Está en la página 1de 50

ALTERNATIVA # 1

VOLUMEN PLANTILLA
EXCAVACION RELLENO (M3) ADEME (M2)
(M3)
(M3)

LINEA PRINCIPAL 1 14,650.43 645.60 13,417.60 13,799.70

LINEA SECUNDARIA 15,772.15 527.80 14,824.63 20,511.60

ARENERO 2,071.25 92.80 1,935.12 2,182.20

HERRADURA 7,383.19 278.40 6,865.07 9,053.60

TOTAL 39,877.02 1,544.60 37,042.42 45,547.10

50
LINEA
MADRINA (M2)

2,220.00

2,940.00

380.00

1,420.00

6,960.00

50
ALTERNATIVA # 1
LINEA PRINCIPAL

VOLUMEN
TERRENO RASANTE DIFERIENCIA PLANTILLA
CADENAMIENTO AREA (M2) EXCAVACION RELLENO (M3) ADEME (M2)
NATURAL HIDRAULICA ALTURA (M3)
(M3)

0+000 3.450 1.200 2.250


0+020 3.610 1.220 2.390 46.40 32.48 1.40 29.67 0.00
0+040 3.570 1.240 2.330 47.20 33.04 1.40 30.23 0.00
0+060 3.400 1.260 2.140 44.70 31.29 1.40 28.48 0.00
0+080 3.720 1.280 2.440 45.80 32.06 1.40 29.25 0.00
0+100 4.050 1.300 2.750 51.90 67.47 2.60 62.83 103.80
0+120 4.240 1.320 2.920 56.70 73.71 2.60 69.07 113.40
0+140 4.330 1.340 2.990 59.10 76.83 2.60 72.19 118.20
0+160 4.320 1.360 2.960 59.50 77.35 2.60 72.71 119.00
0+180 4.380 1.380 3.000 59.60 77.48 2.60 72.84 119.20
0+200 4.440 1.400 3.040 60.40 78.52 2.60 73.88 120.80
0+220 4.450 1.420 3.030 60.70 78.91 2.60 74.27 121.40
0+240 4.410 1.441 2.969 59.99 77.99 2.60 73.35 119.98
0+260 4.370 1.461 2.909 58.78 76.41 2.60 71.77 117.56
0+280 4.450 1.481 2.969 58.78 76.41 2.60 71.77 117.56
0+300 4.440 1.501 2.939 59.08 76.80 2.60 72.16 118.16
0+320 4.350 1.521 2.829 57.68 74.98 2.60 70.34 115.36
0+340 4.300 1.541 2.759 55.88 72.64 2.60 68.00 111.76
0+360 4.270 1.561 2.709 54.68 71.08 2.60 66.44 109.36
0+380 4.210 1.581 2.629 53.38 69.39 2.60 64.75 106.76
0+400 4.210 1.601 2.609 52.38 68.09 2.60 63.45 104.76
0+420 4.260 1.621 2.639 52.48 68.22 2.60 63.58 104.96
0+440 4.260 1.641 2.619 52.58 68.35 2.60 63.71 105.16
0+460 4.250 1.661 2.589 52.08 67.70 2.60 63.06 104.16
0+480 4.260 1.681 2.579 51.68 67.18 2.60 62.54 103.36
0+500 4.320 1.701 2.619 51.98 67.57 2.60 62.93 103.96
0+520 4.250 1.722 2.528 51.47 66.91 2.60 62.27 102.94
0+540 4.220 1.742 2.478 50.06 65.08 2.60 60.44 100.12
0+560 4.210 1.762 2.448 49.26 34.48 1.40 31.67 0.00
0+580 4.270 1.782 2.488 49.36 34.55 1.40 31.74 0.00
0+600 4.310 1.802 2.508 49.96 34.97 1.40 32.16 0.00
0+620 4.330 1.822 2.508 50.16 35.11 1.40 32.30 0.00
0+640 4.300 1.842 2.458 49.66 34.76 1.40 31.95 0.00
0+660 4.260 1.862 2.398 48.56 33.99 1.40 31.18 0.00
0+680 4.310 1.882 2.428 48.26 33.78 1.40 30.97 0.00
0+700 4.290 1.902 2.388 48.16 33.71 1.40 30.90 0.00
0+720 4.270 1.922 2.348 47.36 33.15 1.40 30.34 0.00

3
ALTERNATIVA # 1
LINEA PRINCIPAL

VOLUMEN
TERRENO RASANTE DIFERIENCIA PLANTILLA
CADENAMIENTO AREA (M2) EXCAVACION RELLENO (M3) ADEME (M2)
NATURAL HIDRAULICA ALTURA (M3)
(M3)

0+740 4.230 1.942 2.288 46.36 32.45 1.40 29.64 0.00


0+760 4.230 1.962 2.268 45.56 31.89 1.40 29.08 0.00
0+780 4.280 1.982 2.298 45.66 31.96 1.40 29.15 0.00
0+800 4.250 2.003 2.247 45.45 31.82 1.40 29.00 0.00
0+820 4.380 2.023 2.357 46.04 32.23 1.40 29.41 0.00
0+840 4.470 2.043 2.427 47.84 33.49 1.40 30.67 0.00
0+860 4.550 2.063 2.487 49.14 34.40 1.40 31.58 0.00
0+880 4.630 2.083 2.547 50.34 65.44 2.60 60.80 100.68
0+900 4.650 2.103 2.547 50.94 66.22 2.60 61.58 101.88
0+920 4.650 2.123 2.527 50.74 65.96 2.60 61.32 101.48
0+940 4.570 2.143 2.427 49.54 64.40 2.60 59.76 99.08
0+960 4.520 2.163 2.357 47.84 33.49 1.40 30.67 0.00
0+980 4.540 2.183 2.357 47.14 33.00 1.40 30.18 0.00
1+000 4.480 2.203 2.277 46.34 32.44 1.40 29.62 0.00
1+020 4.440 2.223 2.217 44.94 31.46 1.40 28.64 0.00
1+040 4.420 2.243 2.177 43.94 30.76 1.40 27.94 0.00
1+060 4.430 2.263 2.167 43.44 30.41 1.40 27.59 0.00
1+080 4.420 2.284 2.136 43.03 30.12 1.40 27.31 0.00
1+100 4.290 2.304 1.986 41.22 28.85 1.40 26.04 0.00
1+120 4.260 2.324 1.936 39.22 27.45 1.40 24.64 0.00
1+140 4.380 2.344 2.036 39.72 27.80 1.40 24.99 0.00
1+160 4.400 2.364 2.036 40.72 28.50 1.40 25.69 0.00
1+180 4.420 2.384 2.036 40.72 28.50 1.40 25.69 0.00
1+200 4.400 2.404 1.996 40.32 28.22 1.40 25.41 0.00
1+220 4.360 2.424 1.936 39.32 27.52 1.40 24.71 0.00
1+240 4.250 2.444 1.806 37.42 26.19 1.40 23.38 0.00
1+260 4.290 2.464 1.826 36.32 25.42 1.40 22.61 0.00
1+280 4.310 2.484 1.826 36.52 25.56 1.40 22.75 0.00
1+300 4.380 2.504 1.876 37.02 25.91 1.40 23.10 0.00
1+320 4.280 2.524 1.756 36.32 25.42 1.40 22.61 0.00
1+340 4.270 2.544 1.726 34.82 24.37 1.40 21.56 0.00
1+360 4.240 2.565 1.675 34.01 23.81 1.40 20.99 0.00
1+380 4.190 2.585 1.605 32.80 22.96 1.40 20.15 0.00
1+400 4.220 2.605 1.615 32.20 22.54 1.40 19.73 0.00
1+420 4.120 2.625 1.495 31.10 21.77 1.40 18.96 0.00
1+440 4.150 2.645 1.505 30.00 21.00 1.40 18.19 0.00
1+460 4.200 2.665 1.535 30.40 21.28 1.40 18.47 0.00
1+480 4.180 2.685 1.495 30.30 21.21 1.40 18.40 0.00

