Está en la página 1de 123

DBS3900 WiMAX

V300R003C00

Site Maintenance Guide

Issue 02
Date 2010-10-22

HUAWEI TECHNOLOGIES CO., LTD.


Copyright © Huawei Technologies Co., Ltd. 2010. All rights reserved.
No part of this document may be reproduced or transmitted in any form or by any means without prior written
consent of Huawei Technologies Co., Ltd.

Trademarks and Permissions

and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective holders.

Notice
The purchased products, services and features are stipulated by the contract made between Huawei and the
customer. All or part of the products, services and features described in this document may not be within the
purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information,
and recommendations in this document are provided "AS IS" without warranties, guarantees or representations
of any kind, either express or implied.

The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute the warranty of any kind, express or implied.

Huawei Technologies Co., Ltd.


Address: Huawei Industrial Base
Bantian, Longgang
Shenzhen 518129
People's Republic of China

Website: http://www.huawei.com
Email: support@huawei.com

Issue 02 (2010-10-22) Huawei Proprietary and Confidential i


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide About This Document

About This Document

Overview
After the DBS3900 WiMAX site is deployed, approved, and put into use, routine maintenance
is performed to ensure the functionality of the DBS3900 WiMAX.

This document describes the routine hardware maintenance items for the DBS3900 WiMAX,
such as maintenance items concerning the equipment room, power supply system, grounding
system, and DBS3900 equipment. The document also provides guidelines for replacing the
components, modules, and cables of the DBS3900.

Product Version
The following table lists the product version related to this document.

Product Name Product Version

DBS3900 WiMAX V300R003C00

Intended Audience
This document is intended for:

l System engineers
l Site maintenance engineers

Change History
Version Change History

02(2010-10-22) This is a commercial version, which is


released for the second time.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential iii


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
About This Document Site Maintenance Guide

Version Change History

01(2010-06-07) This is a draft version, which is released for


the first time.
Compared with V300R002C03 02
(2010-04-26), this release has the following
updates:
l 8 Replacing the Components in the
OMB is added.
l 5 Replacing the Components of the
RRU3702/RRU3703 is modified.

Organization
1 Site Maintenance Preparations
The preparations for the DBS3900 site maintenance cover the activities of obtaining site
information, selecting maintenance items, and arranging for tools and spare parts.
2 DBS3900 Routine Hardware Maintenance Tasks
The tasks of the routine hardware maintenance of the DBS3900 include: the environmental
maintenance of the equipment room, the maintenance of the power supply system and grounding
system of the BTS, the maintenance of the BBU, the maintenance of the RRU, the maintenance
of cables, and the maintenance of the antenna system.
3 Powering On and Powering Off the DBS3900
When you power on the DBS3900, you need to check the status of the indicators of all the
equipment. When you power off the DBS3900, you can choose the normal power-off or
emergency power-off according to the actual situation.
4 Replacing the Components of the BBU3900
The faulty BBU3900 components must be replaced promptly. The components that can be
replaced are the BBU case, boards, modules, and optical module. All boards are hot-swappable.
When boards are running, abnormal power-off of boards will not cause damage to the hardware
and software.
5 Replacing the Components of the RRU3702/RRU3703
The faulty RRU3702/RRU3703 components must be replaced promptly. The components that
can be replaced are the RRU3702/RRU3703 module, and the optical module.
6 Replacing the Components of the Fan-Cooling RRU3701C
Faulty RRU3701C components must be replaced promptly. The components that can be replaced
for the fan-cooling RRU3701C are the RRU3701C module, case, fan subrack, and optical
module.
7 Replacing the Components of the Natural-Cooling RRU3701C
Faulty RRU3701C components must be replaced promptly. The components that can be replaced
for the natural-cooling RRU3701C are the RRU3701C module, shell, and optical module.

iv Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide About This Document

8 Replacing the Components in the OMB

This section describes how to replace the HEUA board, AC/DC power cable, DCDU, and the
AC surge protection box in the OMB.

9 Replacing the Components of the SLPU

During maintenance of the SLPU, the components to be replaced include the SLPU case and
the UELP board.

10 Replacing the Surge Protector for the Antenna System

When the surge protector for the antenna system at the BBU side is faulty, you need to replace
it.

11 Replacing the Cables of the DBS3900

When the DBS3900 cables are faulty, you need to replace them promptly. The cables can be
replaced are: transmission cables, signal cables, and RF jumpers.

Conventions
Symbol Conventions

The symbols that may be found in this document are defined as follows.

Symbol Description

Indicates a hazard with a high level of risk, which if not


avoided,will result in death or serious injury.

Indicates a hazard with a medium or low level of risk, which


if not avoided, could result in minor or moderate injury.

Indicates a potentially hazardous situation, which if not


avoided,could result in equipment damage, data loss,
performance degradation, or unexpected results.

Indicates a tip that may help you solve a problem or save


time.

Provides additional information to emphasize or supplement


important points of the main text.

General Conventions

The general conventions that may be found in this document are defined as follows.

Convention Description

Times New Roman Normal paragraphs are in Times New Roman.

Boldface Names of files, directories, folders, and users are in


boldface. For example, log in as user root.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential v


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
About This Document Site Maintenance Guide

Convention Description

Italic Book titles are in italics.


Courier New Examples of information displayed on the screen are in
Courier New.

Command Conventions
The command conventions that may be found in this document are defined as follows.

Convention Description

Boldface The keywords of a command line are in boldface.

Italic Command arguments are in italics.

[] Items (keywords or arguments) in brackets [ ] are optional.

{ x | y | ... } Optional items are grouped in braces and separated by


vertical bars. One item is selected.

[ x | y | ... ] Optional items are grouped in brackets and separated by


vertical bars. One item is selected or no item is selected.

{ x | y | ... }* Optional items are grouped in braces and separated by


vertical bars. A minimum of one item or a maximum of all
items can be selected.

[ x | y | ... ]* Optional items are grouped in brackets and separated by


vertical bars. Several items or no item can be selected.

GUI Conventions
The GUI conventions that may be found in this document are defined as follows.

Convention Description

Boldface Buttons, menus, parameters, tabs, window, and dialog titles


are in boldface. For example, click OK.

> Multi-level menus are in boldface and separated by the ">"


signs. For example, choose File > Create > Folder.

Keyboard Operations
The keyboard operations that may be found in this document are defined as follows.

vi Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide About This Document

Format Description

Key Press the key. For example, press Enter and press Tab.

Key 1+Key 2 Press the keys concurrently. For example, pressing Ctrl+Alt
+A means the three keys should be pressed concurrently.

Key 1, Key 2 Press the keys in turn. For example, pressing Alt, A means
the two keys should be pressed in turn.

Mouse Operations
The mouse operations that may be found in this document are defined as follows.

Action Description

Click Select and release the primary mouse button without moving
the pointer.

Double-click Press the primary mouse button twice continuously and


quickly without moving the pointer.

Drag Press and hold the primary mouse button and move the
pointer to a certain position.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential vii


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide Contents

Contents

About This Document...................................................................................................................iii


1 Site Maintenance Preparations................................................................................................1-1
2 DBS3900 Routine Hardware Maintenance Tasks................................................................2-1
2.1 Environmental Maintenance Tasks of the Equipment Room .........................................................................2-2
2.2 Power Supply System and Grounding System Maintenance Tasks................................................................2-3
2.3 Maintenance Tasks of the BBU...................................................................................................................... 2-4
2.4 Maintenance Tasks of the RRU...................................................................................................................... 2-5
2.5 Maintenance Tasks of the Cables....................................................................................................................2-6
2.6 Maintenance Tasks of the Antenna System................................................................................................... 2-7

3 Powering On and Powering Off the DBS3900.....................................................................3-1


3.1 Powering On the BBU.....................................................................................................................................3-2
3.2 Powering Off the BBU....................................................................................................................................3-4
3.3 Powering On the RRU.....................................................................................................................................3-4
3.4 Powering Off the RRU....................................................................................................................................3-8

4 Replacing the Components of the BBU3900.........................................................................4-1


4.1 Replacing the Case of the BBU3900...............................................................................................................4-3
4.2 Replacing the BMPT.......................................................................................................................................4-5
4.3 Replacing the BBBI........................................................................................................................................ 4-7
4.4 Replacing the UPEU....................................................................................................................................... 4-9
4.5 Replacing the UEIU......................................................................................................................................4-11
4.6 Replacing the FAN........................................................................................................................................4-12
4.7 Replacing the UTRP......................................................................................................................................4-14
4.8 Replacing the USCU.....................................................................................................................................4-17
4.9 Replacing the Optical Modules.....................................................................................................................4-18

5 Replacing the Components of the RRU3702/RRU3703.......................................................5-1


5.1 Replacing the RRU3702/RRU3703................................................................................................................5-2
5.2 Replacing the Optical Modules.......................................................................................................................5-5

6 Replacing the Components of the Fan-Cooling RRU3701C..............................................6-1


6.1 Replacing the Fan-Cooling RRU3701C..........................................................................................................6-2
6.2 Replacing the RRU3701C Case......................................................................................................................6-3
6.3 Replacing the Fan Subrack of the RRU3701C................................................................................................6-4

Issue 02 (2010-10-22) Huawei Proprietary and Confidential ix


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Contents Site Maintenance Guide

6.4 Replacing the Optical Modules.......................................................................................................................6-5

7 Replacing the Components of the Natural-Cooling RRU3701C.......................................7-1


7.1 Replacing the Natural-Cooling RRU3701C....................................................................................................7-2
7.2 Replacing the Shell of the RRU3701C...........................................................................................................7-3
7.3 Replacing the Optical Modules.......................................................................................................................7-4

8 Replacing the Components in the OMB................................................................................8-1


8.1 Replacing the HEUA.......................................................................................................................................8-2
8.2 Replacing the AC/DC Power Equipment........................................................................................................8-4
8.3 Replacing the DCDU......................................................................................................................................8-9
8.4 Replacing the AC Surge Protection Box.......................................................................................................8-12

9 Replacing the Components of the SLPU ..............................................................................9-1


9.1 Replacing the SLPU Case...............................................................................................................................9-2
9.2 Replacing the UELP........................................................................................................................................9-3

10 Replacing the Surge Protector for the Antenna System.................................................10-1


11 Replacing the Cables of the DBS3900................................................................................11-1
11.1 Replacing the BBU Power Cables..............................................................................................................11-3
11.2 Replacing the Dry Contact Alarm Cables...................................................................................................11-4
11.3 Replacing the GPS Clock Signal Cables.....................................................................................................11-5
11.4 Replacing the Monitoring Signal Cables....................................................................................................11-6
11.4.1 Replacing the CMUA-BBU Monitoring Signal Cable......................................................................11-6
11.4.2 Replacing the EMUA Monitoring Signal Cable................................................................................11-7
11.5 Replacing E1/T1 Signal Cables of the BBU3900.......................................................................................11-8
11.6 Replacing the E1/T1 Surge Protection Transfer Cable...............................................................................11-9
11.7 Replacing FE/GE Ethernet Cables of the BBU3900.................................................................................11-10
11.8 Replacing FE/GE Optical Fibers of the BBU3900...................................................................................11-10
11.9 Replacing CPRI Optical Fibers.................................................................................................................11-11
11.10 Replacing the RRU Power Cables..........................................................................................................11-12
11.11 Replacing the AISG Multicore Cable of the RRU3702/RRU3703.........................................................11-14
11.12 Replacing the AISG Extension Cable of the RRU3702/RRU3703........................................................11-15
11.13 Replacing the RF Jumpers of the RRU3702/RRU3703..........................................................................11-16
11.14 Replacing the RF Jumper of the RRU3701C..........................................................................................11-17

x Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide Figures

Figures

Figure 4-1 Removing the BBU case.....................................................................................................................4-4


Figure 4-2 Position of the BMPT.........................................................................................................................4-5
Figure 4-3 Removing the BMPT..........................................................................................................................4-6
Figure 4-4 Position of the BBBI...........................................................................................................................4-7
Figure 4-5 Removing the BBBI........................................................................................................................... 4-8
Figure 4-6 Position of the UPEU......................................................................................................................... 4-9
Figure 4-7 Removing the UPEU........................................................................................................................4-10
Figure 4-8 Position of the UEIU........................................................................................................................4-11
Figure 4-9 Removing the cables.........................................................................................................................4-11
Figure 4-10 Removing the UEIU.......................................................................................................................4-12
Figure 4-11 Position of the FAN........................................................................................................................4-13
Figure 4-12 Removing the FAN.........................................................................................................................4-13
Figure 4-13 Position of the UTRP......................................................................................................................4-14
Figure 4-14 Removing the cables.......................................................................................................................4-15
Figure 4-15 Removing the UTRP......................................................................................................................4-16
Figure 4-16 Position of the USCU.....................................................................................................................4-17
Figure 4-17 Removing the cable........................................................................................................................4-17
Figure 4-18 Removing the USCU......................................................................................................................4-18
Figure 4-19 Position of the optical module........................................................................................................4-19
Figure 4-20 Removing the fibers........................................................................................................................4-20
Figure 4-21 Removing the optical module.........................................................................................................4-20
Figure 5-1 Loosening the screws on the main fixture..........................................................................................5-3
Figure 5-2 Tightening the screws on the attachment plate...................................................................................5-3
Figure 5-3 Hitting the RRU..................................................................................................................................5-4
Figure 5-4 Position of the optical module............................................................................................................5-5
Figure 5-5 Removing the fibers............................................................................................................................5-6
Figure 5-6 Removing the optical module.............................................................................................................5-7
Figure 6-1 Position of the optical module............................................................................................................6-6
Figure 6-2 Removing the fibers............................................................................................................................6-7
Figure 6-3 Removing the optical module.............................................................................................................6-7
Figure 7-1 Position of the optical module............................................................................................................7-5
Figure 7-2 Removing the fibers............................................................................................................................7-6
Figure 7-3 Removing the optical module.............................................................................................................7-6

Issue 02 (2010-10-22) Huawei Proprietary and Confidential xi


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Figures Site Maintenance Guide

Figure 8-1 Position of HEUA...............................................................................................................................8-2


Figure 8-2 Removing the cables...........................................................................................................................8-3
Figure 8-3 Removing the HEUA..........................................................................................................................8-3
Figure 8-4 Position of the AC/DC power equipment in the cabinet....................................................................8-4
Figure 8-5 Positions of the components...............................................................................................................8-5
Figure 8-6 Disconnecting cables from the PDU..................................................................................................8-5
Figure 8-7 Disconnecting cables from the PMU..................................................................................................8-6
Figure 8-8 Disconnecting cables from the equipment subrack............................................................................8-6
Figure 8-9 Removing the PDU.............................................................................................................................8-7
Figure 8-10 Removing the PSU...........................................................................................................................8-7
Figure 8-11 Removing the PMU..........................................................................................................................8-8
Figure 8-12 Removing the equipment subrack....................................................................................................8-8
Figure 8-13 Position of the DCDU.....................................................................................................................8-10
Figure 8-14 Removing the cables.......................................................................................................................8-11
Figure 8-15 Removing the DCDU.....................................................................................................................8-11
Figure 8-16 Position of the AC surge protection box........................................................................................8-12
Figure 8-17 Removing the cables.......................................................................................................................8-13
Figure 8-18 Removing the AC surge protection box.........................................................................................8-14
Figure 9-1 Removing the SLPU...........................................................................................................................9-2
Figure 9-2 Position of the UELP..........................................................................................................................9-3
Figure 9-3 Removing the cable............................................................................................................................9-4
Figure 9-4 Removing the UELP...........................................................................................................................9-4

xii Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide Tables

Tables

Table 2-1 Maintenance tasks for the environment of the equipment room..........................................................2-2
Table 2-2 Routine maintenance items for the power supply system and grounding system of the DBS3900
...............................................................................................................................................................................2-4
Table 2-3 Equipment maintenance tasks..............................................................................................................2-5
Table 2-4 Equipment maintenance tasks..............................................................................................................2-5
Table 2-5 Maintenance tasks of the cables...........................................................................................................2-6
Table 2-6 Maintenance tasks of the antenna system............................................................................................2-7
Table 3-1 Indicators on the BBU3900..................................................................................................................3-2
Table 3-2 Indicators on the RRU3702..................................................................................................................3-5
Table 3-3 Indicators on the RRU3701C...............................................................................................................3-6
Table 3-4 Indicators on the RRU3703 .................................................................................................................3-7

Issue 02 (2010-10-22) Huawei Proprietary and Confidential xiii


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 1 Site Maintenance Preparations

1 Site Maintenance Preparations

The preparations for the DBS3900 site maintenance cover the activities of obtaining site
information, selecting maintenance items, and arranging for tools and spare parts.

Obtaining Site Information


Before setting out for the DBS3900 site, obtain the following site information:
l The uncleared faults and alarms of the site (to make the maintenance process focused and
purposeful)
l Hardware configuration of the site (to avoid improper operation)
l Local conditions (to prevent maintenance from being affected by external factors such as
transportation and weather)
l Spare parts (to prepare new boards or modules for replacement if required)

Selecting Maintenance Items


Based on the specific situations of the DBS3900 site, select maintenance items from the
following list:
l Maintaining the equipment room
l Maintaining the power system and grounding system
l Maintaining the BBU
l Maintaining the RRU
l Maintaining the cables
l Maintaining the antenna system

Preparing Tools and Spare Parts


l Frequency test devices
The following devices are used for frequency test: the frequency meter, spectrum analyzer,
connectors and cables.
The oscilloscope is often used.
l Power test devices
The power test devices are used to measure and analyze the output power of the DBS3900,
which determines the effect of forward coverage.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 1-1


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
1 Site Maintenance Preparations Site Maintenance Guide

The power meter is often used.


l Antenna and feeder test devices
The antenna and feeder test devices are used to locate faults and to measure the standing
wave ratio, return loss, and cable insertion loss.
The Site Master is often used.
l Other materials
– Multimeter, ESD wrist strap or ESD gloves, screwdriver, ESD box or bag, dust free
cloth, and wrench
– Ethernet cables for commissioning
– Spare parts
NOTE

Arrange for the tools and components according to the actual conditions of specified replacement.

