muro 28 K 79 + 360.0 K 79 + 510.0 150.

0 muro 28 y 27 79+355

abscisa altura concreto C m3/m refuerzo kg/m


K 79 + 360.0 4.36
K 79 + 370.0 5.14 5.14 5.50 47.20 3,961.00
K 79 + 370.0 4.42
K 79 + 380.0 5.20 5.20 5.50 47.20 3,961.00
K 79 + 380.0 4.65
K 79 + 390.0 5.43 5.43 5.50 47.20 3,961.00
K 79 + 390.0 4.90
K 79 + 400.0 5.68 5.68 6.00 55.30 4,317.00
K 79 + 400.0 5.14
K 79 + 410.0 5.92 5.92 6.00 55.30 4,317.00
K 79 + 410.0 5.33
K 79 + 420.0 6.10 6.10 6.50 65.60 5,733.00
K 79 + 420.0 5.43
K 79 + 430.0 6.20 6.20 6.50 65.60 5,733.00
K 79 + 430.0 5.50
K 79 + 440.0 6.17 6.17 6.50 65.60 5,733.00
K 79 + 440.0 5.40
K 79 + 450.0 6.14 6.14 6.50 65.60 5,733.00
K 79 + 450.0 5.40
K 79 + 460.0 6.03 6.03 6.50 65.60 5,733.00
K 79 + 460.0 5.16
K 79 + 470.0 5.84 5.84 6.00 55.30 4,317.00
K 79 + 470.0 5.10
K 79 + 480.0 5.73 5.73 6.00 55.30 4,317.00
K 79 + 480.0 5.03
K 79 + 490.0 5.63 5.63 6.00 55.30 4,317.00
K 79 + 490.0 4.95
K 79 + 500.0 5.52 5.52 6.00 55.30 4,317.00
K 79 + 500.0 4.97
K 79 + 510.0 5.52 5.52 6.00 55.30 4,317.00
TOTAL PROYECTADO 6.07 856.70 70,767.00
TOTAL EJECUTADO 288.7 16,703.00
muro 26 K 79 + 080.0 K 79 + 120.0 40.0 muro 26 79+080

abscisa altura concreto C m3/m R1 R2


K 79 + 080.0 4.00
K 79 + 090.0 4.00 4.00 4.50 31.83 256.36 120.78
K 79 + 090.0 2.88
K 79 + 100.0 3.26 3.26 3.50 21.75 197.20 91.08
K 79 + 100.0 2.67
K 79 + 110.0 3.44 3.44 3.50 21.69 197.20 91.08
K 79 + 110.0 3.44
K 79 + 120.0 4.22 4.22 4.50 31.13 256.36 120.78
TOTAL PROYECTADO 4.00 106.39 907.12
TOTAL EJECUTADO -

muro 25 K 78 + 500.0 K 78 + 530.0 30.0 muro 25 NO SE HIZO

abscisa altura concreto C m3/m refuerzo kg/m


K 78 + 500.0 4.63
K 78 + 510.0 5.42 5.42 5.50 47.20 3,961.00
K 78 + 510.0 4.60

K 78 + 520.0 5.36 5.36 5.50 47.20 3,961.00


K 78 + 520.0 4.37
K 78 + 530.0 5.11 5.11 5.50 47.20 3,961.00
TOTAL PROYECTADO 5.50 141.60 11,883.00
TOTAL EJECUTADO 0 -

muro 24 K 77 + 880.0 K 77 + 915.0 35.0 muro 24 77+890

abscisa altura concreto C m3/m refuerzo kg/m


K 77 + 880.0 3.03
K 77 + 890.0 2.72 3.03 3.50
K 77 + 890.0 3.82
K 77 + 900.0 4.49 4.49 4.50 33.90 3,331.00
K 77 + 900.0 3.84
K 77 + 910.0 4.49 4.49 4.50 33.90 3,331.00
K 77 + 910.0 3.71
K 77 + 915.0 4.02 4.02 4.50 16.95 1,665.50
TOTAL PROYECTADO 4.25 84.75 8,327.50
TOTAL EJECUTADO -
muro 23 K 77 + 695.0 K 77 + 765.0 70.0 muro 23 CLB

abscisa altura concreto C m3/m refuerzo kg/m


K 77 + 695.0 5.80
K 77 + 700.0 6.15 6.15 6.50 32.80 2,866.50
K 77 + 700.0 6.15
K 77 + 710.0 6.85 6.85 7.00 74.60 6,135.00
K 77 + 710.0 6.50
K 77 + 720.0 7.20 7.20 7.50 86.50 7,340.00
K 77 + 720.0 6.68
K 77 + 730.0 7.38 7.38 7.50 86.50 7,340.00
K 77 + 730.0 6.84
K 77 + 740.0 7.54 7.54 8.00 97.70 10,456.00
K 77 + 740.0 6.65
K 77 + 750.0 7.35 7.35 7.50 86.50 7,340.00
K 77 + 750.0 6.97
K 77 + 760.0 7.67 7.67 8.00 97.70 10,456.00
K 77 + 760.0 7.13
K 77 + 765.0 7.48 7.48 7.50 43.25 3,670.00
TOTAL PROYECTADO 7.44 605.55 55,603.50
TOTAL EJECUTADO

muro 22.3 K 77 + 480.0 K 77 + 540.0 60.0 muro 22 77+473

abscisa altura concreto C m3/m refuerzo kg/m


K 77 + 480.0 6.11
K 77 + 490.0 6.66 6.66 7.00 74.60 6,135.00
K 77 + 490.0 6.66
K 77 + 500.0 7.23 7.23 7.50 86.50 7,340.00
K 77 + 500.0 7.23
K 77 + 510.0 7.80 7.80 8.00 97.70 10,456.00
K 77 + 510.0 7.26
K 77 + 520.0 7.86 7.86 8.00 97.70 10,456.00
K 77 + 520.0 7.18
K 77 + 530.0 7.82 7.82 8.00 97.70 10,456.00
K 77 + 530.0 7.82
K 77 + 540.0 8.49 8.49 8.50 111.20 11,314.00
TOTAL PROYECTADO 7.83 565.40 56,157.00
TOTAL EJECUTADO 374.26 42,473.00
muro 22.2 K 77 + 055.0 K 77 + 085.0 30.0 muro 22 77+055