4
ALTERNATIVA # 1
LINEA PRINCIPAL

VOLUMEN
TERRENO RASANTE DIFERIENCIA PLANTILLA
CADENAMIENTO AREA (M2) EXCAVACION RELLENO (M3) ADEME (M2)
NATURAL HIDRAULICA ALTURA (M3)
(M3)

1+500 4.230 2.705 1.525 30.20 21.14 1.40 18.33 0.00


1+520 4.240 2.725 1.515 30.40 21.28 1.40 18.47 0.00
1+540 4.320 2.745 1.575 30.90 21.63 1.40 18.82 0.00
1+560 4.250 2.765 1.485 30.60 21.42 1.40 18.61 0.00
1+580 4.200 2.785 1.415 29.00 20.30 1.40 17.49 0.00
1+600 4.240 2.805 1.435 28.50 19.95 1.40 17.14 0.00
1+620 4.240 2.825 1.415 28.50 19.95 1.40 17.14 0.00
1+640 4.180 2.845 1.335 27.50 19.25 1.40 16.44 0.00
1+660 4.100 2.866 1.234 25.69 17.98 1.40 15.17 0.00
1+680 4.050 2.886 1.164 23.98 16.79 1.40 13.97 0.00
1+700 4.060 2.906 1.154 23.18 16.23 1.40 13.41 0.00
1+720 4.110 2.926 1.184 23.38 16.37 1.40 13.55 0.00
1+740 4.180 2.946 1.234 24.18 16.93 1.40 14.11 0.00
1+760 4.180 2.966 1.214 24.48 17.14 1.40 14.32 0.00
1+780 4.140 2.986 1.154 23.68 16.58 1.40 13.76 0.00
1+800 4.130 3.006 1.124 22.78 15.95 1.40 13.13 0.00
1+820 4.120 3.026 1.094 22.18 15.53 1.40 12.71 0.00
1+840 4.080 3.046 1.034 21.28 14.90 1.40 12.08 0.00
1+860 4.110 3.066 1.044 20.78 14.55 1.40 11.73 0.00
1+880 4.130 3.086 1.044 20.88 14.62 1.40 11.80 0.00
1+900 4.180 3.106 1.074 21.18 14.83 1.40 12.01 0.00
1+920 4.200 3.126 1.074 21.48 15.04 1.40 12.22 0.00
1+940 4.210 3.147 1.063 21.37 14.96 1.40 12.15 0.00
1+960 4.270 3.167 1.103 21.66 15.16 1.40 12.35 0.00
1+980 4.220 3.187 1.033 21.36 14.95 1.40 12.14 0.00
2+000 4.230 3.207 1.023 20.56 14.39 1.40 11.58 0.00
2+020 4.220 3.227 0.993 20.16 14.11 1.40 11.30 0.00
2+040 4.230 3.247 0.983 19.76 13.83 1.40 11.02 0.00
2+060 4.240 3.267 0.973 19.56 13.69 1.40 10.88 0.00
2+080 4.160 3.287 0.873 18.46 12.92 1.40 10.11 0.00
2+100 4.130 3.307 0.823 16.96 11.87 1.40 9.06 0.00
2+120 4.230 3.327 0.903 17.26 12.08 1.40 9.27 0.00
2+140 4.310 3.347 0.963 18.66 13.06 1.40 10.25 0.00
2+160 4.300 3.367 0.933 18.96 13.27 1.40 10.46 0.00
2+180 4.350 3.387 0.963 18.96 13.27 1.40 10.46 0.00
2+200 4.340 3.407 0.933 18.96 13.27 1.40 10.46 0.00
2+220 4.370 3.428 0.942 18.75 13.13 1.40 10.31 0.00
2+240 4.440 3.448 0.992 19.34 13.54 1.40 10.72 0.00

5
ALTERNATIVA # 1
LINEA PRINCIPAL

VOLUMEN
TERRENO RASANTE DIFERIENCIA PLANTILLA
CADENAMIENTO AREA (M2) EXCAVACION RELLENO (M3) ADEME (M2)
NATURAL HIDRAULICA ALTURA (M3)
(M3)

2+260 4.430 3.468 0.962 19.54 13.68 1.40 10.86 0.00


2+280 4.369 3.448 0.921 18.83 13.18 1.40 10.37 0.00
2+300 4.460 3.428 1.032 19.53 13.67 1.40 10.86 0.00
2+320 4.520 3.407 1.113 21.45 15.02 1.40 12.20 0.00
2+340 4.520 3.387 1.133 22.46 15.72 1.40 12.91 0.00
2+360 4.570 3.367 1.203 23.36 16.35 1.40 13.54 0.00
2+380 4.580 3.347 1.233 24.36 17.05 1.40 14.24 0.00
2+400 4.570 3.327 1.243 24.76 17.33 1.40 14.52 0.00
2+420 4.550 3.307 1.243 24.86 17.40 1.40 14.59 0.00
2+440 4.490 3.287 1.203 24.46 17.12 1.40 14.31 0.00
2+460 4.460 3.267 1.193 23.96 16.77 1.40 13.96 0.00
2+480 4.510 3.247 1.263 24.56 17.19 1.40 14.38 0.00
2+500 4.520 3.227 1.293 25.56 17.90 1.40 15.08 0.00
2+520 4.280 3.207 1.073 23.67 16.57 1.40 13.75 0.00
2+540 4.220 3.187 1.033 21.07 14.75 1.40 11.93 0.00
2+560 4.260 3.167 1.093 21.27 14.89 1.40 12.07 0.00
2+580 4.310 3.146 1.164 22.57 15.80 1.40 12.99 0.00
2+600 4.270 3.126 1.144 23.07 16.15 1.40 13.34 0.00
2+620 4.130 3.106 1.024 21.67 15.17 1.40 12.36 0.00
2+640 4.120 3.086 1.034 20.57 14.40 1.40 11.59 0.00
2+660 4.110 3.066 1.044 20.78 14.54 1.40 11.73 0.00
2+680 4.140 3.046 1.094 21.38 14.96 1.40 12.15 0.00
2+700 4.210 3.026 1.184 22.78 15.95 1.40 13.13 0.00
2+720 4.240 3.006 1.234 24.18 16.93 1.40 14.11 0.00
2+740 4.320 2.986 1.334 25.68 17.98 1.40 15.16 0.00
2+760 4.390 2.966 1.424 27.58 19.31 1.40 16.49 0.00
2+780 4.340 2.946 1.394 28.18 19.73 1.40 16.92 0.00
2+800 4.290 2.926 1.364 27.59 19.31 1.40 16.50 0.00
2+820 4.200 2.906 1.294 26.59 18.61 1.40 15.80 0.00
2+840 4.220 2.886 1.334 26.29 18.40 1.40 15.59 0.00
2+860 4.230 2.865 1.365 26.99 18.89 1.40 16.08 0.00
2+880 4.260 2.845 1.415 27.79 19.45 1.40 16.64 0.00
2+900 4.340 2.825 1.515 29.29 20.51 1.40 17.69 0.00
2+920 4.430 2.805 1.625 31.39 21.98 1.40 19.16 0.00
2+940 4.350 2.785 1.565 31.90 22.33 1.40 19.51 0.00
2+960 4.320 2.765 1.555 31.20 21.84 1.40 19.02 0.00
2+980 4.350 2.745 1.605 31.60 22.12 1.40 19.30 0.00
3+000 4.460 2.725 1.735 33.40 23.38 1.40 20.57 0.00