1-2 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 2 DBS3900 Routine Hardware Maintenance Tasks

2 DBS3900 Routine Hardware Maintenance


Tasks

About This Chapter

The tasks of the routine hardware maintenance of the DBS3900 include: the environmental
maintenance of the equipment room, the maintenance of the power supply system and grounding
system of the BTS, the maintenance of the BBU, the maintenance of the RRU, the maintenance
of cables, and the maintenance of the antenna system.
2.1 Environmental Maintenance Tasks of the Equipment Room
This task enables you to maintain the environment of the DBS3900 equipment room.
2.2 Power Supply System and Grounding System Maintenance Tasks
This describes the maintenance tasks for the power supply system and grounding system of the
DBS3900.
2.3 Maintenance Tasks of the BBU
This describes how to check the surface of the equipment, cleanness of the equipment, and
indicators.
2.4 Maintenance Tasks of the RRU
This describes how to check the surface of the equipment, cleanness of the equipment, and
indicators.
2.5 Maintenance Tasks of the Cables
The maintenance tasks of cables include checking the following items: the cable distribution
and routing, signal cables, Ethernet cables, optical cables, connectors, and sockets.
2.6 Maintenance Tasks of the Antenna System
The tasks of the maintenance of antenna system include checking towers, poles, antennas
(including satellite antennas and RF antennas), and feeders.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 2-1


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
2 DBS3900 Routine Hardware Maintenance Tasks Site Maintenance Guide

2.1 Environmental Maintenance Tasks of the Equipment


Room
This task enables you to maintain the environment of the DBS3900 equipment room.

Maintenance Tasks for the Environment of the Equipment Room


Table 2-1 lists the maintenance tasks for the environment of the equipment room.

Table 2-1 Maintenance tasks for the environment of the equipment room
Maintenance Task Period Instruction Reference
Standard

Check the Daily Check whether the No power supply


environmental power supply alarm, alarm, fire alarm,
alarms of the fire alarm, smoke smoke alarm, and
equipment room. alarm, or security security alarm is
alarm is generated in generated.
the equipment room.

Check the Every time you Record the -5°C to +45°C


temperature of the maintain the site temperature of the
equipment room. equipment room.

Check the humidity Every time you Record the reading of 5% RH to 85% RH
of the equipment maintain the site the
room hygrothermograph.

Check the lighting Every two months Check whether the -


equipment of the normal lighting and
equipment room the emergency
lighting are normal.

Check the indoor air- Every two months Check whether the -
conditioner air-conditioner
operates properly.

2-2 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 2 DBS3900 Routine Hardware Maintenance Tasks

Maintenance Task Period Instruction Reference


Standard

Check the disaster Every two months Check whether the l The equipment
prevention measures disaster prevention room should be
measures, equipment configured with
protection, and the the carbon
fire hydrants are dioxide fire
normal. extinguisher or
the dry powder
fire extinguisher.
Check the
pressure and the
expired date of
the fire
extinguisher.
l There should be
no mice, ants,
flies and other
potential danger
in the equipment
room.

Clean the equipment Every two months Check whether the All objects in the
room. cabinet, the shell and equipment room
interior of the should be clean and
equipment, the table, neat, and there is no
the floor, the visible dust on the
window, and the door cabinet.
are clean.

2.2 Power Supply System and Grounding System


Maintenance Tasks
This describes the maintenance tasks for the power supply system and grounding system of the
DBS3900.

Maintenance Items for the Power Supply System and Grounding System
Table 2-2 describes the routine maintenance items for the power supply system and grounding
system of the DBS3900.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 2-3


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
2 DBS3900 Routine Hardware Maintenance Tasks Site Maintenance Guide

Table 2-2 Routine maintenance items for the power supply system and grounding system of the
DBS3900
Item Frequency Operation Standard

Power cable Monthly or quarterly Carefully check the The power cables are
connections of power not aging, and there
cables. is no corrosion on the
joints.

Voltage Monthly or quarterly Measure the voltage The external input


of the power supply voltage of the BBU
using a multimeter. ranges from -38.4 V
DC to -57 V DC.
The external input
voltage of the RRU
ranges from -36 V
DC to -57 V DC.

PGND cable Monthly or quarterly Verify that the The joints are secure
PGND cable and and corrosion free.
ground bar are
connected securely.

Earth resistance Monthly or quarterly Measure the earth The earth resistance
resistance using an is smaller than 10
electric earth ohms.
resistance tester and
record the
measurement.

Batteries Annually Check the battery The capacity of all


and rectifier in the batteries meets the
power supply system requirement and the
of each equipment connections of the
room. batteries are correct.
The specifications of
the rectifier meet the
requirements.

2.3 Maintenance Tasks of the BBU


This describes how to check the surface of the equipment, cleanness of the equipment, and
indicators.

Equipment Maintenance Tasks


Table 2-3 describes the equipment maintenance tasks for the BBU.

2-4 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 2 DBS3900 Routine Hardware Maintenance Tasks

Table 2-3 Equipment maintenance tasks


Item Frequency Operation Standard

Equipment surface Monthly or quarterly Check whether the -


surface of the
equipment is
damaged and
whether the label of
the equipment is
legible.

Equipment Monthly or quarterly Check whether the The surface and


cleanliness equipment is clean. inside of the
equipment case are
clean.

indicator check Monthly or quarterly Check whether the For details on the
indicators on the meanings of the
equipment are indicators, see 3.1
functional. Powering On the
BBU.

2.4 Maintenance Tasks of the RRU


This describes how to check the surface of the equipment, cleanness of the equipment, and
indicators.

Equipment Maintenance Tasks


Table 2-4 describes the equipment maintenance tasks for the RRU.

Table 2-4 Equipment maintenance tasks


Item Frequency Operation Standard

Equipment surface Monthly or quarterly Check whether the -


surface of the
equipment is
damaged and
whether the label of
the equipment is
legible.

Equipment Monthly or quarterly Check whether the The surface and


cleanliness equipment is clean. inside of the
equipment case are
clean.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 2-5


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
2 DBS3900 Routine Hardware Maintenance Tasks Site Maintenance Guide

Item Frequency Operation Standard

Indicator check Monthly or quarterly Check whether the For details on the
indicators on the meanings of the
equipment are indicators, see 3.3
functional. Powering On the
RRU.

2.5 Maintenance Tasks of the Cables


The maintenance tasks of cables include checking the following items: the cable distribution
and routing, signal cables, Ethernet cables, optical cables, connectors, and sockets.

Table 2-5 lists the maintenance tasks of the cables.

Table 2-5 Maintenance tasks of the cables

Task Period Instruction Reference Standard

Cable
Check whether all
distribution and Weekly The labels are legible.
cable labels are clear.
routing

l The signal cables are


Check the connection connected securely.
Check the signal
Annually of the signal cables l The signal cables are
cables
carefully. intact.
l The labels are legible.

l The network cables are


securely connected.
Check carefully the l The network cables are
Network cable Annually connections of the not damaged.
network cables. l The concentrators are
intact.
l The labels are legible.

l The optical cables are


Check carefully the securely connected.
Optical cable Annually connections of the l The optical cables are
optical cables. intact.
l The labels are legible.

Check whether the


Check the insulators of the
Monthly The insulators are clear and
connectors and connectors and sockets
(quarterly) not stained.
sockets are stained with dust
and oil.

2-6 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 2 DBS3900 Routine Hardware Maintenance Tasks

2.6 Maintenance Tasks of the Antenna System


The tasks of the maintenance of antenna system include checking towers, poles, antennas
(including satellite antennas and RF antennas), and feeders.
Table 2-6 lists the maintenance tasks of the antenna system.

Table 2-6 Maintenance tasks of the antenna system


Task Period Instruction Reference Standard

Check the tower The towers are not


structure, the contact of distorted, rusted or
Towers Every half a year connection bolts, and corroded. Connection bolts
anticorrosion and are properly tightened. The
antirust status. tower bases do not subside.

Check the fasteners, The fasteners are not loose.


stay wires, ground The stay wires and ground
Poles Every half a year anchors, and anchors are evenly forced.
anticorrosion and The poles are not rusted or
antirust status of poles. corroded.

Check the connection The antennas are protected


between the antenna from lightning in the tilt of
support and the tower 30° from the top of the
Every two
Antennas or roof, and check lightning rod. The antenna
months
whether antennas are support is securely
in the protection scope connected to the tower or
of the lightning rod. roof.

The feeder clips are


Check whether feeder
installed securely. The
Every two clips are loose and
Feeders feeders are not folded or
months whether feeders are
distorted. No copper core is
distorted or folded.
exposed.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 2-7


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 3 Powering On and Powering Off the DBS3900

3 Powering On and Powering Off the DBS3900

About This Chapter

When you power on the DBS3900, you need to check the status of the indicators of all the
equipment. When you power off the DBS3900, you can choose the normal power-off or
emergency power-off according to the actual situation.

3.1 Powering On the BBU


The BBU uses -48 V DC power. After the BBU3900 is powered on, you need to check the
operating status of each indicator and ensure that each indicator is in normal state.
3.2 Powering Off the BBU
This describes how to power off the BBU in a normal situation or in an emergency.
3.3 Powering On the RRU
Power on the RRU. Determine the working state of the RRU according to the status of the
indicators and ensure that the RRU is functional.
3.4 Powering Off the RRU
This section describes how to power off the RRU in a normal situation or in an emergency.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 3-1


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
3 Powering On and Powering Off the DBS3900 Site Maintenance Guide

3.1 Powering On the BBU


The BBU uses -48 V DC power. After the BBU3900 is powered on, you need to check the
operating status of each indicator and ensure that each indicator is in normal state.

Prerequisite
l The installation of the hardware and cables of the BBU is complete.
l The input voltage ranges from -38.4 V DC to -57 V DC.

Procedure
Step 1 Set the circuit breaker on the external power supply equipment that provides power to the BBU
to ON.
Step 2 Turn on the power switch of the BBU.
Step 3 Check the status of the indicators on the boards and modules of the BBU. Table 3-1 describes
the meanings of the indicators.

Table 3-1 Indicators on the BBU3900


Board/ Indicator Color State Description
Module

UPEU RUN Green On The power board is


working properly.

Off The power board stops


working.

BMPT, RUN Green On There is power input, but


USCU, the board is faulty.
UTRP
Off There is no power input,
or the board is faulty.

Blinking at 0.5 Hz The board is working


(on for 1s and off for properly.
1s)

Blinking at 4 Hz (on The board is being


for 0.125s and off for loaded.
0.125s)

ALM Red On An alarm is generated,


and the board needs to be
replaced.

Off No alarm is generated.

3-2 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 3 Powering On and Powering Off the DBS3900

Board/ Indicator Color State Description


Module

Blinking at 0.5 Hz An alarm is generated,


(on for 1s and off for but you cannot
1s) determine that the board
needs to be replaced.
This alarm may be
generated by a faulty
board or port.

ACT Green On Active

Off Standby

BBBI RUN Green On There is power input, but


the board is faulty.

Off There is no power input,


or the board is faulty.

Blinking at 0.5 Hz The board is working as


(on for 1s and off for configured.
1s)

Blinking at 4 Hz (on The board is loading or


for 0.125s and off for not started.
0.125s)

ALM Red On An alarm is generated,


and the board needs to be
replaced.

Off No alarm is generated.

Blinking at 0.5 Hz An alarm is generated,


(on for 1s and off for but you cannot
1s) determine that the board
needs to be replaced.
This alarm may be
generated by a faulty
board or port.

ACT Green On The board is working.

Off The board is not


working.

FAN STATE Green Blinking at 4 Hz (on The board is not


for 0.125s and off for registered, and no alarm
0.125s) is generated.

Blinking at 0.5 Hz The board is working


(on for 1s and off for properly.
1s)

Red On An alarm is generated.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 3-3


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
3 Powering On and Powering Off the DBS3900 Site Maintenance Guide

Step 4 Proceed with the next step according to the status of the indicator.

If... Then...

The boards and modules of the BBU are The power-on procedure is complete.
working properly,

Faults occur in the BBU, Record the fault status, turn off the power
switch, rectify the fault, and then go to Step
1.

----End

3.2 Powering Off the BBU


This describes how to power off the BBU in a normal situation or in an emergency.

Procedure
Step 1 Determine the method for powering off the BBU according to the actual situation.

If... Then...

The BBU needs to be powered off when you Turn off the power switch of the BBU, and
swap the equipment or anticipate a territorial then turn off the power switch of the external
power outage. power supply to the BBU.

The BBU needs to be powered off in an Turn off the power switch of the external
emergency, such as fire, smoke, or water power supply to the BBU, and then turn off
immersion, the power switch of the BBU.

----End

3.3 Powering On the RRU


Power on the RRU. Determine the working state of the RRU according to the status of the
indicators and ensure that the RRU is functional.

Prerequisite
l Ensure that the installation of the RRU and the cables is correct and complete.
l The input voltage ranges from -36 V DC to -57 V DC.

3-4 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 3 Powering On and Powering Off the DBS3900

Context

CAUTION
The RRU must be powered on within 24 hours after being unpacked or after being powered off
for maintenance.

Procedure
Step 1 Connect the power cable of the RRU to the output end of the external power equipment, and
then turn on the power switch to power on RRU.

DANGER
After the RRU is powered on, do not look directly at the beam from the optical module without
taking the necessary eye protection measures.

Step 2 Wait for three to five minutes and then check the status of indicators on the RRU. Table 3-2
lists the meanings of the indicators on the RRU3702. Table 3-3 lists the meanings of the
indicators on the RRU3701C. Table 3-4 lists the meanings of the indicators on the RRU3703.

Table 3-2 Indicators on the RRU3702

Indicato Color Status Description


r

RUN Green On There is power input but the board is


faulty.

Off No power input is available.

Blinks at 0.5 Hz (on The board is working normally.


for 1s, off for 1s)

Blinks at 4 Hz (on for The board is being loaded or not started.


0.125s, off for 0.125s)

ALM Red On An alarm (except the standing-wave


alarm) is generated and the board must
be replaced.

Off No alarm (except the standing-wave


alarm) is generated.

Blinks at 0.5 Hz (on An alarm (except the standing-wave


for 1s, off for 1s) alarm) is generated. Whether the board
needs to be replaced is uncertain. It may
be caused by a fault on the related board
or port.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 3-5


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
3 Powering On and Powering Off the DBS3900 Site Maintenance Guide

Indicato Color Status Description


r

TX_ACT Green On The board is working properly (the


transmit channel is active).

Off The software version is being verified or


the version verification fails.

Blinks at 0.5 Hz (on The version verification succeeds but the


for 1s, off for 1s) transmit channel is inactive.

VSWR Red On A standing wave alarm is generated.

Off No standing wave alarm is generated.

CPRI0 Green On The optical module is in position.

Off The optical module is out of position.

CPRI1 Green On The optical module is in position.

Off The optical module is out of position.

Table 3-3 Indicators on the RRU3701C


Indicator Color Status Meaning

RUN Green On The system is


powered on.

Off The system is not


powered on.

Blinks at 4 Hz (on for The module is being


0.125s, off for loaded or is not
0.125s) started.

Blinks at 0.5 Hz (on The module is


for 1s, off for 1s) working properly.

ALM Red On An alarm is


generated and the
corresponding
module must be
replaced.

Off There is no alarm.

3-6 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 3 Powering On and Powering Off the DBS3900

Indicator Color Status Meaning

Blinks at 0.5 Hz (on An alarm is


for 1s, off for 1s) generated. But
whether the board
needs to be replaced
is uncertain. It may
be caused by a fault
on the related board
or port.

ACT Green On The module is


working properly.

Off The module is not


configured and not
connected to the
BBU.

Blinks at 0.5 Hz (on The configuration is


for 1s, off for 1s) successful, but the
transmit channel is
blocked.

Table 3-4 Indicators on the RRU3703


Indicato Color Status Description
r

RUN Green On There is power input but the board is


faulty.

Off There is no power input.

Blinks at 0.5 Hz (on The board is working normally.


for 1s, off for 1s)

Blinks at 4 Hz (on for The board is being loaded or not started.


0.125s, off for 0.125s)

ALM Red On An alarm (except the standing-wave


alarm) is generated and the board must
be replaced.

Off No alarm (except the standing-wave


alarm) is generated.

Blinks at 0.5 Hz (on An alarm (except the standing-wave


for 1s, off for 1s) alarm) is generated. Whether the board
needs to be replaced is uncertain. It may
be caused by a fault on the related board
or port.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 3-7


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
3 Powering On and Powering Off the DBS3900 Site Maintenance Guide

Indicato Color Status Description


r

ACT Green On The board is working normally (the


sector is activated and the transmit
channel is active).

Off The software version is being verified or


the version verification fails.

Blinks at 0.5 Hz (on The version verification succeeds but the


for 1s, off for 1s) transmit channel is inactive (the sector is
not activated).

