 12.75
M12 M2 1.00 AREA= 23.98 23.98
M13 M2 1.00 AREA= 14.02 14.02
M14 M2 1.00 AREA= 18.66 18.66
M15 M2 1.00 AREA= 25.64 25.64
M16 M2 1.00 AREA= 12.50 12.50
M17 M2 1.00 AREA= 15.69 15.69
M18 M2 1.00 AREA= 18.26 18.26
M19 M2 1.00 AREA= 17.84 17.84
M20 M2 1.00 AREA= 14.73 14.73
M21 M2 1.00 AREA= 9.59 9.59
M22 M2 1.00 AREA= 9.70 9.70
M23 M2 1.00 AREA= 5.84 5.84
M24 M2 1.00 AREA= 13.89 13.89

02.04.05 RAMPAS DE CONCRETO F'C=175KG/CM2 E=4" M2 92.16


RAMPAS PEATONAL TIPO 01 40.32
M1 M2 2.00 AREA= 1.26 2.52
M2 M2 2.00 AREA= 1.26 2.52
M3 M2 2.00 AREA= 1.26 2.52
M4 M2 2.00 AREA= 1.26 2.52
M5 M2 2.00 AREA= 1.26 2.52
M6 M2 - AREA= 1.26 -
M7 M2 1.00 AREA= 1.26 1.26
M8 M2 1.00 AREA= 1.26 1.26
M9 M2 1.00 AREA= 1.26 1.26
M10 M2 1.00 AREA= 1.26 1.26
M11 M2 1.00 AREA= 1.26 1.26
M12 M2 1.00 AREA= 1.26 1.26
M13 M2 1.00 AREA= 1.26 1.26
M14 M2 2.00 AREA= 1.26 2.52
M15 M2 2.00 AREA= 1.26 2.52
M16 M2 1.00 AREA= 1.26 1.26
M17 M2 2.00 AREA= 1.26 2.52
M18 M2 2.00 AREA= 1.26 2.52
M19 M2 2.00 AREA= 1.26 2.52
M20 M2 1.00 AREA= 1.26 1.26
M21 M2 1.00 AREA= 1.26 1.26
M22 M2 1.00 AREA= 1.26 1.26
M23 M2 - AREA= 1.26 -
M24 M2 1.00 AREA= 1.26 1.26

INTERCAMBIO PEATONAL (RAMPA TIPO 02) 51.84


PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (DERECHA) M2 2.00 AREA= 4.32 8.64
PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (IZQUIERDA) M2 1.00 AREA= 4.32 4.32
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (DERECHA) M2 2.00 AREA= 4.32 8.64
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (IZQUIERDA) M2 2.00 AREA= 4.32 8.64
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (DERECHA) M2 1.00 AREA= 4.32 4.32
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (IZQUIERDA) M2 1.00 AREA= 4.32 4.32
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (IZQUIERDA) M2 1.00 AREA= 4.32 4.32
PSJE N°01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (DERECHA) M2 1.00 AREA= 4.32 4.32
PSJE N°01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (IZQUIERDA) M2 1.00 AREA= 4.32 4.32

02.05 VARIOS
02.05.01 SOLAQUEADO DE BORDE DE VEREDAS Y MARTILLOS M2 248.44
VEREDAS 164.91
PLANILLA DE METRADOS

ACTIVIDAD :MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA URBANIZACION LAS FRESIAS DISTRITO DE TACNA - PROVINCIA DE TACNA - REGIÓN TACNA

PROPIETA. : MUNICIPALIDAD PROVINCIAL DE TACNA


FECHA : ENERO DEL 2018

MEDIDAS
ITEM DESCRIPCION UND CANT PARCIAL SUBTOTAL TOTAL
L A H

AV. HUMBOLDT ENTRE PSJE N° 01 Y CALLE N° 20 M2 1.00 29.17 0.15 4.38


AV. HUMBOLDT ENTRE CALLE N° 20 Y AV. TARAPACA M2 1.00 82.01 0.15 12.30
PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (DERECHA) M2 1.00 22.82 0.15 3.42
PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (IZQUIERDA) M2 1.00 31.38 0.15 4.71
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (DERECHA) M2 1.00 76.15 0.15 11.42
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (IZQUIERDA) M2 1.00 76.48 0.15 11.47
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (DERECHA) M2 1.00 56.32 0.15 8.45
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (IZQUIERDA) M2 1.00 56.04 0.15 8.41
PSJE N° 02 FONDO M2 1.00 5.61 0.15 0.84
PSJE N° 02 ENTRE CALLE N° 20 Y AV. TARAPACA (DERECHA) M2 1.00 83.40 0.15 12.51
PSJE N° 02 ENTRE CALLE N° 20 Y AV. TARAPACA (IZQUIERDA) M2 1.00 84.61 0.15 12.69
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (DERECHA) M2 1.00 57.70 0.15 8.66
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y CALLE N° 02 (IZQUIERDA) M2 1.00 13.31 0.15 2.00
PSJE N° 01 ENTRE CALLE N° 02 Y CALLE N° 20 (IZQUIERDA) M2 1.00 34.02 0.15 5.10
PSJE N° 01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (DERECHA) M2 1.00 46.18 0.15 6.93
PSJE N° 01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (IZQUIERDA) M2 1.00 45.57 0.15 6.84
PSJE N° 01 FONDO M2 1.00 3.72 0.15 0.56
PSJE N° 01 ENTRE AV. HUMBOLDT Y PSJE N° 01 (DERECHA) M2 1.00 23.36 0.15 3.50
PSJE N° 01 ENTRE AV. HUMBOLDT Y PSJE N° 01 (IZQUIERDA) M2 1.00 26.57 0.15 3.99
CALLE N° 20 ENTRE AV. HUMBOLDT Y PSJE N° 01 (DERECHA) M2 1.00 26.57 0.15 3.99
CALLE N° 20 ENTRE AV. HUMBOLDT Y PSJE N° 01 (IZQUIERDA) M2 1.00 26.35 0.15 3.95
CALLE N° 20 ENTRE PSJE N° 01 Y PSJE N° 02 (DERECHA) M2 1.00 27.82 0.15 4.17
CALLE N° 20 ENTRE PSJE N° 01 Y PSJE N° 02 (IZQUIERDA) M2 1.00 28.82 0.15 4.32
CALLE N° 20 ENTRE PSJE N° 02 Y PSJE N° 01 (DERECHA) M2 1.00 30.71 0.15 4.61
CALLE N° 20 ENTRE PSJE N° 02 Y PSJE N° 01 (IZQUIERDA) M2 1.00 36.67 0.15 5.50
CALLE N° 20 CRUCE CON PSJE N° 01 M2 1.00 9.39 0.15 1.41
AV. TARAPACA ENTRE AV. HUMBOLDT Y PSJE N° 01 M2 1.00 19.70 0.15 2.96
AV. TARAPACA ENTRE PSJE N° 01 Y PSJE N° 02 M2 1.00 27.03 0.15 4.05
AV. TARAPACA ENTRE PSJE N° 02 Y FIN DE INTERVENCION M2 1.00 11.82 0.15 1.77