6
ALTERNATIVA # 1
LINEA PRINCIPAL

VOLUMEN
TERRENO RASANTE DIFERIENCIA PLANTILLA
CADENAMIENTO AREA (M2) EXCAVACION RELLENO (M3) ADEME (M2)
NATURAL HIDRAULICA ALTURA (M3)
(M3)

3+020 4.530 2.705 1.825 35.60 24.92 1.40 22.11 0.00


3+040 4.470 2.685 1.785 36.10 25.27 1.40 22.46 0.00
3+060 4.490 2.665 1.825 36.10 25.27 1.40 22.46 0.00
3+080 4.500 2.645 1.855 36.81 25.76 1.40 22.95 0.00
3+100 4.420 2.625 1.795 36.51 25.55 1.40 22.74 0.00
3+120 4.350 2.605 1.745 35.41 24.79 1.40 21.97 0.00
3+140 4.370 2.584 1.786 35.31 24.72 1.40 21.90 0.00
3+160 4.370 2.564 1.806 35.91 25.14 1.40 22.32 0.00
3+180 4.320 2.544 1.776 35.81 25.07 1.40 22.25 0.00
3+200 4.320 2.524 1.796 35.71 25.00 1.40 22.19 0.00
3+220 4.240 2.504 1.736 35.32 24.72 1.40 21.91 0.00
3+240 4.290 2.484 1.806 35.42 24.79 1.40 21.98 0.00
3+260 4.430 2.464 1.966 37.72 26.40 1.40 23.59 0.00
3+280 4.360 2.444 1.916 38.82 27.17 1.40 24.36 0.00
3+300 4.370 2.424 1.946 38.62 27.03 1.40 24.22 0.00
3+320 4.150 2.404 1.746 36.92 25.85 1.40 23.03 0.00
3+340 4.100 2.384 1.716 34.62 24.24 1.40 21.42 0.00
3+360 4.090 2.364 1.726 34.43 24.10 1.40 21.28 0.00
3+380 4.160 2.344 1.816 35.43 24.80 1.40 21.98 0.00
3+400 4.170 2.324 1.846 36.63 25.64 1.40 22.83 0.00
3+420 4.210 2.304 1.907 37.53 26.27 1.40 23.46 0.00
3+440 4.180 2.283 1.897 38.03 26.62 1.40 23.81 0.00
3+460 4.220 2.263 1.957 38.53 26.97 1.40 24.16 0.00
3+480 4.170 2.243 1.927 38.83 27.18 1.40 24.37 0.00
3+500 4.190 2.223 1.967 38.93 27.25 1.40 24.44 0.00
3+520 4.170 2.203 1.967 39.34 27.54 1.40 24.72 0.00
3+540 4.140 2.183 1.957 39.24 27.47 1.40 24.65 0.00
3+560 4.170 2.163 2.007 39.64 27.75 1.40 24.93 0.00
3+580 4.230 2.143 2.087 40.94 28.66 1.40 25.84 0.00
3+600 4.300 2.123 2.177 42.64 29.85 1.40 27.04 0.00
3+620 4.380 2.103 2.277 44.54 31.18 1.40 28.37 0.00
3+640 4.410 2.083 2.327 46.04 32.23 1.40 29.42 0.00
3+660 4.450 2.063 2.387 47.15 33.00 1.40 30.19 0.00
3+680 4.630 2.043 2.587 49.75 64.67 2.60 60.03 99.50
3+700 4.680 2.023 2.657 52.45 68.18 2.60 63.54 104.90
3+720 4.670 2.002 2.668 53.25 69.23 2.60 64.58 106.50
3+740 4.640 1.982 2.658 53.25 69.23 2.60 64.59 106.50
3+760 4.600 1.962 2.638 52.95 68.84 2.60 64.20 105.91

7
ALTERNATIVA # 1
LINEA PRINCIPAL

VOLUMEN
TERRENO RASANTE DIFERIENCIA PLANTILLA
CADENAMIENTO AREA (M2) EXCAVACION RELLENO (M3) ADEME (M2)
NATURAL HIDRAULICA ALTURA (M3)
(M3)