abscisa altura concreto C m3/m refuerzo kg/m


K 77 + 055.0 4.72
K 77 + 060.0 4.91 4.91 5.00 19.90 1,797.50
K 77 + 060.0 4.60
K 77 + 070.0 4.94 4.94 5.00 39.80 3,595.00
K 77 + 070.0 4.20
K 77 + 080.0 4.52 4.52 5.00 39.80 3,595.00
K 77 + 080.0 3.88
K 77 + 085.0 4.04 4.04 4.50 16.95 1,665.50
TOTAL PROYECTADO 4.88 116.45 10,653.00
TOTAL EJECUTADO 141.91 13,861.00

muro 22.1 K 76 + 800.0 K 76 + 900.0 100.0 muro 22 76+820

abscisa altura concreto C m3/m refuerzo kg/m


K 76 + 800.0 5.99
K 76 + 810.0 6.76 6.76 7.00 74.60 6,135.00
K 76 + 810.0 6.31
K 76 + 820.0 7.09 7.09 7.50 86.50 7,340.00
K 76 + 820.0 6.76
K 76 + 830.0 7.55 7.55 8.00 97.70 10,456.00
K 76 + 830.0 7.21
K 76 + 840.0 7.99 7.99 8.00 97.70 10,456.00
K 76 + 840.0 7.21
K 76 + 850.0 7.99 7.99 8.00 97.70 10,456.00
K 76 + 850.0 7.21
K 76 + 860.0 7.99 7.99 8.00 97.70 10,456.00
K 76 + 860.0 7.00
K 76 + 870.0 7.79 7.79 8.00 97.70 10,456.00
K 76 + 870.0 7.00
K 76 + 880.0 7.79 7.79 8.00 97.70 10,456.00
K 76 + 880.0 7.00
K 76 + 890.0 7.79 7.79 8.00 97.70 10,456.00
K 76 + 890.0 7.00
K 76 + 900.0 7.79 7.79 8.00 97.70 10,456.00
TOTAL PROYECTADO 7.85 942.70 97,123.00
TOTAL EJECUTADO 234.12 22,474.00
muro 21 K 76 + 350.0 K 76 + 400.0 50.0 muro 21 VIGA

abscisa altura concreto C m3/m refuerzo kg/m


K 76 + 350.0 4.25
K 76 + 360.0 4.48 4.48 4.50 33.90 3,331.00
K 76 + 360.0 4.79
K 76 + 370.0 4.94 4.94 5.00 39.80 3,595.00
K 76 + 370.0 4.94
K 76 + 380.0 5.06 5.06 5.50 47.20 3,961.00
K 76 + 380.0 4.93
K 76 + 390.0 4.97 4.97 5.00 39.80 3,595.00
K 76 + 390.0 4.88
K 76 + 400.0 4.99 4.99 5.00 39.80 3,595.00
TOTAL PROYECTADO 5.00 200.50 18,077.00
TOTAL EJECUTADO

muro 18 K 75 + 525.0 K 75 + 600.0 75.0 muro 18

abscisa altura concreto C m3/m refuerzo kg/m


K 75 + 525.0 3.15
K 75 + 530.0 3.52 3.52 4.00
K 75 + 530.0 3.52
K 75 + 540.0 4.23 4.23 4.50 33.90 3,331.00
K 75 + 540.0 4.23
K 75 + 545.0 4.65 4.65 5.00 19.90 1,797.50
K 75 + 545.0 5.27
K 75 + 550.0 5.57 5.57 6.00 27.65 2,158.50
K 75 + 550.0 6.09
K 75 + 560.0 6.80 6.80 7.00 74.60 6,135.00
K 75 + 560.0 6.80
K 75 + 570.0 7.52 7.52 8.00 97.70 10,456.00
K 75 + 570.0 7.52
K 75 + 580.0 8.25 8.25 8.50 111.20 11,314.00
K 75 + 580.0 7.59
K 75 + 585.0 7.94 7.94 8.00 48.85 5,228.00
K 75 + 585.0 5.10
K 75 + 590.0 5.46 5.46 5.50 23.60 1,980.50
K 75 + 590.0 4.34
K 75 + 595.0 4.70 4.70 5.00 19.90 1,797.50
K 75 + 595.0 3.40
K 75 + 597.5 3.58 3.58 4.00
K 75 + 597.5 1.57
K 75 + 600.0 1.75 1.75 2.00
TOTAL PROYECTADO 5.63 457.30 44,198.00
TOTAL EJECUTADO

muro 17 K 75 + 375.0 K 75 + 415.0 40.0 muro 17

abscisa altura concreto C m3/m refuerzo kg/m


K 75 + 375.0 4.37
K 75 + 380.0 4.73 4.73 5.00 19.90 1,797.50
K 75 + 380.0 5.68
K 75 + 390.0 6.41 6.41 6.50 65.60 5,733.00
K 75 + 390.0 6.41
K 75 + 395.0 6.77 6.77 7.00 37.30 3,067.50
K 75 + 395.0 5.60
K 75 + 400.0 5.97 5.97 6.00 27.65 2,158.50
K 75 + 400.0 5.19
K 75 + 405.0 5.55 5.55 6.00 27.65 2,158.50
K 75 + 405.0 5.05
K 75 + 410.0 5.41 5.41 5.50 23.60 1,980.50
K 75 + 410.0 4.02
K 75 + 415.0 4.39 4.39 4.50 16.95 1,665.50
TOTAL PROYECTADO 5.79 218.65 18,561.00
TOTAL EJECUTADO
muro 16.2 K 75 + 181.0 K 75 + 273.0 92.0 muro 16