MARTILLOS 77.05
M1 M2 1.00 25.43 0.15 3.81
M2 M2 1.00 25.83 0.15 3.87
M3 M2 1.00 24.85 0.15 3.73
M4 M2 1.00 24.54 0.15 3.68
M5 M2 1.00 23.62 0.15 3.54
M6 M2 1.00 11.15 0.15 1.67
M7 M2 1.00 19.08 0.15 2.86
M8 M2 1.00 19.21 0.15 2.88
M9 M2 1.00 24.86 0.15 3.73
M10 M2 1.00 19.50 0.15 2.93
M11 M2 1.00 18.74 0.15 2.81
M12 M2 1.00 24.76 0.15 3.71
M13 M2 1.00 21.25 0.15 3.19
M14 M2 1.00 23.31 0.15 3.50
M15 M2 1.00 24.36 0.15 3.65
M16 M2 1.00 20.67 0.15 3.10
M17 M2 1.00 24.81 0.15 3.72
M18 M2 1.00 24.46 0.15 3.67
M19 M2 1.00 22.91 0.15 3.44
M20 M2 1.00 21.43 0.15 3.21
M21 M2 1.00 17.72 0.15 2.66
M22 M2 1.00 18.32 0.15 2.75
M23 M2 1.00 11.67 0.15 1.75
M24 M2 1.00 21.29 0.15 3.19

INTERCAMBIO PEATONAL 6.48


PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (DERECHA) M2 2.00 3.60 0.15 1.08
PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (IZQUIERDA) M2 1.00 3.60 0.15 0.54
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (DERECHA) M2 2.00 3.60 0.15 1.08
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (IZQUIERDA) M2 2.00 3.60 0.15 1.08
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (DERECHA) M2 1.00 3.60 0.15 0.54
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (IZQUIERDA) M2 1.00 3.60 0.15 0.54
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (IZQUIERDA) M2 1.00 3.60 0.15 0.54
PSJE N°01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (DERECHA) M2 1.00 3.60 0.15 0.54
PSJE N°01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (IZQUIERDA) M2 1.00 3.60 0.15 0.54

02.05.02 CURADO DE VEREDAS Y MARTILLOS CON YUTE M2 1,846.62


VEREDAS 1,372.45
AV. HUMBOLDT ENTRE PSJE N° 01 Y CALLE N° 20 M2 1.00 AREA= 53.14 53.14
AV. HUMBOLDT ENTRE CALLE N° 20 Y AV. TARAPACA M2 1.00 AREA= 147.26 147.26
PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (DERECHA) M2 1.00 AREA= 27.39 27.39
PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (IZQUIERDA) M2 1.00 AREA= 37.66 37.66
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (DERECHA) M2 1.00 AREA= 91.38 91.38
PLANILLA DE METRADOS

ACTIVIDAD :MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA URBANIZACION LAS FRESIAS DISTRITO DE TACNA - PROVINCIA DE TACNA - REGIÓN TACNA

PROPIETA. : MUNICIPALIDAD PROVINCIAL DE TACNA


FECHA : ENERO DEL 2018

MEDIDAS
ITEM DESCRIPCION UND CANT PARCIAL SUBTOTAL TOTAL
L A H

PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (IZQUIERDA) M2 1.00 AREA= 91.78 91.78
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (DERECHA) M2 1.00 AREA= 67.69 67.69
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (IZQUIERDA) M2 1.00 AREA= 67.14 67.14
FONDO DE PSJE N° 02 M2 1.00 AREA= 6.74 6.74
PSJE N° 02 ENTRE CALLE N° 20 Y AV. TARAPACA (DERECHA) M2 1.00 AREA= 100.12 100.12
PSJE N° 02 ENTRE CALLE N° 20 Y AV. TARAPACA (IZQUIERDA) M2 1.00 AREA= 100.77 100.77
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (DERECHA) M2 1.00 AREA= 69.31 69.31
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y CALLE N° 02 (IZQUIERDA) M2 1.00 AREA= 15.96 15.96
PSJE N° 01 ENTRE CALLE N° 02 Y CALLE N° 20 (IZQUIERDA) M2 1.00 AREA= 40.74 40.74
PSJE N° 01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (DERECHA) M2 1.00 AREA= 55.45 55.45
PSJE N° 01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (IZQUIERDA) M2 1.00 AREA= 54.78 54.78
FONDO DE PSEJE N° 01 M2 1.00 AREA= 4.43 4.43