3+780 4.560 1.942 2.618 52.55 68.32 2.60 63.68 105.11


3+800 4.750 1.922 2.828 54.46 70.79 2.60 66.15 108.91
3+820 4.700 1.902 2.798 56.26 73.13 2.60 68.49 112.51
3+840 4.570 1.882 2.688 54.86 71.32 2.60 66.67 109.72
3+860 4.400 1.862 2.538 52.26 67.94 2.60 63.30 104.52
3+880 4.410 1.842 2.568 51.06 66.38 2.60 61.74 102.12
3+900 4.370 1.822 2.548 51.16 66.51 2.60 61.87 102.33
3+920 4.360 1.802 2.558 51.06 66.38 2.60 61.74 102.13
3+940 4.340 1.782 2.558 51.17 66.52 2.60 61.87 102.33
3+960 4.420 1.762 2.658 52.17 67.82 2.60 63.18 104.33
3+980 4.450 1.742 2.708 53.67 69.77 2.60 65.13 107.34
4+000 4.640 1.721 2.919 56.27 73.15 2.60 68.51 112.54
4+020 4.660 1.701 2.959 58.77 76.40 2.60 71.76 117.54
4+040 4.760 1.681 3.079 60.37 78.48 2.60 73.84 120.75
4+060 4.930 1.661 3.269 63.47 82.52 2.60 77.87 126.95
4+080 5.020 1.641 3.379 66.48 86.42 2.60 81.78 132.95
4+100 5.280 1.621 3.659 70.38 91.49 2.60 86.85 140.75
4+120 5.530 1.601 3.929 75.88 98.64 2.60 94.00 151.76
4+140 5.690 1.581 4.109 80.38 104.49 2.60 99.85 160.76
4+160 5.700 1.561 4.139 82.48 107.23 2.60 102.58 164.96
4+180 5.700 1.541 4.159 82.98 107.88 2.60 103.24 165.97
4+200 5.700 1.521 4.179 83.38 108.40 2.60 103.76 166.77
4+220 5.840 1.501 4.339 85.19 110.74 2.60 106.10 170.37
4+240 5.780 1.481 4.299 86.39 112.30 2.60 107.66 172.77
4+260 5.610 1.461 4.149 84.49 109.83 2.60 105.19 168.98
4+280 5.250 1.440 3.810 79.59 103.47 2.60 98.82 159.18
4+300 4.940 1.420 3.520 73.29 95.28 2.60 90.64 146.58
4+320 4.620 1.400 3.220 67.39 87.61 2.60 82.97 134.78
4+340 4.540 1.380 3.160 63.79 82.93 2.60 78.29 127.59
4+360 4.540 1.360 3.180 63.40 82.41 2.60 77.77 126.79
4+380 4.440 1.340 3.100 62.80 81.64 2.60 76.99 125.59
4+400 4.370 1.320 3.050 61.50 79.95 2.60 75.31 123.00
4+420 4.360 1.300 3.060 61.10 79.43 2.60 74.79 122.20
4+440 4.360 1.280 3.080 61.40 79.82 2.60 75.18 122.80
4+460 4.380 1.260 3.120 62.00 80.60 2.60 75.96 124.00
4+480 4.360 1.240 3.120 62.40 81.12 2.60 76.48 124.81
4+500 4.450 1.220 3.230 63.50 82.56 2.60 77.91 127.01
4+520 4.420 1.200 3.220 64.51 83.86 2.60 79.22 129.01

8
ALTERNATIVA # 1
LINEA PRINCIPAL

VOLUMEN
TERRENO RASANTE DIFERIENCIA PLANTILLA
CADENAMIENTO AREA (M2) EXCAVACION RELLENO (M3) ADEME (M2)
NATURAL HIDRAULICA ALTURA (M3)
(M3)

4+540 4.450 1.180 3.270 64.91 84.38 2.60 79.74 129.82


4+560 4.470 1.160 3.310 65.81 85.55 2.60 80.91 131.62
4+580 4.450 1.139 3.311 66.21 86.07 2.60 81.43 132.42
4+600 4.430 1.119 3.311 66.21 86.08 2.60 81.43 132.42
4+620 4.470 1.099 3.371 66.81 86.86 2.60 82.22 133.63
4+640 4.440 1.079 3.361 67.31 87.51 2.60 82.87 134.63
4+660 4.540 1.059 3.481 68.42 88.94 2.60 84.30 136.83
4+680 4.620 1.039 3.581 70.62 91.80 2.60 87.16 141.24
4+700 4.770 1.019 3.751 73.32 95.31 2.60 90.67 146.64
4+720 4.750 0.999 3.751 75.02 97.53 2.60 92.88 150.04
4+740 4.800 0.979 3.821 75.72 98.44 2.60 93.80 151.44
4+760 4.820 0.959 3.861 76.82 99.87 2.60 95.23 153.65
4+780 4.680 0.939 3.741 76.02 98.83 2.60 94.19 152.05
4+800 4.570 0.919 3.651 73.93 96.10 2.60 91.46 147.85
4+820 4.580 0.899 3.681 73.33 95.33 2.60 90.68 146.65
4+840 4.580 0.879 3.701 73.83 95.98 2.60 91.34 147.66
4+860 4.570 0.858 3.712 74.13 96.37 2.60 91.73 148.26
4+880 4.530 0.838 3.692 74.03 96.24 2.60 91.60 148.06
4+900 4.600 0.818 3.782 74.73 97.15 2.60 92.51 149.47
4+920 4.590 0.798 3.792 75.73 98.45 2.60 93.81 151.47
4+940 4.540 0.778 3.762 75.54 98.20 2.60 93.55 151.07
4+960 4.430 0.758 3.672 74.34 96.64 2.60 92.00 148.67
4+980 4.380 0.738 3.642 73.14 95.08 2.60 90.44 146.28
5+000 4.410 0.718 3.692 73.34 95.34 2.60 90.70 146.68
5+020 4.480 0.698 3.782 74.74 97.16 2.60 92.52 149.48
5+040 4.520 0.678 3.842 76.24 99.12 2.60 94.47 152.49
5+060 4.450 0.658 3.792 76.34 99.25 2.60 94.61 152.69
5+080 4.500 1.710 2.790 65.82 85.57 2.60 80.93 131.64
5+100 4.390 1.730 2.660 54.50 70.84 2.60 66.20 108.99
5+120 4.370 1.750 2.620 52.79 68.63 2.60 63.99 105.59
5+140 4.430 1.770 2.660 52.79 68.63 2.60 63.99 105.59
5+160 4.270 1.790 2.480 51.39 66.81 2.60 62.17 102.78
5+180 4.360 1.811 2.549 50.29 65.38 2.60 60.74 100.58
5+200 4.430 1.831 2.599 51.49 66.94 2.60 62.29 102.98
5+220 4.390 1.851 2.539 51.39 66.80 2.60 62.16 102.78
5+240 4.350 1.871 2.479 50.19 65.24 2.60 60.60 100.37
5+260 4.340 1.891 2.449 49.28 34.50 1.40 31.69 0.00
5+280 4.340 1.911 2.429 48.78 34.15 1.40 31.33 0.00

9
ALTERNATIVA # 1
LINEA PRINCIPAL

VOLUMEN
TERRENO RASANTE DIFERIENCIA PLANTILLA
CADENAMIENTO AREA (M2) EXCAVACION RELLENO (M3) ADEME (M2)
NATURAL HIDRAULICA ALTURA (M3)
(M3)