abscisa altura concreto C m3/m refuerzo kg/m


K 75 + 181.0 3.87
K 75 + 185.0 4.10 4.10 4.50 13.56 1,332.40
K 75 + 185.0 4.10
K 75 + 190.0 4.40 4.40 4.50 16.95 1,665.50
K 75 + 190.0 5.27
K 75 + 195.0 5.58 5.58 6.00 27.65 2,158.50
K 75 + 195.0 5.90
K 75 + 200.0 6.20 6.20 6.50 32.80 2,866.50
K 75 + 200.0 6.20
K 75 + 205.0 6.51 6.51 7.00 37.30 3,067.50
K 75 + 205.0 5.00
K 75 + 210.0 5.34 5.34 5.50 23.60 1,980.50
K 75 + 210.0 3.84
K 75 + 220.0 4.52 4.52 5.00 39.80 3,595.00
K 75 + 220.0 4.52
K 75 + 230.0 5.20 5.20 5.50 47.20 3,961.00
K 75 + 230.0 5.86
K 75 + 240.0 6.60 6.60 7.00 74.60 6,135.00
K 75 + 240.0 6.60
K 75 + 245.0 6.97 6.97 7.00 37.30 3,067.50
K 75 + 245.0 6.70
K 75 + 250.0 7.09 7.09 7.50 43.25 3,670.00
K 75 + 250.0 6.06
K 75 + 255.0 6.45 6.45 6.50 32.80 2,866.50
K 75 + 255.0 5.76
K 75 + 260.0 6.15 6.15 6.50 32.80 2,866.50
K 75 + 260.0 5.25
K 75 + 265.0 5.62 5.62 6.00 27.65 2,158.50
K 75 + 265.0 4.14
K 75 + 270.0 4.54 4.54 5.00 19.90 1,797.50
K 75 + 270.0 2.30
K 75 + 273.0 2.54 2.54 3.00
TOTAL PROYECTADO 5.81 507.16 43,188.40
TOTAL EJECUTADO

muro 16.1 K 75 + 035.0 K 75 + 065.0 30.0 muro 16

abscisa altura concreto C m3/m refuerzo kg/m


K 75 + 035.0 3.65
K 75 + 040.0 4.06 4.06 4.50 16.95 1,665.50
K 75 + 040.0 4.42
K 75 + 050.0 5.21 5.21 5.50 47.20 3,961.00
K 75 + 050.0 4.66
K 75 + 055.0 5.06 5.06 5.50 23.60 1,980.50
K 75 + 055.0 3.87
K 75 + 060.0 4.27 4.27 4.50 16.95 1,665.50
K 75 + 060.0 3.01
K 75 + 065.0 3.41 3.41 3.50
TOTAL PROYECTADO 4.70 104.70 9,272.50
TOTAL EJECUTADO
muro 15 K 74 + 095.0 K 74 + 145.0 50.0 muro 15

abscisa altura concreto C m3/m refuerzo kg/m


K 74 + 095.0 2.18
K 74 + 100.0 2.45 2.45 2.50
K 74 + 100.0 2.45
K 74 + 110.0 3.02 3.02 3.50
K 74 + 110.0 2.94
K 74 + 120.0 3.54 3.54 4.00
K 74 + 120.0 2.96
K 74 + 125.0 3.28 3.28 3.50
K 74 + 125.0 2.92
K 74 + 130.0 3.26 3.26 3.50
K 74 + 130.0 2.85
K 74 + 135.0 3.19 3.19 3.50
K 74 + 135.0 2.85
K 74 + 140.0 3.19 3.19 3.50
K 74 + 140.0 2.85
K 74 + 145.0 3.19 3.19 3.50
TOTAL PROYECTADO 3.44 - -
TOTAL EJECUTADO

muro 14.2 K 73 + 641.0 K 73 + 670.0 29.0 muro 14

abscisa altura concreto C m3/m refuerzo kg/m


K 73 + 641.0 2.41
K 73 + 650.0 2.56 2.56 3.00
K 73 + 650.0 2.56
K 73 + 655.0 2.68 2.68 3.00
K 73 + 655.0 3.66
K 73 + 660.0 3.79 3.79 4.00
K 73 + 660.0 3.79
K 73 + 665.0 3.92 3.92 4.00
K 73 + 665.0 2.66
K 73 + 670.0 2.82 2.82 3.00 9.25 604.50
TOTAL PROYECTADO 3.40 9.25 604.50
TOTAL EJECUTADO
muro 14.1 K 73 + 401.0 K 73 + 458.0 57.0 muro 14

abscisa altura concreto C m3/m refuerzo kg/m


K 73 + 401.0 2.51
K 73 + 403.0 2.60 2.60 3.00
K 73 + 403.0 2.83
K 73 + 410.0 3.15 3.15 3.50
K 73 + 410.0 4.70
K 73 + 415.0 4.96 4.96 5.00 19.90 1,797.50
K 73 + 415.0 5.43
K 73 + 420.0 5.66 5.66 6.00 27.65 2,158.50
K 73 + 420.0 5.66
K 73 + 425.0 5.97 5.97 6.00 27.65 2,158.50
K 73 + 425.0 5.46
K 73 + 430.0 5.76 5.76 6.00 27.65 2,158.50
K 73 + 430.0 5.04
K 73 + 435.0 5.36 5.36 5.50 23.60 1,980.50
K 73 + 435.0 3.53
K 73 + 440.0 3.84 3.84 4.00
K 73 + 440.0 3.31
K 73 + 445.0 3.64 3.64 4.00
K 73 + 445.0 3.42
K 73 + 450.0 3.76 3.76 4.00
K 73 + 450.0 2.84
K 73 + 455.0 3.19 3.19 3.50
K 73 + 455.0 2.25
K 73 + 458.0 2.46 2.46 2.50
TOTAL PROYECTADO 4.42 126.45 10,253.50
TOTAL EJECUTADO

muro 13 K 72 + 045.0 K 72 + 080.0 35.0 muro 13

abscisa altura concreto C m3/m refuerzo kg/m


K 72 + 045.0 2.33
K 72 + 050.0 2.68 2.68 3.00
K 72 + 050.0 3.25
K 72 + 060.0 3.91 3.91 4.00
K 72 + 060.0 3.91
K 72 + 065.0 4.30 4.30 4.50 16.95 1,665.50
K 72 + 065.0 3.76
K 72 + 070.0 4.15 4.15 4.50 16.95 1,665.50
K 72 + 070.0 4.15
K 72 + 075.0 4.53 4.53 5.00 19.90 1,797.50
K 72 + 075.0 3.77
K 72 + 080.0 4.15 4.15 4.50 16.95 1,665.50
TOTAL PROYECTADO 4.25 70.75 6,794.00
TOTAL EJECUTADO