VSWR Red On A standing wave alarm is generated.

Off No standing wave alarm is generated.

CPRI0/ Red and On (green) The CPRI link is functional.


IR0 green
On (red) An optical module receiving exception
alarm is generated.

Off The optical module is not in position.

CPRI1/ Red and On (green) The CPRI link is functional.


IR1 green
On (red) An optical module receiving exception
alarm is generated.

Off The optical module is not in position.

Step 3 Proceed with the next step according to the status of the indicator.

If... Then...

The RRU is working properly, The power-on procedure is complete.

The RRU is faulty, Record the faulty status, turn off the power switch, rectify
the fault, and then go to Step 1.

----End

3.4 Powering Off the RRU


This section describes how to power off the RRU in a normal situation or in an emergency.

Context
The RRU can be powered off in a normal situation or in an emergency. The handling methods
in these two situations are the same.

3-8 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 3 Powering On and Powering Off the DBS3900

l In a normal situation: The RRU needs to be powered off when you swap the equipment or
anticipate a territorial power outage.
l In an emergency: The RRU needs to be powered off in an emergency, such as fire, smoke,
or water immersion.

Procedure
Step 1 Turn off the switch of the external power supply equipment of the RRU.
NOTE

The external power supply equipment of the RRU is the APM or DCDU. Thus, you need to turn off the
power switch of the RRU through the APM or DCDU.

----End

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 3-9


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 4 Replacing the Components of the BBU3900

4 Replacing the Components of the BBU3900

About This Chapter

The faulty BBU3900 components must be replaced promptly. The components that can be
replaced are the BBU case, boards, modules, and optical module. All boards are hot-swappable.
When boards are running, abnormal power-off of boards will not cause damage to the hardware
and software.

4.1 Replacing the Case of the BBU3900


The case of the BBU3900 consists of the outer case and the Universal BBU Subrack Backplane
Type C (2U) (BSBC). The BSBC is the backplane of the BBU3900, which provides power
supply, clock, and the data of the control panel and service panel for each board.
4.2 Replacing the BMPT
The BWA Main Processing&Transmission Unit (BMPT) is the main processing and
transmission board of the BBU3900. The BMPT implements centralized management over the
boards of the system.
4.3 Replacing the BBBI
The BWA BaseBand Processing and Radio Interface Unit (BBBI) is the baseband processing
and radio interface board of the BBU3900, which processes baseband signals and provides RF
interfaces. There are two types of BBBI board: 8 HP and 4 HP. The procedures for replacing
the two types of BBBIs are the same. The following procedure for replacing the 4 HP BBBI is
given as an example.
4.4 Replacing the UPEU
The Universal Power and Environment Interface Unit (UPEU) is the power and environment
monitoring module of the BBU3900. The UPEU supports the -48 V DC power input and provides
power to the boards in the BBU.
4.5 Replacing the UEIU
The Universal Environment Interface Unit (UEIU) is the environment interface unit of the
BBU3900. The UEIU reports alarms and information of the environment monitoring equipment
to the BMPT.
4.6 Replacing the FAN
The FAN module of the BBU is used to cool the BBU3900. The FAN and the air inlet box form
an air duct for forcible ventilation and heat dissipation.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 4-1


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
4 Replacing the Components of the BBU3900 Site Maintenance Guide

4.7 Replacing the UTRP


The Universal Transmission Processing Unit (UTRP) is the extended transmission board of the
BBU3900 and provides eight E1/T1 interfaces.
4.8 Replacing the USCU
The Universal Satellite card and Clock Unit (USCU) is the extended satellite card and clock unit
of the BBU. The USCU receives the GPS, RGPS, BITS, and M-1PPS clock signals, and receives
or transmits 1PPS + TOD clock signals.
4.9 Replacing the Optical Modules
The optical module provides an interface for photoelectric conversion, which enables the
transmission between the BBU and other equipment through the optical fiber. Replacing the
optical modules requires removing the optical fibers. This disrupts the CPRI transmission signal.
The procedures of replacing optical modules in different BS equipment are the same. The
following section describes how to replace an optical module in the BBU.

4-2 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 4 Replacing the Components of the BBU3900

4.1 Replacing the Case of the BBU3900


The case of the BBU3900 consists of the outer case and the Universal BBU Subrack Backplane
Type C (2U) (BSBC). The BSBC is the backplane of the BBU3900, which provides power
supply, clock, and the data of the control panel and service panel for each board.

Prerequisite
l The required tools and materials are ready. The tools and materials are the ESD wrist strap
or ESD gloves, M6 screwdriver, and ESD box or bag.
l The quantity and models of the components to be replaced are confirmed and new cases
are ready.
l Keep the keys ready for use after you obtain site admission.

Context
Replacing the BBU case disrupts all the services carried by the BS. Therefore, the BBU case
must be replaced within 20 minutes.

Procedure
Step 1 Inform the administrator of the M2000 that the BBU case needs to be replaced and ask the
administrator to perform the following operations:
1. Obtain the BTS data configuration file by referring to Backing Up Configuration Data.
2. If necessary, transfer the services carried by the boards in the BBU.
3. Change the ESN to that of the new BBU case by referring to DHCP Parameter Preparation.
Step 2 Power off the BBU by referring to 3.2 Powering Off the BBU.
Step 3 Wear the ESD wrist strap or ESD gloves.

CAUTION
When performing the replacement, take proper ESD prevention measures, for example, wear
ESD wrist straps or gloves to prevent boards, modules, and electronic components from being
destroyed by static discharge from the human body.

Step 4 Record the connection positions of all the cables connected to the boards in the BBU case.
Step 5 Disconnect the cables from the boards in the BBU case.
Step 6 Loosen the four M6 screws on the BBU case and then remove the BBU case, as shown in Figure
4-1.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 4-3


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
4 Replacing the Components of the BBU3900 Site Maintenance Guide

Figure 4-1 Removing the BBU case

NOTE
The procedure of replacing the BBU case with regularly installed mounting ears and that of replacing the
BBU case with reversely installed mounting ears are the same. In the preceding figure, the BBU is in a 19-
inch space and the mounting ears are regularly installed.

Step 7 Remove all the boards in the faulty BBU case, install the boards to the new BBU case, and then
install filler panels to the idle slots.

Step 8 Install the new BBU case, fasten the screws on the case [torque: 2 N.m (17.70 lbf.in.)], and then
install the cables according to the recorded positions.
NOTE
If the mounting ears of the BBU case to be replaced are reversely installed, you need to install the mounting
ears to the new BBU case in the same way. See the DBS3900 WiMAX Quick Installation Guide
(RRU3702&RRU3703) for the procedure of reversely installing the mounting ears.

Step 9 Power on the BBU by referring to 3.1 Powering On the BBU.

Step 10 Determine whether the new BBU case is functional according to the status of indicators of the
boards in the BBU.
NOTE

For description of the indicators, see DBS3900 WiMAX Hardware Description.

Step 11 Inform the administrator of the M2000 that the hardware replacement is complete and ask the
administrator to confirm that the boards and modules in the BBU do not generate any alarms.

Step 12 Remove the ESD wrist strap or gloves and put the tools away.

----End

Postrequisite
l Put the replaced components into the ESD bag and then put the bag into the cardboard box
filled with foam.
l Fill the fault card to record the information of the replaced components.
l Contact the local Huawei office to handle the faulty components.

4-4 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 4 Replacing the Components of the BBU3900

4.2 Replacing the BMPT


The BWA Main Processing&Transmission Unit (BMPT) is the main processing and
transmission board of the BBU3900. The BMPT implements centralized management over the
boards of the system.

Prerequisite
l The required tools and materials are ready. The tools and materials are the ESD wrist strap
or ESD gloves, M3 screwdriver, and ESD box or bag.
l The quantity and models of the boards to be replaced are confirmed.
l Keep the keys ready for use after you obtain site admission.

Context
l Figure 4-2 shows the position of the BMPT in the BBU.

Figure 4-2 Position of the BMPT

NOTE
This figure is only for your reference. Determine the actual configuration positions according to the onsite
condition.

l The board is hot-swappable.


l If no backup BMPT is configured, replacing the BMPT disrupts all the services carried by
the BS. Therefore, the BMPT must be replaced within 20 minutes.

Procedure
Step 1 Inform the administrator of the M2000 that the BMPT needs to be replaced and ask the
administrator to perform the following operations:
1. Obtain the BTS data configuration file by referring to Backing Up Configuration Data.
2. If necessary, transfer the services carried by the boards in the BBU.

Step 2 Wear the ESD wrist strap or ESD gloves.

CAUTION
When performing the replacement, take proper ESD prevention measures, for example, wear
ESD wrist straps or gloves to prevent boards, modules, and electronic components from being
destroyed by static discharge from the human body.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 4-5


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
4 Replacing the Components of the BBU3900 Site Maintenance Guide

Step 3 Remove the board.


1. Record the connection positions of all the cables connected to the board and then remove
these cables.
2. Loosen the two M3 screws on the panel, lift the ejector levers on the faulty board, and
remove the faulty board from the slot, as shown in Figure 4-3.

Figure 4-3 Removing the BMPT

3. Put the removed board in an ESD bag.


Step 4 Install the new board.
1. Insert the new board into the slot of the original faulty board.
2. Press the ejector levers on the panel of the new board and fasten the screws on both sides
of the panel of the board [torque: 0.6 N.m (5.31 lbf.in.)].
3. Install the cables.
Step 5 Inform the administrator of the M2000 that the hardware replacement is complete and ask the
administrator to perform the following operations:
1. Run the DLD CFGFILE command to download the backup configuration data to the new
BMPT.
2. Run the ACT CFGFILE command to activate the configuration data.
3. Run the DSP BRDVER command to check whether BootROM version and software
version of the new board are correct.
If the software version is incorrect, upgrade the BS software. For details of the procedures,
see the DBS3900 WiMAX Upgrade Guide.
Step 6 Determine whether the new BMPT is functional according to the status of the indicators.
1. In the normal state, the RUN indicator of the board blinks at 0.5 Hz (on for 1s and off for
1s) and the ALM indicator is off.
2. The ACT indicator on the active board is on.

NOTE
For description of the indicators, see DBS3900 WiMAX Hardware Description.

Step 7 Remove the ESD wrist strap or gloves and put the tools away.

----End

Postrequisite
l Put the replaced components into the ESD bag and then put the bag into the cardboard box
filled with foam.

4-6 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 4 Replacing the Components of the BBU3900

l Fill the fault card to record the information of the replaced components.
l Contact the local Huawei office to handle the faulty components.

4.3 Replacing the BBBI


The BWA BaseBand Processing and Radio Interface Unit (BBBI) is the baseband processing
and radio interface board of the BBU3900, which processes baseband signals and provides RF
interfaces. There are two types of BBBI board: 8 HP and 4 HP. The procedures for replacing
the two types of BBBIs are the same. The following procedure for replacing the 4 HP BBBI is
given as an example.

Prerequisite
l The required tools and materials are ready. The tools and materials are the ESD wrist strap
or ESD gloves, M3 screwdriver, and ESD box or bag.
l The quantity and models of the boards to be replaced are confirmed.
l Admission to the site is obtained and the keys to the site are ready.

Context
l Figure 4-4 shows the position of the BBBI in the BBU.

Figure 4-4 Position of the BBBI

NOTE
This figure is only for your reference. Determine the actual configuration positions according to the onsite
condition.

l The board is hot-swappable.


l Replacing the BBBI disrupts all the services carried by the BS. Therefore, the BBBI must
be replaced within 20 minutes.
l The procedure described here is applicable to replacing BBBIs of the same type as the 8
HP or 4 HP BBBI. See DBS3900 WiMAX Reconfiguration Guide to replace BBBIs of a
different type from the 8 HP or 4 HP BBBI.

Procedure
Step 1 Inform the administrator of the M2000 that the BBBI needs to be replaced. If necessary, ask the
administrator to transfer the services carried by the board.

Step 2 Wear the ESD wrist strap or ESD gloves.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 4-7


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
4 Replacing the Components of the BBU3900 Site Maintenance Guide

CAUTION
When performing the replacement, take proper ESD prevention measures, for example, wear
ESD wrist straps or gloves to prevent boards, modules, and electronic components from being
destroyed by static discharge from the human body.

Step 3 Remove the board.


1. Record the connection positions of all the cables connected to the board and then remove
these cables.
2. Loosen the two M3 screws on the panel, lift the ejector levers on the faulty board, and
remove the faulty board from the slot, as shown in Figure 4-5.

Figure 4-5 Removing the BBBI

3. Put the removed board in an ESD bag.

Step 4 Install the new board.


1. Insert the new board into the slot of the original faulty board.
2. Press the ejector levers on the panel of the new board and fasten the screws on both sides
of the panel of the board [torque: 0.6 N.m (5.31 lbf.in.)].
3. Install the cables.

Step 5 Inform the administrator of the M2000 that the hardware replacement is complete and ask the
administrator to run the DSP BRDVER command to check whether the BootROM version and
software version of the new board are correct.

If the software version is incorrect, upgrade the BS software. For details of the procedures, see
the DBS3900 WiMAX Upgrade Guide.

Step 6 Determine whether the new BBBI is functional according to the status of the indicators. In the
normal state, the RUN indicator of the board blinks at 0.5 Hz (on for 1s and off for 1s).
NOTE

For description of the indicators, see DBS3900 WiMAX Hardware Description.

Step 7 Remove the ESD wrist strap or ESD gloves and put the tools away.

----End

4-8 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 4 Replacing the Components of the BBU3900

Postrequisite
l Put the replaced components into an ESD bag and then put the bag into a cardboard box
filled with foam.
l Fill the fault card to record the information of the replaced components.
l Contact the local Huawei office to handle the faulty components.

4.4 Replacing the UPEU


The Universal Power and Environment Interface Unit (UPEU) is the power and environment
monitoring module of the BBU3900. The UPEU supports the -48 V DC power input and provides
power to the boards in the BBU.

Prerequisite
l The required tools and materials are ready. The tools and materials are the ESD wrist strap
or ESD gloves, M3 screwdriver, and ESD box or bag.
l The quantity and models of the modules to be replaced are confirmed.
l Keep the keys ready for use after you obtain site admission.

Context
l Figure 4-6 shows the position of the UPEU in the BBU.

Figure 4-6 Position of the UPEU

UPEU

l If no backup UPEU is configured, replacing the UPEU powers off the BBU and disrupts
services. Therefore, the UPEU must be replaced within 10 minutes.

Procedure
Step 1 Inform the administrator of the M2000 that the UPEU needs to be replaced. If necessary, ask
the administrator to back up or transfer the services carried by the module.
Step 2 Power off the BBU by referring to 3.2 Powering Off the BBU.
Step 3 Wear the ESD wrist strap or ESD gloves.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 4-9


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
4 Replacing the Components of the BBU3900 Site Maintenance Guide

WARNING
When performing the replacement, take proper ESD prevention measures, for example, wear
ESD wrist straps or gloves to prevent boards, modules, and electronic components from being
destroyed by static discharge from the human body.

Step 4 Remove the module.


1. Record the connection positions of all the cables connected to the module and then
disconnect these cables from the module.
2. Loosen the two M3 screws on the panel, lift the ejector levers on the faulty module and
remove the faulty module from the slot, as shown in Figure 4-7.

Figure 4-7 Removing the UPEU

1
2

3. Put the removed module in an ESD bag.


Step 5 Install the new module.
1. Insert the new module into the slot of the original faulty module.
2. Press the ejector levers on the panel of the new module and fasten the screws on both sides
of the panel of the new module [torque: 0.6 N.m (5.31 lbf.in.)].
3. Install the cables according to the recorded installation positions.
Step 6 Power on the BBU by referring to 3.1 Powering On the BBU.
Step 7 Determine whether the new UPEU is functional according to the status of the indicators. In the
normal state, the RUN indicator of the UPEU is on.
NOTE

For description of the indicators, see DBS3900 WiMAX Hardware Description.

Step 8 Inform the administrator of the M2000 that the hardware replacement is complete and ask the
administrator to confirm that the boards and the module do not generate any alarms.
Step 9 Remove the ESD wrist strap or gloves and put the tools away.

----End

Postrequisite
l Put the replaced components into the ESD bag and then put the bag into the cardboard box
filled with foam.
l Fill the fault card to record the information of the replaced components.
l Contact the local Huawei office to handle the faulty components.

4-10 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 4 Replacing the Components of the BBU3900

4.5 Replacing the UEIU


The Universal Environment Interface Unit (UEIU) is the environment interface unit of the
BBU3900. The UEIU reports alarms and information of the environment monitoring equipment
to the BMPT.

Prerequisite
l The required tools and materials are ready. The tools and materials are the ESD wrist strap
or ESD gloves, M3 screwdriver, and ESD box or bag.
l The quantity and models of the boards to be replaced are confirmed.
l Keep the keys ready for use after you obtain site admission.

Context
l Figure 4-8 shows the position of the UEIU in the BBU.

Figure 4-8 Position of the UEIU

UEIU

l The board is hot-swappable.


l Replacing the UEIU disrupts the monitoring of external equipment. Therefore, the UEIU
must be replaced in five minutes.

Procedure
Step 1 Wear the ESD wrist strap or ESD gloves.

WARNING
When performing the replacement, take proper ESD prevention measures, for example, wear
ESD wrist straps or gloves to prevent boards, modules, and electronic components from being
destroyed by static discharge from the human body.

