Customer Hold Points (CHP) for planned jobs as on 11/04/2017

Raw Material Mfg Process Final test

Cust vendor
Customer Job Qty
CRGO & list
PICC CTC Insl'tn /PCB OIP Bush Radiator Oil Tank Fab OLTC Others Wdg Core Assy CCA Others Test Others
Lamination

500, 200 MVA CHP of Mother Test on insl CHP on CHP CHP on one M. Box CHP
2+2 X X X X X X X CHP Nil CHP Not Available
400 kV ICT coil from TPL bushing one unit unit in final test

Essel Infra
125, 80 & 50
CHP of Mother Test on insl CHP on CHP on one CHP on one M. Box CHP
MVAr, 3Φ 4+2+2 X X X X NA Nil X CHP Nil CHP Not Available
coil from TPL bushing unit unit in final test
420KV Reactor

RIP Bushing
315 MVA, 3Φ CHP Measurement
CIP on 20% of CHP:M.Box & Approved by
400/220/33 kV, 2 X X CHP X CHP Long duration CHP CHP on 1 Unit CHP CHP X X of air Flow CHP:Oil test
offered lot of CCP Cust
ICT tests at TPL during testing
each rating
Adani Power
RIP Bushing
CHP Measurement
125 MVAr, 3Φ CIP on 20% of CHP:M.Box & Approved by
1 X X CHP X CHP Long duration CHP NA CHP CHP X X of air Flow CHP:Oil test
420 kV, Reactor offered lot of CCP Cust
tests at TPL during testing
each rating

200 MVA, 3Φ,


Bhushan 220/34 kV, 2 X X X X X X X X X Nil X X X Nil CHP Nil Not available
Transformer

PGCIL
(RT1 & RT2) 80 MVAr, 1Φ Test on insl
34 PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP NA Nil X PCCIL MQP PCCIL MQP Nil PCCIL MQP X Available
Nizamabad/ 765 kV Reactor from TPL
Wardha

PGCIL (SR) 80 MVAr, 1Φ Test on insl


7 PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP NA Nil X PCCIL MQP PCCIL MQP Nil PCCIL MQP X Available
Cudappah 765 kV Reactor from TPL

80 MVAr, 1Φ Test on insl


10 PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP NA Nil X PCCIL MQP PCCIL MQP Nil PCCIL MQP X Available
765 kV Reactor from TPL

PGCIL, Aligarh

110 MVAr, 1Φ Test on insl


10 PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP NA Nil X PCCIL MQP PCCIL MQP Nil PCCIL MQP X Available
765 kV Reactor from TPL

PGCIL, Lucknow 80 MVAr, 1Φ, Test on insl


1 PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP NA Nil X PCCIL MQP PCCIL MQP Nil PCCIL MQP X Available
Repair 765 kV Reactor from TPL

CIP: Verification
500 MVA, 3Φ, CIP during CIP during CIP at CIP during CIP during
CIP for each CIP for each CIP at Vendor's CIP for first of oil prior to CIP during stage Approved
TSTRANSCO 400/220/33 kV 2 Stage X stage vendor's stage X stage X CIP X
lot lot works Transformer dispatch at inspection Available
ICT inspection inspection works inspection inspection
vendor's works

80 MVAr, 1Φ, Test on insl


2 PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP NA Nil X PCCIL MQP PCCIL MQP Nil PCCIL MQP X Available
765 kV Reactor from TPL

PGCIL, Spare
Raw Material Mfg Process Final test

Cust vendor
Customer Job Qty
CRGO & list
PICC CTC Insl'tn /PCB OIP Bush Radiator Oil Tank Fab OLTC Others Wdg Core Assy CCA Others Test Others
Lamination

PGCIL, Spare

110 MVAr, 1Φ Test on insl


1 PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP NA Nil X PCCIL MQP PCCIL MQP Nil PCCIL MQP X Available
765 kV Reactor from TPL

PGCIL, 110 MVAr, 1Φ, Test on insl


16 PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP NA Nil X PCCIL MQP PCCIL MQP Nil PCCIL MQP X Available
Bhuj - Banaskanta 765 kV Reactor from TPL

500 MVA, 3Φ
Shyam Indus Test on insl
400/220/33 kV 3 PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP CIP for 1 Unit Nil X PCCIL MQP PCCIL MQP Nil PCCIL MQP X Available
A/C PGCIL from TPL
ICT

500 MVA, 1Φ,


Test on insl
PGCIL Badla 765/400/33 kV 10 PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP CIP for 1 Unit Nil X PCCIL MQP PCCIL MQP Nil PCCIL MQP X Available
from TPL
ICT

80 MVAr, 3Φ Test on insl


2 PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP NA Nil X PCCIL MQP PCCIL MQP Nil PCCIL MQP X Available
420 kV Reactor from TPL
Techno
A/C PGCIL
125 MVAr, 3Φ Test on insl
1 PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP NA Nil X PCCIL MQP PCCIL MQP Nil PCCIL MQP X Available
420 kV Reactor from TPL

L&T Tumkur 125 MVAr, 3Φ Test on insl


1 PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP NA Nil X PCCIL MQP PCCIL MQP Nil PCCIL MQP X Available
A/C PGCIL 420 kV Reactor from TPL

500
MVA,400/220/33 Test on insl
2 PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP CIP for 1 Unit Nil X PCCIL MQP PCCIL MQP Nil PCCIL MQP X Available
kV Auto- from TPL
Transformer

315
MVA,400/132/33 Test on insl
1 PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP CIP for 1 Unit Nil X PCCIL MQP PCCIL MQP Nil PCCIL MQP X Available
kV Auto- from TPL
Transformer