PSJE N° 01 ENTRE AV. HUMBOLDT Y PSJE N° 01 (DERECHA) M2 1.00 AREA= 14.94 14.94
PSJE N° 01 ENTRE AV. HUMBOLDT Y PSJE N° 01 (IZQUIERDA) M2 1.00 AREA= 14.02 14.02
CALLE N° 20 ENTRE AV. HUMBOLDT Y PSJE N° 01 (DERECHA) M2 1.00 AREA= 31.88 31.88
CALLE N° 20 ENTRE AV. HUMBOLDT Y PSJE N° 01 (IZQUIERDA) M2 1.00 AREA= 31.62 31.62
CALLE N° 20 ENTRE AV. PSJE N° 01 Y PSJE N° 02 (DERECHA) M2 1.00 AREA= 33.39 33.39
CALLE N° 20 ENTRE AV. PSJE N° 01 Y PSJE N° 02 (IZQUIERDA) M2 1.00 AREA= 34.58 34.58
CALLE N° 20 ENTRE AV. PSJE N° 02 Y PSJE N° 01 (DERECHA) M2 1.00 AREA= 37.24 37.24
CALLE N° 20 ENTRE AV. PSJE N° 02 Y PSJE N° 01 (IZQUIERDA) M2 1.00 AREA= 44.01 44.01
CALLE N° 20 CON PSJE N° 01 M2 1.00 AREA= 11.32 11.32
AV. TARAPACA ENTRE AV. HUMBOLTD Y PSJE N° 01 M2 1.00 AREA= 29.50 29.50
AV. TARAPACA ENTRE PSJE N° 01 Y PSJE N° 02 M2 1.00 AREA= 40.48 40.48
AV. TARAPACA CRUCE CON PSJE N° 02 M2 1.00 AREA= 17.73 17.73

MARTILLOS 382.01
M1 M2 1.00 AREA= 19.53 19.53
M2 M2 1.00 AREA= 19.65 19.65
M3 M2 1.00 AREA= 21.81 21.81
M4 M2 1.00 AREA= 21.49 21.49
M5 M2 1.00 AREA= 23.22 23.22
M6 M2 1.00 AREA= 4.05 4.05
M7 M2 1.00 AREA= 11.44 11.44
M8 M2 1.00 AREA= 11.50 11.50
M9 M2 1.00 AREA= 24.05 24.05
M10 M2 1.00 AREA= 12.18 12.18
M11 M2 1.00 AREA= 12.75 12.75
M12 M2 1.00 AREA= 23.98 23.98
M13 M2 1.00 AREA= 14.02 14.02
M14 M2 1.00 AREA= 18.66 18.66
M15 M2 1.00 AREA= 25.64 25.64
M16 M2 1.00 AREA= 12.50 12.50
M17 M2 1.00 AREA= 15.69 15.69
M18 M2 1.00 AREA= 18.26 18.26
M19 M2 1.00 AREA= 17.84 17.84
M20 M2 1.00 AREA= 14.73 14.73
M21 M2 1.00 AREA= 9.59 9.59
M22 M2 1.00 AREA= 9.70 9.70
M23 M2 1.00 AREA= 5.84 5.84
M24 M2 1.00 AREA= 13.89 13.89

RAMPAS PEATONAL TIPO 01 40.32


M1 M2 2.00 AREA= 1.26 2.52
M2 M2 2.00 AREA= 1.26 2.52
M3 M2 2.00 AREA= 1.26 2.52
M4 M2 2.00 AREA= 1.26 2.52
M5 M2 2.00 AREA= 1.26 2.52
M6 M2 - AREA= 1.26 -
M7 M2 1.00 AREA= 1.26 1.26
M8 M2 1.00 AREA= 1.26 1.26
M9 M2 1.00 AREA= 1.26 1.26
M10 M2 1.00 AREA= 1.26 1.26
M11 M2 1.00 AREA= 1.26 1.26
M12 M2 1.00 AREA= 1.26 1.26
M13 M2 1.00 AREA= 1.26 1.26
M14 M2 2.00 AREA= 1.26 2.52
M15 M2 2.00 AREA= 1.26 2.52
M16 M2 1.00 AREA= 1.26 1.26
M17 M2 2.00 AREA= 1.26 2.52
M18 M2 2.00 AREA= 1.26 2.52
M19 M2 2.00 AREA= 1.26 2.52
M20 M2 1.00 AREA= 1.26 1.26
M21 M2 1.00 AREA= 1.26 1.26
PLANILLA DE METRADOS

ACTIVIDAD :MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA URBANIZACION LAS FRESIAS DISTRITO DE TACNA - PROVINCIA DE TACNA - REGIÓN TACNA

PROPIETA. : MUNICIPALIDAD PROVINCIAL DE TACNA


FECHA : ENERO DEL 2018

MEDIDAS
ITEM DESCRIPCION UND CANT PARCIAL SUBTOTAL TOTAL
L A H

M22 M2 1.00 AREA= 1.26 1.26


M23 M2 - AREA= 1.26 -
M24 M2 1.00 AREA= 1.26 1.26

INTERCAMBIO PEATONAL (RAMPA TIPO 02) 51.84


PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (DERECHA) M2 2.00 AREA= 4.32 8.64
PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (IZQUIERDA) M2 1.00 AREA= 4.32 4.32
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (DERECHA) M2 2.00 AREA= 4.32 8.64
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (IZQUIERDA) M2 2.00 AREA= 4.32 8.64
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (DERECHA) M2 1.00 AREA= 4.32 4.32
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (IZQUIERDA) M2 1.00 AREA= 4.32 4.32
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (IZQUIERDA) M2 1.00 AREA= 4.32 4.32
PSJE N°01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (DERECHA) M2 1.00 AREA= 4.32 4.32
PSJE N°01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (IZQUIERDA) M2 1.00 AREA= 4.32 4.32