muro 10.2 K 70 + 960.0 K 71 + 012.0 52.0 muro 10

abscisa altura concreto C m3/m refuerzo kg/m


K 70 + 960.0 2.29
K 70 + 970.0 3.06 3.06 3.50
K 70 + 970.0 3.06
K 70 + 980.0 3.84 3.84 4.00
K 70 + 980.0 3.84
K 70 + 985.0 4.23 4.23 4.50 16.95 1,665.50
K 70 + 985.0 3.36
K 70 + 990.0 3.75 3.75 4.00 13.40 1,446.50
K 70 + 990.0 3.75
K 70 + 995.0 4.15 4.15 4.50 16.95 1,665.50
K 70 + 995.0 3.34
K 71 + 000.0 3.74 3.74 4.00
K 71 + 000.0 2.65
K 71 + 005.0 3.04 3.04 3.50
K 71 + 005.0 2.17
K 71 + 010.0 2.56 2.56 3.00
K 71 + 010.0 1.15
K 71 + 012.0 1.31 1.31 1.50
TOTAL PROYECTADO 3.61 47.30 4,777.50
TOTAL EJECUTADO

muro 10.1 K 70 + 830.0 K 70 + 855.0 25.0 muro 10

abscisa altura concreto C m3/m refuerzo kg/m


K 70 + 830.0 2.00
K 70 + 840.0 2.78 2.78 3.00
K 70 + 840.0 2.29
K 70 + 845.0 2.69 2.69 3.00
K 70 + 845.0 2.20
K 70 + 850.0 2.61 2.61 3.00
K 70 + 850.0 1.83
K 70 + 855.0 2.23 2.23 2.50
TOTAL PROYECTADO 2.88 - -
TOTAL EJECUTADO
muro 7 K 69 + 987.0 K 70 + 070.0 83.0 muro 7

abscisa altura concreto C m3/m refuerzo kg/m


K 69 + 987.0 1.30
K 69 + 990.0 1.54 1.54 2.00
K 69 + 990.0 2.59
K 70 + 000.0 3.39 3.39 3.50
K 70 + 000.0 3.39
K 70 + 010.0 4.19 4.19 4.50 33.90 3,331.00
K 70 + 010.0 3.77
K 70 + 020.0 4.57 4.57 5.00 39.80 3,595.00
K 70 + 020.0 3.95
K 70 + 030.0 4.75 4.75 5.00 39.80 3,595.00
K 70 + 030.0 4.19
K 70 + 040.0 4.99 4.99 5.00 39.80 3,595.00
K 70 + 040.0 4.40
K 70 + 043.0 4.96 4.96 5.00 11.94 1,078.50
K 70 + 043.0 3.69
K 70 + 050.0 3.93 3.93 4.00
K 70 + 050.0 3.08
K 70 + 055.0 3.48 3.48 3.50
K 70 + 055.0 2.94
K 70 + 060.0 3.34 3.34 3.50
K 70 + 060.0 2.54
K 70 + 065.0 2.94 2.94 3.00
K 70 + 065.0 2.19
K 70 + 070.0 2.59 2.59 3.00
TOTAL PROYECTADO 3.92 165.24 15,194.50
TOTAL EJECUTADO

muro 6.2 K 69 + 743.0 K 69 + 820.0 77.0 muro 6

abscisa altura concreto C m3/m refuerzo kg/m


K 69 + 743.0 2.04
K 69 + 750.0 2.49 2.49 2.50
K 69 + 750.0 3.31
K 69 + 755.0 3.64 3.64 4.00
K 69 + 755.0 3.46
K 69 + 760.0 3.79 3.79 4.00
K 69 + 760.0 3.46
K 69 + 765.0 3.80 3.80 4.00
K 69 + 765.0 3.64
K 69 + 770.0 3.98 3.98 4.00
K 69 + 770.0 3.57
K 69 + 775.0 3.92 3.92 4.00
K 69 + 775.0 3.58
K 69 + 780.0 3.93 3.93 4.00
K 69 + 780.0 3.69
K 69 + 785.0 4.05 4.05 4.50 16.95 1,665.50
K 69 + 785.0 3.77
K 69 + 790.0 4.14 4.14 4.50 16.95 1,665.50
K 69 + 790.0 3.63
K 69 + 795.0 3.99 3.99 4.00 13.40 1,446.50
K 69 + 795.0 3.81
K 69 + 800.0 4.18 4.18 4.50 16.95 1,665.50
K 69 + 800.0 3.84
K 69 + 805.0 4.21 4.21 4.50 16.95 1,665.50
K 69 + 805.0 3.89
K 69 + 810.0 4.27 4.27 4.50 16.95 1,665.50
K 69 + 810.0 3.81
K 69 + 815.0 4.20 4.20 4.50 16.95 1,665.50
K 69 + 815.0 3.62
K 69 + 820.0 4.01 4.01 4.50 16.95 1,665.50
TOTAL PROYECTADO 4.13 132.05 13,105.00
TOTAL EJECUTADO
muro 6.1 K 69 + 445.0 K 69 + 605.0 160.0 muro 6