Step 2 Record the connection positions of all the cables connected to the board.
Step 3 Disconnect the monitoring cables and alarm cables from the UEIU, as shown in Figure 4-9.

Figure 4-9 Removing the cables

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 4-11


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
4 Replacing the Components of the BBU3900 Site Maintenance Guide

Step 4 Loosen the two screws on the panel by using the M3 screwdriver and then remove the UEIU,
as shown in Figure 4-10.

Figure 4-10 Removing the UEIU

1
2

Step 5 Install the new board, fasten the screws on the board [torque: 0.6 N.m (5.31 lbf.in.)], and then
install the cables.

Step 6 Inform the administrator of the M2000 that the hardware replacement is complete and ask the
administrator to confirm that the board does not generate any alarms.

Step 7 Remove the ESD wrist strap or gloves and put the tools away.

----End

Postrequisite
l Put the replaced components into the ESD bag and then put the bag into the cardboard box
filled with foam.
l Fill the fault card to record the information of the replaced components.
l Contact the local Huawei office to handle the faulty components.

4.6 Replacing the FAN


The FAN module of the BBU is used to cool the BBU3900. The FAN and the air inlet box form
an air duct for forcible ventilation and heat dissipation.

Prerequisite
l The required tools and materials are ready. The tools and materials are the ESD wrist strap
or ESD gloves, M3 screwdriver, and ESD box or bag.
l The quantity and models of the modules to be replaced are confirmed.
l Keep the keys ready for use after you obtain site admission.

Context
l Figure 4-11 shows the position of the FAN in the BBU.

4-12 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 4 Replacing the Components of the BBU3900

Figure 4-11 Position of the FAN

FAN

l The FAN is hot-swappable.


l Replacing the FAN may affect the ventilation and heat dissipation of the BBU and cause
an increase in temperature. In this case, an overtemperature alarm may be generated, but
services are not affected. Therefore, the replacement must be implemented in three minutes.

Procedure
Step 1 Wear the ESD wrist strap or ESD gloves.

CAUTION
When performing the replacement, take proper ESD prevention measures, for example, wear
ESD wrist straps or gloves to prevent boards, modules, and electronic components from being
destroyed by static discharge from the human body.

Step 2 Loosen the two M3 screws on the panel and then remove the FAN, as shown in Figure 4-12.

Figure 4-12 Removing the FAN

1 2

CAUTION
If one or more fans in the FAN are running, do not touch the running fans when removing the
FAN.

Step 3 Install the new module, fasten the screws on the new module [torque: 0.6 N.m (5.31 lbf.in.)],
and then install the cables.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 4-13


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
4 Replacing the Components of the BBU3900 Site Maintenance Guide

Step 4 Determine whether the new module is functional according to the status of indicators. In the
normal state, the START indicator of the FAN blinks at 0.5 Hz (on for 1s and off for 1s).
NOTE

For description of the indicators, see DBS3900 WiMAX Hardware Description.

Step 5 Inform the administrator of the M2000 that the replacement is complete and ask the administrator
to confirm that the module does not generate any alarms.
Step 6 Remove the ESD wrist strap or gloves and put the tools away.

----End

Postrequisite
l Put the replaced components into the ESD bag and then put the bag into the cardboard box
filled with foam.
l Fill the fault card to record the information of the replaced components.
l Contact the local Huawei office to handle the faulty components.

4.7 Replacing the UTRP


The Universal Transmission Processing Unit (UTRP) is the extended transmission board of the
BBU3900 and provides eight E1/T1 interfaces.

Prerequisite
l The required tools and materials are ready. The tools and materials are the ESD wrist strap
or ESD gloves, M3 screwdriver, and ESD box or bag.
l The quantity and models of the boards to be replaced are confirmed.
l Keep the keys ready for use after you obtain site admission.

Context
l Figure 4-13 shows the position of the UTRP in the BBU.

Figure 4-13 Position of the UTRP


UTRP

UTRP RUN
ALM
ACT

E1/T1(0-3) E1/T1(4-7)

l The board is hot-swappable.

Procedure
Step 1 Inform the administrator of the M2000 that the UTRP needs to be replaced. If necessary, ask
the administrator to back up or transfer the services carried by the board.

4-14 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 4 Replacing the Components of the BBU3900

Step 2 Wear the ESD wrist strap or ESD gloves.

CAUTION
When performing the replacement, take proper ESD prevention measures, for example, wear
ESD wrist straps or gloves to prevent boards, modules, and electronic components from being
destroyed by static discharge from the human body.

Step 3 Record the connection positions of all the cables connected to the board.
Step 4 Disconnect the transmission cable from the UTRP. If the surge protection board is configured,
you need to disconnect the surge protection transfer cable, as shown in Figure 4-14.

Figure 4-14 Removing the cables

Step 5 Loosen the two M3 screws on the panel and then remove the UTRP, as shown in Figure 4-15.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 4-15


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
4 Replacing the Components of the BBU3900 Site Maintenance Guide

Figure 4-15 Removing the UTRP

1 2

Step 6 Ensure that the settings of the DIP switches on the new board are consistent with the settings of
the removed board. If necessary, refer to UTRP for the information of the DIP switches.

Step 7 Install the new board, fasten the screws on the board [torque: 0.6 N.m (5.31 lbf.in.)], and then
install the cables.

Step 8 Determine whether the new board is working properly according to the status of indicators. In
the normal state, the RUN indicator of the board blinks at 0.5 Hz (on for 1s and off for 1s).
NOTE

For description of the indicators, see DBS3900 WiMAX Hardware Description.

Step 9 Inform the administrator of the M2000 that the replacement is complete and ask the administrator
to confirm that the board does not generate any alarms.

Step 10 Remove the ESD wrist strap or gloves and put the tools away.

----End

Postrequisite
l Put the replaced components into the ESD bag and then put the bag into the cardboard box
filled with foam.

4-16 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 4 Replacing the Components of the BBU3900

l Fill the fault card to record the information of the replaced components.
l Contact the local Huawei office to handle the faulty components.

4.8 Replacing the USCU


The Universal Satellite card and Clock Unit (USCU) is the extended satellite card and clock unit
of the BBU. The USCU receives the GPS, RGPS, BITS, and M-1PPS clock signals, and receives
or transmits 1PPS + TOD clock signals.

Prerequisite
l The required tools and materials are ready. The tools and materials are the ESD wrist strap
or ESD gloves, screwdriver, and ESD box or bag.
l The quantity and models of the boards to be replaced are confirmed.
l Keep the keys ready for use after you obtain site admission.

Context
l Figure 4-16 shows the position of the USCU in the BBU.

Figure 4-16 Position of the USCU


USCU

USCU GPS M-1PPS BITS


YELLOW OUT

GREEN IN

RX+ RX- TX+ TX- 1S+ 1S- GND PWR RUN


ALM
ACT

RGPS TOD0 TOD1

l The board is hot-swappable.

Procedure
Step 1 Wear the ESD wrist strap or ESD gloves.

CAUTION
When performing the replacement, take proper ESD prevention measures, for example, wear
ESD wrist straps or gloves to prevent boards, modules, and electronic components from being
destroyed by static discharge from the human body.

Step 2 Record the connection positions of all the cables connected to the board.
Step 3 Disconnect the GPS clock signal cable from the USCU, as shown in Figure 4-17.

Figure 4-17 Removing the cable

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 4-17


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
4 Replacing the Components of the BBU3900 Site Maintenance Guide

Step 4 Loosen the two M3 screws on the panel and then remove the USCU, as shown in Figure 4-18.

Figure 4-18 Removing the USCU

Step 5 Install the new board, fasten the screws on the board [torque: 0.6 N.m (5.31 lbf.in.)], and then
install the cables.
Step 6 Determine whether the new board functions properly according to the status of the indicators.
In the normal state, the RUN indicator of the board blinks at 0.5 Hz (on for 1s and off for 1s).
NOTE

For description of the indicators, see DBS3900 WiMAX Hardware Description.

Step 7 Inform the administrator of the M2000 that the replacement is complete and ask the administrator
to perform the following operations:
1. Load and activate the software version of the USCU.
2. Confirm that the board does not generate any alarms.
Step 8 Remove the ESD wrist strap or gloves and put the tools away.

----End

Postrequisite
l Put the replaced components into the ESD bag and then put the bag into the cardboard box
filled with foam.
l Fill the fault card to record the information of the replaced components.
l Contact the local Huawei office to handle the faulty components.

4.9 Replacing the Optical Modules


The optical module provides an interface for photoelectric conversion, which enables the
transmission between the BBU and other equipment through the optical fiber. Replacing the
optical modules requires removing the optical fibers. This disrupts the CPRI transmission signal.
The procedures of replacing optical modules in different BS equipment are the same. The
following section describes how to replace an optical module in the BBU.

Prerequisite
l The required tools and materials are ready. The tools and materials are the ESD wrist strap
or ESD gloves, and ESD box or bag.

4-18 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 4 Replacing the Components of the BBU3900

l The quantity and models of the faulty optical modules are confirmed, and new optical
modules are ready.
l Keep the keys ready for use after you gain site admission.

Context
l Figure 4-19 shows the position of the optical module on the board.

Figure 4-19 Position of the optical module

(1) Optical module

l The optical modules are hot-swappable.


l You need to disconnect the optical fibers when replacing the faulty optical module.
Therefore, services carried on the optical fibers are disrupted during the replacement.

CAUTION
The RRU may restart when you replace the optical module. Do not activate or deactivate the
RRU if no antenna or matched load is connected to the RRU.

Procedure
Step 1 Wear the ESD wrist strap or ESD gloves.

CAUTION
When performing the replacement, take proper ESD prevention measures, for example, wear
ESD wrist straps or gloves to prevent boards, modules, and electronic components from being
destroyed by static discharge from the human body.

Step 2 Prepare optical modules of the same type as the faulty modules according to the labels on the
optical modules.
Step 3 Record the positions of the optical modules on the boards.
Step 4 Press the latch on the connector of the optical fiber, and then remove the connector from the
faulty optical module, as shown in Figure 4-20.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 4-19


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
4 Replacing the Components of the BBU3900 Site Maintenance Guide

Figure 4-20 Removing the fibers

WARNING
After removing the optical fibers from the optical modules, do not look directly at the optical
modules without taking the necessary eye-protection measures.

Step 5 Turn the ring-pull on the faulty optical module outwards. Hold the ring-pull and take the faulty
optical module out of the slot to remove it from the BBU, as shown in Figure 4-21.

Figure 4-21 Removing the optical module

2 1

Step 6 Install the new optical module to the BBU.

Step 7 Remove the dustproof caps from the optical module and the optical fiber connector, and then
connect the optical fiber connector to the new optical module.

Step 8 Observe the status of indicators of the boards and determine whether the transmission is normal.
NOTE

For description of the indicators, see DBS3900 WiMAX Hardware Description.

4-20 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 4 Replacing the Components of the BBU3900

Step 9 Remove the ESD wrist strap or gloves and put the tools away.

----End

Postrequisite
l Put the replaced components into the ESD bag and then put the bag into the cardboard box
filled with foam.
l Fill the fault card to record the information of the replaced components.
l Contact the local Huawei office to handle the faulty components.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 4-21


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 5 Replacing the Components of the RRU3702/RRU3703

5 Replacing the Components of the RRU3702/


RRU3703

About This Chapter

The faulty RRU3702/RRU3703 components must be replaced promptly. The components that
can be replaced are the RRU3702/RRU3703 module, and the optical module.

5.1 Replacing the RRU3702/RRU3703


As the remote RF unit of the Huawei WiMAX base station, the RRU3702/RRU3703 works with
modules such as the BBU to constitute a distributed base station system. The procedures for
replacing the RRU3702 and the RRU3703 are the same. The following section describes how
to replace the RRU3702.
5.2 Replacing the Optical Modules
The optical module provides an interface for photoelectric conversion, which enables the
transmission between the BBU and other equipment through the optical fiber. Replacing the
optical modules requires removing the optical fibers. This disrupts the CPRI transmission signal.
The procedures of replacing optical modules in different BS equipment are the same. The
following section describes how to replace an optical module in the BBU.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 5-1


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
5 Replacing the Components of the RRU3702/RRU3703 Site Maintenance Guide

5.1 Replacing the RRU3702/RRU3703


As the remote RF unit of the Huawei WiMAX base station, the RRU3702/RRU3703 works with
modules such as the BBU to constitute a distributed base station system. The procedures for
replacing the RRU3702 and the RRU3703 are the same. The following section describes how
to replace the RRU3702.

Prerequisite
l The required tools and materials are ready. The tools and materials are the ESD wrist strap
or ESD gloves, M4 screwdriver, waterproof tape, and insulation tape.
l The quantity of RRUs to be replaced is confirmed and new RRUs are ready.

Context
l Replacing the RRU3702/RRU3703 disrupts the services carried by the RRU.
l If the new RRU3702/RRU3703 and the replaced RRU3702/RRU3703 have the same
software version, restoring services takes about 30 minutes after the new RRU3702/
RRU3703 is powered on.
l If the software of the original RRU3702 is V300R003C00 and it is replaced with an
RRU3702 whose software is in an earlier version, the software of the new RRU3702 is
automatically upgraded to V300R003C00. In this case, if the transmission rate over the
CPRI port of the new RRU3702 is 3.84 Gbit/s, restoring services takes about 35 minutes
after the new RRU2702 is powered on. The maximum time for restoring services is about
55 minutes.
l See DBS3900 WiMAX Reconfiguration Guide to replace RRU3702 with RRU3703.
NOTE
See the DBS3900 WiMAX Quick Installation Guide (RRU3702&RRU3703) to install new RRU3702s or
RRU3703s.

Procedure
Step 1 Inform the administrator of the M2000 that the RRU needs to be replaced. If necessary, ask the
administrator to transfer the services carried by the RRU.
Step 2 Power off the RRU by referring to 3.4 Powering Off the RRU.
Step 3 Wear the ESD wrist strap or ESD gloves.

WARNING
When performing the replacement, take proper ESD prevention measures, for example, wear
ESD wrist straps or gloves to prevent boards, modules, and electronic components from being
destroyed by static discharge from the human body.

Step 4 Use the M4 screwdriver to loosen the six screws on the cover plate of the cabling cavity and
then open the cabling cavity of the RRU.
Step 5 Record the connection positions of all the cables connected to the board.

5-2 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 5 Replacing the Components of the RRU3702/RRU3703

Step 6 Disconnect the cables connected to the bottom of the RRU cabling cavity.

Step 7 Use the M4 screwdriver to loosen the captive screws on the two spring plates on the main fixture,
as shown in Figure 5-1.

Figure 5-1 Loosening the screws on the main fixture

Step 8 Use the M4 screwdriver to tighten the two screws on the transfer piece of the RRU [torque: 4.8
N.m (42.48 lbf.in.)], as shown in Figure 5-2. Lift up the screws to loosen the connection between
the transfer piece and the main fixture. Then, lift up the RRU to remove it.

Figure 5-2 Tightening the screws on the attachment plate

WARNING
Do not lift up the screws by force. You can use a rubber hammer to hit the bottom of the RRU
until the connection between the transfer piece and the main fixture is loosened, as shown in
Figure 5-3.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 5-3


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
5 Replacing the Components of the RRU3702/RRU3703 Site Maintenance Guide

Figure 5-3 Hitting the RRU

Step 9 Install the new RRU, tighten the captive screws on the two spring plates on the main fixture
[torque: 4.8 N.m (42.48 lbf.in.)], and then take waterproof measures.
Step 10 Connect the cables back to the RRU.
Step 11 Close the cabling cavity of the RRU and tighten the screws on the cover plate of the cabling
cavity [torque: 1.4 N.m (12.39 lbf.in.)].
Step 12 Power on the RRU by referring to 3.3 Powering On the RRU.
Step 13 Determine whether the new RRU is functional according to the status of the indicators on the
RRU. In the normal state, the RUN indicator of the RRU blinks at 0.5 Hz (on for 1s and off for
1s).
NOTE

For description of the indicators, see DBS3900 WiMAX Hardware Description.

Step 14 Inform the administrator of the M2000 that the hardware replacement is complete and ask the
administrator to confirm that no alarms are generated.
Step 15 Remove the ESD wrist strap or ESD gloves and put the tools away.

----End

Postrequisite
l Put the replaced RRU into an ESD bag and then put the bag into a cardboard box filled
with foam.
l Fill the fault card to record the information of the replaced components.
l Contact the local Huawei office to handle the faulty components.

5-4 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 5 Replacing the Components of the RRU3702/RRU3703

5.2 Replacing the Optical Modules


The optical module provides an interface for photoelectric conversion, which enables the
transmission between the BBU and other equipment through the optical fiber. Replacing the
optical modules requires removing the optical fibers. This disrupts the CPRI transmission signal.
The procedures of replacing optical modules in different BS equipment are the same. The
following section describes how to replace an optical module in the BBU.

Prerequisite
l The required tools and materials are ready. The tools and materials are the ESD wrist strap
or ESD gloves, and ESD box or bag.
l The quantity and models of the faulty optical modules are confirmed, and new optical
modules are ready.
l Keep the keys ready for use after you gain site admission.

Context
l Figure 5-4 shows the position of the optical module on the board.

Figure 5-4 Position of the optical module

(1) Optical module

l The optical modules are hot-swappable.


l You need to disconnect the optical fibers when replacing the faulty optical module.
Therefore, services carried on the optical fibers are disrupted during the replacement.

CAUTION
The RRU may restart when you replace the optical module. Do not activate or deactivate the
RRU if no antenna or matched load is connected to the RRU.