02.05.03 JUNTAS DE DILATACION RELLENAS CON MEZCLA ASFALTICA E=1" M 701.75


VEREDAS 510.30
AV. HUMBOLDT ENTRE PSJE N° 01 Y CALLE N° 20 M 11.00 1.80 19.80
AV. HUMBOLDT ENTRE CALLE N° 20 Y AV. TARAPACA M 29.00 1.80 52.20
PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (DERECHA) M 9.00 1.20 10.80
PSJE N° 01 ENTRE PSJE N° 01 Y CALLE N° 20 (IZQUIERDA) M 12.00 1.20 14.40
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (DERECHA) M 27.00 1.20 32.40
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA (IZQUIERDA) M 27.00 1.20 32.40
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (DERECHA) M 20.00 1.20 24.00
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (IZQUIERDA) M 20.00 1.20 24.00
PSJE N° 02 FONDO M 3.00 1.20 3.60
PSJE N° 02 ENTRE CALLE N° 20 Y AV. TARAPACA (DERECHA) M 29.00 1.20 34.80
PSJE N° 02 ENTRE CALLE N° 20 Y AV. TARAPACA (IZQUIERDA) M 30.00 1.20 36.00
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 (DERECHA) M 21.00 1.20 25.20
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y CALLE N° 02 (IZQUIERDA) M 6.00 1.20 7.20
PSJE N° 01 ENTRE CALLE N° 02 Y CALLE N° 20 (IZQUIERDA) M 13.00 1.20 15.60
PSJE N° 01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (DERECHA) M 17.00 1.20 20.40
PSJE N° 01 ENTRE CALLE N° 20 Y LIMITE DE INTERVENCION (IZQUIERDA) M 17.00 1.20 20.40
PSJE N° 01 FONDO M 3.00 1.20 3.60
PSJE N° 01 ENTRE AV. HUMBOLDT Y PSJE N° 01 (DERECHA) M 9.00 0.60 5.40
PSJE N° 01 ENTRE AV. HUMBOLDT Y PSJE N° 01 (IZQUIERDA) M 10.00 0.60 6.00
CALLE N° 20 ENTRE AV. HUMBOLDT Y PSJE N° 01 (DERECHA) M 10.00 1.20 12.00
CALLE N° 20 ENTRE AV. HUMBOLDT Y PSJE N° 01 (IZQUIERDA) M 10.00 1.20 12.00
CALLE N° 20 ENTRE PSJE N° 01 Y PSJE N° 02 (DERECHA) M 11.00 1.20 13.20
CALLE N° 20 ENTRE PSJE N° 01 Y PSJE N° 02 (IZQUIERDA) M 11.00 1.20 13.20
CALLE N° 20 ENTRE PSJE N° 02 Y PSJE N° 01 (DERECHA) M 12.00 1.20 14.40
CALLE N° 20 ENTRE PSJE N° 02 Y PSJE N° 01 (IZQUIERDA) M 14.00 1.20 16.80
CALLE N° 20 CRUCE CON PSJE N° 01 M 5.00 1.20 6.00
AV. TARAPACA ENTRE AV. HUMBOLDT Y PSJE N° 01 M 8.00 1.50 12.00
AV. TARAPACA ENTRE PSJE N° 01 Y PSJE N° 02 M 10.00 1.50 15.00
AV. TARAPACA ENTRE PSJE N° 02 Y FIN DE INTERVENCION M 5.00 1.50 7.50
MARTILLOS 191.45
M1 M 1.00 14.06 14.06
M2 M 1.00 11.73 11.73
M3 M 1.00 14.40 14.40
M4 M 1.00 13.45 13.45
M5 M 1.00 10.56 10.56
M6 M 1.00 0.60 0.60
M7 M 1.00 4.87 4.87
M8 M 1.00 4.85 4.85
M9 M 1.00 14.26 14.26
M10 M 1.00 5.15 5.15
M11 M 1.00 3.95 3.95
M12 M 1.00 14.20 14.20
M13 M 1.00 5.13 5.13
M14 M 1.00 10.84 10.84
M15 M 1.00 17.90 17.90
M16 M 1.00 5.56 5.56
M17 M 1.00 6.35 6.35
M18 M 1.00 8.50 8.50
M19 M 1.00 6.46 6.46
M20 M 1.00 5.44 5.44
M21 M 1.00 2.86 2.86
M22 M 1.00 4.27 4.27
M23 M 1.00 1.06 1.06
M24 M 1.00 5.00 5.00

02.05.04 REUBICACION Y REPOSICION DE CAJA Y TAPA DE AGUA EXISTENTES UND 51.00 51.00
AV. HUMBOLDT ENTRE PSJE N° 01 Y AV TARAPACA UND 11.00 11.00
PLANILLA DE METRADOS

ACTIVIDAD :MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA URBANIZACION LAS FRESIAS DISTRITO DE TACNA - PROVINCIA DE TACNA - REGIÓN TACNA

PROPIETA. : MUNICIPALIDAD PROVINCIAL DE TACNA


FECHA : ENERO DEL 2018

MEDIDAS
ITEM DESCRIPCION UND CANT PARCIAL SUBTOTAL TOTAL
L A H

CALLE N° 20 ENTRE PSJE N° 01 Y AV TARAPACA UND 6.00 6.00


PSJE N° 02 ENTRE PSJE N° 01 Y AV TARAPACA UND 12.00 12.00
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y CALLE SIN SALIDA UND 9.00 9.00
CALLE N° 20 ENTRE AV. HUMBOLDT Y PSJE N° 01 UND 10.00 10.00
AV. TARAPACA ENTRE AV. HUMBOLDT Y LIMITE DE INTERVENCION UND 3.00 3.00