abscisa altura concreto C m3/m refuerzo kg/m


K 69 + 445.0 1.30
K 69 + 450.0 1.70 1.70 2.00
K 69 + 450.0 2.39
K 69 + 455.0 2.78 2.78 3.00
K 69 + 455.0 3.34
K 69 + 460.0 3.71 3.71 4.00
K 69 + 460.0 3.71
K 69 + 465.0 4.10 4.10 4.50 16.95 1,665.50
K 69 + 465.0 3.95
K 69 + 470.0 4.34 4.34 4.50 16.95 1,665.50
K 69 + 470.0 3.94
K 69 + 475.0 4.32 4.32 4.50 16.95 1,665.50
K 69 + 475.0 4.32
K 69 + 480.0 4.68 4.68 5.00 19.90 1,797.50
K 69 + 480.0 5.12
K 69 + 485.0 5.48 5.48 5.50 23.60 1,980.50
K 69 + 485.0 5.48
K 69 + 490.0 5.85 5.85 6.00 27.65 2,158.50
K 69 + 490.0 5.25
K 69 + 495.0 5.61 5.61 6.00 27.65 2,158.50
K 69 + 495.0 5.33
K 69 + 500.0 5.69 5.69 6.00 27.65 2,158.50
K 69 + 500.0 5.69
K 69 + 505.0 6.05 6.05 6.50 32.80 2,866.50
K 69 + 505.0 7.41
K 69 + 510.0 7.74 7.74 8.00 48.85 5,228.00
K 69 + 510.0 7.74
K 69 + 515.0 8.08 8.08 8.50 55.60 5,657.00
K 69 + 515.0 6.56
K 69 + 520.0 6.90 6.90 7.00 37.30 3,067.50
K 69 + 520.0 6.65
K 69 + 525.0 6.97 6.97 7.00 37.30 3,067.50
K 69 + 525.0 5.85
K 69 + 530.0 6.15 6.15 6.50 32.80 2,866.50
K 69 + 530.0 5.14
K 69 + 535.0 5.43 5.43 5.50 23.60 1,980.50
K 69 + 535.0 5.43
K 69 + 540.0 5.73 5.73 6.00 27.65 2,158.50
K 69 + 540.0 5.73
K 69 + 545.0 6.02 6.02 6.50 32.80 2,866.50
K 69 + 545.0 6.02
K 69 + 550.0 6.32 6.32 6.50 32.80 2,866.50
K 69 + 550.0 5.41
K 69 + 555.0 5.72 5.72 6.00 27.65 2,158.50
K 69 + 555.0 5.33
K 69 + 560.0 5.64 5.64 6.00 27.65 2,158.50
K 69 + 560.0 5.24
K 69 + 565.0 5.54 5.54 6.00 27.65 2,158.50
K 69 + 565.0 5.54
K 69 + 570.0 5.86 5.86 6.00 27.65 2,158.50
K 69 + 570.0 5.13
K 69 + 575.0 5.45 5.45 5.50 23.60 1,980.50
K 69 + 575.0 4.89
K 69 + 580.0 5.21 5.21 5.50 23.60 1,980.50
K 69 + 580.0 4.86
K 69 + 585.0 5.18 5.18 5.50 23.60 1,980.50
K 69 + 585.0 4.68
K 69 + 590.0 4.99 4.99 5.00 19.90 1,797.50
K 69 + 590.0 4.08
K 69 + 595.0 4.39 4.39 4.50 16.95 1,665.50
K 69 + 595.0 3.36
K 69 + 600.0 3.66 3.66 4.00
K 69 + 600.0 1.87
K 69 + 605.0 2.18 2.18 2.50
TOTAL PROYECTADO 5.48 757.05 65,913.50
TOTAL EJECUTADO
muro 2 K 67 + 055.0 K 67 + 090.0 35.0 muro 6

abscisa altura concreto C m3/m refuerzo kg/m


K 67 + 055.0 3.68
K 67 + 060.0 3.73 3.73 4.00
K 67 + 060.0 4.93
K 67 + 065.0 4.98 4.98 5.00 19.90 1,797.50
K 67 + 065.0 5.90
K 67 + 070.0 5.96 5.96 6.00 27.65 2,158.50
K 67 + 070.0 5.96
K 67 + 075.0 6.01 6.01 6.50 32.80 2,866.50
K 67 + 075.0 6.01
K 67 + 080.0 6.06 6.06 6.50 32.80 2,866.50
K 67 + 080.0 6.06
K 67 + 085.0 6.11 6.11 6.50 32.80 2,866.50
K 67 + 085.0 6.58
K 67 + 090.0 6.64 6.64 7.00 37.30 3,067.50
K 67 + 090.0 6.64
TOTAL PROYECTADO 5.93 183.25 15,623.00
TOTAL EJECUTADO 289 24,540.00

muro 2 K 67 + 095.0 K 67 + 195.0 100.0 muro 6

abscisa altura concreto C m3/m refuerzo kg/m

K 67 + 095.0 6.69 6.69 7.00 37.30 3,067.50


K 67 + 095.0 5.83
K 67 + 100.0 5.89 5.89 6.00 27.65 2,158.50
K 67 + 100.0 5.30
K 67 + 105.0 5.36 5.36 5.50 23.60 1,980.50
K 67 + 105.0 5.36
K 67 + 110.0 5.41 5.41 5.50 23.60 1,980.50
K 67 + 110.0 5.32
K 67 + 115.0 5.37 5.37 5.50 23.60 1,980.50
K 67 + 115.0 5.37
K 67 + 120.0 5.42 5.42 5.50 23.60 1,980.50
K 67 + 120.0 5.20
K 67 + 125.0 5.25 5.25 5.50 23.60 1,980.50
K 67 + 125.0 4.81
K 67 + 130.0 4.86 4.86 5.00 19.90 1,797.50
K 67 + 130.0 4.86
K 67 + 135.0 4.91 4.91 5.00 19.90 1,797.50
K 67 + 135.0 4.91
K 67 + 140.0 4.96 4.96 5.00 19.90 1,797.50
K 67 + 140.0 4.96
K 67 + 145.0 5.02 5.02 5.50 23.60 1,980.50
K 67 + 145.0 5.02
K 67 + 150.0 5.07 5.07 5.50 23.60 1,980.50
K 67 + 150.0 4.83
K 67 + 155.0 4.88 4.88 5.00 19.90 1,797.50
K 67 + 155.0 4.88
K 67 + 160.0 4.93 4.93 5.00 19.90 1,797.50
K 67 + 160.0 4.68
K 67 + 165.0 4.74 4.74 5.00 19.90 1,797.50
K 67 + 165.0 4.74
K 67 + 170.0 4.79 4.79 5.00 19.90 1,797.50
K 67 + 170.0 4.79
K 67 + 175.0 4.84 4.84 5.00 19.90 1,797.50
K 67 + 175.0 4.84
K 67 + 180.0 4.89 4.89 5.00 19.90 1,797.50
K 67 + 180.0 4.58
K 67 + 185.0 4.63 4.63 5.00 19.90 1,797.50
K 67 + 185.0 3.42
K 67 + 190.0 3.48 3.48 3.50
K 67 + 190.0 1.69
K 67 + 195.0 1.74 1.74 2.00
TOTAL PROYECTADO 5.10 429.15 37,064.50
TOTAL EJECUTADO 732.7 61,300.00

muro 1 K 66 + 820.0 K 66 + 855.0 35.0 muro 1

abscisa altura concreto C m3/m refuerzo kg/m


K 66 + 820.0 2.34
K 66 + 825.0 2.74 2.74 3.00
K 66 + 825.0 2.74
K 66 + 830.0 3.14 3.14 3.50
K 66 + 830.0 2.68
K 66 + 835.0 3.08 3.08 3.50
K 66 + 835.0 2.73
K 66 + 840.0 3.13 3.13 3.50
K 66 + 840.0 2.82
K 66 + 845.0 3.22 3.22 3.50
K 66 + 845.0 3.22
K 66 + 850.0 3.62 3.62 4.00
K 66 + 850.0 2.87
K 66 + 855.0 3.27 3.27 3.50
TOTAL PROYECTADO - -
TOTAL EJECUTADO 115.36
RESUMEN MUROS DE CONTENCION