Procedure
Step 1 Wear the ESD wrist strap or ESD gloves.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 5-5


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
5 Replacing the Components of the RRU3702/RRU3703 Site Maintenance Guide

CAUTION
When performing the replacement, take proper ESD prevention measures, for example, wear
ESD wrist straps or gloves to prevent boards, modules, and electronic components from being
destroyed by static discharge from the human body.

Step 2 Prepare optical modules of the same type as the faulty modules according to the labels on the
optical modules.
Step 3 Record the positions of the optical modules on the boards.
Step 4 Press the latch on the connector of the optical fiber, and then remove the connector from the
faulty optical module, as shown in Figure 5-5.

Figure 5-5 Removing the fibers

WARNING
After removing the optical fibers from the optical modules, do not look directly at the optical
modules without taking the necessary eye-protection measures.

Step 5 Turn the ring-pull on the faulty optical module outwards. Hold the ring-pull and take the faulty
optical module out of the slot to remove it from the BBU, as shown in Figure 5-6.

5-6 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 5 Replacing the Components of the RRU3702/RRU3703

Figure 5-6 Removing the optical module

2 1

Step 6 Install the new optical module to the BBU.


Step 7 Remove the dustproof caps from the optical module and the optical fiber connector, and then
connect the optical fiber connector to the new optical module.
Step 8 Observe the status of indicators of the boards and determine whether the transmission is normal.
NOTE

For description of the indicators, see DBS3900 WiMAX Hardware Description.

Step 9 Remove the ESD wrist strap or gloves and put the tools away.

----End

Postrequisite
l Put the replaced components into the ESD bag and then put the bag into the cardboard box
filled with foam.
l Fill the fault card to record the information of the replaced components.
l Contact the local Huawei office to handle the faulty components.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 5-7


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 6 Replacing the Components of the Fan-Cooling RRU3701C

6 Replacing the Components of the Fan-


Cooling RRU3701C

About This Chapter

Faulty RRU3701C components must be replaced promptly. The components that can be replaced
for the fan-cooling RRU3701C are the RRU3701C module, case, fan subrack, and optical
module.

6.1 Replacing the Fan-Cooling RRU3701C


If the RRU3701C is faulty, replace the RRU3701C.
6.2 Replacing the RRU3701C Case
If the case of the fan-cooling RRU3701C is faulty, replace the case.
6.3 Replacing the Fan Subrack of the RRU3701C
If the fan subrack of the RRU3701C is faulty, replace the fan subrack.
6.4 Replacing the Optical Modules
The optical module provides an interface for photoelectric conversion, which enables the
transmission between the BBU and other equipment through the optical fiber. Replacing the
optical modules requires removing the optical fibers. This disrupts the CPRI transmission signal.
The procedures of replacing optical modules in different BS equipment are the same. The
following section describes how to replace an optical module in the BBU.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 6-1


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
6 Replacing the Components of the Fan-Cooling RRU3701C Site Maintenance Guide

6.1 Replacing the Fan-Cooling RRU3701C


If the RRU3701C is faulty, replace the RRU3701C.

Prerequisite
l The quantity and model of the faulty RRU3701Cs are confirmed and the new RRU3701Cs
are ready.
l The installation position of each RRU3701C is recorded.
l The position of each screw on the RRU3701Cs is recorded.
l The ports to which all RRU3701C cables are connected are recorded.
l The sectors of the RRU3701C are deactivated.
l The required tools and materials are ready. The tools and materials are the ESD wrist strap
or ESD gloves, Phillips screwdriver, flat-head screwdriver, ESD box or bag, dust free cloth,
and key to the cabinet door.

Context
As a remote RF unit of the distributed base station, the RRU3701C works with other modules
such as the BBU to constitute the DBS3900 base station system.
Replacing an RRU3701C disrupts all the services carried by the RRU3701C.
It takes about 30 minutes to replace a fan-cooling RRU3701C. In this time, the cables are
disconnected from the faulty RRU3701C and then connected to the new RRU3701C, and the
services are resumed.

CAUTION
l Take proper ESD prevention measures, for example, wear ESD wrist straps or gloves to
prevent boards, modules, and electronic components from being destroyed by static
discharge from the human body.
l Use an optical fiber clip to remove the connector of the optical fiber on the RRU3701C
side.

NOTE

See the DBS3900 WiMAX Quick Installation Guide (RRU3701C) to install new RRU3701Cs.

The procedure described here is applicable to replacing RRUs of the same type as the
RRU3701C. See DBS3900 WiMAX Reconfiguration Guide to replace RRUs of a different type
from the RRU3701C.

Procedure
Step 1 Turn off the power switch of the external power supply of the RRU3701C by referring to 3.4
Powering Off the RRU.
Step 2 Open the case of the RRU3701C.

6-2 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 6 Replacing the Components of the Fan-Cooling RRU3701C

Step 3 Open the cover of the cabling cavity, disconnect all the cables from the faulty RRU3701C, and
take insulation measures for the cables.

Step 4 Loosen the two captive screws at the bottom of the case.

Step 5 Unfasten the tabs on the attachment plates from the anchor slots on the case, and then remove
the RRU3701C from the case.

Step 6 Remove the four screws that fasten the upper and lower attachment plates.

Step 7 Get the new RRU3701C.

Step 8 Use the four screws to fasten the attachment plates to the new RRU3701C.

Step 9 Fasten the RRU3701C module onto the case by fitting the tabs on the attachment plate into the
anchor slots.

Step 10 Tighten the two captive screws at the bottom of the case.

Step 11 Connect all the cables to the new RRU3701C and fix the cover of the cabling cavity.

Step 12 Turn on the power switch of the external power supply of the RRU3701C. Then, power on the
RRU3701C by referring to 3.3 Powering On the RRU.

Step 13 Lock the door of the RRU3701C case.

----End

Postrequisite
Check the following items after replacing the faulty RRU3701C:
l All the cables on the new RRU3701C are correctly connected.
l Each screw is fastened in the correct position on the new RRU3701C.
l The new RRU3701C is functional after being powered on and all the services are normal.
l Check the BIOS version and upgrade the version at the BBU3900 side.
Contact the local Huawei office to handle the faulty RRU3701C.

6.2 Replacing the RRU3701C Case


If the case of the fan-cooling RRU3701C is faulty, replace the case.

Prerequisite
l The new RRU3701C case is ready.
l The sectors of the RRU3701C are deactivated.
l A cross screwdriver and the key to the door of the case are ready.

Context
Replacing the case of an RRU3701C may interrupt all the services carried by the RRU3701C.

It takes about 20 minutes to replace the RRU3701C case.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 6-3


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
6 Replacing the Components of the Fan-Cooling RRU3701C Site Maintenance Guide

Procedure
Step 1 Turn off the power switch of the external power supply of the RRU3701C by referring to 3.4
Powering Off the RRU.

Step 2 Open the case of the RRU3701C.

Step 3 Open the cover of the cabling cavity, disconnect all the cables from the faulty RRU3701C, and
take insulation measures for the cables.

Step 4 Loosen the two captive screws at the bottom of the case.

Step 5 Unfasten the tabs on the attachment plate from the anchor slots on the case, and then remove
the RRU3701C from the case.

Step 6 Remove the four screws used for fixing the faulty case, and then remove the faulty case.

Step 7 Install the new case by referring to the DBS3900 WiMAX Quick Installation Guide.

Step 8 Fasten the RRU3701C module onto the case by fitting the tabs on the attachment plate into the
anchor slots.

Step 9 Tighten the two captive screws at the bottom of the case.

Step 10 Connect all the cables to the new RRU3701C and fix the cover of the cabling cavity.

Step 11 Turn on the power switch of the external power supply of the RRU3701C. Then, power on the
RRU3701C by referring to 3.3 Powering On the RRU.

Step 12 Lock the door of the RRU3701C case.

----End

Postrequisite
Check the following items after replacing the faulty RRU3701C case:
l The two tabs at the top of the RRU3701C are fitted into the anchor slots on the case.
l The four bolts used for fixing the case are tightened.
l The door of the case is locked.
Contact the local Huawei office to handle the faulty RRU3701C case.

6.3 Replacing the Fan Subrack of the RRU3701C


If the fan subrack of the RRU3701C is faulty, replace the fan subrack.

Prerequisite
l The new fan subrack of the RRU3701C rack is ready.
l The cross screwdriver, ESD wrist strap or gloves, and key to the door of the case are ready.

Context
Replacing the fan subrack of an RRU3701C may interrupt all the services carried by the
RRU3701C.

6-4 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 6 Replacing the Components of the Fan-Cooling RRU3701C

Procedure
Step 1 Turn off the power switch of the external power supply of the RRU3701C by referring to 3.4
Powering Off the RRU.

Step 2 Open the case of the RRU3701C.

Step 3 Loosen the captive screws on the cover of the cabling cavity containing the CPRI optical cables
and power cables of the fan and remove the cover of the cabling cavity.

Step 4 Disconnect the power cable of the fan subrack in the cabling cavity.

CAUTION
Do not touch the CPRI optical cable when disconnecting the power cable of the fan subrack.

Step 5 Loosen the two captive screws on the panel of the fan subrack.

Step 6 Remove the fan subrack from the anchor slots on the case.

Step 7 Slightly push the new fan subrack into the anchor slots and tighten the two captive screws on
the panel of the fan subrack.

Step 8 Install the power cable of the fan subrack.

Step 9 Fix the cover of the cabling cavity containing the CPRI optical cables and power cables of the
fan and tighten the captive screws on the cover of the cabling cavity.

Step 10 Turn on the power switch of the external power supply of the RRU3701C. Then, power on the
RRU3701C by referring to 3.3 Powering On the RRU.

Step 11 Lock the door of the RRU3701C case.

----End

Postrequisite
Check the following items after replacing the faulty fan subrack of the RRU3701C:
l The two bolts of the fan subrack are tightened.
l The fans are working properly.
l The door of the case is locked.
Contact the local Huawei office to handle the faulty fan subrack of the RRU3701C.

6.4 Replacing the Optical Modules


The optical module provides an interface for photoelectric conversion, which enables the
transmission between the BBU and other equipment through the optical fiber. Replacing the
optical modules requires removing the optical fibers. This disrupts the CPRI transmission signal.
The procedures of replacing optical modules in different BS equipment are the same. The
following section describes how to replace an optical module in the BBU.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 6-5


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
6 Replacing the Components of the Fan-Cooling RRU3701C Site Maintenance Guide

Prerequisite
l The required tools and materials are ready. The tools and materials are the ESD wrist strap
or ESD gloves, and ESD box or bag.
l The quantity and models of the faulty optical modules are confirmed, and new optical
modules are ready.
l Keep the keys ready for use after you gain site admission.

Context
l Figure 6-1 shows the position of the optical module on the board.

Figure 6-1 Position of the optical module

(1) Optical module

l The optical modules are hot-swappable.


l You need to disconnect the optical fibers when replacing the faulty optical module.
Therefore, services carried on the optical fibers are disrupted during the replacement.

CAUTION
The RRU may restart when you replace the optical module. Do not activate or deactivate the
RRU if no antenna or matched load is connected to the RRU.

Procedure
Step 1 Wear the ESD wrist strap or ESD gloves.

CAUTION
When performing the replacement, take proper ESD prevention measures, for example, wear
ESD wrist straps or gloves to prevent boards, modules, and electronic components from being
destroyed by static discharge from the human body.

6-6 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 6 Replacing the Components of the Fan-Cooling RRU3701C

Step 2 Prepare optical modules of the same type as the faulty modules according to the labels on the
optical modules.

Step 3 Record the positions of the optical modules on the boards.

Step 4 Press the latch on the connector of the optical fiber, and then remove the connector from the
faulty optical module, as shown in Figure 6-2.

Figure 6-2 Removing the fibers

WARNING
After removing the optical fibers from the optical modules, do not look directly at the optical
modules without taking the necessary eye-protection measures.

Step 5 Turn the ring-pull on the faulty optical module outwards. Hold the ring-pull and take the faulty
optical module out of the slot to remove it from the BBU, as shown in Figure 6-3.

Figure 6-3 Removing the optical module

2 1

Step 6 Install the new optical module to the BBU.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 6-7


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
6 Replacing the Components of the Fan-Cooling RRU3701C Site Maintenance Guide

Step 7 Remove the dustproof caps from the optical module and the optical fiber connector, and then
connect the optical fiber connector to the new optical module.
Step 8 Observe the status of indicators of the boards and determine whether the transmission is normal.
NOTE

For description of the indicators, see DBS3900 WiMAX Hardware Description.

Step 9 Remove the ESD wrist strap or gloves and put the tools away.

----End

Postrequisite
l Put the replaced components into the ESD bag and then put the bag into the cardboard box
filled with foam.
l Fill the fault card to record the information of the replaced components.
l Contact the local Huawei office to handle the faulty components.

6-8 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX 7 Replacing the Components of the Natural-Cooling
Site Maintenance Guide RRU3701C

7 Replacing the Components of the Natural-


Cooling RRU3701C

About This Chapter

Faulty RRU3701C components must be replaced promptly. The components that can be replaced
for the natural-cooling RRU3701C are the RRU3701C module, shell, and optical module.

7.1 Replacing the Natural-Cooling RRU3701C


If the RRU3701C is faulty, replace the RRU3701C.
7.2 Replacing the Shell of the RRU3701C
If the shell of the natural-cooling RRU3701C is faulty, replace the shell.
7.3 Replacing the Optical Modules
The optical module provides an interface for photoelectric conversion, which enables the
transmission between the BBU and other equipment through the optical fiber. Replacing the
optical modules requires removing the optical fibers. This disrupts the CPRI transmission signal.
The procedures of replacing optical modules in different BS equipment are the same. The
following section describes how to replace an optical module in the BBU.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 7-1


Copyright © Huawei Technologies Co., Ltd.
7 Replacing the Components of the Natural-Cooling DBS3900 WiMAX
RRU3701C Site Maintenance Guide

7.1 Replacing the Natural-Cooling RRU3701C


If the RRU3701C is faulty, replace the RRU3701C.

Prerequisite
l The quantity and model of the faulty RRU3701Cs are confirmed and the new RRU3701Cs
are ready.
l The installation position of each RRU3701C is recorded.
l The position of each screw on the RRU3701Cs is recorded.
l The ports to which all RRU3701C cables are connected are recorded.
l The sectors of the RRU3701C are deactivated.
l The required tools and materials are ready. The tools and materials are the ESD wrist strap
or ESD gloves, Phillips screwdriver, flat-head screwdriver, ESD box or bag, and dust-free
cloth.

Context
As a remote RF unit of the distributed base station, the RRU3701C works with other modules
such as the BBU to constitute the DBS3900 base station system.
Replacing an RRU3701C disrupts all the services carried by the RRU3701C.
It takes about 30 minutes to replace a natural-cooling RRU3701C. In this time, the cables are
disconnected from the faulty RRU3701C and then connected to the new RRU3701C, and the
services are resumed.

CAUTION
l Take proper ESD prevention measures, for example, wear ESD wrist straps or gloves to
prevent boards, modules, and electronic components from being destroyed by static
discharge from the human body.
l Use an optical fiber clip to remove the connector of the optical fiber on the RRU3701C
side.

NOTE

See the DBS3900 WiMAX Quick Installation Guide (RRU3701C) to install new RRU3701Cs.

The procedure described here is applicable to replacing RRUs of the same type as the
RRU3701C. See DBS3900 WiMAX Reconfiguration Guide to replace RRUs of a different type
from the RRU3701C.

Procedure
Step 1 Turn off the power switch of the external power supply of the RRU3701C by referring to 3.4
Powering Off the RRU.
Step 2 Remove the shell by referring to 7.2 Replacing the Shell of the RRU3701C.

7-2 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX 7 Replacing the Components of the Natural-Cooling
Site Maintenance Guide RRU3701C

Step 3 Open the cover of the cabling cavity, disconnect all the cables from the faulty RRU3701C, and
take insulation measures for the cables.

Step 4 Remove the two screws from the installation holes on the lower attachment plate of the
RRU3701C.

Step 5 Loosen the screws in the installation holes on the upper attachment plate of the RRU3701C, and
remove the RRU3701C.

Step 6 Remove the four screws that fasten the attachment plates.

Step 7 Get the new RRU3701C.

Step 8 Use the four screws to fasten the attachment plates to the new RRU3701C.

Step 9 Align the installation holes of the upper attachment plate to the screws used to fasten the
RRU3701C and tighten the screws.

Step 10 Fix the two screws into the installation holes on the lower attachment plate of the RRU3701C
to install the RRU3701C.

Step 11 Connect all the cables to the new RRU3701C and fix the cover of the cabling cavity.

Step 12 Turn on the power switch of the external power supply of the RRU3701C. Then, power on the
RRU3701C by referring to 3.3 Powering On the RRU.

Step 13 Align the shell of the RRU3701C to the positioning holes on the attachment plates of the
RRU3701C and fit the tabs on the shell into the anchor slots of the attachment plates.

Step 14 Tighten the two captive screws at the bottom of the shell of the RRU3701C to fix the shell.

Step 15 Lift the sliding blades on the right of the RRU3701C shell to secure the RF jumper. Hold the
sliding blades and tighten the captive screws of the blades.

----End

Postrequisite
Check the following items after replacing the faulty RRU3701C:
l All the cables on the new RRU3701C are correctly connected.
l Each screw is fastened in the correct position on the new RRU3701C.
l The new RRU3701C is functional after being powered on and all the services are normal.
l Check the BIOS version and upgrade the version at the BBU3900 side.
Contact the local Huawei office to handle the faulty RRU3701C.

