CUADRO DE MÁXIMA DEMANDA EDIFICACIÓN DE TRES PISOS

A.TEC ALIMENTADOR PRINCIPAL


C.unit Carga F.DEM M.DEM M.DEM In Id It Ic
CONCEPTO H W/m2 INSTAL % PARC TOTAL A A A A n° AWG
M2
PRIMER PISO
KWH - TG
Bomba de 1 HP 1 746.00 746.00 1.00 746.00 746.0 1.3 1.6 25 22 4 14
Bodega 23.12 30.00 693.60 693.60
1.00 6840.6 11.5 14.4 25 22 4 14
Restaurante 204.9 30.00 6147.00 6147.00

TG - TD

6840.6 11.5 14.4 25 22 4 14


BODEGA 23.12 30.00 693.60 693.60
Restaurante 204.9 30.00 6147.00 1.00 6147.00

TD - PUNTOS DE LUZ Y TOMACORRIENTES / TG-BOMBA USO UN SISTEMA MONOFÁSICO EN ESTA ZONA


Luminarias 1 3420.30 3420.30 1.00 3420.30 3420.3 17.3 21.6 25 22 2 14

Tomacorrientes 1 3420.30 3420.30 1.00 3420.30 3420.3 17.3 21.6 25 22 2 14

Bomba de 1 HP 1 746.00 746.00 746.00 746.0 1.3 1.6 25 22 2 14

SEGUNDO PISO
PISOS
ALIMENTADOR PRINCIPAL Dv 2.5% 4%
L (m) CUMPLE
DESCRIPCION V (380V) (380V)

4 x 2.1mm2/Ф 1/2" PVC SAP 1.26 0.026 9.5 15.2 SI

4 x 2.1mm2/Ф 1/2" PVC SAP 1.26 0.236 9.5 15.2 SI

4 x 2.1mm2/Ф 1/2" PVC SAP 1.97 0.369 9.5 15.2 SI

Dv 2.5% 4%
L (m) CUMPLE
FÁSICO EN ESTA ZONA V (220V) (220V)
2 x 2.1mm2/Ф 3/4" PVC SEL 16.2 5.247 5.5 8.8 SI
2 x 2.1mm2/Ф 3/4" PVC SEL + 1 T x 15.4 4.988 5.5 8.8 SI
4 mm2 TW
2 x 2.1mm2/Ф 3/4" PVC SEL + 1 T x 56.8 1.162 5.5 8.8 SI
4 mm2 TW