2. “blank” will ensure MRP does not take any reservations, etc., into account
during execution
3. “1” will look at reservations, etc., that have a requirement date within the
total horizon (ie – no end date)
4. “2” will only look at reservations, etc., that have a requirement date during
the replenishment lead time (ie – procurement processing time + planned
delivery time + GR processing time)
iv. In “VB” – manual reorder point planning:
1. The indicator “Include ext. rqmts” is set to blank to show “External reqmts
are not taken into account”
2. MRP will generate requirements only up to the max stock level when this
type is used in the material masters
c. IMG -> Materials Management -> Consumption-Based Planning -> Planning -> Activate
Materials Requirements Planning
i. MRP
1. Select Materials Requirement Planning
2. Set check mark for plants requiring MRP activation and SAVE
b. Review results
d. IMG -> Materials Management -> Consumption-Based Planning -> Planning -> Define
Scope of Planning for Total Planning
iii. Planning horizon definition: the length of time in days that the system will review
to determine if there is any requirement for a material
f. Skldfj
g. Sdkfj
h. Sskldjf
i. Skldjf[
j. skldfj
2. SAP Support: Ensure specific material type is set up for MRP
a. IMG -> Logistics-General -> Material Master -> Basic Settings -> Material Types -> Define
Attributes of Material Types
b. Double-click on desired material type
d. SAVE changes
3. Ensure material master records have MRP tabs created:
a. Sdkfj
b. Should be able to use LSMW to extend existing material records to include MRP and Gen
Plant Data / Storage tabs
c. Sdlkfj