5+300 4.290 1.931 2.359 47.88 33.52 1.40 30.70 0.00


5+320 4.350 1.951 2.399 47.58 33.31 1.40 30.49 0.00
5+340 4.340 1.971 2.369 47.68 33.38 1.40 30.56 0.00
5+360 4.530 1.991 2.539 49.08 63.80 2.60 59.16 98.16
5+380 4.630 2.011 2.619 51.58 67.05 2.60 62.41 103.15
5+400 4.600 2.031 2.569 51.88 67.44 2.60 62.80 103.75
5+420 4.600 2.051 2.549 51.17 66.53 2.60 61.88 102.35
5+440 4.580 2.071 2.509 50.57 65.74 2.60 61.10 101.14
5+460 4.570 2.091 2.479 49.87 34.91 1.40 32.10 0.00
5+480 4.570 2.112 2.458 49.37 34.56 1.40 31.74 0.00
5+500 4.510 2.132 2.378 48.37 33.86 1.40 31.04 0.00
5+520 4.460 2.152 2.308 46.87 32.81 1.40 29.99 0.00
5+540 4.430 2.172 2.258 45.67 31.97 1.40 29.15 0.00
5+560 4.390 2.192 2.198 44.56 31.19 1.40 28.38 0.00
5+580 4.380 2.212 2.168 43.66 30.56 1.40 27.75 0.00
5+600 4.340 2.232 2.108 42.76 29.93 1.40 27.12 0.00
5+620 4.300 2.252 2.048 41.56 29.09 1.40 26.28 0.00
5+640 4.430 2.272 2.158 42.06 29.44 1.40 26.63 0.00
5+660 4.630 2.292 2.338 44.96 31.47 1.40 28.66 0.00
5+680 4.630 2.312 2.318 46.56 32.59 1.40 29.77 0.00
5+700 4.740 2.332 2.408 47.25 33.08 1.40 30.26 0.00
5+720 4.770 2.352 2.418 48.25 33.78 1.40 30.96 0.00
5+740 4.690 2.372 2.318 47.35 33.15 1.40 30.33 0.00
5+760 4.630 2.393 2.237 45.55 31.88 1.40 29.07 0.00
5+780 4.510 2.413 2.097 43.35 30.34 1.40 27.53 0.00
5+800 4.470 2.433 2.037 41.35 28.94 1.40 26.13 0.00
5+820 4.460 2.453 2.007 40.45 28.31 1.40 25.50 0.00
5+840 4.430 2.473 1.957 39.64 27.75 1.40 24.94 0.00
5+860 4.360 2.493 1.867 38.24 26.77 1.40 23.96 0.00
5+880 4.280 2.513 1.767 36.34 25.44 1.40 22.63 0.00
5+900 4.280 2.533 1.747 35.14 24.60 1.40 21.78 0.00
5+920 4.320 2.553 1.767 35.14 24.60 1.40 21.78 0.00
5+940 4.460 2.573 1.887 36.54 25.58 1.40 22.76 0.00
5+960 4.490 2.593 1.897 37.84 26.49 1.40 23.67 0.00
5+980 4.550 2.613 1.937 38.33 26.83 1.40 24.02 0.00
6+000 4.600 2.633 1.967 39.03 27.32 1.40 24.51 0.00
6+020 4.640 2.653 1.987 39.53 27.67 1.40 24.86 0.00
6+040 4.640 2.674 1.966 39.53 27.67 1.40 24.86 0.00

10
ALTERNATIVA # 1
LINEA PRINCIPAL

VOLUMEN
TERRENO RASANTE DIFERIENCIA PLANTILLA
CADENAMIENTO AREA (M2) EXCAVACION RELLENO (M3) ADEME (M2)
NATURAL HIDRAULICA ALTURA (M3)
(M3)

6+060 4.590 2.694 1.896 38.63 27.04 1.40 24.23 0.00


6+080 4.520 2.714 1.806 37.03 25.92 1.40 23.11 0.00
6+100 4.500 2.734 1.766 35.73 25.01 1.40 22.19 0.00
6+120 4.460 2.754 1.706 34.72 24.31 1.40 21.49 0.00
6+140 4.490 2.774 1.716 34.22 23.96 1.40 21.14 0.00
6+160 4.340 2.794 1.546 32.62 22.84 1.40 20.02 0.00
6+180 4.310 2.814 1.496 30.42 21.29 1.40 18.48 0.00
6+200 4.230 2.834 1.396 28.92 20.24 1.40 17.43 0.00
6+220 4.210 2.854 1.356 27.52 19.26 1.40 16.45 0.00
6+240 4.140 2.874 1.266 26.22 18.35 1.40 15.54 0.00
6+260 4.000 2.894 1.106 23.71 16.60 1.40 13.79 0.00
6+280 4.398 2.914 1.484 25.89 18.13 1.40 15.31 0.00
6+300 4.010 2.934 1.076 25.59 17.91 1.40 15.10 0.00
6+320 4.050 2.955 1.096 21.71 15.20 1.40 12.38 0.00
6+340 4.070 2.975 1.095 21.91 15.34 1.40 12.52 0.00
6+360 4.060 2.995 1.065 21.61 15.13 1.40 12.31 0.00
6+380 3.920 3.015 0.905 19.71 13.79 1.40 10.98 0.00
6+400 3.820 3.035 0.785 16.91 11.83 1.40 9.02 0.00
6+420 3.870 3.055 0.815 16.00 11.20 1.40 8.39 0.00
6+440 3.970 3.075 0.895 17.10 11.97 1.40 9.16 0.00
6+460 4.050 3.095 0.955 18.50 12.95 1.40 10.14 0.00
6+480 4.120 3.115 1.005 19.60 13.72 1.40 10.91 0.00
6+500 4.190 3.135 1.055 20.60 14.42 1.40 11.60 0.00
6+520 4.120 3.155 0.965 20.20 14.14 1.40 11.32 0.00
6+540 4.110 3.175 0.935 19.00 13.30 1.40 10.48 0.00
6+560 4.230 3.195 1.035 19.69 13.79 1.40 10.97 0.00
6+580 4.150 3.215 0.935 19.69 13.78 1.40 10.97 0.00
6+600 4.210 3.235 0.975 19.09 13.36 1.40 10.55 0.00
6+620 4.250 3.256 0.994 19.69 13.78 1.40 10.97 0.00
6+640 4.250 3.276 0.974 19.69 13.78 1.40 10.97 0.00
6+660 4.320 3.296 1.024 19.99 13.99 1.40 11.18 0.00
6+680 4.380 3.316 1.064 20.89 14.62 1.40 11.81 0.00
6+700 4.520 3.336 1.184 22.48 15.74 1.40 12.92 0.00
6+720 4.590 3.356 1.234 24.18 16.93 1.40 14.11 0.00
6+740 4.630 3.376 1.254 24.88 17.42 1.40 14.60 0.00
6+760 4.560 3.396 1.164 24.18 16.93 1.40 14.11 0.00
6+780 4.600 3.416 1.184 23.48 16.43 1.40 13.62 0.00
6+800 4.650 3.436 1.214 23.98 16.78 1.40 13.97 0.00

11
ALTERNATIVA # 1
LINEA PRINCIPAL

VOLUMEN
TERRENO RASANTE DIFERIENCIA PLANTILLA
CADENAMIENTO AREA (M2) EXCAVACION RELLENO (M3) ADEME (M2)
NATURAL HIDRAULICA ALTURA (M3)
(M3)