200
Sterling Wilson MVA,400/132/33 Test on insl
1 PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP CIP for 1 Unit Nil X PCCIL MQP PCCIL MQP Nil PCCIL MQP X Available
A/C PGCIL kV Auto- from TPL
Transformer

160
MVA,220/132/33 Test on insl
1 PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP CIP for 1 Unit Nil X PCCIL MQP PCCIL MQP Nil PCCIL MQP X Available
kV Auto- from TPL
Transformer

50 MVA, 132/33
Test on insl
kV Power- 1 PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP CIP for 1 Unit Nil X PCCIL MQP PCCIL MQP Nil PCCIL MQP X Available
from TPL
Transformer

133 MVA, 3Φ
KEC Afghanistan 500/220/20 kV 4 X X X X X X X X X X X X X X CHP X Not Available
ICT
Raw Material Mfg Process Final test

Cust vendor
Customer Job Qty
CRGO & list
PICC CTC Insl'tn /PCB OIP Bush Radiator Oil Tank Fab OLTC Others Wdg Core Assy CCA Others Test Others
Lamination

KPTL, 80 MVAr, 3Φ,


2 X X X X X X X X X X X X X X CHP X Not Available
Dharbhanga 420 kV Reactor

CIP for: CIP for:


315 MVA, 3Φ, Samples to be
CIP on first #Check FOS # Sheet selection
WESEB 400/220/33 kV, 1 X X tested at third X X X X X X X X CIP X Not Available
unit #Wdg Resis # IR on bolt
ICT party lab
#Copper purity # Fllux Density Cal

Samples to be
CIP at CIP during
MSETCL a/c BNC 125 MVAr, 3Φ taken in CIP during stage
1 X X X X X vendor's CIP for PT/VT NA X X stage X CIP X Available
Power 420 kV Reactor presence of inspection
works inspection
customner

500 MVA, 400 kV Test on insl


2 PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP CIP for 1 Unit Nil X PCCIL MQP PCCIL MQP Nil PCCIL MQP X Available
ICT from TPL

315 MVA, 400 kV Test on insl


3 PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP CIP for 1 Unit Nil X PCCIL MQP PCCIL MQP Nil PCCIL MQP X Available
ICT from TPL

125 MVAR, 400 Test on insl


PGCIL Ballabgarh 3 PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP NA Nil X PCCIL MQP PCCIL MQP Nil PCCIL MQP X Available
kV Reactor from TPL

80 MVAR, 400 kV Test on insl


1 PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP NA Nil X PCCIL MQP PCCIL MQP Nil PCCIL MQP X Available
Reactor from TPL

50 MVAR, 400 kV Test on insl


1 PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP NA Nil X PCCIL MQP PCCIL MQP Nil PCCIL MQP X Available
Reactor from TPL

500 MVA,
PGCIL, Test on insl
400/230 kV 1 PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP CIP for 1 Unit Nil X PCCIL MQP PCCIL MQP Nil PCCIL MQP X Available
Arasur Transformer
from TPL

500 MVA,
PGCIL, Test on insl
400/220 kV 4 PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP CIP for 1 Unit Nil X PCCIL MQP PCCIL MQP Nil PCCIL MQP X Available
Kozhikode Transformer
from TPL

Check of
CIP for leak B/Relay
500 MVA,765 kV OTI/WTI,
7 X X X X X test at vendor X CIP for PT/VT X Witness by X X X X CIP Not Available
Auto-Transformer MOLG, B/R
end TBEA
Check of PRV

Sterlite Grid
Raw Material Mfg Process Final test

Cust vendor
Customer Job Qty
CRGO & list
PICC CTC Insl'tn /PCB OIP Bush Radiator Oil Tank Fab OLTC Others Wdg Core Assy CCA Others Test Others
Lamination

Check of
CIP for leak B/Relay
80 MVAR,765 kV OTI/WTI,
Sterlite Grid 17 X X X X X test at vendor X CIP for PT/VT NA Witness by X X X X CIP Not Available
Reactor MOLG, B/R
end TBEA
Check of PRV

Check of
CIP for leak B/Relay
125 MVAR,400 OTI/WTI,
1 X X X X X test at vendor X CIP for PT/VT NA Witness by X X X X CIP Not Available
kV Reactor MOLG, B/R
end TBEA
Check of PRV

For Customer inspection points (CIP), advance notice for inspection is to be given. Fifteen days for utilities and seven days for POWERGRID. In case where the final customer is PGCIL and the order is thru the Contractor, ten day's notice for inspection is required.
NOTE: Description
Please refer to the final MQP for details.
Rev 15

MQP

MQP Approved

MQP Approved

MQP Approved

MQP Approved

Approved MQP
Available

Revised MQP
Available

Revised MQP
Available

Revised MQP
Available

Revised MQP
Available

Revised MQP
Available

MQP Approved

Revised MQP
Available
MQP

Revised MQP
Available

Revised MQP
Available

Revised MQP
Available

Revised MQP
Available

Revised MQP
Available

Revised MQP
Available

Revised MQP
Available

Revised MQP
Available

Revised MQP
Available

Revised MQP
Available

Revised MQP
Available

Revised MQP
Available

Approved
Available
MQP

Approved
Available

Approved
Available

Approved
Available

Revised MQP
Available

Revised MQP
Available

Revised MQP
Available

Revised MQP
Available

Revised MQP
Available

Revised MQP
Available

Revised MQP
Available

Approved
Available
MQP

Approved
Available

Approved
Available