Rendimiento de Concreto Por 1 M 3 para R PDF
Rendimiento de Concreto Por 1 M 3 para R PDF
PROPORCION
CEMENTO
GRAVA
ARENA
AGUA
RESISTENCIA CANTIDAD DE MATERIAL PARA 1 M3
BULTOS
BOTES
BOTES
BOTES
CEMENTO 8 BULTOS
100 Kg/m2 ARENA 6 1/2 X 8 X 19 LT. = 988 LT. = 0.988 M 3 1 2 1/4 6 1/2 7
GRAVA 7 3/4 X 8 X 19 LT. = 1064 LT. = 1.064 M 3
CEMENTO 8 BULTOS
150 Kg/m 2
ARENA 5 X 8 X 19 LT. = 760 LT. = 0.760 M 3 1 2 5 5 3/4
GRAVA 5 3/4 X 8 X 19 LT. = 874 LT. = 0.874 M 3
CEMENTO 8 BULTOS
200 Kg/m 2
ARENA 4 X 8 X 19 LT. = 608 LT. = 0.608 M 3 1 1 1/2 4 5
GRAVA 5 X 8 X 19 LT. = 780 LT. = 0.780 M 3
CEMENTO 8 BULTOS
250 Kg/m2 ARENA 3 X 8 X 19 LT. = 456 LT. = 0.456 M 3 1 1 1/3 3 4
GRAVA 4 X 8 X 19 LT. = 608 LT. = 0.608 M 3
ARENA
RESISTENCIA CANTIDAD DE MATERIAL PARA 1 M3
BULTOS
BOTES