Fecha: 04/01/2020
N° de Hojas: 7
Asunto:
Informe de desactivado de anclajes
Referencia:
Proyecto Edificio multifamiliar Los recuerdos 387
Página : 1 of 7
Revisión : A
Fecha : 04/01/20
All rights in connection with this document, including translation thereof, are reserved to MURO ANCLADO PERU S.A.C. No part of this document may be reproduced, stored in a retrieval system or
transmitted in any form or by any means, whether electronic, mechanical, photocopying, recording or otherwise, without the prior permission of MURO ANCLADO PERU S.A.C.
Se encontraron 10 anclajes de altura mayor a 2.50 a 3.00 mt. de altura en el 1 er. Sótano los cuales
requirieron el uso de andamios para el desactivado de los mismos y se amplió los tiempos de desactivado
entre 35 a 40 minutos por punto con movilización de andamios.
Página : 2 of 7
Revisión : A
Fecha : 04/01/20
All rights in connection with this document, including translation thereof, are reserved to MURO ANCLADO PERU S.A.C. No part of this document may be reproduced, stored in a retrieval system or
transmitted in any form or by any means, whether electronic, mechanical, photocopying, recording or otherwise, without the prior permission of MURO ANCLADO PERU S.A.C.
Posteriormente también se encontraron 6 anclajes a nivel de la losa y 10 a nivel a 1.50 o 1.80 mt. los
cuales agilizaron el desactivado de los mismo y teniendo un mayor rendimiento de lo esperado.
Página : 3 of 7
Revisión : A
Fecha : 04/01/20
All rights in connection with this document, including translation thereof, are reserved to MURO ANCLADO PERU S.A.C. No part of this document may be reproduced, stored in a retrieval system or
transmitted in any form or by any means, whether electronic, mechanical, photocopying, recording or otherwise, without the prior permission of MURO ANCLADO PERU S.A.C.
Imagen 03: Anclajes a nivel de 1.50 a 1.80 mt.
Página : 4 of 7
Revisión : A
Fecha : 04/01/20
All rights in connection with this document, including translation thereof, are reserved to MURO ANCLADO PERU S.A.C. No part of this document may be reproduced, stored in a retrieval system or
transmitted in any form or by any means, whether electronic, mechanical, photocopying, recording or otherwise, without the prior permission of MURO ANCLADO PERU S.A.C.
Imagen 05: Retiro de plaza y cabezal
Página : 5 of 7
Revisión : A
Fecha : 04/01/20
All rights in connection with this document, including translation thereof, are reserved to MURO ANCLADO PERU S.A.C. No part of this document may be reproduced, stored in a retrieval system or
transmitted in any form or by any means, whether electronic, mechanical, photocopying, recording or otherwise, without the prior permission of MURO ANCLADO PERU S.A.C.
Imagen 06: Corte de cable excedente a nivel del muro
Página : 6 of 7
Revisión : A
Fecha : 04/01/20
All rights in connection with this document, including translation thereof, are reserved to MURO ANCLADO PERU S.A.C. No part of this document may be reproduced, stored in a retrieval system or
transmitted in any form or by any means, whether electronic, mechanical, photocopying, recording or otherwise, without the prior permission of MURO ANCLADO PERU S.A.C.
Finalmente, se adjunta cuadro detallado de control del desactivado con horas de inicio y fin.
Por lo expuesto, damos por concluido el desactivado de los anclajes en el edificio multifamiliar “Los
recuerdos 287”.
Atte,
Página : 7 of 7
Revisión : A
Fecha : 04/01/20
All rights in connection with this document, including translation thereof, are reserved to MURO ANCLADO PERU S.A.C. No part of this document may be reproduced, stored in a retrieval system or
transmitted in any form or by any means, whether electronic, mechanical, photocopying, recording or otherwise, without the prior permission of MURO ANCLADO PERU S.A.C.