Está en la página 1de 1

DIgSILENT

P. PATRIA
500 kV
0108 RINCON
ET PIRAYÚ
STA MARIA
135.96 132 kV ET ITÁ IBATÉ
1.03
LAT Olivari-Ituz 500/132 kV 134.64
0106 132 kV 1.02
(DOBLE TERNA) 0101
LAT PPatria-Ctes este 0105 17.1 17.1

134.40
150/25 Al/Ac -2.6 -2.6

1.02
17.7 17.7
300/50 (DOBLE TERNA) 59.8 59.8 40.9
5.0
-5.0
5.0
-5.0
-6.0 -12.2 12.3 TRANSNEA 16 km
20.0 20.0 8.0 -1.0 -3.0
DPEC 15,5 km 41.3 41.3 27.2
-40.7
-0.9
3.4
3.4 1.0
5.2
5.2 0.4
13.1 13.1 -13.1 LAT RSMaria-Itu
40.9 2.7
8.0 -8.3
27.3 14.1 (DOBLE TERNA)
27.3 -5.0 5.0 -5.0
5.0 12.3
-59.4 -0.9 -1.0 1.0
5.2
-6.0 -12.2
0.4 -3.0
-13.1
2.7 13.2 13.2 -17.1 -17.1 240/40 Al/Ac
3.4 5.2 13.1 -3.5 2.2
-19.5
41.3 LAT PPatria-Pirayu 3.4 13.1 14.1 -3.5
14.1 14.1 17.7
2.2
17.7 TRANSNEA 10 km
300/50 LAT Pirayù-Itati LAT Itati-IIbaté LAT IIbaté-Olivari
FUTURA 133.68 FUTURA ET ITUZAINGÓ
DPEC 16,2 km (DOBLE TERNA) (DOBLE TERNA) 1.01 (DOBLE TERNA)
-59.4 ET ITATI ET VILLA 134.56 132 kV
-19.5
41.3 300/25 Al/Ac 300/25 150/25 Al/Ac 1.02
134.42 OLIVARI 7.8 0103
1.02 DPEC 33,6 km DPEC 94,8 km TRANSNEA 56,6 km 2.6

ET CTES ESTE Demanda Ituzaingó

132/33/13,2 kV

Flujo Carga Trifásica (ABC)


Nodos Ramas
[kV] [MW]
[p.u.] [Mvar]
[%]
Estudio Eléctrico conexión Pirayú 2020-03
Sistema Norte Corrientes 132 kV Anexo: Esquema 01
Demanda pico Verano 2038/2039
PowerFactory 13.2.337 Escenario 03 B

También podría gustarte