7.2 Replacing the Shell of the RRU3701C


If the shell of the natural-cooling RRU3701C is faulty, replace the shell.

Prerequisite
l The new RRU3701C shell is ready.
l A cross screwdriver is ready.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 7-3


Copyright © Huawei Technologies Co., Ltd.
7 Replacing the Components of the Natural-Cooling DBS3900 WiMAX
RRU3701C Site Maintenance Guide

Context
It takes about 5 minutes to replace the RRU3701C shell. Replacing the RRU3701C shell does
not affect the ongoing services.

Procedure
Step 1 Loosen the captive screws of the sliding blades on the right of the RRU3701C shell and press
down the sliding blades.

Step 2 Loosen the two captive screws at the bottom of the RRU3701C shell.

Step 3 Pull the shell outward slightly to take the bottom of the shell away from the installation parts
and then lift the shell higher to remove the tabs from the anchor slots on the attachment plate.

Step 4 Remove the faulty shell.

Step 5 Align the new shell of the RRU3701C to the positioning holes on the attachment plates of the
RRU3701C and fit the tabs on the shell into the anchor slots of the attachment plates.

Step 6 Tighten the two captive screws at the bottom of the shell of the RRU3701C to fix the shell.

Step 7 Lift up the sliding blades on the right of the RRU3701C shell to secure the RF jumper. Hold the
sliding blades and tighten the captive screws of the blades.

----End

Postrequisite
Check the following items after replacing the faulty RRU3701C shell:
l The two tabs at the top of the RRU3701C shell are fitted into the anchor slots on the
attachment plate.
l The two captive screws at the bottom of the RRU3701C shell are tightened.
Contact the local Huawei office to handle the faulty RRU3701C shell.

7.3 Replacing the Optical Modules


The optical module provides an interface for photoelectric conversion, which enables the
transmission between the BBU and other equipment through the optical fiber. Replacing the
optical modules requires removing the optical fibers. This disrupts the CPRI transmission signal.
The procedures of replacing optical modules in different BS equipment are the same. The
following section describes how to replace an optical module in the BBU.

Prerequisite
l The required tools and materials are ready. The tools and materials are the ESD wrist strap
or ESD gloves, and ESD box or bag.
l The quantity and models of the faulty optical modules are confirmed, and new optical
modules are ready.
l Keep the keys ready for use after you gain site admission.

7-4 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX 7 Replacing the Components of the Natural-Cooling
Site Maintenance Guide RRU3701C

Context
l Figure 7-1 shows the position of the optical module on the board.

Figure 7-1 Position of the optical module

(1) Optical module

l The optical modules are hot-swappable.


l You need to disconnect the optical fibers when replacing the faulty optical module.
Therefore, services carried on the optical fibers are disrupted during the replacement.

CAUTION
The RRU may restart when you replace the optical module. Do not activate or deactivate the
RRU if no antenna or matched load is connected to the RRU.

Procedure
Step 1 Wear the ESD wrist strap or ESD gloves.

CAUTION
When performing the replacement, take proper ESD prevention measures, for example, wear
ESD wrist straps or gloves to prevent boards, modules, and electronic components from being
destroyed by static discharge from the human body.

Step 2 Prepare optical modules of the same type as the faulty modules according to the labels on the
optical modules.

Step 3 Record the positions of the optical modules on the boards.

Step 4 Press the latch on the connector of the optical fiber, and then remove the connector from the
faulty optical module, as shown in Figure 7-2.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 7-5


Copyright © Huawei Technologies Co., Ltd.
7 Replacing the Components of the Natural-Cooling DBS3900 WiMAX
RRU3701C Site Maintenance Guide

Figure 7-2 Removing the fibers

WARNING
After removing the optical fibers from the optical modules, do not look directly at the optical
modules without taking the necessary eye-protection measures.

Step 5 Turn the ring-pull on the faulty optical module outwards. Hold the ring-pull and take the faulty
optical module out of the slot to remove it from the BBU, as shown in Figure 7-3.

Figure 7-3 Removing the optical module

2 1

Step 6 Install the new optical module to the BBU.

Step 7 Remove the dustproof caps from the optical module and the optical fiber connector, and then
connect the optical fiber connector to the new optical module.

Step 8 Observe the status of indicators of the boards and determine whether the transmission is normal.
NOTE

For description of the indicators, see DBS3900 WiMAX Hardware Description.

7-6 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX 7 Replacing the Components of the Natural-Cooling
Site Maintenance Guide RRU3701C

Step 9 Remove the ESD wrist strap or gloves and put the tools away.

----End

Postrequisite
l Put the replaced components into the ESD bag and then put the bag into the cardboard box
filled with foam.
l Fill the fault card to record the information of the replaced components.
l Contact the local Huawei office to handle the faulty components.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 7-7


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 8 Replacing the Components in the OMB

8 Replacing the Components in the OMB

About This Chapter

This section describes how to replace the HEUA board, AC/DC power cable, DCDU, and the
AC surge protection box in the OMB.
8.1 Replacing the HEUA
The Heat Exchange Unit Type A (HEUA) is a fan monitoring board. It distributes power to the
FAN, monitors the running status of the FAN, collects the cabinet alarm information, and reports
it to the host.
8.2 Replacing the AC/DC Power Equipment
The AC/DC power equipment is applicable to the AC cabinet and converts 220 V AC input to
-48 V DC output.
8.3 Replacing the DCDU
The DCDU is the DC power distribution unit. Replacing the DCDU cuts off the power supply
to the site and therefore disrupts the services.
8.4 Replacing the AC Surge Protection Box
The AC surge protection box protects the input power supply from surge.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 8-1


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
8 Replacing the Components in the OMB Site Maintenance Guide

8.1 Replacing the HEUA


The Heat Exchange Unit Type A (HEUA) is a fan monitoring board. It distributes power to the
FAN, monitors the running status of the FAN, collects the cabinet alarm information, and reports
it to the host.

Prerequisite
l The required tools and materials are ready. The tools and materials are the ESD wrist strap
or ESD gloves and the M3 screwdriver.
l The quantity and models of HEUAs to be replaced are confirmed and new HEUAs are
ready.
l Keep the keys ready for use after you gain site admission.

Context
Figure 8-1 shows the position of the HEUA in the OMB.

Figure 8-1 Position of HEUA

HEUA

Procedure
Step 1 Wear the ESD wrist strap or ESD gloves.

8-2 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 8 Replacing the Components in the OMB

CAUTION
When performing the replacement, take proper ESD prevention measures, for example, wear
ESD wrist straps or gloves to prevent boards, modules, and electronic components from being
destroyed by static discharge from the human body.

Step 2 Record the connection positions of all the cables connected to the HEUA.

Step 3 Remove the power cables and monitoring cables connected to the HEUA, as shown in Figure
8-2.

Figure 8-2 Removing the cables

Step 4 Loosen the four M3 screws on the panel and then remove the HEUA, as shown in Figure 8-3.

Figure 8-3 Removing the HEUA

Step 5 Install the new board, fasten the screws on the board [torque: 0.55 N.m (4.87 lbf.in.)], and then
install the cables.

Step 6 Remove the ESD wrist strap or gloves and put the tools away.

----End

Postrequisite
l Put the replaced components into the ESD bag and then put the bag into the cardboard box
filled with foam.
l Fill the fault card to record the information of the replaced components.
l Contact the local Huawei office to handle the faulty components.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 8-3


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
8 Replacing the Components in the OMB Site Maintenance Guide

8.2 Replacing the AC/DC Power Equipment


The AC/DC power equipment is applicable to the AC cabinet and converts 220 V AC input to
-48 V DC output.

Prerequisite
l The required tools and materials are ready. The tools and materials are the ESD wrist strap
or ESD gloves, M3 screwdriver, and M6 screwdriver.
l The quantity and models of the modules to be replaced are confirmed and new modules
are ready.
l Keep the keys ready for use after you gain site admission.

Context
l The AC/DC power equipment consists of the PDU, PSU, PMU, and equipment subrack.
When a component of the AC/DC power equipment is confirmed to be faulty, replace the
faulty component. When the entire AC/DC power equipment is confirmed to be faulty,
replace the entire AC/DC power equipment.
l Figure 8-4 shows the position of the AC/DC power equipment in the cabinet.

Figure 8-4 Position of the AC/DC power equipment in the cabinet

(1) AC/DC power equipment

l Figure 8-5 shows the positions of components of the AC/DC power equipment.

8-4 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 8 Replacing the Components in the OMB

Figure 8-5 Positions of the components

(1) PDU (2) PSU (3) PMU (4) Equipment subrack

l Replacing the AC/DC power equipment, PSU, PDU, or the equipment subrack disrupts all
the services carried by the BS. Therefore, the AC/DC power equipment, PSU, PDU, or the
equipment subrack must be replaced within 20 minutes.

Procedure
Step 1 Power off the AC/DC power equipment.

Step 2 Wear the ESD wrist strap or ESD gloves.

CAUTION
When performing the replacement, take proper ESD prevention measures, for example, wear
ESD wrist straps or gloves to prevent boards, modules, and electronic components from being
destroyed by static discharge from the human body.

Step 3 Record the connection positions of all the cables connected to the components to be replaced.

Step 4 Disconnect the cables.


1. Disconnect the DC output cables from the PDU, as shown in Figure 8-6.

Figure 8-6 Disconnecting cables from the PDU

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 8-5


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
8 Replacing the Components in the OMB Site Maintenance Guide

2. Disconnect the monitoring signal cables from the PMU, as shown in Figure 8-7.

Figure 8-7 Disconnecting cables from the PMU

3. Disconnect the AC input cables and DC output cables from the equipment subrack, as
shown in Figure 8-8.

Figure 8-8 Disconnecting cables from the equipment subrack

Step 5 Remove the components to be replaced.


1. Loosen the M3 screw on the panel of the PDU and remove the PDU, as shown in Figure
8-9.

8-6 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 8 Replacing the Components in the OMB

Figure 8-9 Removing the PDU

2. Loosen the M3 screw on the panel of the PSU and remove the PSU, as shown in Figure
8-10.

Figure 8-10 Removing the PSU

3. Loosen the M3 screw on the panel of the PMU and remove the PMU, as shown in Figure
8-11.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 8-7


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
8 Replacing the Components in the OMB Site Maintenance Guide

Figure 8-11 Removing the PMU

4. Loosen the four M6 screws on the mounting ears of the equipment subrack and remove the
equipment subrack, as shown in Figure 8-12.

Figure 8-12 Removing the equipment subrack

NOTE

l When the equipment subrack is confirmed to be faulty, remove the PDU, PSU, and PMU first
and then remove the equipment subrack from the cabinet.
l When the entire AC/DC power equipment is confirmed to be faulty, remove the entire AC/DC
power equipment from the cabinet for replacement.

8-8 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 8 Replacing the Components in the OMB

Step 6 If the PMU is to be replaced, set the DIP switches of the new PMU according to the positions
of the DIP switches of the faulty PMU.
Step 7 Install the new components.
1. Install the AC/DC power equipment or the equipment subrack, fasten the bolts on the
mounting ears, and install the cables.
2. Install the PDU, PSU, or PMU, fasten the screws on the panel [torque: 0.55 N.m (4.87
lbf.in.)], and then install the cables.
Step 8 Determine whether the new AC/DC power equipment functions properly according to the
indicators on the AC/DC power equipment, BBU, and RRU.
NOTE
For the descriptions of the indicators on the AC/DC power equipment, BBU, and RRU, see relevant
hardware descriptions.

Step 9 Power on the AC/DC power equipment.


Step 10 Remove the ESD wrist strap or gloves and put the tools away.

----End

Postrequisite
l Put the replaced components into the ESD bag and then put the bag into the cardboard box
filled with foam.
l Fill the fault card to record the information of the replaced components.
l Contact the local Huawei office to handle the faulty components.

8.3 Replacing the DCDU


The DCDU is the DC power distribution unit. Replacing the DCDU cuts off the power supply
to the site and therefore disrupts the services.

Prerequisite
l The required tools and materials are ready. The tools and materials are the ESD wrist strap
or ESD gloves and the M6 screwdriver.
l The quantity and models of the modules to be replaced are confirmed and new modules
are ready.
l Keep the keys ready for use after you gain site admission.

Context
l Figure 8-13 shows the position of the DCDU in the OMB.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 8-9


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
8 Replacing the Components in the OMB Site Maintenance Guide

Figure 8-13 Position of the DCDU

DCDU

l Replacing the DCDU disrupts all the services carried by the BS. Therefore, the DCDU
must be replaced within 20 minutes.

Procedure
Step 1 Power off the DCDU.
Step 2 Wear the ESD wrist strap or ESD gloves.

CAUTION
When performing the replacement, take proper ESD prevention measures, for example, wear
ESD wrist straps or gloves to prevent boards, modules, and electronic components from being
destroyed by static discharge from the human body.

Step 3 Record the connection positions of all the cables connected to the DCDU.
Step 4 Remove the power cables connected to the DCDU, as shown in Figure 8-14.

8-10 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 8 Replacing the Components in the OMB

Figure 8-14 Removing the cables

Step 5 Loosen the four M6 screws on the panel and then remove the DCDU, as shown in Figure
8-15.

Figure 8-15 Removing the DCDU

Step 6 Install the new board, fasten the screws on the board [torque: 2 N.m (17.70 lbf.in.)], and then
install the cables.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 8-11


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
8 Replacing the Components in the OMB Site Maintenance Guide

Step 7 Power on the DCDU.


Step 8 Remove the ESD wrist strap or gloves and put the tools away.
----End

Postrequisite
l Put the replaced components into the ESD bag and then put the bag into the cardboard box
filled with foam.
l Fill the fault card to record the information of the replaced components.
l Contact the local Huawei office to handle the faulty components.

8.4 Replacing the AC Surge Protection Box


The AC surge protection box protects the input power supply from surge.

Prerequisite
l The required tools and materials are ready. The tools and materials are the ESD wrist strap
or ESD gloves and the M4 screwdriver.
l The quantity and models of the surge protection boxes to be replaced are confirmed and
new surge protection boxes are ready.
l Keep the keys ready for use after you gain site admission.

Context
l Figure 8-16 shows the position of the surge protection box in the OMB.

Figure 8-16 Position of the AC surge protection box

(1) AC surge protection box

8-12 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 8 Replacing the Components in the OMB

l Replacing the AC surge protection box disrupts the surge protection function of the BS.
Therefore, the AC surge protection box must be replaced within 10 minutes.

Procedure
Step 1 Power off the BS.
Step 2 Wear the ESD wrist strap or ESD gloves.

CAUTION
When performing the replacement, take proper ESD prevention measures, for example, wear
ESD wrist straps or gloves to prevent boards, modules, and electronic components from being
destroyed by static discharge from the human body.

Step 3 Record the connection positions of all the cables connected to the AC surge protection box.
Step 4 Remove the monitoring cables and alarm cables from the AC surge protection box, as shown in
Figure 8-17.

Figure 8-17 Removing the cables

Step 5 Loosen the screws on the panel by using the M4 screwdriver and then remove the AC surge
protection box, as shown in Figure 8-18.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 8-13


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
8 Replacing the Components in the OMB Site Maintenance Guide

Figure 8-18 Removing the AC surge protection box

Step 6 Install the new AC surge protection box, fasten the screws on the box [torque: 1.2 N.m (10.62
lbf.in.)], and then install the cables.
Step 7 Power on the BS.
Step 8 Remove the ESD wrist strap or gloves and put the tools away.

----End

Postrequisite
l Put the replaced components into the ESD bag and then put the bag into the cardboard box
filled with foam.
l Fill the fault card to record the information of the replaced components.
l Contact the local Huawei office to handle the faulty components.

8-14 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 9 Replacing the Components of the SLPU

9 Replacing the Components of the SLPU

About This Chapter

During maintenance of the SLPU, the components to be replaced include the SLPU case and
the UELP board.

9.1 Replacing the SLPU Case


The Signal Lightning Protection Unit (SLPU) provides surge protection for a BS.
9.2 Replacing the UELP
The Universal E1/T1 Lightning Protection Unit (UELP) provides lightning protection for four
E1/T1 links.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 9-1


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
9 Replacing the Components of the SLPU Site Maintenance Guide

9.1 Replacing the SLPU Case


The Signal Lightning Protection Unit (SLPU) provides surge protection for a BS.

Prerequisite
l The model of the faulty SLPU case is confirmed and the new SLPU case is ready.
l Ensure that the new SLPU case is intact and has the same version as the faulty one.
l The required tools and materials are ready. The tools and materials are the ESD wrist strap
or gloves, Phillips screwdriver, ESD box or bag, and key to the cabinet door.

Context

CAUTION
Do not replace and install the SLPU case during a thunderstorm.

Procedure
Step 1 Inform the administrator of the M2000 that the SLPU case needs to be replaced. If necessary,
ask the administrator to back up or transfer the services carried by the boards in the SLPU case.
Step 2 Wear the ESD wrist strap or ESD gloves.

WARNING
When performing the replacement, take proper ESD prevention measures, for example, wear
ESD wrist straps or gloves to prevent boards, modules, and electronic components from being
destroyed by static discharge from the human body.

Step 3 Record the connection positions of all the cables connected to the boards.
Step 4 Remove the transmission cables connected to the boards in the SLPU case.
Step 5 Loosen the four M6 screws on the panel of the SLPU case and then remove the SLPU case, as
shown in Figure 9-1.