RESUMEN UNIDAD CANTIDAD VR. UNIT. 97


CONCRETO CLASE C M3 4,656.59 334937
ACERO DE REFUERZO GRADO 60 KG 413,213.40 1,464.00
EXCAVACION VARIAS EN SECO M3 22,804.80 4,541.00
RELLENO PARA ESTRUCTURAS M3 23,816.40 8,044.00
MATERIAL FILTRANTE M3 915.20 30,011.00
SUMINSTRO PERF E INST. TUBERIA 6" FIL ML 1,540.00 19,152.00
GEOTEXTIL PARA FILTRO NT1600 M2 12,320.00 1,440.00
SOLADO DE LIMPIEZA M3 211.05 150,687.00
R3 R4 R5 R6 R7

966.24 355.08 619.08 133.98 177.48

406.22 151.23 264.19 103.29 138.04

406.22 150.68 263.08 102.80 138.04

966.24 343.86 596.64 128.37 177.48


DE CONTENCION TRAMO 7 SECTOR 1
79+500
Material granular
Excavacion m3/m Lleno m3/m filtro m3/m Solado m2/m concreto clase G m3/m

161.00 168.00 8.50 44.00

161.00 168.00 8.50 44.00

161.00 168.00 8.50 44.00

192.00 202.00 9.00 48.00

192.00 202.00 9.00 48.00

236.00 248.00 10.00 54.50

236.00 248.00 10.00 54.50

236.00 248.00 10.00 54.50

236.00 248.00 10.00 54.50

236.00 248.00 10.00 54.50

192.00 202.00 9.00 48.00

192.00 202.00 9.00 48.00

192.00 202.00 9.00 48.00

192.00 202.00 9.00 48.00


192.00 202.00 9.00 48.00
3,007.00 3158 138.5 740.5
3007 3158 138.5 36.84 503.37
79+110
Material granular
Excavacion m3/m Lleno m3/m filtro m3/m Solado m2/m concreto clase G m3/m

63.50

40.40

40.40

114.00 118.00 7.00 38.00


114.00 118.00 7.00 38.00 144.30
114.00 118.00 90.67

Material granular
Excavacion m3/m Lleno m3/m filtro m3/m Solado m2/m concreto clase G m3/m

161.00 168.00 8.50 44.00

161.00 168.00 8.50 44.00

161.00 168.00 8.50 44.00


483.00 504.00 25.50 132.00 -
-

77+915
Material granular
Excavacion m3/m Lleno m3/m filtro m3/m Solado m2/m concreto clase G m3/m

40.40
114.00 118.00 7.00 38.00

114.00 118.00 7.00 38.00

57.00 59.00 3.50 19.00


285.00 295.00 17.50 95.00 40.40
285.00 295.00 17.50 95.00 168.38
Material granular
Excavacion m3/m Lleno m3/m filtro m3/m Solado m2/m concreto clase G m3/m

118.00 124.00 5.00 27.25

271.00 284.00 11.00 58.00

323.00 340.00 11.50 64.50

323.00 340.00 11.50 64.50

368.00 389.00 12.00 69.00

323.00 340.00 11.50 64.50

368.00 389.00 12.00 69.00

161.50 170.00 5.75 32.25


2,255.50 2,376.00 80.25 449.00 -

77+550
Material granular
Excavacion m3/m Lleno m3/m filtro m3/m Solado m2/m concreto clase G m3/m

271.00 284.00 11.00 58.00

323.00 340.00 11.50 64.50

368.00 389.00 12.00 69.00

368.00 389.00 12.00 69.00


368.00 389.00 12.00 69.00

428.00 454.00 13.00 75.50


2,126.00 2,245.00 71.50 405.00 -
2,126.00 2,245.00 71.50 405.00 155.5
77+085
Material granular
Excavacion m3/m Lleno m3/m filtro m3/m Solado m2/m concreto clase G m3/m

66.50 69.00 4.00 20.00

133.00 138.00 8.00 40.00

133.00 138.00 8.00 40.00

57.00 59.00 3.50 19.00


389.50 404.00 23.50 119.00 -
389.50 404.00 23.50 119.00 -

76+980 PARCIAL
Material granular
Excavacion m3/m Lleno m3/m filtro m3/m Solado m2/m concreto clase G m3/m

271.00 284.00 11.00 58.00

323.00 340.00 11.50 64.50

368.00 389.00 12.00 69.00

368.00 389.00 12.00 69.00

368.00 389.00 12.00 69.00

368.00 389.00 12.00 69.00

368.00 389.00 12.00 69.00

368.00 389.00 12.00 69.00


368.00 389.00 12.00 69.00

368.00 389.00 12.00 69.00


3,538.00 3,736.00 118.50 674.50 -
3,538.00 3,736.00 118.50 674.50 -
Material granular
Excavacion m3/m Lleno m3/m filtro m3/m Solado m2/m concreto clase G m3/m

114.00 118.00 7.00

133.00 138.00 8.00 40.00

161.00 168.00 8.50 44.00

133.00 138.00 8.00 40.00

133.00 138.00 8.00 40.00


674.00 700.00 39.50 164.00 -

Material granular
Excavacion m3/m Lleno m3/m filtro m3/m Solado m2/m concreto clase G m3/m

25.75

114.00 118.00 7.00 38.00

66.50 69.00 4.00 20.00

96.00 101.00 4.50 24.00

271.00 284.00 11.00 58.00

368.00 389.00 12.00 69.00

428.00 454.00 13.00 75.50


184.00 194.50 6.00 34.50

80.50 84.00 4.25 22.00

66.50 69.00 4.00 20.00

12.88

4.18
1,674.50 1,762.50 65.75 361.00 42.81

Material granular
Excavacion m3/m Lleno m3/m filtro m3/m Solado m2/m concreto clase G m3/m

