CARBON PORTFOLIO - PERU 2010

Energy, Industry and Others

PARIAC 5 & 6 Hydropower Project H29


Description: The project consists of a new hydropower project connected to the grid with an installed capacity of 7.7 MW and an estimated energy
annual production of 53.4 GWh. It will be located in the department of Ancash.

Current Status: Projects Benefits:


Earliest project start date: 2007. Number of direct and indirect jobs generated:
Operation start date: To be defined. It will generate 200 indirect jobs during construction works.
Project lifetime: 40 years. Sustainable development contribution: It displaces GHG emissions
Current Status: Energy and water concession permits in progress. which otherwise will be emitted by thermal generation. It creates the
Environmental Management Program and Environmental Impact As- opportunity to easily interconnect the villages located in the project
sessment in progress. EPC bid process in place and on-going. site.

Estimated Annual Emission Reductions (tCO2/year):


An average of 30,399 tCO2-equivalent per year. CER´s negotiation:
Open
Project Participant and Financing
Total project cost: US$ 12,010,000

Contact Information:
Sources of finance to be sought or already identified:
Name: Kristine Kjelaas
Equity: 35 % Company: SN Power Invest AS
Debt: 65 % Title: Director of Climate Programmes
Phone: +47 24 06 86 29 / +47 95 24 70 18
E-mail: kristine.kjelaas@snpower.no

RAPAY Salto 2 Hydropower Project H30


Description: The project consists of a new hydropower project connected to the grid with an installed capacity of 77 MW and an estimated energy
annual production of 411 GWh. It will be located in the department of Lima.

Current Status: Projects Benefits:


Earliest project start date: 2010. Number of direct and indirect jobs generated:
Operation start date: To be defined. It will generate 2,000 indirect jobs during construction works.
Project lifetime: 40 years. Sustainable development contribution: It displaces GHG emissions
Current Status: Environmental impact assessment under development. which otherwise will be emitted by thermal generation. It promotes
sustainable development of the surroundings of the Project (local com-
Estimated Annual Emission Reductions (tCO2/year): munities). It supplies more clean and cheap energy.
An average of 233,969 tCO2-equivalent per year.
CER´s negotiation:
Project Participant and Financing Open
Total project cost: US$ 76,600,000

Sources of finance to be sought or already identified:


Equity: 25 %
Contact Information:
Debt: 75 %
Name: Kristine Kjelaas
Company: SN Power Invest AS
Title: Director of Climate Programmes
Phone: +47 24 06 86 29 / +47 95 24 70 18
E-mail: kristine.kjelaas@snpower.no

www.fonamperu.org

National Environmental Fund - Peru