ORE PROCESSING PLANT

Repair and Maint Budget for 2020-21


Sl. No. Budget Estimate Rs in
Job lakh 19-20 Justification
Code
Job related contracts
1 Belt joint (Cold) and pulley lagging (OLD 703660204 22.00 Cold vulcanising is carried out for conveyor belts joining and pulley laggings, Due
Regular JOB) to shortage of manpower and lack of skill, this job is being off-loaded.
2 Hot Vulcanising joint for 1000 & 1200mm 10.00 For down hill conveyors and long length conveyor to achieve long conveyor life,
conv. Belt at BOM (New) HOT Vulcanising shall be carried out to achieve smooth performance, Due to
shortage of manpower and lack of skill, this job is being off-loaded.
3 Non-drive pulley lagging with 10mm thick 24.00 After increase in speed of conveyors; pulley shell damage reports have increase
plain rubber sheet ( NEW, Special drive) substantially. There are sudden failures and repeated production losses. It is
proposed to lag non-drive pulleys lagged with 10mm thick plain lagging sheet. In
first phase, it is proposed to lag 200 sqm of pulley surface area of non-drive
pulleys during FY 19-20. This job is to be off-loaded as it requires special type of
skill sets and materials.

4 AMC for repair & maintenance of chute, 703660104 25.00 Due to normal wear and tear the chutes in the plant need repair to prevent
skirts, base frames and tension units in OPP spillage and down time. Total of 80T. of Steel work is estimated for changing
(OLD JOB) mother plate and fixing liners. It has been proposed that the work will be executed
through outside agency on Sundays and holidays. Many new fabrication jobs have
also been planned. Allocation is increased by 60% over last FY, as the Chute
bodies require modifications due to new wearing surfaces.

5 AMC for fixing of rubber & polymer liners in 10.00 There are instances of liners getting dislodged after wearing leading to belt
chutes. damage and flowability issues with the fines products. It is proposed to install
rubber liners and pre-fabricated Mn liners in ROM and lump handling chutes and
Polymer liners in fines handling Chutes to improve the system productivity. The
job of fixing of these liners is proposed to be off-loaded, as the departmental
resources are very limited.

7 AMC for the hydraulics system of Mobile 6.00 A number of new hydraulic systems have been installed in mobile equipment of
equipment of OPP (New) ore processing plant, as maintenace of hydraulic system require special type of
skills. It is proposed to off-load the jobs of hydraulic system mainteance.

8 Annual Maintenance Contract for servicing of 1.25 Detail inspection of the machine., Monitoring , Periodic maintenance
the air compressor GA 30+(WASHING Repairing/Servicing/ trouble shooting
PLANT)
9 Annual Maintenance Contract of belt scales 5.00 Detail inspection of the machine., Monitoring , Periodic maintenance
of make Newton weighing system inn OPP & Repairing/Servicing/ trouble shooting
600tph plant area
10 Machining job from outside 4.00 In-house maching facility is not available. Coupling, shafts etc will be machined at
outside local workshop
11 Pulley repairing (OLD) 703701904 6.00 Worn out shell/shaft/side plates etc are changed and pulleys are made usable.
This is 50-60% of the cost of a new pulley
12 Rate Contract for replacement of pulleys and 5.00 The production targets are very high and for meeting these production targets,
bearing The utilisation of available maintenance time can be improved by taking more jobs
during the maintenance time. During the available maintenance time, conveyor
pulley replacement jobs take substantial time, it is proposed to off-load the job of
pulley maintenance during shutdown. On trial basis, this year it is proposed to
under take 24 pulley replacement jobs during the year @ 20k

13 Repairing & Paiting of plant structures & 10.00 various structures are exposed to nature & got rusted,which in turn getting weak &
Mobile Equipments(stacker,reclaimer) prone to collapse,hence need reapiring as & where required & painting.

14 Contingency 5.00
15 Monsoon preparation 10.00
16 Rate contract for auto lubrication system of auto lub system need to be revamped in reclaimer & stacker. Presently not
SSP reclaimer & stacker and fines stacker working properly. AMC is to be given to ensure proper functioning.
5.00
Tot= 148.25
ORE PROCESSING PLANT
Repair and Maint Budget for 2019-20
One time job:
1 Thickener arm Repairing job 6.00 Thickener arms have worn out badly & need to be fitted with fresh fabricated steel
structures. Required steel will be in our scope.
2 Replacement of 6" diameter pipe line of 4.00 200 m length of pipe line repalcement @ Rs 600 per RM
Jhikaria
3 Removal of old spilled accumulated materials 10.00 WJ-1,WJ-2,SC-3,F-1 & F-2,LC-2 conveyor junctions or area around it gets
from different locations of OPP enormous amount of materials & due to accumulation,it requires thourough
cleaning with the help of man & machine. Like previous years,we have kept this.

4 Additional support for primary crusher 2.00 Assistance during major shutdown
shutdown job
5 Provision of winch system(supply & fixing) 30.00 Requirement for WFC-3 & SC-1
6 Deck plate replacement 7.00 For conveyor FS-2,WPC-8,WPC-9,SC-2,SC-1
7 Conveyor gallery strengthening & structural 10.00 10 nos. & 20 nos. sites
repairing,column encasing
8 Replacement of luffing cylinder in MAMC 10.00
reclaimer
9 Replacement of head shaft,track chain,bull 6.00
gear etc for A/F-106
10 Replacement of head shaft for A/F-112 3.00
11 strengthening of drive unit foundation of PC-7 2.00

Tot= 90.00