2 MURO "B"
2.1 ELEMENTOS PARA LA CIMENTACION
2.1.1 TRAZO, NIVELACION Y REPLANTEO m 500.00 S/ 1.07 S/ 535.00
2.1.2 EXCAVACION PARA CIMIENTOS HASTA 1.00 MT TERRENO NORM m3 270.00 S/ 16.27 S/ 4,392.90
2.1.3 ELIMINACION CON TRANSPORTE (CARGUIO A MANO) REN.=25 M m3 364.50 S/ 37.78 S/ 13,770.81
2.1.4 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 5077.50 S/ 2.28 S/ 11,576.70
2.1.5 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% m3 270.00 S/ 89.92 S/ 24,278.40
2.1.6 ENCOFRADO SOBRECIMIENTO HASTA 0.30 MT m2 500.00 S/ 15.45 S/ 7,725.00
2.1.7 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 37.50 S/ 189.16 S/ 7,093.50
2.1.8 DEDESENCOFRADO SOBRECIMIENTO HASTA 0.30 MT m2 500.00 S/ 3.37 S/ 1,685.00
2.2 ELEMENTOS VERTICALES
2.2.1 MURO SOGA 1 CARAV. LADR. SIL-CALC. KK AMARRE CON CEM-C m2 1222.32 S/ 23.64 S/ 28,895.64
2.2.2 ENCOFRADO NORMAL EN COLUMNAS m2 315.00 S/ 30.75 S/ 9,686.25
2.2.3 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 28.13 S/ 372.18 S/ 10,467.56
2.2.4 DESENCOFRADO NORMAL EN COLUMNAS m2 315.00 S/ 3.21 S/ 1,011.15
Costo Directo S/ 403,052.82
Gastos Generales (6%) S/ 24,183.17
Utilidad (10%) S/ 40,305.28
Sub total S/ 467,541.27
IGV (18%) S/ 84,157.43
Total Presupuesto S/ 551,698.69
Cronograma de Avance
2 MURO "B"
2.1 ELEMENTOS PARA LA CIMEN
2.1.1 TRAZO, NIVELACION Y REPLAN
2.1.2 EXCAVACION PARA CIMIENTOS
2.1.3 ELIMINACION CON TRANSPORTE
2.1.4 ACERO ESTRUCTURAL TRABAJ
2.1.5 CIMIENTOS CORRIDOS MEZCLA
2.1.6 ENCOFRADO SOBRECIMIENTO H
2.1.7 CONCRETO 1:8+25% P.M. PARA
2.1.8 DEDESENCOFRADO SOBRECIM
2.2 ELEMENTOS VERTICALES
2.2.1 MURO SOGA 1 CARAV. LADR.
2.2.2 ENCOFRADO NORMAL EN COLU
2.2.3 CONCRETO EN COLUMNAS F'C=
2.2.4 DESENCOFRADO NORMAL EN C
Programado
Mayo Junio Julio Agosto Total
100%
100%
100%
100%
100%
100%
100%
100%
100%
40% 100%
40% 100%
40% 100%
30% 100%
50% 100%
40% 50% 100%
30% 40% 100%
100% 100%
70% 30% 100%
50% 50% 100%
10% 40% 50% 100%
30% 30% 40% 100%
20% 20% 60% 100%
20% 20% 60% 100%
20% 20% 60% 100%
Avance Valorizad
Descripción Enero Febrero Marzo
Costo Directo S/ 44,474.50 S/ 46,836.20 S/ 92,399.56
Gastos Generales (6%) S/ 2,668.47 S/ 2,810.17 S/ 5,543.97
Utilidad (10%) S/ 4,447.45 S/ 4,683.62 S/ 9,239.96
Sub Total S/ 51,590.42 S/ 54,329.99 S/ 107,183.49
IGV (18%) S/ 9,286.28 S/ 9,779.40 S/ 19,293.03
Total Presupuesto S/ 60,876.70 S/ 64,109.39 S/ 126,476.52
ntro de Capacitación