REUBICACION Y/O REPOSICION DE CAJA Y TAPA DE REGISTRO DE DESAGUE


02.05.05 UND 47.00 47.00
EXISTENTES
AV. HUMBOLDT ENTRE PSJE N° 01 Y AV TARAPACA UND 6.00 6.00
CALLE N° 20 ENTRE PSJE N° 01 Y AV TARAPACA UND 6.00 6.00
PSJE N° 02 ENTRE PSJE N° 01 Y AV TARAPACA UND 14.00 14.00
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y CALLE SIN SALIDA UND 9.00 9.00
CALLE N° 20 ENTRE AV. HUMBOLDT Y PSJE N° 01 UND 9.00 9.00
AV. TARAPACA ENTRE AV. HUMBOLDT Y LIMITE DE INTERVENCION UND 3.00 3.00

03 SEÑALIZACION VEHICULAR
03.01 SEÑALIZACIÓN HORIZONTAL
03.01.01 PINTADO LINEAL CONTINUO LATERAL E=0.10M. M 1,168.59
PINTADO LINEAL CONTINUO 1,168.59
PJE 01 ENTRE AV. HUMBOLDT Y PJE 01 M 1.00 30.92 30.92
CONTORNO MANZANA A M 1.00 112.37 112.37
CONTORNO MANZANA B M 1.00 139.44 139.44
CONTORNO MANZANA C Y G M 1.00 317.43 317.43
CONTORNO MANZANA D M 1.00 234.88 234.88
CONTORNO MANZANA E Y F M 1.00 261.39 261.39
PJE 01 ENTRE CALLE N° 20 Y PJE SIN SALIDA M 1.00 72.16 72.16

03.01.02 PINTADO LINEAL INTERMITENTE CENTRAL E=0.10M. M 152.26


PINTADO LINEAL INTERMITENTE 152.26
CALLE N° 20 ENTRE AV. HUMBOLDT Y PSJE N° 01 M 1.00 22.93 22.93
CALLE N° 20 ENTRE PSJE N° 01 Y PSJE N° 02 M 1.00 24.56 24.56
CALLE N° 20 ENTRE PSJE N° 02 Y PSJE N° 01 M 1.00 29.77 29.77
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 M 4.00 3.00 12.00
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 M 1.00 15.00 15.00
PSJE N° 02 ENTRE CALLE N° 20 Y AV. TARAPACA M 6.00 3.00 18.00
PSJE N° 02 ENTRE CALLE N° 20 Y AV. TARAPACA M 1.00 15.00 15.00
PSJE N° 02 ENTRE CALLE N° 20 Y AV. TARAPACA M 1.00 15.00 15.00

03.01.03 PINTADO DE SEÑALIZACIÓN EN EL PAVIMENTO M2 166.68


CRUCERO PEATONAL 103.50
PSJE N° 01 CON AV. HUMBOLDT M2 2.00 3.00 0.50 3.00
CALLE N° 20 CON AV. HUMBOLDT M2 6.00 3.00 0.50 9.00
CRUCE CALLE N° 20 CON PSJE N° 01 M2 18.00 3.00 0.50 27.00
PSJE N° 01 CON AV. TARAPACA M2 3.00 3.00 0.50 4.50
CRUCE CALLE N° 20 CON PSJE N° 02 M2 22.00 3.00 0.50 33.00
PSJE N° 02 CON AV. TARAPACA M2 5.00 3.00 0.50 7.50
PSJE N° 01 CON CALLE N° 20 M2 13.00 3.00 0.50 19.50
LETRAS "PARE" 26.16
PSJE N° 01 CON AV. HUMBOLDT M2 1.00 AREA= 3.27 3.27
CALLE N° 20 CON AV. HUMBOLDT M2 1.00 AREA= 3.27 3.27
CRUCE CALLE N° 20 CON PSJE N° 01 M2 1.00 AREA= 3.27 3.27
CRUCE CALLE N° 20 CON PSJE N° 02 M2 2.00 AREA= 3.27 6.54
PSJE N° 02 CON AV. TARAPACA M2 1.00 AREA= 3.27 3.27
PSJE N° 01 CON CALLE N° 20 M2 2.00 AREA= 3.27 6.54

LINEA EN CRUCERO PEATONAL 21.11


PSJE N° 01 CON AV. HUMBOLDT M2 1.00 2.41 0.50 1.21
CALLE N° 20 CON AV. HUMBOLDT M2 1.00 3.23 0.50 1.62
CRUCE CALLE N° 20 CON PSJE N° 01 M2 1.00 9.72 0.50 4.86
CRUCE CALLE N° 20 CON PSJE N° 02 M2 1.00 11.86 0.50 5.93
PSJE N° 02 CON AV. TARAPACA M2 1.00 2.62 0.50 1.31
PSJE N° 01 CON CALLE N° 20 M2 1.00 12.37 0.50 6.19

FLECHA DEFRENTE 5.83


CALLE N° 20 ENTRE AV. HUMBOLTD Y PSJE N° 01 M2 6.00 AREA= 0.53 3.18
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA M2 1.00 AREA= 0.53 0.53
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y AV. TARAPACA M2 3.00 AREA= 0.53 1.59
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 M2 1.00 AREA= 0.53 0.53