Figure 9-1 Removing the SLPU

9-2 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 9 Replacing the Components of the SLPU

Step 6 Remove all the boards in the faulty SLPU case, install the boards to the new SLPU case, and
then install filler panels to the idle slots.

Step 7 Install the new case, fasten the screws on the case [torque: 2 N.m (5.31 lbf.in.)], and then install
the cables.

Step 8 Inform the administrator of the M2000 that the hardware replacement is complete and ask the
administrator to confirm that no related alarms are generated.

Step 9 Remove the ESD wrist strap or gloves and put the tools away.

----End

Postrequisite
After replacing the SLPU case, perform the following steps:
l Put the replaced components into the ESD bag and then put the bag into the cardboard box
filled with foam.
l Fill the fault card to record the information of the replaced components.
l Contact the local Huawei office to handle the faulty components.

9.2 Replacing the UELP


The Universal E1/T1 Lightning Protection Unit (UELP) provides lightning protection for four
E1/T1 links.

Prerequisite
l The required tools and materials are ready. The tools and materials are the ESD wrist strap
or ESD gloves, M3 screwdriver, and ESD box or bag.
l The quantity and models of the boards to be replaced are confirmed.
l Keep the keys ready for use after you obtain site admission.

Context
l Figure 9-2 shows the position of the UELP in the BBU.

Figure 9-2 Position of the UELP

l The board is hot-swappable.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 9-3


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
9 Replacing the Components of the SLPU Site Maintenance Guide

CAUTION
Do not replace and install the UELP during a thunderstorm.

Procedure
Step 1 Wear the ESD wrist strap or ESD gloves.

CAUTION
When performing the replacement, take proper ESD prevention measures, for example, wear
ESD wrist straps or gloves to prevent boards, modules, and electronic components from being
destroyed by static discharge from the human body.

Step 2 Record the connection positions of all the cables connected to the board.

Step 3 Disconnect the transmission cable connected to the UELP, as shown in Figure 9-3.

Figure 9-3 Removing the cable

Step 4 Loosen the two M3 screws on the panel and then remove the UELP, as shown in Figure 9-4.

Figure 9-4 Removing the UELP

1 2

Step 5 Ensure that the settings of the DIP switches on the new board are consistent with the settings of
the removed board. If necessary, refer to UELP for the information of the DIP switches.

Step 6 Install the new board, fasten the screws on the board [torque: 0.6 N.m (5.31 lbf.in.)], and then
install the cables.

9-4 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 9 Replacing the Components of the SLPU

Step 7 Inform the administrator of the M2000 that the replacement is complete and ask the administrator
to load and activate the software version of the UELP.
Step 8 Remove the ESD wrist strap or gloves and put the tools away.

----End

Postrequisite
l Put the replaced components into the ESD bag and then put the bag into the cardboard box
filled with foam.
l Fill the fault card to record the information of the replaced components.
l Contact the local Huawei office to handle the faulty components.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 9-5


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 10 Replacing the Surge Protector for the Antenna System

10 Replacing the Surge Protector for the


Antenna System

When the surge protector for the antenna system at the BBU side is faulty, you need to replace
it.

Prerequisite
l A new surge protector is ready.
l The required tools are ready. The tools are Phillips screwdriver, ESD wrist strap or gloves,
and ESD box or bag.

Context
Replacing the surge protector takes about five minutes, which does not affect the system.

Procedure
Step 1 Remove the faulty surge protector.
1. Remove the GPS clock signal cables and feeders connected to the faulty surge protector.
2. Remove the PGND cables connected to the faulty surge protector.
3. Put the faulty surge protector into the ESD bag.

Step 2 Install a new surge protector.


1. Connect the PGND cables to the surge protector.
2. Connect the GPS clock signal cables and feeders to the surge protector.
3. Take waterproofing measures if the outdoor surge protector is provided.

CAUTION
Do not replace and install the surge protector in a thunderstorm.

----End

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 10-1


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
10 Replacing the Surge Protector for the Antenna System Site Maintenance Guide

Result Verification
After replacing the faulty GPS surge protector, check that:
l The surge protector is correctly grounded.
l The cable connectors on the two ends of the surge protector are tightened.
Contact the local Huawei office to handle the faulty surge protector.

10-2 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 11 Replacing the Cables of the DBS3900

11 Replacing the Cables of the DBS3900

About This Chapter

When the DBS3900 cables are faulty, you need to replace them promptly. The cables can be
replaced are: transmission cables, signal cables, and RF jumpers.

Context
NOTE

Contact Huawei engineers in the following situations:


l You decide to arrange for devices, cables, and connectors by yourself.
l You need to cut the cable in specified length.

11.1 Replacing the BBU Power Cables


The BBU power cable provides -48 V DC power input to the BBU.
11.2 Replacing the Dry Contact Alarm Cables
The dry contact alarm cable transmits external Boolean value alarm signals to the BBU.
11.3 Replacing the GPS Clock Signal Cables
The GPS clock signal cable is connected to the GPS antenna system to receive GPS signals. The
received GPS signals can be used as the clock reference for the BBU.
11.4 Replacing the Monitoring Signal Cables
The monitoring signal cables are used to transmit the alarm signals from external monitoring
equipment. The replaceable monitoring signal cables are the CMUA-BBU monitoring signal
cable and the EMUA monitoring signal cable.
11.5 Replacing E1/T1 Signal Cables of the BBU3900
The E1/T1 signal cables are used to connect the BBU and external transmission equipment and
to transmit baseband signals.
11.6 Replacing the E1/T1 Surge Protection Transfer Cable
The E1/T1 surge protection transfer cable connects the UTRP and the UELP, and protects the
E1/T1 signals from surge.
11.7 Replacing FE/GE Ethernet Cables of the BBU3900
The FE/GE Ethernet cables are used to connect the BBU3900 and ASN-GW through the router.
11.8 Replacing FE/GE Optical Fibers of the BBU3900

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 11-1


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
11 Replacing the Cables of the DBS3900 Site Maintenance Guide

The FE/GE optical fibers are used to transmit the optical signals between the BBU and the ASN-
GW.
11.9 Replacing CPRI Optical Fibers
The Common Public Radio Interface (CPRI) optical fibers are used to connect the BBU3900
and the RRU and to transmit digital signals.
11.10 Replacing the RRU Power Cables
The RRU power cable feeds external -48 V DC power to the RRU.
11.11 Replacing the AISG Multicore Cable of the RRU3702/RRU3703
The AISG multicore cable connects the RRU and the remote control unit (RCU) and transmits
control signals from the BS to the RET antenna.
11.12 Replacing the AISG Extension Cable of the RRU3702/RRU3703
When the distance between the RRU and the RCU is longer than 5 m, you need to connect an
AISG extension cable to the AISG multicore cable to extend the length.
11.13 Replacing the RF Jumpers of the RRU3702/RRU3703
The RF jumpers of the RRU are used to input and output RF signals. The procedures of replacing
the RF jumpers of the RRU3702 and the RRU3703 are the same.
11.14 Replacing the RF Jumper of the RRU3701C
The RF jumper of the RRU is used to input and output RF signals.

11-2 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 11 Replacing the Cables of the DBS3900

11.1 Replacing the BBU Power Cables


The BBU power cable provides -48 V DC power input to the BBU.

Prerequisite
l The required tools and materials are ready. The tools and materials are the ESD wrist strap
or ESD gloves, M3 Phillips screwdriver, cable cutter, and power cable crimping tool.
l The quantity and models of the cables to be replaced are confirmed.
l Keep the keys ready for use after you obtain site admission.

Context
Replacing the BBU power cable disrupts the services provided by the BBU.

Procedure
Step 1 Prepare the new power cable of the same length as the faulty power cable to be replaced.

Step 2 Wear the ESD wrist strap or ESD gloves.

WARNING
When performing the replacement, take proper ESD prevention measures, for example, wear
ESD wrist straps or gloves to prevent boards, modules, and electronic components from being
destroyed by static discharge from the human body.

Step 3 Power off the BBU by referring to 3.2 Powering Off the BBU.

Step 4 Use a Phillips screwdriver to loosen the screws of the faulty 3V3 connector, and then remove
the connector from the BBU panel.

Step 5 Connect the 3V3 connector on one end of the new power cable to the power port on the BBU
panel, and then use a Phillips screwdriver to tighten the screws.

Step 6 Route the new power cable to the external power supply along the path of the faulty cable.

Step 7 Strip the sheath and shielding layer at the ends of the new power cable and make OT terminals.

Step 8 Take away the faulty power cable. Install the power cable.

Step 9 Power on the BBU by referring to Powering On the BBU.

Step 10 Determine whether the boards function properly according to the status of the indicators. For
description of the indicators, see DBS3900 WiMAX Hardware Description.

Step 11 Remove the ESD wrist strap or gloves and put the tools away.

----End

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 11-3


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
11 Replacing the Cables of the DBS3900 Site Maintenance Guide

Postrequisite
l Put the replaced cables in an ESD bag.
l Fill the fault card to record the information of the replaced cables.
l Contact the local Huawei office to handle the faulty cables.

11.2 Replacing the Dry Contact Alarm Cables


The dry contact alarm cable transmits external Boolean value alarm signals to the BBU.

Prerequisite
l The required tools and materials are ready. The tools and materials are the ESD wrist strap
or ESD gloves, M3 Phillips screwdriver, cable cutter, and crimping tool.
l The quantity and models of the cables to be replaced are confirmed.
l Keep the keys ready for use after you gain site admission.

Context
Replacing the dry contact alarm cable disrupts the monitoring of external equipment but does
not affect services.

Procedure
Step 1 Wear the ESD wrist strap or ESD gloves.

WARNING
When performing the replacement, take proper ESD prevention measures, for example, wear
ESD wrist straps or gloves to prevent boards, modules, and electronic components from being
destroyed by static discharge from the human body.

Step 2 Mark the position of the cable to be replaced. Attach a replacement label close to the installation
position to avoid incorrect operations.

Step 3 Prepare a terminal for one end of the new dry contact alarm cable and connect the terminal to
the external alarm equipment.

Step 4 Disconnect one end of the faulty dry contact alarm cable from the BBU and the other end from
the external alarm equipment.

Step 5 Route the new dry contact alarm cable along the path of the faulty dry contact alarm cable.

Step 6 Check whether the new dry contact alarm cable functions properly.

Step 7 Remove the ESD wrist strap or gloves and put the tools away.

----End

11-4 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 11 Replacing the Cables of the DBS3900

Postrequisite
l Put the replaced cables in an ESD bag.
l Fill the fault card to record the information of the replaced cables.
l Contact the local Huawei office to handle the faulty cables.

11.3 Replacing the GPS Clock Signal Cables


The GPS clock signal cable is connected to the GPS antenna system to receive GPS signals. The
received GPS signals can be used as the clock reference for the BBU.

Prerequisite
l The required tools and materials are ready. The tools and materials are the ESD wrist strap
or ESD gloves.
l The quantity and models of the cables to be replaced are confirmed.
l Keep the keys ready for use after you obtain site admission.

Context
Replacing the GPS clock signal cable disrupts the clock signals.

Procedure
Step 1 Wear the ESD wrist strap or ESD gloves.

WARNING
When performing the replacement, take proper ESD prevention measures, for example, wear
ESD wrist straps or gloves to prevent boards, modules, and electronic components from being
destroyed by static discharge from the human body.

Step 2 Mark the installation position of the cable to be replaced. Attach a replacement label close to
the installation position to avoid incorrect operations.

Step 3 Disconnect the faulty clock signal cable.

Step 4 Route the new clock signal cable along the path of the faulty clock signal cable.

Step 5 Ensure that the new clock signal cable functions properly.

Step 6 Remove the ESD wrist strap or gloves and put the tools away.

----End

Postrequisite
l Put the replaced cables in an ESD bag.
l Fill the fault card to record the information of the replaced cables.
l Contact the local Huawei office to handle the faulty cables.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 11-5


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
11 Replacing the Cables of the DBS3900 Site Maintenance Guide

11.4 Replacing the Monitoring Signal Cables


The monitoring signal cables are used to transmit the alarm signals from external monitoring
equipment. The replaceable monitoring signal cables are the CMUA-BBU monitoring signal
cable and the EMUA monitoring signal cable.

11.4.1 Replacing the CMUA-BBU Monitoring Signal Cable


The CMUA-BBU monitoring signal cable connects the CMUA in the APM cabinet and the
BBU, and reports the monitoring signals collected by the CMUA to the BBU.
11.4.2 Replacing the EMUA Monitoring Signal Cable
The EMUA monitoring signal cable connects the BBU3900 and the EMUA or the EMU, and
reports the alarms from environment monitoring equipment.

11.4.1 Replacing the CMUA-BBU Monitoring Signal Cable


The CMUA-BBU monitoring signal cable connects the CMUA in the APM cabinet and the
BBU, and reports the monitoring signals collected by the CMUA to the BBU.

Prerequisite
l The required tools and materials are ready. The tools and materials are the ESD wrist strap
or ESD gloves.
l The quantity and models of the cables to be replaced are confirmed.
l Keep the keys ready for use after you obtain site admission.

Procedure
Step 1 Wear the ESD wrist strap or ESD gloves.

WARNING
When performing the replacement, take proper ESD prevention measures, for example, wear
ESD wrist straps or gloves to prevent boards, modules, and electronic components from being
destroyed by static discharge from the human body.

Step 2 Mark the installation position of the cable to be replaced. Attach a replacement label close to
the installation position to avoid incorrect operations.

Step 3 Disconnect the faulty CMUA-BBU monitoring signal cable.

Step 4 Route the new CMUA-BBU monitoring signal cable along the path of the faulty CMUA-BBU
monitoring signal cable.

Step 5 Ensure that the new CMUA-BBU monitoring signal cable functions properly.

Step 6 Remove the ESD wrist strap or gloves and put the tools away.

----End

11-6 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 11 Replacing the Cables of the DBS3900

Postrequisite
l Put the replaced cables in an ESD bag.
l Fill the fault card to record the information of the replaced cables.
l Contact the local Huawei office to handle the faulty cables.

11.4.2 Replacing the EMUA Monitoring Signal Cable


The EMUA monitoring signal cable connects the BBU3900 and the EMUA or the EMU, and
reports the alarms from environment monitoring equipment.

Prerequisite
l The required tools and materials are ready. The tools and materials are the ESD wrist strap
or ESD gloves.
l The quantity and models of the cables to be replaced are confirmed.
l Keep the keys ready for use after you obtain site admission.

Procedure
Step 1 Wear the ESD wrist strap or ESD gloves.

WARNING
When performing the replacement, take proper ESD prevention measures, for example, wear
ESD wrist straps or gloves to prevent boards, modules, and electronic components from being
destroyed by static discharge from the human body.

Step 2 Mark the installation position of the cable to be replaced. Attach a replacement label close to
the installation position to avoid incorrect operations.

Step 3 Disconnect the faulty EMUA monitoring signal cable.

Step 4 Route the new EMUA monitoring signal cable along the path of the faulty EMUA monitoring
signal cable.

Step 5 Ensure that the new EMUA monitoring signal cable functions properly.

Step 6 Remove the ESD wrist strap or gloves and put the tools away.

----End

Postrequisite
l Put the replaced cables in an ESD bag.
l Fill the fault card to record the information of the replaced cables.
l Contact the local Huawei office to handle the faulty cables.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 11-7


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
11 Replacing the Cables of the DBS3900 Site Maintenance Guide

11.5 Replacing E1/T1 Signal Cables of the BBU3900


The E1/T1 signal cables are used to connect the BBU and external transmission equipment and
to transmit baseband signals.

Prerequisite
l The required tools and materials are ready. The tools and materials are the ESD wrist strap
or ESD gloves, M3 Phillips screwdriver, cable cutter, crimping pliers, and ESD box or bag.
l The quantity and models of the cables to be replaced are confirmed.
l Keep the keys ready for use after you gain site admission.

Context
Replacing the E1/T1 signal cables disrupts the services provided by the BBU.

Procedure
Step 1 Wear the ESD wrist strap or ESD gloves.

CAUTION
When performing the replacement, take proper ESD prevention measures, for example, wear
ESD wrist straps or gloves to prevent boards, modules, and electronic components from being
destroyed by static discharge from the human body.

Step 2 Route the new E1/T1 signal cables to the device at the peer end along the path of the faulty
cables.

Step 3 Remove the DB26 male connectors of the faulty E1/T1 signal cables from E1/T1 ports and the
other ends of the E1/T1 signal cables from the peer equipment.

Step 4 Put the faulty E1/T1 signal cables in an ESD bag.

Step 5 Connect the DB26 male connectors of the new E1/T1 signal cables to E1/T1 ports and the other
ends of the E1/T1 signal cables to the peer equipment.

Step 6 Arrange and bind the new E1/T1 signal cables.

----End

Postrequisite
l Put the replaced cables in an ESD bag.
l Fill the fault card to record the information of the replaced cables.
l Contact the local Huawei office to handle the faulty cables.

11-8 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 11 Replacing the Cables of the DBS3900

11.6 Replacing the E1/T1 Surge Protection Transfer Cable


The E1/T1 surge protection transfer cable connects the UTRP and the UELP, and protects the
E1/T1 signals from surge.

Prerequisite
l The required tools and materials are ready. The tools and materials are the ESD wrist strap
or ESD gloves.
l The quantity and models of the cables to be replaced are confirmed.
l Keep the keys ready for use after you obtain site admission.