66.50 69.00 4.00 20.00

236.00 248.00 10.00 54.50

135.50 142.00 5.50 29.00

96.00 101.00 4.50 24.00

96.00 101.00 4.50 24.00

80.50 84.00 4.25 22.00

57.00 59.00 3.50 19.00


767.50 804.00 36.25 192.50 -
Material granular
Excavacion m3/m Lleno m3/m filtro m3/m Solado m2/m concreto clase G m3/m

45.60 47.20 2.80 15.20

57.00 59.00 3.50 19.00

96.00 101.00 4.50 24.00

118.00 124.00 5.00 27.25

135.50 142.00 5.50 29.00

80.50 84.00 4.25 22.00

133.00 138.00 8.00 40.00

161.00 168.00 8.50 44.00

271.00 284.00 11.00 58.00

135.50 142.00 5.50 29.00

161.50 170.00 5.75 32.25

118.00 124.00 5.00 27.25

118.00 124.00 5.00 27.25

96.00 101.00 4.50 24.00

66.50 69.00 4.00 20.00


9.75
1,793.10 1,877.20 82.80 438.20 9.75

Material granular
Excavacion m3/m Lleno m3/m filtro m3/m Solado m2/m concreto clase G m3/m

57.00 59.00 3.50 19.00

161.00 168.00 8.50 44.00

80.50 84.00 4.25 22.00

57.00 59.00 3.50 19.00

20.20
355.50 370.00 19.75 104.00 20.20
Material granular
Excavacion m3/m Lleno m3/m filtro m3/m Solado m2/m concreto clase G m3/m

11.95

40.40

51.50

20.20

20.20

20.20

20.20

20.20
- - - - 204.85

Material granular
Excavacion m3/m Lleno m3/m filtro m3/m Solado m2/m concreto clase G m3/m

29.25

16.25

25.75

25.75
24.00 23.00 2.50 12.00 16.25
24.00 23.00 2.50 12.00 113.25
Material granular
Excavacion m3/m Lleno m3/m filtro m3/m Solado m2/m concreto clase G m3/m

6.50

28.28

66.50 69.00 4.00 20.00

96.00 101.00 4.50 24.00

96.00 101.00 4.50 24.00

96.00 101.00 4.50 24.00

80.50 84.00 4.25 22.00

25.75

25.75

25.75

20.20

7.17
435.00 456.00 21.75 114.00 139.40

Material granular
Excavacion m3/m Lleno m3/m filtro m3/m Solado m2/m concreto clase G m3/m
16.25

51.50

57.00 59.00 3.50 19.00

57.00 59.00 3.50 19.00

66.50 69.00 4.00 20.00

57.00 59.00 3.50 19.00


237.50 246.00 14.50 77.00 67.75

Material granular
Excavacion m3/m Lleno m3/m filtro m3/m Solado m2/m concreto clase G m3/m

40.40

51.50

57.00 59.00 3.50 19.00

42.50 43.00 3.00 16.00

57.00 59.00 3.50 19.00

25.75

20.20
16.25

2.15
156.50 161.00 10.00 54.00 156.25

Material granular
Excavacion m3/m Lleno m3/m filtro m3/m Solado m2/m concreto clase G m3/m

32.50

16.25

16.25

11.95
- - - - 76.95
Material granular
Excavacion m3/m Lleno m3/m filtro m3/m Solado m2/m concreto clase G m3/m

5.02

40.40

114.00 118.00 7.00 38.00

133.00 138.00 8.00 40.00

133.00 138.00 8.00 40.00

133.00 138.00 8.00 40.00

39.90 41.40 2.40 12.00

36.05

20.20

20.20

16.25

16.25
552.90 573.40 33.40 170.00 154.37

Material granular
Excavacion m3/m Lleno m3/m filtro m3/m Solado m2/m concreto clase G m3/m
16.73

25.75

25.75

25.75

25.75

25.75

25.75

57.00 59.00 3.50 19.00

57.00 59.00 3.50 19.00

42.50 43.00 3.00 16.00

57.00 59.00 3.50 19.00

57.00 59.00 3.50 19.00

57.00 59.00 3.50 19.00

57.00 59.00 3.50 19.00

57.00 59.00 3.50 19.00


441.50 456.00 27.50 149.00 171.23
Material granular
Excavacion m3/m Lleno m3/m filtro m3/m Solado m2/m concreto clase G m3/m

8.36

16.25

25.75

57.00 59.00 3.50 19.00

57.00 59.00 3.50 19.00

57.00 59.00 3.50 19.00

66.50 69.00 4.00 20.00

80.50 84.00 4.25 22.00

96.00 101.00 4.50 24.00

96.00 101.00 4.50 24.00

96.00 101.00 4.50 24.00

118.00 124.00 5.00 27.25

184.00 194.50 6.00 34.50

214.00 227.00 6.50 37.75

135.50 142.00 5.50 29.00


135.50 142.00 5.50 29.00

118.00 124.00 5.00 27.25

80.50 84.00 4.25 22.00

96.00 101.00 4.50 24.00

118.00 124.00 5.00 27.25

118.00 124.00 5.00 27.25

96.00 101.00 4.50 24.00

96.00 101.00 4.50 24.00

96.00 101.00 4.50 24.00

96.00 101.00 4.50 24.00

80.50 84.00 4.25 22.00

80.50 84.00 4.25 22.00

80.50 84.00 4.25 22.00

66.50 69.00 4.00 20.00

57.00 59.00 3.50 19.00

25.75
11.95
2,672.50 2,803.50 122.75 657.25 88.06
Material granular
Excavacion m3/m Lleno m3/m filtro m3/m Solado m2/m concreto clase G m3/m

25.75

66.50 69.00 4.00 20.00

96.00 101.00 4.50 24.00

118.00 124.00 5.00 27.25

118.00 124.00 5.00 27.25

118.00 124.00 5.00 27.25

135.50 142.00 5.50 29.00

652.00 684.00 29.00 154.75 25.75


652.00 684.00 29.00 154.75 25.75

Material granular
Excavacion m3/m Lleno m3/m filtro m3/m Solado m2/m concreto clase G m3/m