FLECHA DEFRENTE Y DOBLA 10.08


PSJE N° 01 CON AV. HUMBOLDT M2 1.00 AREA= 0.72 0.72
CALLE N° 20 ENTRE AV. HUMBOLTD Y PSJE N° 01 M2 6.00 AREA= 0.72 4.32
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y AV. TARAPACA M2 2.00 AREA= 0.72 1.44
PSJE N° 02 ENTRE LIMITE DE INTERVENCION Y AV. TARAPACA M2 3.00 AREA= 0.72 2.16
PSJE N° 01 ENTRE LIMITE DE INTERVENCION Y CALLE N° 20 M2 2.00 AREA= 0.72 1.44
PLANILLA DE METRADOS

ACTIVIDAD :MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA URBANIZACION LAS FRESIAS DISTRITO DE TACNA - PROVINCIA DE TACNA - REGIÓN TACNA

PROPIETA. : MUNICIPALIDAD PROVINCIAL DE TACNA


FECHA : ENERO DEL 2018

MEDIDAS
ITEM DESCRIPCION UND CANT PARCIAL SUBTOTAL TOTAL
L A H

03.01.04 PINTADO DE BORDE DE VEREDAS C/PINTURA ESMALTE M2 210.15


PINTADO ZONA RIGIDA (AMARILLO) 131.96
PJE 01 ENTRE AV. HUMBOLDT Y PJE 01 M2 1.00 33.85 0.15 5.08
CONTORNO MANZANA A M2 1.00 98.97 0.15 14.85
CONTORNO MANZANA B M2 1.00 134.26 0.15 20.14
CONTORNO MANZANA C Y G M2 1.00 257.08 0.15 38.56
CONTORNO MANZANA D M2 1.00 135.91 0.15 20.39
CONTORNO MANZANA E Y F M2 1.00 147.50 0.15 22.13
PJE 01 ENTRE CALLE N° 20 Y PJE SIN SALIDA M2 1.00 72.16 0.15 10.82

PINTADO ZONA DE ESTACIONAMIENTO (AZUL) 78.19


CONTORNO MANZANA A M2 1.00 54.92 0.15 8.24
CONTORNO MANZANA B M2 1.00 128.56 0.15 19.28
CONTORNO MANZANA C M2 1.00 28.52 0.15 4.28
CONTORNO MANZANA D M2 1.00 137.35 0.15 20.60
CONTORNO MANZANA E M2 1.00 126.32 0.15 18.95
CONTORNO MANZANA F M2 1.00 9.22 0.15 1.38
CONTORNO MANZANA G M2 1.00 36.37 0.15 5.46

03.02 SEÑALIZACION VERTICAL


03.02.01 SUMINISTRO E INSTALACION DE SEÑAL VERTICAL UND 9.00
SEÑALIZACION VERTICAL (PARE) 8.00
AV. HUMBOLDT CRUCE CON AV. AV. TARAPACA UND 1.00 1.00
CALLE N° 20 ENTRE LA AV. HUMBOLDT Y PSJE N° 01 UND 1.00 1.00
PSJE N° 01 ENTRE CALLE N° 20 Y AV. TARAPACA UND 1.00 1.00
PSJE N° 02 ENTRE LIMITE DE INTERVENCIÓN Y AV. TARAPACA UND 3.00 3.00
CRUCE ENTRE PSJE N° 01 Y CALLE N° 20 UND 2.00 2.00
SEÑALIZACION VERTICAL (NO VOLTEAR) 1.00
AV. HUMBOLDT CRUCE CON AV. AV. TARAPACA UND 1.00 1.00

04 MITIGACION DE IMPACTO AMBIENTAL


04.01 LIMPIEZA FINAL DE OBRA M2 #REF! #REF!
VIAS ASFALTADAS - NUEVO M2 1.00 AREA= #REF! #REF!
BERMAS M2 1.00 AREA= 13,221.97 13,221.97
VEREDA M2 1.00 AREA= 1,372.45 1,372.45
MARTILLO M2 1.00 AREA= 382.01 382.01
RAMPAS PEATONAL TIPO 01 M2 1.00 AREA= 40.32 40.32
INTERCAMBIO PEATONAL (RAMPA TIPO 02) M2 1.00 AREA= 51.84 51.84

05 MITIGACION DE IMPACTO AMBIENTAL


05.01 RIEGO EN ZONA DE TRABAJO M2 #REF! #REF!
VIAS ASFALTADAS - NUEVO M2 1.00 AREA= #REF! #REF!
BERMAS M2 1.00 AREA= 13,221.97 13,221.97
VEREDA M2 1.00 AREA= 1,372.45 1,372.45
MARTILLO M2 1.00 AREA= 382.01 382.01
RAMPAS PEATONAL TIPO 01 M2 1.00 AREA= 40.32 40.32
INTERCAMBIO PEATONAL (RAMPA TIPO 02) M2 1.00 AREA= 51.84 51.84

05.02 MONITOREO DE RUIDOS PTO 1.00 1.00


PUNTOS DE MONITOREO DE RUIDO PTO 1.00 1.00

05.03 ACONDICIONAMIENTO DE MATERIAL EXCEDENTE EN BOTADEROS M3 32,810.60 32,810.60


VOLUMEN DE MATERIAL EXCEDENTE - PISTAS M3 1.00 VOL= 25,847.70 25,847.70
VOLUMEN DE MATERIAL EXCEDENTE - BERMAS M3 1.00 VOL= 6,610.99 6,610.99
VOLUMEN DE MATERIAL EXCEDENTE DEMOLICIONES - VEREDAS M3 1.00 VOL= 111.39 111.39
VOLUMEN DE MATERIAL EXCEDENTE - VEREDAS M3 1.00 VOL= 240.53 240.53

