Datos:
Lc = 2.5370 Km longitud cauce principal
S = 11.82 % pendiente del cauce
A = 3.1510 Km area de cuenca de aporte
Longitud del fech 0.654 km
PP registrada en los ultimos 5 dias 4.105 cm
�_𝐶=(0.00032∗𝐿^0.77)/𝑆^0.385
�_�= 0.304452125 Hr
�_𝑒= 𝑡_�
�_𝑒= 0.304452125 Hr
𝑡_𝑟=0.6∗𝑡_�
𝑡_𝑟= 0.182671275 Hr
𝑡_𝑝=𝑡_�/2+𝑡_𝑟
𝑡_𝑝= 0.3348973375 Hr
𝑡_𝑏=2.67∗𝑡_𝑝
𝑡_𝑏= 0.894175891 Hr
s = 4.105 cm = 41.05 mm
p= 41.4874182106 mm
𝑝_𝑒= 14.8987626561 mm
T Q
0 0
0.3348973375 29.1574973665
0.894175891 0
35
30 29.1574973665
25
CAUDAL (Q)
20
15
10
5
1; 0 0
0
0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1
TIEMPO (T)
� (�^3/(𝑠.��))
� (�^3/𝑠)
〖�/𝑡 〗 _𝑝 〖 � (ℎ 〗 _𝑟) 〖
〖 〖�/� 〗 _𝑝
0.00 0.000 0.00 0.000 0.000
0.10 0.033 0.03 0.875 0.875
0.30 0.100 0.19 5.540 5.540
0.40 0.134 0.31 9.039 9.039
0.60 0.201 0.66 19.244 19.244
0.70 0.234 0.82 23.909 23.909
0.80 0.268 0.93 27.116 27.116
0.90 0.301 0.99 28.866 28.866
1.00 0.335 1.00 29.157 29.157
1.00 0.335 0.99 28.866 28.866
1.20 0.402 0.93 27.116 27.116
1.30 0.435 0.80 23.326 23.326
1.50 0.502 0.68 19.827 19.827
1.70 0.569 0.46 13.412 13.412
1.90 0.636 0.33 9.622 9.622
2.20 0.737 0.21 6.123 6.123
2.60 0.871 0.11 3.207 3.207
3.20 1.072 0.04 1.166 1.166
5.00 1.674 0.00 0.000 0.000
considerando:
Eje de la presa 306.7891 m
L = 30.679 = 31.000 m
∆t = 0.33490 Hr = 120.56 seg
VOLUMEN ACUMULADO
4160
4150
4145
4140
4135
0 500000 1000000 1500000 2000000 2500000 3000000 3500000 4000000
1/9∗(−10000000∗√(−9∗𝑌+37678)+200000000)
3. Transito de avenidas
�_𝑒 (�^3/𝑠) 𝐿_1−𝐿_2 (�^3/𝑠) 2*S/∆𝑡 - Q1 �^3/𝑠 2*S/∆𝑡 + Q �^3/𝑠 �_𝑠 �^3/𝑠
〖 � (ℎ 〗 _𝑟)
0.000 0.000 34822.349 0.000
0.875 0.033 0.875 34823.218 34823.223 0.005
5.540 0.100 6.415 34829.589 34829.633 0.044
9.039 0.134 14.579 34844.037 34844.168 0.131
19.244 0.201 28.283 34872.019 34872.319 0.300
23.909 0.234 43.153 34914.614 34915.172 0.558
27.116 0.268 51.026 34964.779 34965.640 0.861
28.866 0.301 55.982 35019.569 35020.761 1.192
29.157 0.335 58.023 35076.058 35077.592 1.534
28.866 0.335 58.023 35132.209 35134.082 1.873
27.116 0.402 55.982 35185.992 35188.191 2.199
23.326 0.435 50.442 35233.946 35236.435 2.488
19.827 0.502 43.153 35274.367 35277.099 2.733
13.412 0.569 33.240 35304.690 35307.606 2.916
9.622 0.636 23.034 35324.687 35327.724 3.037
6.123 0.737 15.745 35337.319 35340.432 3.113
3.207 0.871 9.330 35343.498 35346.649 3.151
1.166 1.072 4.374 35344.714 35347.872 3.158
0.000 1.674 1.166 35342.734 35345.880 3.146
L = 31.000 m
0.000 4150.000
3.158 NAME
5.545 4150.200
30.000
25.000
CAUDAL (m3/s)
20.000
15.000
10.000
5.000
0.000
25.000
CAUDAL (m3/s)
20.000
15.000
10.000
5.000
0.000
0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800
TIEMPO (Hr)
Qe Qs
BL = 1.2
BL = factor de seguridad*BL
Factor 1.2
Consideramos un factor de 1.2 por tratarse de una presa de tierra
Coronacion
�= 𝐻𝑃/5+3
B = 5.000 m
BASE = 40.000 m
REPRESENTACION DE LA PRESA
12
10
ALTURA DE LA PRESA (m)
0
0 5 10 15 20 25 30 35 40 45
ANCHO DE LA PRESA (m)
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###