6+820 4.750 3.456 1.294 25.08 17.55 1.40 14.74 0.00


6+840 4.770 3.476 1.294 25.87 18.11 1.40 15.30 0.00
6+860 5.000 3.496 1.504 27.97 19.58 1.40 16.77 0.00
6+880 5.020 3.516 1.504 30.07 21.05 1.40 18.24 0.00
6+900 5.080 3.537 1.543 30.47 21.33 1.40 18.52 0.00
6+920 5.050 3.557 1.493 30.37 21.26 1.40 18.44 0.00
6+940 5.040 3.577 1.463 29.57 20.70 1.40 17.88 0.00
6+960 5.040 3.597 1.443 29.07 20.35 1.40 17.53 0.00
6+980 5.120 3.617 1.503 29.46 20.63 1.40 17.81 0.00
7+000 5.070 3.637 1.433 29.36 20.55 1.40 17.74 0.00
7+020 5.050 3.657 1.393 28.26 19.78 1.40 16.97 0.00
7+040 5.070 3.677 1.393 27.86 19.50 1.40 16.69 0.00
7+060 5.010 3.697 1.313 27.06 18.94 1.40 16.13 0.00
7+080 4.890 3.717 1.173 24.86 17.40 1.40 14.59 0.00
7+100 4.920 3.737 1.183 23.56 16.49 1.40 13.68 0.00
7+120 4.880 3.757 1.123 23.05 16.14 1.40 13.32 0.00
7+140 4.780 3.777 1.003 21.25 14.88 1.40 12.06 0.00
7+160 4.770 3.797 0.973 19.75 13.83 1.40 11.01 0.00
7+180 4.760 3.818 0.942 19.15 13.41 1.40 10.59 0.00
7+200 4.770 3.838 0.932 18.75 13.12 1.40 10.31 0.00
7+220 4.710 3.858 0.852 17.85 12.49 1.40 9.68 0.00
7+240 4.700 3.878 0.822 16.75 11.72 1.40 8.91 0.00
7+260 4.690 3.898 0.792 16.14 11.30 1.40 8.49 0.00
7+280 4.880 3.918 0.962 17.54 12.28 1.40 9.47 0.00
7+300 4.940 3.938 1.002 19.64 13.75 1.40 10.94 0.00
7+320 4.940 3.958 0.982 19.84 13.89 1.40 11.07 0.00

TOTALES 14,650.43 645.60 13,417.60 13,799.70

VOLUMEN
TERRENO RASANTE DIFERIENCIA PLANTILLA
CADENAMIENTO AREA (M2) EXCAVACION RELLENO (M3) ADEME (M2)
NATURAL HIDRAULICA ALTURA (M3)
(M3)

12
LINEA
MADRINA (M2)

0.00
0.00
0.00
0.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

13
LINEA
MADRINA (M2)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
20.00
20.00
20.00
20.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

14
LINEA
MADRINA (M2)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

15
LINEA
MADRINA (M2)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

16
LINEA
MADRINA (M2)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20.00
20.00
20.00
20.00
20.00

17
LINEA
MADRINA (M2)

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

18
LINEA
MADRINA (M2)

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
0.00
0.00

19
LINEA
MADRINA (M2)

0.00
0.00
0.00
20.00
20.00
20.00
20.00
20.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

20
LINEA
MADRINA (M2)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

21
LINEA
MADRINA (M2)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

2,220.00

LINEA
MADRINA (M2)

22
ALTERNATIVA # 1
LINEA SECUNDARIA

VOLUMEN
TERRENO RASANTE DIFERIENCIA PLANTILLA RELLENO
CADENAMIENTO AREA (M2) EXCAVACION ADEME (M2)
NATURAL HIDRAULICA ALTURA (M3) (M3)
(M3)

7+720 3.800 3.000 0.800


7+740 3.410 2.980 0.430 12.30 8.61 1.40 5.80 0.00
7+760 3.800 2.960 0.840 12.70 8.89 1.40 6.08 0.00
7+780 3.710 2.940 0.770 16.10 11.27 1.40 8.46 0.00
7+800 3.680 2.920 0.760 15.30 10.71 1.40 7.90 0.00
7+820 3.870 2.900 0.970 17.30 12.11 1.40 9.30 0.00
7+840 3.760 2.880 0.880 18.50 12.95 1.40 10.14 0.00
7+860 3.680 2.860 0.820 17.00 11.90 1.40 9.09 0.00
7+880 3.700 2.840 0.860 16.80 11.76 1.40 8.95 0.00
7+900 3.650 2.820 0.830 16.90 11.83 1.40 9.02 0.00
7+920 3.740 2.800 0.940 17.70 12.39 1.40 9.58 0.00
7+940 3.800 2.780 1.020 19.60 13.72 1.40 10.91 0.00
7+960 3.930 2.760 1.170 21.90 15.33 1.40 12.52 0.00
7+980 3.980 2.740 1.240 24.10 16.87 1.40 14.06 0.00
8+000 3.990 2.720 1.270 25.10 17.57 1.40 14.76 0.00
8+020 3.910 2.700 1.210 24.80 17.36 1.40 14.55 0.00
8+040 4.080 2.680 1.400 26.10 18.27 1.40 15.46 0.00
8+060 4.270 2.660 1.610 30.10 21.07 1.40 18.26 0.00
8+080 3.990 2.640 1.350 29.60 20.72 1.40 17.91 0.00
8+100 3.960 2.620 1.340 26.90 18.83 1.40 16.02 0.00
8+120 3.970 2.600 1.370 27.10 18.97 1.40 16.16 0.00
8+140 4.000 2.580 1.420 27.90 19.53 1.40 16.72 0.00
8+160 4.010 2.560 1.450 28.70 20.09 1.40 17.28 0.00
8+180 3.930 2.540 1.390 28.40 19.88 1.40 17.07 0.00
8+200 3.980 2.520 1.460 28.50 19.95 1.40 17.14 0.00
8+220 4.030 2.500 1.530 29.90 20.93 1.40 18.12 0.00
8+240 4.060 2.480 1.580 31.10 21.77 1.40 18.96 0.00
8+260 4.030 2.460 1.570 31.50 22.05 1.40 19.24 0.00
8+280 3.910 2.440 1.470 30.40 21.28 1.40 18.47 0.00
8+300 3.700 2.420 1.280 27.50 19.25 1.40 16.44 0.00
8+320 3.750 2.400 1.350 26.30 18.41 1.40 15.60 0.00
8+340 3.790 2.380 1.410 27.60 19.32 1.40 16.51 0.00
8+360 3.770 2.360 1.410 28.20 19.74 1.40 16.93 0.00
8+380 3.830 2.340 1.490 29.00 20.30 1.40 17.49 0.00
8+400 3.900 2.320 1.580 30.70 21.49 1.40 18.68 0.00
8+420 3.840 2.300 1.540 31.20 21.84 1.40 19.03 0.00
8+440 3.720 2.280 1.440 29.80 20.86 1.40 18.05 0.00

25
ALTERNATIVA # 1
LINEA SECUNDARIA

VOLUMEN
TERRENO RASANTE DIFERIENCIA PLANTILLA RELLENO
CADENAMIENTO AREA (M2) EXCAVACION ADEME (M2)
NATURAL HIDRAULICA ALTURA (M3) (M3)
(M3)

