INSTALLATION DRAWING OF SINGLE EARTH PIT

Installation Process : Augur/drill/bore a pit of 4-6 inch In diameter and 2-3 mtr deep at the place of
Earthing, mixing the soil with the “Ash” Back-Fill-Compound nicely which has been dug out. Refill
the empty space around the earthing electrode with this compound.
INSTALLATION DRAWING OF TRI-POD EARTH GRID EARTH

Bus Bar
L
L
L

ASH Gel
Earthing
Electrode

ASH Gel ASH Gel


Earthing Earthing
Electrode Electrode
L