06 PLAN DE MONITOREO ARQUEOLOGICO


06.01 SERVICIO DE EJECUCION DE PLAN DE MONITOREO ARQUEOLOGICO SERV 1.00 1.00
PUNTOS DE MONITOREO DE RUIDO SERV 1.00 1.00
"MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL EN LA ASOC. DE VIVIENDA
FEDERICO BARRETO, AMPLIACION BOLOGNESI, A.H. FRANCISCO BOLOGNESI, URB. LAS MAGNOLIAS, URB. SEVE
VILDOSO, URB. VELEZ, DISTRITO DE POCOLLAY - TACNA - TACNA

TODA LA VIA COMPLETA LONGITUD

ASOCIACION DE VIVIENDA FEDERICO BARRETO


PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL 154.20
CALLE 8 DE FEBRERO 64.00
CALLE EL PORVENIR ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL 131.69
CALLE CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. INDUSTRIAL 120.30

ASENTAMIENTO HUMANO FRANCISCO BOLOGNESI


AV. MIGUEL GRAU ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI 423.63
PASAJE PROGRESO ENTRE AV. MIGUEL GRAU Y AV. MARISCAL CASTILLA 74.03
AV. CHORILLOS ENTRE AV. MIGUEL GRAU Y AV. LO ANGELES 405.00
AV. MARISCAL CASTILLA ENTRE CALLE CAHUIDE Y AV. CHORILLOS 135.44
AV. JORGE CHAVEZ ENTRE CALLE CAHUIDE Y CALLE CAROLINA REPETTI 401.60
PASAJE FRANCISCO BOLOGNESI ENTRE CALLE CAHUIDE Y AV. CHORILLOS 133.39
CALLE MOQUEGUA ENTRE AV. MIGUEL GRAU Y CALLE UGARTE 337.42
PASAJE FEDERICO BARRETO - PASAJE N°01 - A 47.45
PASAJE FEDERICO BARRETO - PASAJE N°02 - B 67.82
PASAJE FEDERICO BARRETO - PASAJE N°03 - C 62.28
CALLE MONITOR HUASCAR ENTRE AV. CHORILLOS Y CALLE CUSCO 166.02
CALLE AREQUIPA 145.76
CALLE CUSCO ENTRE CALLE MONITOR HUASCAR Y AV. LOS ANGELES 149.95
CALLE UGARTE ENTRE AV. CHORILLOS Y CALLE PACIFICO 246.05
CALLE PACIFICO 54.06
CALLE ALTO DE LA ALIANZA 56.00
CALLE OLLANTA 47.75
AV- LOS ANGELES ENTRE CALLE CAHUIDE Y AV. JORGE BASADRE 522.04

AMPLIACION BOLOGNESI
AV. CAROLINA REPETTI 160.97
CALLE JUAN SEGOVIA 110.96
CALLE CIRILO CARBAJAL ENTRE AV. INDUSTRIAL Y CALLE PUENTE ARNAO 90.03
CALLE MIGUEL SOTTO ENTRE AV. CAROLINA REPETTI Y CALLE JUAN SEGOVIA 51.23
PASAJE S/N 34.76
CALLE MANUEL GODINEZ 69.65
CALLE CANDARAVE 69.89
CALLE PUENTE ARNAO ENTRE CALLE JUAN SEGOVIA Y AV. JORGE BASADRE GRO 93.70

URBANIZACION VELEZ
CALLE PUENTE ARNAO ENTRE AV. CAROLINA REPETTI Y CALLE JUAN SEGOVIA 91.94
CALLE CIRILO CARBAJAL ENTRE CALLE PUENTE ARNAO Y PROLO. AV. JORGE CHAV 69.96

URBANIZACION LAS MAGNOLIAS


PASAJE LAS ORQUIDEAS 79.19
PASAJE LOS LIRIOS 50.29
CALLE LAS VIOLETAS 52.33

URBANIZACION SEVERO VILDOSO


PASAJE N°16 72.29
PASAJE N°17 52.13
CALLE MONITOR HUASCAR ENTRE CALLE CUSCO Y AV. JORGE BASADRE GROHM 237.75
CALLE CUSCO ENTRE PROL. AV. JORGE CHAVEZ Y CALLE MONITOR HUASCAR 97.42
L EN LA ASOC. DE VIVIENDA
URB. LAS MAGNOLIAS, URB. SEVERO

ANCHO AREA VIAS BERMAS VEREDAS VOL VIAS VOL BERMAS


0.4 0.4

14.00 2158.80 1326.12 462.60 370.08 2158.80 530.45 185.04


9.00 576.00 448.00 128.00 576.00 179.20
16.00 2107.04 1395.91 395.07 316.06 2107.04 558.37 158.028
21.00 2526.30 1876.68 360.90 288.72 2526.30 750.67 144.36

23.00 9743.49 7032.26 1694.52 1016.71 9743.49 2812.90 677.808


16.00 1184.48 784.72 222.09 177.67 1184.48 313.89 88.836
19.00 7695.00 5103.00 1620.00 972.00 7695.00 2041.20 648
14.57 1973.36 1241.98 406.32 325.06 1973.36 496.79 162.528
15.27 6132.43 3963.79 1204.80 963.84 6132.43 1585.52 481.92
11.13 1484.63 764.32 400.17 320.14 1484.63 305.73 160.068
13.23 4464.07 2642.00 1012.26 809.81 4464.07 1056.80 404.904
9.82 465.96 352.08 113.88 465.96 140.83
12.00 813.84 447.61 203.46 162.77 813.84 179.04 81.384
5.97 371.81 247.25 124.56 371.81 98.90
9.28 1540.67 1142.22 398.45 1540.67 456.89
12.05 1756.41 969.30 437.28 349.82 1756.41 387.72 174.912
11.79 1767.91 958.18 449.85 359.88 1767.91 383.27 179.94
12.03 2959.98 1631.31 738.15 590.52 2959.98 652.52 295.26
12.05 651.42 359.50 162.18 129.74 651.42 143.80 64.872
12.46 697.76 395.36 168.00 134.40 697.76 158.14 67.2
7.78 371.50 276.00 95.50 371.50 110.40
25.00 13051.00 9709.94 2088.16 1252.90 13051.00 3883.98 835.264