8+460 3.800 2.260 1.540 29.80 20.86 1.40 18.05 0.00


8+480 3.800 2.240 1.560 31.00 21.70 1.40 18.89 0.00
8+500 3.790 2.220 1.570 31.30 21.91 1.40 19.10 0.00
8+520 3.870 2.200 1.670 32.40 22.68 1.40 19.87 0.00
8+540 3.940 2.180 1.760 34.30 24.01 1.40 21.20 0.00
8+560 3.860 2.160 1.700 34.60 24.22 1.40 21.41 0.00
8+580 3.820 2.140 1.680 33.80 23.66 1.40 20.85 0.00
8+600 3.820 2.120 1.700 33.80 23.66 1.40 20.85 0.00
8+620 3.930 2.100 1.830 35.30 24.71 1.40 21.90 0.00
8+640 4.010 2.080 1.930 37.60 26.32 1.40 23.51 0.00
8+660 4.020 2.060 1.960 38.90 27.23 1.40 24.42 0.00
8+680 4.040 2.040 2.000 39.60 27.72 1.40 24.91 0.00
8+700 4.030 2.020 2.010 40.10 28.07 1.40 25.26 0.00
8+720 3.870 2.000 1.870 38.80 27.16 1.40 24.35 0.00
8+740 3.780 1.980 1.800 36.70 25.69 1.40 22.88 0.00
8+760 3.750 1.960 1.790 35.90 25.13 1.40 22.32 0.00
8+780 3.790 1.940 1.850 36.40 25.48 1.40 22.67 0.00
8+800 3.860 1.920 1.940 37.90 26.53 1.40 23.72 0.00
8+820 3.910 1.900 2.010 39.50 27.65 1.40 24.84 0.00
8+840 3.800 1.880 1.920 39.30 27.51 1.40 24.70 0.00
8+860 3.830 1.860 1.970 38.90 27.23 1.40 24.42 0.00
8+880 3.850 1.840 2.010 39.80 27.86 1.40 25.05 0.00
8+900 3.810 1.820 1.990 40.00 28.00 1.40 25.19 0.00
8+920 3.810 1.800 2.010 40.00 28.00 1.40 25.19 0.00
8+940 3.910 1.780 2.130 41.40 28.98 1.40 26.17 0.00
8+960 3.790 1.760 2.030 41.60 29.12 1.40 26.31 0.00
8+980 3.780 1.740 2.040 40.70 28.49 1.40 25.68 0.00
9+000 3.810 1.720 2.090 41.30 28.91 1.40 26.10 0.00
9+020 3.820 1.700 2.120 42.10 29.47 1.40 26.66 0.00
9+040 3.880 1.680 2.200 43.20 30.24 1.40 27.43 0.00
9+060 4.010 1.660 2.350 45.50 31.85 1.40 29.04 0.00
9+080 3.940 1.640 2.300 46.50 32.55 1.40 29.74 0.00
9+100 3.850 1.620 2.230 45.30 31.71 1.40 28.90 0.00
9+120 3.840 1.600 2.240 44.70 31.29 1.40 28.48 0.00
9+140 3.860 1.580 2.280 45.20 31.64 1.40 28.83 0.00
9+160 3.850 1.560 2.290 45.70 31.99 1.40 29.18 0.00
9+180 3.970 1.540 2.430 47.20 33.04 1.40 30.23 0.00

26
ALTERNATIVA # 1
LINEA SECUNDARIA

VOLUMEN
TERRENO RASANTE DIFERIENCIA PLANTILLA RELLENO
CADENAMIENTO AREA (M2) EXCAVACION ADEME (M2)
NATURAL HIDRAULICA ALTURA (M3) (M3)
(M3)

9+200 3.910 1.520 2.390 48.20 33.74 1.40 30.93 0.00


9+220 3.970 1.500 2.470 48.60 34.02 1.40 31.21 0.00
9+240 3.940 1.480 2.460 49.30 34.51 1.40 31.70 0.00
9+260 3.890 1.460 2.430 48.90 34.23 1.40 31.42 0.00
9+280 3.810 1.440 2.370 48.00 33.60 1.40 30.79 0.00
9+300 3.770 1.420 2.350 47.20 33.04 1.40 30.23 0.00
9+320 3.650 1.400 2.250 46.00 32.20 1.40 29.39 0.00
9+340 3.690 1.380 2.310 45.60 31.92 1.40 29.11 0.00
9+360 3.810 1.360 2.450 47.60 33.32 1.40 30.51 0.00
9+380 3.890 1.340 2.550 50.00 65.00 2.60 60.36 100.00
9+400 3.940 1.320 2.620 51.70 67.21 2.60 62.57 103.40
9+420 3.970 1.300 2.670 52.90 68.77 2.60 64.13 105.80
9+440 3.980 1.280 2.700 53.70 69.81 2.60 65.17 107.40
9+460 3.970 1.260 2.710 54.10 70.33 2.60 65.69 108.20
9+480 4.040 1.240 2.800 55.10 71.63 2.60 66.99 110.20
9+500 4.130 1.220 2.910 57.10 74.23 2.60 69.59 114.20
9+520 4.070 1.200 2.870 57.80 75.14 2.60 70.50 115.60
9+540 4.080 1.180 2.900 57.70 75.01 2.60 70.37 115.40
9+560 3.940 1.160 2.780 56.80 73.84 2.60 69.20 113.60
9+580 3.830 1.140 2.690 54.70 71.11 2.60 66.47 109.40
9+600 3.900 1.120 2.780 54.70 71.11 2.60 66.47 109.40
9+620 3.860 1.100 2.760 55.40 72.02 2.60 67.38 110.80
9+640 3.910 1.080 2.830 55.90 72.67 2.60 68.03 111.80
9+660 3.970 1.060 2.910 57.40 74.62 2.60 69.98 114.80
9+680 4.000 1.040 2.960 58.70 76.31 2.60 71.67 117.40
9+700 3.960 1.020 2.940 59.00 76.70 2.60 72.06 118.00
9+720 3.990 1.000 2.990 59.30 77.09 2.60 72.45 118.60
9+740 4.010 0.980 3.030 60.20 78.26 2.60 73.62 120.40
9+760 3.910 0.960 2.950 59.80 77.74 2.60 73.10 119.60
9+780 3.950 0.940 3.010 59.60 77.48 2.60 72.84 119.20
9+800 3.900 0.920 2.980 59.90 77.87 2.60 73.23 119.80
9+820 3.790 0.900 2.890 58.70 76.31 2.60 71.67 117.40
9+840 3.840 0.880 2.960 58.50 76.05 2.60 71.41 117.00
9+860 3.900 0.860 3.040 60.00 78.00 2.60 73.36 120.00
9+880 3.980 0.840 3.140 61.80 80.34 2.60 75.70 123.60
9+900 4.070 0.820 3.250 63.90 83.07 2.60 78.43 127.80
9+920 3.910 0.800 3.110 63.60 82.68 2.60 78.04 127.20

