Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Cust vendor
Customer Job Qty
CRGO & list
PICC CTC Insl'tn /PCB OIP Bush Radiator Oil Tank Fab OLTC Others Wdg Core Assy CCA Others Test Others
Lamination
500, 200 MVA CHP of Mother Test on insl CHP on CHP CHP on one M. Box CHP
2+2 X X X X X X X CHP Nil CHP Not Available
400 kV ICT coil from TPL bushing one unit unit in final test
Essel Infra
125, 80 & 50
CHP of Mother Test on insl CHP on CHP on one CHP on one M. Box CHP
MVAr, 3Φ 4+2+2 X X X X NA Nil X CHP Nil CHP Not Available
coil from TPL bushing unit unit in final test
420KV Reactor
RIP Bushing
315 MVA, 3Φ CHP Measurement
CIP on 20% of CHP:M.Box & Approved by
400/220/33 kV, 2 X X CHP X CHP Long duration CHP CHP on 1 Unit CHP CHP X X of air Flow CHP:Oil test
offered lot of CCP Cust
ICT tests at TPL during testing
each rating
Adani Power
RIP Bushing
CHP Measurement
125 MVAr, 3Φ CIP on 20% of CHP:M.Box & Approved by
1 X X CHP X CHP Long duration CHP NA CHP CHP X X of air Flow CHP:Oil test
420 kV, Reactor offered lot of CCP Cust
tests at TPL during testing
each rating
PGCIL
(RT1 & RT2) 80 MVAr, 1Φ Test on insl
34 PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP NA Nil X PCCIL MQP PCCIL MQP Nil PCCIL MQP X Available
Nizamabad/ 765 kV Reactor from TPL
Wardha
PGCIL, Aligarh
CIP: Verification
500 MVA, 3Φ, CIP during CIP during CIP at CIP during CIP during
CIP for each CIP for each CIP at Vendor's CIP for first of oil prior to CIP during stage Approved
TSTRANSCO 400/220/33 kV 2 Stage X stage vendor's stage X stage X CIP X
lot lot works Transformer dispatch at inspection Available
ICT inspection inspection works inspection inspection
vendor's works
PGCIL, Spare
Raw Material Mfg Process Final test
Cust vendor
Customer Job Qty
CRGO & list
PICC CTC Insl'tn /PCB OIP Bush Radiator Oil Tank Fab OLTC Others Wdg Core Assy CCA Others Test Others
Lamination
PGCIL, Spare
500 MVA, 3Φ
Shyam Indus Test on insl
400/220/33 kV 3 PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP CIP for 1 Unit Nil X PCCIL MQP PCCIL MQP Nil PCCIL MQP X Available
A/C PGCIL from TPL
ICT
500
MVA,400/220/33 Test on insl
2 PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP CIP for 1 Unit Nil X PCCIL MQP PCCIL MQP Nil PCCIL MQP X Available
kV Auto- from TPL
Transformer
315
MVA,400/132/33 Test on insl
1 PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP CIP for 1 Unit Nil X PCCIL MQP PCCIL MQP Nil PCCIL MQP X Available
kV Auto- from TPL
Transformer
200
Sterling Wilson MVA,400/132/33 Test on insl
1 PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP CIP for 1 Unit Nil X PCCIL MQP PCCIL MQP Nil PCCIL MQP X Available
A/C PGCIL kV Auto- from TPL
Transformer
160
MVA,220/132/33 Test on insl
1 PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP CIP for 1 Unit Nil X PCCIL MQP PCCIL MQP Nil PCCIL MQP X Available
kV Auto- from TPL
Transformer
50 MVA, 132/33
Test on insl
kV Power- 1 PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP CIP for 1 Unit Nil X PCCIL MQP PCCIL MQP Nil PCCIL MQP X Available
from TPL
Transformer
133 MVA, 3Φ
KEC Afghanistan 500/220/20 kV 4 X X X X X X X X X X X X X X CHP X Not Available
ICT
Raw Material Mfg Process Final test
Cust vendor
Customer Job Qty
CRGO & list
PICC CTC Insl'tn /PCB OIP Bush Radiator Oil Tank Fab OLTC Others Wdg Core Assy CCA Others Test Others
Lamination
Samples to be
CIP at CIP during
MSETCL a/c BNC 125 MVAr, 3Φ taken in CIP during stage
1 X X X X X vendor's CIP for PT/VT NA X X stage X CIP X Available
Power 420 kV Reactor presence of inspection
works inspection
customner
500 MVA,
PGCIL, Test on insl
400/230 kV 1 PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP CIP for 1 Unit Nil X PCCIL MQP PCCIL MQP Nil PCCIL MQP X Available
Arasur Transformer
from TPL
500 MVA,
PGCIL, Test on insl
400/220 kV 4 PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP PCCIL MQP CIP for 1 Unit Nil X PCCIL MQP PCCIL MQP Nil PCCIL MQP X Available
Kozhikode Transformer
from TPL
Check of
CIP for leak B/Relay
500 MVA,765 kV OTI/WTI,
7 X X X X X test at vendor X CIP for PT/VT X Witness by X X X X CIP Not Available
Auto-Transformer MOLG, B/R
end TBEA
Check of PRV
Sterlite Grid
Raw Material Mfg Process Final test
Cust vendor
Customer Job Qty
CRGO & list
PICC CTC Insl'tn /PCB OIP Bush Radiator Oil Tank Fab OLTC Others Wdg Core Assy CCA Others Test Others
Lamination
Check of
CIP for leak B/Relay
80 MVAR,765 kV OTI/WTI,
Sterlite Grid 17 X X X X X test at vendor X CIP for PT/VT NA Witness by X X X X CIP Not Available
Reactor MOLG, B/R
end TBEA
Check of PRV
Check of
CIP for leak B/Relay
125 MVAR,400 OTI/WTI,
1 X X X X X test at vendor X CIP for PT/VT NA Witness by X X X X CIP Not Available
kV Reactor MOLG, B/R
end TBEA
Check of PRV
For Customer inspection points (CIP), advance notice for inspection is to be given. Fifteen days for utilities and seven days for POWERGRID. In case where the final customer is PGCIL and the order is thru the Contractor, ten day's notice for inspection is required.
NOTE: Description
Please refer to the final MQP for details.
Rev 15
MQP
MQP Approved
MQP Approved
MQP Approved
MQP Approved
Approved MQP
Available
Revised MQP
Available
Revised MQP
Available
Revised MQP
Available
Revised MQP
Available
Revised MQP
Available
MQP Approved
Revised MQP
Available
MQP
Revised MQP
Available
Revised MQP
Available
Revised MQP
Available
Revised MQP
Available
Revised MQP
Available
Revised MQP
Available
Revised MQP
Available
Revised MQP
Available
Revised MQP
Available
Revised MQP
Available
Revised MQP
Available
Revised MQP
Available
Approved
Available
MQP
Approved
Available
Approved
Available
Approved
Available
Revised MQP
Available
Revised MQP
Available
Revised MQP
Available
Revised MQP
Available
Revised MQP
Available
Revised MQP
Available
Revised MQP
Available
Approved
Available
MQP
Approved
Available
Approved
Available