Context

CAUTION
Do not replace and install the surge protection transfer cable during a thunderstorm.

Procedure
Step 1 Wear the ESD wrist strap or ESD gloves.

WARNING
When performing the replacement, take proper ESD prevention measures, for example, wear
ESD wrist straps or gloves to prevent boards, modules, and electronic components from being
destroyed by static discharge from the human body.

Step 2 Mark the installation position of the cable to be replaced. Attach a replacement label close to
the installation position to avoid incorrect operations.
Step 3 Disconnect the E1/T1 surge protection transfer cable.
Step 4 Route the new E1/T1 surge protection transfer cable along the path of the faulty E1/T1 surge
protection transfer cable.
Step 5 Ensure that the new E1/T1 surge protection transfer cable functions properly.
Step 6 Remove the ESD wrist strap or gloves and put the tools away.

----End

Postrequisite
l Put the replaced cables in an ESD bag.
l Fill the fault card to record the information of the replaced cables.
l Contact the local Huawei office to handle the faulty cables.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 11-9


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
11 Replacing the Cables of the DBS3900 Site Maintenance Guide

11.7 Replacing FE/GE Ethernet Cables of the BBU3900


The FE/GE Ethernet cables are used to connect the BBU3900 and ASN-GW through the router.

Prerequisite
l The required tools and materials are ready. The tools and materials are the ESD wrist strap
or ESD gloves, M3 Phillips screwdriver, cable cutter, crimping pliers, and ESD box or bag.
l The quantity and models of the cables to be replaced are confirmed.
l Keep the keys ready for use after you gain site admission.

Context
Replacing the Ethernet cable disrupts the services provided by the BBU.

Procedure
Step 1 Wear the ESD wrist strap or ESD gloves.

CAUTION
When performing the replacement, take proper ESD prevention measures, for example, wear
ESD wrist straps or gloves to prevent boards, modules, and electronic components from being
destroyed by static discharge from the human body.

Step 2 Route the new Ethernet cable to the peer device along the path of the faulty cable.
Step 3 Remove the RJ45 connector of the faulty Ethernet cable from the GE port of the BBU and
disconnect the other end of the Ethernet cable from the peer device or switch.
Step 4 Put the faulty Ethernet cable in an ESD bag.
Step 5 Connect the RJ45 connector of the new Ethernet cable to the GE port of the BBU and connect
the other end of the Ethernet cable to the peer equipment or switch.
Step 6 Arrange and bind the new Ethernet cables.

----End

Postrequisite
l Put the replaced cables in an ESD bag.
l Fill the fault card to record the information of the replaced cables.
l Contact the local Huawei office to handle the faulty cables.

11.8 Replacing FE/GE Optical Fibers of the BBU3900


The FE/GE optical fibers are used to transmit the optical signals between the BBU and the ASN-
GW.

11-10 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 11 Replacing the Cables of the DBS3900

Prerequisite
l The required tools and materials are ready. The tools and materials are the ESD wrist strap
or ESD gloves, M3 Phillips screwdriver, cable cutter, crimping pliers, and ESD box or bag.
l The quantity and models of the fibers to be replaced are confirmed.
l Keep the keys ready for use after you gain site admission.

Context
Replacing the FE/GE optical fiber disrupts the services provided by the BBU.

Procedure
Step 1 Wear the ESD wrist strap or ESD gloves.

CAUTION
When performing the replacement, take proper ESD prevention measures, for example, wear
ESD wrist straps or gloves to prevent boards, modules, and electronic components from being
destroyed by static discharge from the human body.

Step 2 Route the new FE/GE optical fiber to the peer device along the path of the faulty fiber.

Step 3 Press the latch on the LC connector of the faulty optical fiber, and then remove the LC connector
from the optical module. Remove the other connector from the peer device.

Step 4 Put the faulty FE/GE optical fiber in an ESD box.

Step 5 Plug the LC connector of the new optical fiber into the same optical module according to the
label on the optical fiber. Install the other connector on the peer device.

Step 6 Arrange and bind the new optical fibers.

----End

Postrequisite
l Put the replaced fibers in an ESD bag.
l Fill the fault card to record the information of the replaced fibers.
l Contact the local Huawei office to handle the faulty fibers.

11.9 Replacing CPRI Optical Fibers


The Common Public Radio Interface (CPRI) optical fibers are used to connect the BBU3900
and the RRU and to transmit digital signals.

Prerequisite
l The required tools and materials are ready. The tools and materials are the ESD wrist strap
or ESD gloves, M3 Phillips screwdriver, cable cutter, crimping pliers, and ESD box or bag.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 11-11


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
11 Replacing the Cables of the DBS3900 Site Maintenance Guide

l The quantity and models of the fibers to be replaced are confirmed.


l Keep the keys ready for use after you gain site admission.

Context
Replacing the CPRI optical fiber disrupts the services carried by the optical fiber.

Procedure
Step 1 Wear the ESD wrist strap or ESD gloves.

CAUTION
When performing the replacement, take proper ESD prevention measures, for example, wear
ESD wrist straps or gloves to prevent boards, modules, and electronic components from being
destroyed by static discharge from the human body.

Step 2 Route the new CPRI optical fiber to the peer device along the path of the faulty fiber.
NOTE

When routing the optical fiber, place the end of the fiber with longer exposed part on the BBU side, protect
the exposed part with a winding tube, and place the other end on the RRU side.

Step 3 Press the latches on the connectors of the faulty optical fiber connected to the BBU and RRU,
and then pull the connectors out of the optical modules.
Step 4 Put the faulty optical fiber into an ESD box.
Step 5 Insert the connectors of the new optical fiber into the optical modules according to the labels on
the optical fiber.
Step 6 Arrange and bind the new optical fibers.

----End

Postrequisite
l Put the replaced fibers in an ESD bag.
l Fill the fault card to record the information of the replaced fibers.
l Contact the local Huawei office to handle the faulty fibers.

11.10 Replacing the RRU Power Cables


The RRU power cable feeds external -48 V DC power to the RRU.

Prerequisite
l The required tools and materials are ready. The tools and materials are the ESD wrist strap
or ESD gloves, M3 Phillips screwdriver, cable cutter, crimping pliers, and ESD box or bag.
l The quantity and models of the cables to be replaced are confirmed.
l Keep the keys ready for use after you obtain site admission.

11-12 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 11 Replacing the Cables of the DBS3900

Context
The wires at the two ends of the RRU3701C/RRU3702 power cable are exposed. Prepare OT
terminals on site for one end of the power cable and connect the terminals to the power port in
the RRU cabling cavity. The other end is connected to the power supply system at the installation
site according to the onsite condition. At one end of the RRU3703 power cable are two female
FA (field assembled) connectors and the other end of the power cable are exposed wires which
are connected to the power supply system at the installation site according to the onsite condition.
NOTE
Prepare cable connectors by referring to the Quick Installation Guide

Replacing the RRU power cable disrupts the services provided by the RRU.

Procedure
Step 1 Prepare the new power cable of the same length as the faulty power cable to be replaced, and
make corresponding cable connectors.
Step 2 Wear the ESD wrist strap or ESD gloves.

WARNING
When performing the replacement, take proper ESD prevention measures, for example, wear
ESD wrist straps or gloves to prevent boards, modules, and electronic components from being
destroyed by static discharge from the human body.

Step 3 Power off the RRU by referring to 3.4 Powering Off the RRU.
Step 4 Disconnect the faulty power cable.

If... Then...

RRU3701C/RRU3702 power cable Use the Phillips screwdriver to loosen the screw on the
connector of the faulty power cable and remove the
cable from the power port on the RRU panel.
Disconnect the other end of the power cable from the
onsite power supply system.

RRU3703 power cable Remove the female FA connectors from the power port
on the RRU panel and disconnect the other end of the
power cable from the onsite power supply system.

Step 5 Route the new power cable to the external power supply along the path of the faulty cable and
then install the new power cable.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 11-13


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
11 Replacing the Cables of the DBS3900 Site Maintenance Guide

If... Then...

RRU3701C/RRU3702 power cable Connect the OT terminal to the power port in the RRU
cabling cavity, and press the shielding layer of the
power cable under the spring plate at the cable outlet to
ensure the grounding of the cable. Connect the other
end to the power supply system according to the onsite
condition.

RRU3703 power cable Connect the female FA connector of the blue wire to
the NEG (-) 0 port in the RRU cabling cavity and the
female FA connector of the black wire to the RTN (+)
0 port in the RRU cabling cavity. The other end of the
power cable is connected to power supply system at the
installation site according to the onsite condition.

Step 6 Power on the RRU by referring to 3.3 Powering On the RRU.

Step 7 Determine whether the equipment functions properly according to the status of the indicators.
For description of the indicators, see DBS3900 WiMAX Hardware Description.

Step 8 Remove the ESD wrist strap or gloves and put the tools away.

----End

Postrequisite
l Put the replaced cables in an ESD bag.
l Fill the fault card to record the information of the replaced cables.
l Contact the local Huawei office to handle the faulty cables.

11.11 Replacing the AISG Multicore Cable of the RRU3702/


RRU3703
The AISG multicore cable connects the RRU and the remote control unit (RCU) and transmits
control signals from the BS to the RET antenna.

Prerequisite
l The required tools and materials are ready. The tools and materials are the ESD wrist strap
or ESD gloves, M3 Phillips screwdriver, cable cutter, and power cable crimping tool.
l The quantity and models of the cables to be replaced are confirmed.
l Keep the keys ready for use after you obtain site admission.

Procedure
Step 1 Wear the ESD wrist strap or ESD gloves.

11-14 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 11 Replacing the Cables of the DBS3900

WARNING
When performing the replacement, take proper ESD prevention measures, for example, wear
ESD wrist straps or gloves to prevent boards, modules, and electronic components from being
destroyed by static discharge from the human body.

Step 2 Disconnect the AISG multicore cable of the RRU3702/RRU3703.


Step 3 Install the new AISG multicore cable of the RRU3702/RRU3703.
Step 4 Determine whether the boards function properly according to the status of the indicators. For
description of the indicators, see DBS3900 WiMAX Hardware Description.
Step 5 Remove the ESD wrist strap or gloves and put the tools away.

----End

Postrequisite
l Put the replaced cables in an ESD bag.
l Fill the fault card to record the information of the replaced cables.
l Contact the local Huawei office to handle the faulty cables.

11.12 Replacing the AISG Extension Cable of the RRU3702/


RRU3703
When the distance between the RRU and the RCU is longer than 5 m, you need to connect an
AISG extension cable to the AISG multicore cable to extend the length.

Prerequisite
l The required tools and materials are ready. The tools and materials are the ESD wrist strap
or ESD gloves, M3 Phillips screwdriver, cable cutter, and power cable crimping tool.
l The quantity and models of the cables to be replaced are confirmed.
l Keep the keys ready for use after you obtain site admission.

Procedure
Step 1 Wear the ESD wrist strap or ESD gloves.

WARNING
When performing the replacement, take proper ESD prevention measures, for example, wear
ESD wrist straps or gloves to prevent boards, modules, and electronic components from being
destroyed by static discharge from the human body.

Step 2 Disconnect the AISG extension cable of the RRU3702/RRU3703.


Step 3 Install the new AISG extension cable of the RRU3702/RRU3703.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 11-15


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
11 Replacing the Cables of the DBS3900 Site Maintenance Guide

Step 4 Determine whether the boards function properly according to the status of the indicators. For
description of the indicators, see DBS3900 WiMAX Hardware Description.

Step 5 Remove the ESD wrist strap or gloves and put the tools away.

----End

Postrequisite
l Put the replaced cables in an ESD bag.
l Fill the fault card to record the information of the replaced cables.
l Contact the local Huawei office to handle the faulty cables.

11.13 Replacing the RF Jumpers of the RRU3702/RRU3703


The RF jumpers of the RRU are used to input and output RF signals. The procedures of replacing
the RF jumpers of the RRU3702 and the RRU3703 are the same.

Prerequisite
l The required tools and materials are ready. The tools and materials are the ESD wrist strap
or ESD gloves, screwdriver, cable cutter, crimping pliers, waterproof tape, insulation tape,
feeder cable cutting tool, and ESD box or bag.
l The quantity and models of the jumpers to be replaced are confirmed.
l Keep the keys ready for use after you gain site admission.

Context
Powering off the RRU before replacing the RRU RF jumper disrupts all the services carried by
the sector carriers associated with the RRU.

NOTE

See the DBS3900 WiMAX Quick Installation Guide (RRU3702&RRU3703) to install new RRU RF
jumpers.

Procedure
Step 1 Wear the ESD wrist strap or ESD gloves.

CAUTION
When performing the replacement, take proper ESD prevention measures, for example, wear
ESD wrist straps or gloves to prevent boards, modules, and electronic components from being
destroyed by static discharge from the human body.

Step 2 Turn off the switch of the external power supply to the RRU.

Step 3 Remove the waterproof insulation tapes on RF ports of the RRU and of the antenna system.

Step 4 Remove the faulty RF jumpers from the RF port of the RRU.

11-16 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 11 Replacing the Cables of the DBS3900

Step 5 Remove the faulty RF jumpers from the RF ports of the antenna system.

Step 6 Connect the connector of the new RF jumper to the RF port on the RRU.

Step 7 Wrap the joints at the RRU RF ports with a layer of insulation tape. Wind the tape around the
joint from top down.

Step 8 Wrap the insulation tape with three layers of waterproof tape.
NOTE

The tape is wrapped in the following sequence: from top down, from bottom up, and then from top down.
For every two adjacent tape layers, the tape on the upper layer overlaps about half the width of the tape on
the lower layer.

Step 9 Wrap the waterproof tape with three layers of insulation tape. For details about how to wrap the
insulation tape, see Step 8.

Step 10 Mount the matched load on the idle RF port. Use the waterproof insulation tape and PVC tape
to wrap the joint between the matched load and the RF port in the same way as described in the
previous steps.

Step 11 Connect the RF jumpers to the antenna system.

Step 12 Wrap the joint at the RF ports of the antenna system with the waterproof insulation tape.

Step 13 Stick the color rings. The new color rings should have the same color as the color rings on the
old RF jumpers.

Step 14 Turn on the switch of the external power supply to the RRU.

----End

Postrequisite
l Put the replaced jumpers in an ESD bag.
l Fill the fault card to record the information of the replaced jumpers.
l Contact the local Huawei office to handle the faulty jumpers.

11.14 Replacing the RF Jumper of the RRU3701C


The RF jumper of the RRU is used to input and output RF signals.

Prerequisite
l The required tools and materials are ready. The tools and materials are the ESD wrist strap
or ESD gloves, screwdriver, cable cutter, crimping pliers, waterproof tape, insulation tape,
feeder cable cutting tool, and ESD box or bag.
l The quantity and models of the cables to be replaced are confirmed.
l Keep the keys ready for use after you obtain site admission.

Context
Replacing the RF jumper of the RRU3701C disrupts all the services carried by the sectors related
to the RRU3701C.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 11-17


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
11 Replacing the Cables of the DBS3900 Site Maintenance Guide

NOTE

See the DBS3900 WiMAX Quick Installation Guide (RRU3701C) to install new RRU3701C RF jumpers.

Procedure
Step 1 Wear the ESD wrist strap or ESD gloves.

CAUTION
When performing the replacement, take proper ESD prevention measures, for example, wear
ESD wrist straps or gloves to prevent boards, modules, and electronic components from being
destroyed by static discharge from the human body.

Step 2 Turn off the switch of the external power supply to the RRU3701C.

Step 3 Open the door of the RRU3701C case or dismantle the RRU3701C shell.

Step 4 Remove the waterproof tape at the RF ports of the RRU3701C and the antenna system.

Step 5 Remove the faulty RF jumper from the RF port of the RRU3701C.

Step 6 Remove the faulty RF jumper from the RF port of the antenna system.

Step 7 Connect the connector of the new RF jumper to the RF port of the RRU3701C.

Step 8 Wrap the joint of the RF port of the RRU3701C with the waterproof insulation tape.
NOTE

Wrap the joint spirally upward, downward, and then upward again. That is, the joint is wrapped by three
layers of waterproof insulation tape. For every two adjacent tape layers, the tape on the upper layer overlaps
about half the width of the tape on the lower layer.

Step 9 Wrap up the waterproof insulation tape with the PVC tape in the same way.

Step 10 Mount the 50-ohm matched load on the idle RF port. Use the waterproof insulation tape and
PVC tape to wrap the joint between the matched load and the RF port in the same way as
described in the previous steps.
Step 11 Connect the RF jumper to the antenna system.

Step 12 Wrap the joint at the RF ports of the antenna system with the waterproof insulation tape.

Step 13 Stick the color rings. The new color rings should have the same color as the color rings on the
old RF jumpers.
Step 14 Turn on the switch of the external power supply to the RRU3701C.

Step 15 Lock the door of the RRU3701C case or reinstall the RRU3701C shell after ensuring that the
RRU3701C is operational.

----End

Postrequisite
l Put the replaced cables in an ESD bag.
l Fill the fault card to record the information of the replaced cables.

11-18 Huawei Proprietary and Confidential Issue 02 (2010-10-22)


Copyright © Huawei Technologies Co., Ltd.
DBS3900 WiMAX
Site Maintenance Guide 11 Replacing the Cables of the DBS3900

l Contact the local Huawei office to handle the faulty cables.

Issue 02 (2010-10-22) Huawei Proprietary and Confidential 11-19


Copyright © Huawei Technologies Co., Ltd.