Está en la página 1de 1

PLANT NORTH

TRUE NORTH

PLANT NORTH PREVAILING


WIND

TRUE NORTH
7.125

PREVAILING
WIND

7.125 1 2 3 4 5 6 7 8 9

48000

6000 6000 6000 6000 6000 6000 6000 6000

TRANSFORMER YARD
4800 4800 4800 4800 4800 4800 4800

KEYPLAN

3500

3500
NOTES:

1. ALL COORDINATES ARE EXPRESSED IN METERS.

3000

3000

3000

3000

3000

3000

3000
7610 7610 2. FOR TYPICAL INSTALLATION DETAILS FOR SUBSTATION WORK, REFER TO DWG. NO.

2000
4370 3240 4370 3240 BRS1-DR-E-BRS-1901 (D-000-1381-0901).

3. FOR EQUIPMENT LIST, REFER TO DWG. No. BRS1-DR-E-CPF-1102 (D-A20-1381-0102).

4. EXCEPT WHEN INSTALLED AGAINST THE WALL, ALL PANEL INSTALLATION DISTANCES SHALL BE

MEASURED FROM BUILDING CENTER LINE.


2180 1400 1220 2180 1400 1220 2180 1400 1220 2180 1400 1220 2180 1400 1220 2180 1400 1220 2180 1400 1220

5. MEASUREMENT FOR TRANSFORMER INSTALLATION SHALL BE BASED FROM THE TRANSFORMER

8300
3 1 CENTER LINE.
1100 5 1100 6 1100 9 1100 10 1100 11 1100 7 1100 8

6300
1000 4 1000 2

4960

4960
3283 3283

3370
900 900 900

3370

3370

3370

3370

3370

3370
2160 2160 2160 2160 2160 2160 2160

(1040)

(1040)
100
1550

1550
100
500 1200

100

100

100
500

100
2700
46 900

2400
900

2400
300 300 300 630 775 4

1800
1850
3000
27

1670
TYP. TYP. 41 45 47 48 28 29
TYP. 49 53
1100 14900 1100 4350 1100 14200 1100 3400
38 40
1500
FUT FUT FUT

1400

1400
FUT
14 15
36 37 FUT FUT FUT FUT

1400 14900 1100 1100 15300 1100 2950 LEGENDS

1700

1700
6800
15150 4650
2200 9550
185
1616
1500 1600 800

1400

1400
FUT FUT
80 16
17 SWITCHGEAR ROOM FRONT OF PANEL
96 FUT
EL. +103.13
250 300 1550 1100 10200 10100 16250 3100

2025

2025
97
2300

ELECTRICAL EQUIPMENT (PHASE 1)


16500

650 2700 800 3700 500 2700 200600 2250


33
14250 3060 7200 200 350

35
22 23 34
FUTURE

FUTURE
19 25 26 ELECTRICAL EQUIPMENT (PHASE 2)

800

800

200
1725

525
13
18 21 24 20

4540 2280 10260 1710 2960 7200 3700


650 2700 1000 7200 2550 FUTURE SPACE
2500

2500
300 600 350
4380

32
7450 30200 10350
DUMMY PANEL
5500
FUTURE

FUTURE

1725

(830)
12
300 3605
200

1350
1350

5100 20000 5100 30 31

B
2580
(1600)
1850

1850

1850

1850

1850

1850

1100
56 58 54 57 59 55
36500

8000

2870 3300 1590 3300 1590 6700 1600 3300 1850 3300 1320 6700 4580

2200
7760 3300 2440 3300 2440 3300 2440 3300 2440 6700
5050

1100

1100

1100
VSD PANEL ROOM 64 63 61 62 60
EL. +103.03
100

1750

1750

1750

1750

1750
210
3150 1290 100
100

100 100

C
715 770

830

68 67 72
1200

BATTERY ROOM 640


87 81 84 88 82 85
EL. +103.18 86
100

440 100
715

66 65
79
83
1960

71 75
77 90 92
69
100

73
12000

HVAC ROOM
1700 2040
EL. +103.13
95
70 74 78
89
5400

CONTROL ROOM
EL. +103.73
FAP
4580

450 1100
800

91c 91a 94 4
820

622
1740

720 91e 93
1240

1240

100 720 720


4

D
100

100

100

800 597
91d 91b 800

1390

For Inf. For Review For Approval For Const. As Built

PCWBS

A220
0 2 4 6 8 10m
PROJECT:
BIR SEBA FIELD DEVELOPMENT
TITLE

GRAPHIC SCALE 1:100 EQUIPMENT LAYOUT

CLIENT CPF SUBSTATION


GROUPEMENT BIR SEBA
(1 OF 2)
4 29/JUL/13 V.I. H.O. T.H. REVISED AS MARKED
CONTRACTOR’s DOCUMENT No. JOB CODE SIZE
BRS1-DR-E-BRS-1901 D-000-1381-0901 TYPICAL INSTALLATION DETAILS - SUBSTATION WORK 3 21/MAY/13 V.I. H.O. T.H. REVISED AS MARKED
BRS1-DR-E-CPF-1102 D-A22-1381-0102 EQUIPMENT LAYOUT CPF SUBSTATION (2 OF 2) 2 17/DEC/12 V.I. H.O. T.H. REVISED AS MARKED D-A20-1381-0101 0-6092 A0
BRS1-DR-A-CPF-1302 D-A22-134A-0002 CPF SUBSTATION FLOOR PLAN 1 05/OCT/12 V.I. H.O. T.H. ISSUED FOR CONSTRUCTION
CA’s DOCUMENT No. SCALE SHT. REV.
CA’s DOCUMENT No. CONTRACTOR’S DOCUMENT No. DOCUMENT TITLE 0 07/JUN/12 G.E. H.O. T.H. ISSUED FOR APPROVAL
BRS1-DR-E-CPF-1101 1/100 1 OF 1 4
DR20A
REFERENCE DRAWINGS REV DATE DRAFTED CHK’D APP’D CA APP’D REASON FOR ISSUE

IN
06-A
13
UG-

PBASED
JGC01.01
Plot
Electrical

También podría gustarte