135.50 142.00 5.50 29.00

96.00 101.00 4.50 24.00

80.50 84.00 4.25 22.00

80.50 84.00 4.25 22.00


80.50 84.00 4.25 22.00

80.50 84.00 4.25 22.00

80.50 84.00 4.25 22.00

66.50 69.00 4.00 20.00

66.50 69.00 4.00 20.00

66.50 69.00 4.00 20.00

80.50 84.00 4.25 22.00

80.50 84.00 4.25 22.00

66.50 69.00 4.00 20.00

66.50 69.00 4.00 20.00

66.50 69.00 4.00 20.00

66.50 69.00 4.00 20.00

66.50 69.00 4.00 20.00

66.50 69.00 4.00 20.00

66.50 69.00 4.00 20.00

20.20
8.36
1,460.00 1,521.00 79.75 407.00 28.56
1,460.00 1,521.00 79.75 407.00 28.56

Material granular
Excavacion m3/m Lleno m3/m filtro m3/m Solado m2/m concreto clase G m3/m

16.25

20.20

20.20

20.20

20.20

25.75

20.20
- - - - 143.00
VR. TOTAL 97
1,559,664,284.83
604,944,417.60
103,556,611.94
191,579,148.41
27,466,067.20
29,494,080.00
17,740,800.00
31,802,792.72
2,566,248,202.70
Excavacion m3/m Lleno m3/m
Excavacion m3/m Lleno m3/m

87.00 87.00

54.83 54.83

54.83 54.83

196.67 196.67
196.67 196.67

Excavacion m3/m Lleno m3/m

- -

Excavacion m3/m Lleno m3/m

54.83 54.83
54.83 54.83
Excavacion m3/m Lleno m3/m

- -

Excavacion m3/m Lleno m3/m


- -
Excavacion m3/m Lleno m3/m

- -
- -

Excavacion m3/m Lleno m3/m


- -
- -
Excavacion m3/m Lleno m3/m

- -

Excavacion m3/m Lleno m3/m

34.67 34.67
17.33 17.33

5.27 5.27
57.27 57.27

Excavacion m3/m Lleno m3/m

- -
Excavacion m3/m Lleno m3/m
12.48 12.48
12.48 12.48

Excavacion m3/m Lleno m3/m

27.42 27.42
27.42 27.42
Excavacion m3/m Lleno m3/m

15.67 15.67

54.83 54.83

69.33 69.33

27.42 27.42

27.42 27.42

27.42 27.42

27.42 27.42

27.42 27.42
276.92 276.92

Excavacion m3/m Lleno m3/m

37.44 37.44

20.80 20.80

34.67 34.67

34.67 34.67
20.80 20.80
148.37 148.37
Excavacion m3/m Lleno m3/m

8.32 8.32

38.38 38.38

34.67 34.67

34.67 34.67

34.67 34.67

27.42 27.42

9.40 9.40
187.52 187.52

Excavacion m3/m Lleno m3/m


20.80 20.80

69.33 69.33

90.13 90.13

Excavacion m3/m Lleno m3/m

54.83 54.83

69.33 69.33

34.67 34.67

27.42 27.42
20.80 20.80

2.56 2.56
209.61 209.61

Excavacion m3/m Lleno m3/m

41.60 41.60

20.80 20.80

20.80 20.80

15.67 15.67
98.87 98.87
Excavacion m3/m Lleno m3/m

6.32 6.32

54.83 54.83

48.53 48.53

27.42 27.42

27.42 27.42

20.80 20.80

20.80 20.80
206.12 206.12

Excavacion m3/m Lleno m3/m


21.93 21.93

34.67 34.67

34.67 34.67

34.67 34.67

34.67 34.67

34.67 34.67

34.67 34.67

229.93 229.93
Excavacion m3/m Lleno m3/m

10.53 10.53

20.80 20.80

34.67 34.67
34.67 34.67
15.67 15.67
116.33 116.33
Excavacion m3/m Lleno m3/m

34.67 34.67

34.67 34.67
34.67 34.67

Excavacion m3/m Lleno m3/m


27.42 27.42
10.53 10.53
37.95 37.95
37.95 37.95

Excavacion m3/m Lleno m3/m

20.80 20.80

27.42 27.42

27.42 27.42

27.42 27.42

27.42 27.42

34.67 34.67

27.42 27.42
192.55 192.55
RELACION DE MUROS TRAMO 7 SECTOR 1 MVVCC

DEMOLICIÓN DE MATERIAL EXCAVACIÓN EN


INICIO FIN INICIO FIN LONGITUD REAL EST CONCRETO CLASE G CONCRETO CLASE C ACERO DE REFUERZO FILTRANTE SOLADO TUBO GEOTEXTIL EXCAVACION ROCA RELLENO NOTA CONSTRUCTOR
### ### ### ### 140.00 4.87 989.37 288.70 16,703.00 149.04 13.50 54.00 410.40 768.21 2,920.40 EJECUTADO CSS
### ### ### ### 30.00 90.67 148.00 EJECUTADO PAV
### ### - NO SE REQUIERE
### ### ### ### 25.00 79.00 392.00 176.90 EJECUTADO PAV
K + 30.0 K + 45.0 15.00 89.38 PAV
### ### - SE REALIZO POR CLB
### ### ### ### 77.00 155.50 374.26 42,473.00 34.68 5,344.92 2,625.00 EJECUTADO CSS
### ### ### ### 30.00 141.91 13,860.90 15.84 16.10 44.00 118.80 53.44 540.48 EJECUTADO CSS
### ### ### ### 190.00 234.12 22,474.80 5.28 70.80 70.80 EJECUTADO CSS
### ### -
### ### -
### ### -
### ### ### ### 95.00 6,069.90 375.00 EN EJECUCIÓN PAVCOL
### ### - 15.31 95.00 5630 5.70 240.90 PAVCOL
### ### -
### ### ### ### 35.00 62.68 EN EJECUCIÓN PAVCOL
### ### ### ### 65.00 206.34 10,897.76 2.98 EN ENJECUCIÓN CSS
### ### -
### ### -
### ### -
### ### -
### ### -
### ### -
### ### ### ### 100.00 - 761.05 59,686.42 207.00 18.91 100.00 660.00 2,798.93 3,302.11 EN EJECUCION CSS
### ### ### ### POR EJECUTAR PAV
### ### -
TOTAL 802.0 4.9 1419.2 2101.4 177795.8 371.9 97.2 198.0 1189.2 7308.0 3410.2 9172.4