90 m
METODO DE CORTE Y RELLENO CONVENCIONAL EN REALCE METODO DE TALADROS LARGOS LONGITUDINALES - BF
TIPO DE LABOR Secc. (m) Long, (m) OBS. $/m $ PERIODO 1 PERIODO 2 PERIODO 3 TIPO DE LABOR Secc. (m) Long, (m) OBS. $/m $ PERIODO 1 PRIODO 2
RP1947 (-) 3.50 x 3.50 188.5 Accesibilidad 1,822 343,502 -188.5 188.5 0 0 RP1947 (-) 3.50 x 3.50 188.5 Accesibilidad 1,822 343,502 -188.5 188.5 0
CA2075SW 3.50 x 3.50 10 Poza 1,639 16,389 -10 10 0 0 CA2075SW 3.50 x 3.50 10 Poza 1,639 16,389 -10 10 0
RF1981 2.50 x 2.10 1.5 594 890 -1.5 1.5 0 0 RF1981 2.50 x 2.10 1.5 594 890 -1.5 1.5 0
RF1982 2.50 x 2.10 1.5 594 890 -1.5 1.5 0 0 RF1982 2.50 x 2.10 1.5 594 890 -1.5 1.5 0
GL2087SW 3.50 x 3.50 40 Desarrollo 2,035 81,388 -40 40 0 0 GL2087SW 3.50 x 3.50 40 Desarrollo 2,035 81,388 -40 40 0
GL2087NE 3.50 x 3.50 40 Desarrollo 2,035 81,388 -40 40 0 0 GL2087NE 3.50 x 3.50 40 Desarrollo 2,035 81,388 -40 40 0
0 0 0 RP(+) 3.50 x 3.50 383 1,822 698,546 -384.666667 384 0
0 0 0 BP Nv. 1 3.50 x 3.50 80 1,639 131,113 -80 80 0
0 0 0 VE Nv.1 3.50 x 3.50 40 1,639 65,556 -40 40 0
0 0 0 BP Nv. 2 3.50 x 3.50 80 1,639 131,113 -80 80 0
0 0 0 VE Nv.2 3.50 x 3.50 40 1,639 65,556 -40 40 0
0 0 0 CX Nv.2 3.50 x 3.50 25 1,639 40,973 -25 25 0
0 0 0 BP Nv. 3 3.50 x 3.50 80 1,639 131,113 -80 80 0
0 0 0 VE Nv.3 3.50 x 3.50 40 1,639 65,556 -40 40 0
0 0 0 CX Nv.3 3.50 x 3.50 25 1,639 40,973 -25 25 0
0 0 0 BP Nv. 4 3.50 x 3.50 80 1,639 131,113 -80 80 0
0 0 0 VE Nv.4 3.50 x 3.50 40 1,639 65,556 -40 40 0
0 0 0 CX Nv.4 3.50 x 3.50 25 1,639 40,973 -25 25 0
0 0 0 CH OP 1.50 x 1.50 50 1,047 52,350 -50 50 0
0 0 0 CA 1 3.50 x 3.50 10 1,639 16,389 -10 10 0
0 0 0 CA 2 3.50 x 3.50 10 1,639 16,389 -10 10 0
0 0 0 CA 3 3.50 x 3.50 10 1,639 16,389 -10 10 0
CAPEX (m) 282 281.5 0 0 CAPEX (m) 1301 1300.5 0
Avance por mes 403 402.5 0 0 Avance por mes 1,541 1540.5 0
TIPO DE LABOR Secc. (m) Long, (m) OBS. $/m $ PERIODO 1 PERIODO 2 PERIODO 3 TIPO DE LABOR Secc. (m) Long, (m) OBS. $/m $ PERIODO 1 PERIODO 2
RP1947 (-) 3.50 x 3.50 188.5 Accesibilidad 1,822 343,502 -686816.139 343,502 0 0 RP1947 (-) 3.50 x 3.50 188.5 Accesibilidad 1,822 343,502 -686816.139 343,502 0
CA2075SW 3.50 x 3.50 10 Poza 1,639 16,389 -32768.2299 16,389 0 0 CA2075SW 3.50 x 3.50 10 Poza 1,639 16,389 -32768.2299 16,389 0
RF1981 2.50 x 2.10 1.5 594 890 -1779.42857 890 0 0 RF1981 2.50 x 2.10 1.5 594 890 -1779.42857 890 0
RF1982 2.50 x 2.10 1.5 594 890 -1779.42857 890 0 0 RF1982 2.50 x 2.10 1.5 594 890 -1779.42857 890 0
GL2087SW 3.50 x 3.50 40 Desarrollo 2,035 81,388 -162735.359 81,388 0 0 GL2087SW 3.50 x 3.50 40 Desarrollo 2,035 81,388 -162735.359 81,388 0
GL2087NE 3.50 x 3.50 40 Desarrollo 2,035 81,388 -162735.359 81,388 0 0 GL2087NE 3.50 x 3.50 40 Desarrollo 2,035 81,388 -162735.359 81,388 0
0 0 0 RP(+) 3.50 x 3.50 383 1,822 698,546 -1399138.05 699,761 0
0 0 0 BP Nv. 1 3.50 x 3.50 80 1,639 131,113 -262145.839 131,113 0
0 0 0 VE Nv.1 3.50 x 3.50 40 1,639 65,556 -131072.92 65,556 0
0 0 0 BP Nv. 2 3.50 x 3.50 80 1,639 131,113 -262145.839 131,113 0
0 0 0 VE Nv.2 3.50 x 3.50 40 1,639 65,556 -131072.92 65,556 0
0 0 0 CX Nv.2 3.50 x 3.50 25 1,639 40,973 -81920.5747 40,973 0
0 0 0 BP Nv. 3 3.50 x 3.50 80 1,639 131,113 -262145.839 131,113 0
0 0 0 VE Nv.3 3.50 x 3.50 40 1,639 65,556 -131072.92 65,556 0
0 0 0 CX Nv.3 3.50 x 3.50 25 1,639 40,973 -81920.5747 40,973 0
0 0 0 BP Nv. 4 3.50 x 3.50 80 1,639 131,113 -262145.839 131,113 0
0 0 0 VE Nv.4 3.50 x 3.50 40 1,639 65,556 -131072.92 65,556 0
0 0 0 CX Nv.4 3.50 x 3.50 25 1,639 40,973 -81920.5747 40,973 0
0 0 0 CH OP 1.50 x 1.50 50 1,047 52,350 -104650.413 52,350 0
0 0 0 CA 1 3.50 x 3.50 10 1,639 16,389 -32768.2299 16,389 0
0 0 0 CA 2 3.50 x 3.50 10 1,639 16,389 -32768.2299 16,389 0
0 0 0 CA 3 3.50 x 3.50 10 1,639 16,389 -32768.2299 16,389 0
COSTO CAPEX ($) 524,448 524,448 0 0 COSTO CAPEX ($) 2,235,322 2,235,322 0
COSTO OPEX ($) 141,562 141,562 0 0 COSTO OPEX ($) 442,993 442,993 0
* Opex dentro del Costo Directo - Costo de Preparaciones * Opex dentro del Costo Directo - Costo de Preparaciones
Margen $ -381,365 273,850 228,208 -381,365 273,850 228,208 Margen $ -2,235,322 709,613 -2,235,322 709,613
CONCLUSIONES CONCLUSIONES
RECOMENDACIÓN RECOMENDACIÓN
- OPTAR POR UN METODO CONVENCIONAL QUE INCOLUCRE MENOR CAPEX - OPTAR POR UN METODO CONVENCIONAL QUE INCOLUCRE MENOR CAPEX