12.29 1978.32 1109.08 482.91 386.33 1978.32 443.63 193.164


7.94 881.02 659.10 221.92 881.02 263.64
7.82 704.03 523.97 180.06 704.03 209.59
5.76 295.08 192.62 102.46 295.08 77.05
5.00 173.80 104.28 69.52 173.80 41.71
7.69 535.61 396.31 139.30 535.61 158.52
8.00 559.12 419.34 139.78 559.12 167.74
8.69 814.25 626.85 187.40 814.25 250.74

8.67 797.12 613.24 183.88 797.12 245.30


7.72 540.09 400.17 139.92 540.09 160.07

7.56 598.68 440.30 158.38 598.68 176.12


5.29 266.03 165.45 100.58 266.03 66.18
3.44 180.02 180.02 180.02 72.01

8.70 628.92 484.34 144.58 628.92 193.74


7.14 372.21 267.95 104.26 372.21 107.18
11.03 2622.38 1338.53 713.25 570.60 2622.38 535.41 285.3
9.65 940.10 706.30 233.81 940.10 282.52
OL BERMAS
"MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL EN LA JUNTA DE COMPRADORE
PEAÑAS, ASOC. VILLA INGENIO, VILLA UNIVERSITARIA CAPANIQUE, ASOCIACION DE VIVIENDA VILLA EL SALVAD
JUNTA DE COMPRADORES EL IMPERIO, ASOCIACION DE VIVIENDA LOS DAMASCOS, JUNTA DE COMPRADORES L
CASUARINAS, DISTRITO DE POCOLLAY - TACNA - TACNA

TODA LA VIA COMPLETA LONGITUD

JUNTA DE COMPRADORES LAS PEAÑAS


AV. CAPANIQUE ENTRE CALLE LAS BUGANBILLAS Y CALLE LOS JADES 147.24
CALLE LAS ESMERALDAS 191.05
CALLE LOS SAFIROS 242.02
CALLE LOS TOPACIOS 143.29
CALLE LOS RUBIES 174.46
CALLE LAS AGATAS 66.50
AV. LAS PEAÑAS 229.07

ASOCIACION VILLA INGENIO


CALLE N°06 136.00

VILLA UNIVERSITARIA CAPANIQUE


CALLE N°12 183.54
CALLE ENRIQUE LOPEZ ALBUJAR ENTRE PSJ N°06 Y AV. CIRCUNVALACION ESTE 205.21
CALLE N°10 ENTRE PSJ N°06 Y AV. CIRCUNVALACION ESTE 203.64
CALLE N°11 87.68

ASOCIACION DE VIVIENDA VILLA EL SALVADOR


AV. CAPANIQUE ENTRE CALLE LOS OLIVOS Y CALLE LOS DAMASCOS 138.71
CALLE LOS SAUCES ENTRE CALLE LOS OLIVOS Y CALLE LOS DAMASCOS 140.98
CALLE LOS CIPRECES ENTRE CALLE LOS OLIVOS Y CALLE LOS DAMASCOS 144.85
CALLE LAS ACACIAS ENTRE CALLE LOS OLIVOS Y CALLE LOS DAMASCOS 139.06
CALLE LOS DAMASCOS ENTRE AV. CAPANIQUE Y CALLE LAS ACACIAS 136.67

JUNTA DE COMPRADORES EL IMPERIO


CALLE LOS DAMASCOS ENTRE CALLE LAS ACACIAS Y AV. EL ROBLE 153
PASAJE N°01 46.81
CALLE LAS MORAS 104.56

ASOCIACION DE VIVIENDA LOS DAMASCOS


AV. EL ROBLE ENTRE PSJ N°06 Y CALLE LOS DAMASCOS 196.52
CALLE LAS ORQUIDEAS 175.42
CALLE LOS DAMASCOS ENTRE AV. EL ROBLE Y CALLE LOS JAZMINES 155
CALLE LOS LIRIOS 52.63
CALLE LOS AMANCAES 33.88
CALLE LOS GERANIOS 49.91
JUNTA DE COMPRADORES LAS CASUARINAS
CALLE LOS TULIPANES ENTRE CALLE LOS OLIVOS Y CALLE LAS CASUARINAS 120.17
PASAJE LAS DALIAS 50.68
AV- CAPANIQUE ENTRE CALLE LAS CASUARINAS Y CALLE LOS OLIVOS 123.34
CALLE LOS CIPRECES ENTRE CALLES LAS CASUARINAS Y LOS OLIVOS 136.57
CALLE LAS ACACIAS ENTRE CALLE LAS CASUARINAS Y LOS OLIVOS 138.97
CALLES LAS CASUARINAS ENTRE CALLE LAS ACACIAS Y LOS TULIPANES 206.24
EN LA JUNTA DE COMPRADORES LAS
N DE VIVIENDA VILLA EL SALVADOR,
OS, JUNTA DE COMPRADORES LAS

ANCHO

17.20
10.17
9.90
10.19
5.51
6.32
11.30

9.00

12.8
12.8
12.8
8.99

11.09
8.49
10.1
11.07
5.83

3.93
6.21
11.06

11.03
16.41
5
5.92
6.57
6.81
11.1
6.35
11.29
10.7
11
9.47

También podría gustarte