Está en la página 1de 5

Página :

0303002 MEJORAMIENTO DE LOS SERVICIOS DE LA GERENCIA SUB REGIONAL- COMPONENTE GERENCIA

025 OTROS
31/10/2018
090701 HUANCAVELICA - TAYACAJA - PAMPAS
Recurso Unidad Cantidad Precio S/. Parcial S

OPERARIO hh 333.1141 18.37 6,119.3


OFICIAL hh 95.9248 14.90 1,429.2
PEON hh 917.3542 13.41 12,301.7
19,850.3

ALAMBRE NEGRO RECOCIDO # 16 kg 32.9090 3.70 121.7


ALAMBRE NEGRO RECOCIDO # 8 kg 10.1189 3.70 37.4
CLAVOS PARA MADERA C/C 3" kg 10.6081 3.70 39.2
CLAVOS DE 3" kg 0.2475 3.70 0.9
ACERO DE REFUERZO FY=4200 GRADO 60 kg 225.8663 3.08 695.6
ARENA FINA PUESTO EN OBRA m3 31.5044 145.00 4,568.1
PIEDRA CHANCADA DE 1/2" PUESTO EN OBRA m3 20.7308 145.00 3,005.9
ARENA GRUESA PUESTO EN OBRA m3 17.3196 118.00 2,043.7
MATERIAL DE RELLENO CLASIFICADO m3 40.1175 110.00 4,412.9
GRAVA 1 1/2" - 2" m3 140.8275 73.00 10,280.4
SUMIDERO CROMADO DE 3" und 3.0000 3.50 10.5
CEMENTO PORTLAND TIPO I (42.5KG) PUESTO EN OBRA BOL 297.9225 24.80 7,388.4
TAPA DE CONCRETO ARMADO PARA BUZON und 11.0000 50.00 550.0
CINTA SEÑALADORA AMARILLA pza 9.8250 54.90 539.3
CINTA TEFLON und 0.0600 1.00 0.0
YESO DE 25 Kg BOL 19.6500 17.50 343.8
IMPERMEABILIZANTE gln 22.7956 18.00 410.3
PEGAMENTO PARA PVC gln 0.3477 49.90 17.3
WINCHA DE 50 MTRS. und 4.4213 24.00 106.1
FLEXOMETRO DE 8 MTRS. und 7.3687 39.90 294.0
MADERA NACIONAL P/ENCOFRADO-CARP p2 233.5800 2.50 583.9
MADERA TORNILLO p2 1,138.3666 18.00 20,490.6
REGLA DE MADERA p2 0.7425 12.00 8.9
ESTACA DE MADERA p2 208.7813 1.50 313.1
GEOTEXTIL NO TEJIDO m2 844.9700 3.36 2,839.1
PINTURA ESMALTE SINTETICO gln 19.6500 35.00 687.7
TUBERIA PVC-SAL ø3"x3.00m ml 35.1330 5.50 193.2
CODO PVC-SAL DE 3"x45° und 9.0000 3.10 27.9
CODO PVC-SAL DE 3"x90° und 3.0000 3.70 11.1
TUBERIA PVC SIST TDP 160mm. ml 328.5975 36.58 12,020.1
TUBERIA PVC SIST TDP 200mm. ml 187.2150 41.30 7,731.9
YEE PVC-SAL SIMPLE ø3" und 1.0000 5.20 5.2
79,779.2

HERRAMIENTAS MANUALES %MO 539.1


TEODOLITO HE 3.9300 29.50 115.9
ESTACION TOTAL hm 7.8600 29.50 231.8
VOLQUETE DE 15 M3 hm 2.3052 150.00 345.7
MOTOBOMBA 4" INCL. MANGUERA Y ACCS. hm 529.8034 14.80 7,841.0
ANDAMIO METALICO hm 35.7732 3.66 130.9
CIZALLA P/CORTE DE FIERRO hm 6.7551 0.35 2.3
ENCOFRADO METALICO PARA BUZON und 198.5430 59.00 11,714.0
ENCOFRADO METALICO PARA TECHO DE BUZON und 77.8600 59.00 4,593.7
COMPACTADOR VIBR. TIPO PLANCHA 4 HP hm 86.9628 14.75 1,282.7
CARGADOR S/LLANTAS 125 HP 2.5 YD3. hm 1.1526 200.00 230.5
RETROEXCAVADORA 225 H.P. hm 93.4678 8.85 827.1
VIBRADOR DE CONCRETO 4 HP 2.40" hm 29.1853 8.85 258.2
ZARANDA METALICA 3/4" und 13.7550 354.00 4,869.2
MOTONIVELADORA DE 125 HP hm 1.1526 180.00 207.4
MEZCLADORA CONCRETO TAMBOR 18HP 11P3 hm 34.1279 34.81 1,187.9
NIVEL HE 3.1440 29.50 92.7
34,471.0
Total S/. 134,100.6

Fecha : 13/08/2019 11:58:04


1

Parcial S/. H TRABAJO 8

6,119.31 146.96 2500 2 5000


1,429.28 119.2 2200 2 4400
12,301.72 107.28 1800 5 9000
0
19,850.31 18,400.00

121.76
37.44
39.25
0.92
695.67
4,568.14
3,005.97
2,043.71
4,412.93
10,280.41
10.50
7,388.48
550.00
539.39
0.06
343.88
410.32
17.35
106.11
294.01
583.95
20,490.60
8.91
313.17
2,839.10
687.75
193.23
27.90
11.10
12,020.10
7,731.98
5.20
79,779.29

539.12
115.94
231.87
345.78
7,841.09
130.93
2.36
11,714.04
4,593.74
1,282.70
230.52
827.19
258.29
4,869.27
207.47
1,187.99
92.75
34,471.05
34,100.65

11:58:04
REQUERIMIENTO DE MATERIALES PARA OBRAS DE REPOSICION ESTRAORDINARIA - OBRA 31 DE OCTUBRE HUANCAN

PERSONAL
DESCRIPCION CANTIDAD CONDICION OBSERVACION
OPERARIOASIGNADO POR EL AREA DE VIAS MPH 5 EN OBRA

MATERIALES
DESCRIPCION CANTIDAD CONDICION OBSERVACION
PIEDRA CHANCADA DE 1/2" m3 1.00 FALTA PARA REPONER SARDINELES, CUNETAS
ARENA GRUESA m3 1.00 FALTA PARA REPONER SARDINELES, CUNETAS
MATERIAL DE RELLENO CLASIFICADO (PIEDRA GRANDE) m3 34 EN OBRA PARA ESTABILIZAR TERRENO DE FUNDACION, HASTA EL NIVEL DE OPTIMO
CEMENTO PORTLAND TIPO I (42.5KG) PUESTO EN OBRA BOL 37 FALTA PARA CUNETAS, SARDINELES Y ELEB. DE TIERRA CEMENTO
YESO DE 25 Kg BOL 5 FALTA PARA MARCAR TRAZOS
MATEROAL GRANULAR (CALICHE) m3 30 FALTA 15M3 PARA ELEBORACION DE NUEVA BASE, SE TIENE SOLO 15M3
TUBERIA PVC SIST TDP 160mm. TUB. 29 FALTA OPCIONAL PARA SU NCOLOCADO EN EL DREN
GASOLINA Gln 48 FALTA PARA LAS MAQUINARIAS CARGADOR, VOLQUETE Y RETROEXCAVADO
* LAS OBRAS DE REPOSICION DE PAVIMENTOS, SE COORDINA CON EL ARES DE PISTAS DE LA MPH