12/27/2019
2 MURO "B"
2.1 ELEMENTOS PARA LA
2.1.1 TRAZO, NIVELACION Y S/ - S/ - S/ - S/ -
2.1.2 EXCAVACION PARA CIM S/ - S/ - S/ - S/ -
2.1.3 ELIMINACION CON TRANS/ - S/ - S/ - S/ -
2.1.4 ACERO ESTRUCTURAL S/ - S/ - S/ - S/ -
2.1.5 CIMIENTOS CORRIDOS S/ - S/ - S/ - S/ -
2.1.6 ENCOFRADO SOBRECIMI
S/ - S/ - S/ - S/ -
2.1.7 CONCRETO 1:8+25% P. S/ - S/ - S/ - S/ -
2.1.8 DEDESENCOFRADO SOB
S/ - S/ - S/ - S/ -
2.2 ELEMENTOS VERTICA
2.2.1 MURO SOGA 1 CARAV. L S/ - S/ - S/ - S/ -
2.2.2 ENCOFRADO NORMAL S/ - S/ - S/ - S/ -
2.2.3 CONCRETO EN COLUMNA
S/ - S/ - S/ - S/ -
2.2.4 DESENCOFRADO NORMS/ - S/ - S/ - S/ -
Costo Directo S/ 44,474.50 S/ 46,836.20 S/ 92,399.56 S/ 51,511.97
Valorizado (S/.)
Mayo Junio Julio Agosto
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ - S/ - S/ - S/ -
S/ 7,749.00 S/ - S/ - S/ -
S/ 8,374.05 S/ - S/ - S/ -
S/ 811.44 S/ - S/ - S/ -
S/ 393.60 S/ - S/ - S/ -
S/ 1,980.28 S/ - S/ - S/ -
S/ 6,618.93 S/ 8,273.66 S/ - S/ -
S/ 3,049.89 S/ 4,066.51 S/ - S/ -
S/ 712.91 S/ 950.54 S/ - S/ -
S/ 1,524.94 S/ 2,033.26 S/ - S/ -
S/ 74.42 S/ 99.23 S/ - S/ -
S/ 535.00 S/ - S/ - S/ -
S/ 3,075.03 S/ 1,317.87 S/ - S/ -
S/ 6,885.41 S/ 6,885.41 S/ - S/ -
S/ 1,157.67 S/ 4,630.68 S/ 5,788.35 S/ -
S/ 7,283.52 S/ 7,283.52 S/ 9,711.36 S/ -
S/ 1,545.00 S/ 1,545.00 S/ 4,635.00 S/ -
S/ 1,418.70 S/ 1,418.70 S/ 4,256.10 S/ -
S/ 337.00 S/ 337.00 S/ 1,011.00 S/ -
S/ - S/ 14,447.82 S/ 14,447.82 S/ -
S/ - S/ 2,905.88 S/ 2,905.88 S/ 3,874.50
S/ - S/ 3,140.27 S/ 3,140.27 S/ 4,187.03
S/ - S/ 303.35 S/ 303.35 S/ 404.46
S/ 53,526.78 S/ 59,638.69 S/ 46,199.12 S/ 8,465.99
Curva "S"
MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. N° 80423 NUESTRA
Presupuesto SEÑORA DE GUADALUPE NIVEL PRIMARA DEL DISTRITO DE TAYABAMBA –
Supervisor PROVINCIA
Ing. Leonidas DEMartín
PATAZ – DEPARTAMENTO
Aspilcueta ValderramaLA LIBERTAD
Cliente Equipo Gestion de Proyectos Norte
Lugar Trujillo - Trujillo - La Libertad Fecha: 12/27/2019
Avance Valorizado (S/.)
Descripción MES 1 MES 2 MES 3 MES 4 MES 5 MES 6
Total Acumulado S/ 934,780.67 S/ 539,978.11 S/ 545,015.97 S/ 945,203.01 S/ 919,396.53 S/ 914,358.66
S/1,600,000.00
S/1,400,000.00
S/1,200,000.00
S/1,000,000.00
Axis Title
S/800,000.00
S/600,000.00
S/400,000.00
S/200,000.00
S/400,000.00
S/200,000.00
S/-
MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8
MES 7 MES 8
S/ 985,047.21 S/ 1,369,774.04