27
ALTERNATIVA # 1
LINEA SECUNDARIA

VOLUMEN
TERRENO RASANTE DIFERIENCIA PLANTILLA RELLENO
CADENAMIENTO AREA (M2) EXCAVACION ADEME (M2)
NATURAL HIDRAULICA ALTURA (M3) (M3)
(M3)

9+940 3.920 0.780 3.140 62.50 81.25 2.60 76.61 125.00


9+960 4.120 0.760 3.360 65.00 84.50 2.60 79.86 130.00
9+980 4.140 0.740 3.400 67.60 87.88 2.60 83.24 135.20
10+000 4.120 0.720 3.400 68.00 88.40 2.60 83.76 136.00
10+020 4.000 0.700 3.300 67.00 87.10 2.60 82.46 134.00
10+040 3.860 0.680 3.180 64.80 84.24 2.60 79.60 129.60
10+060 3.770 0.660 3.110 62.90 81.77 2.60 77.13 125.80
10+080 3.830 0.640 3.190 63.00 81.90 2.60 77.26 126.00
10+100 3.790 0.620 3.170 63.60 82.68 2.60 78.04 127.20
10+120 3.920 0.600 3.320 64.90 84.37 2.60 79.73 129.80
10+140 3.830 0.580 3.250 65.70 85.41 2.60 80.77 131.40
10+160 3.770 0.560 3.210 64.60 83.98 2.60 79.34 129.20
10+180 3.570 0.540 3.030 62.40 81.12 2.60 76.48 124.80
10+200 3.700 0.520 3.180 62.10 80.73 2.60 76.09 124.20
10+220 3.720 0.500 3.220 64.00 83.20 2.60 78.56 128.00
10+240 3.840 0.480 3.360 65.80 85.54 2.60 80.90 131.60
10+260 3.830 0.460 3.370 67.30 87.49 2.60 82.85 134.60
10+280 3.840 0.440 3.400 67.70 88.01 2.60 83.37 135.40
10+300 3.850 0.420 3.430 68.30 88.79 2.60 84.15 136.60
10+320 3.870 0.400 3.470 69.00 89.70 2.60 85.06 138.00
10+340 3.930 0.380 3.550 70.20 91.26 2.60 86.62 140.40
10+360 3.900 0.360 3.540 70.90 92.17 2.60 87.53 141.80
10+380 4.010 0.340 3.670 72.10 93.73 2.60 89.09 144.20
10+400 3.860 0.320 3.540 72.10 93.73 2.60 89.09 144.20
10+420 3.850 0.300 3.550 70.90 92.17 2.60 87.53 141.80
10+440 3.830 0.280 3.550 71.00 92.30 2.60 87.66 142.00
10+460 3.910 0.260 3.650 72.00 93.60 2.60 88.96 144.00
10+480 3.930 0.240 3.690 73.40 95.42 2.60 90.78 146.80
10+500 3.870 0.220 3.650 73.40 95.42 2.60 90.78 146.80
10+520 3.900 0.200 3.700 73.50 95.55 2.60 90.91 147.00
10+540 3.880 0.180 3.700 74.00 96.20 2.60 91.56 148.00
10+560 3.810 0.160 3.650 73.50 95.55 2.60 90.91 147.00
10+580 3.820 0.140 3.680 73.30 95.29 2.60 90.65 146.60
10+600 3.940 0.120 3.820 75.00 97.50 2.60 92.86 150.00
10+620 4.000 0.100 3.900 77.20 100.36 2.60 95.72 154.40
10+640 3.810 0.080 3.730 76.30 99.19 2.60 94.55 152.60
10+660 4.070 0.060 4.010 77.40 100.62 2.60 95.98 154.80

28
ALTERNATIVA # 1
LINEA SECUNDARIA

VOLUMEN
TERRENO RASANTE DIFERIENCIA PLANTILLA RELLENO
CADENAMIENTO AREA (M2) EXCAVACION ADEME (M2)
NATURAL HIDRAULICA ALTURA (M3) (M3)
(M3)

10+680 4.130 0.040 4.090 81.00 105.30 2.60 100.66 162.00


10+700 4.200 0.020 4.180 82.70 107.51 2.60 102.87 165.40
10+720 4.070 0.000 4.070 82.50 107.25 2.60 102.61 165.00
10+740 4.040 -0.020 4.060 81.30 105.69 2.60 101.05 162.60
10+760 4.010 -0.040 4.050 81.10 105.43 2.60 100.79 162.20
10+780 3.950 -0.060 4.010 80.60 104.78 2.60 100.14 161.20
10+800 3.950 -0.080 4.030 80.40 104.52 2.60 99.88 160.80
10+820 3.990 -0.100 4.090 81.20 105.56 2.60 100.92 162.40
10+840 3.960 -0.120 4.080 81.70 106.21 2.60 101.57 163.40
10+860 3.940 -0.140 4.080 81.60 106.08 2.60 101.44 163.20
10+880 3.950 -0.435 4.385 84.65 110.05 2.60 105.40 169.30
10+900 3.920 -0.415 4.335 87.20 113.36 2.60 108.72 174.40
10+920 3.900 -0.395 4.295 86.30 112.19 2.60 107.55 172.60
10+940 4.040 -0.375 4.415 87.10 113.23 2.60 108.59 174.20
10+960 3.950 -0.355 4.305 87.20 113.36 2.60 108.72 174.40
10+980 3.850 -0.335 4.185 84.90 110.37 2.60 105.73 169.80
11+000 3.880 -0.315 4.195 83.80 108.94 2.60 104.30 167.60
11+020 3.930 -0.295 4.225 84.20 109.46 2.60 104.82 168.40
11+040 3.850 -0.275 4.125 83.50 108.55 2.60 103.91 167.00
11+060 3.770 -0.255 4.025 81.50 105.95 2.60 101.31 163.00
11+080 3.760 -0.235 3.995 80.20 104.26 2.60 99.62 160.40
11+100 3.830 -0.215 4.045 80.40 104.52 2.60 99.88 160.80
11+120 3.780 -0.195 3.975 80.20 104.26 2.60 99.62 160.40
11+140 3.910 -0.175 4.085 80.60 104.78 2.60 100.14 161.20
11+160 3.900 -0.155 4.055 81.40 105.82 2.60 101.18 162.80
11+180 3.740 -0.135 3.875 79.30 103.09 2.60 98.45 158.60
11+200 3.720 -0.115 3.835 77.10 100.23 2.60 95.59 154.20
11+220 3.750 -0.095 3.845 76.80 99.84 2.60 95.20 153.60
11+240 3.820 -0.075 3.895 77.40 100.62 2.60 95.98 154.80
11+260 3.900 -0.055 3.955 78.50 102.05 2.60 97.41 157.00
11+280 3.920 -0.035 3.955 79.10 102.83 2.60 98.19 158.20
11+300 3.820 -0.015 3.835 77.90 101.27 2.60 96.63 155.80
11+320 3.800 0.005 3.795 76.30 99.19 2.60 94.55 152.60
11+340 3.860 0.025 3.835 76.30 99.19 2.60 94.55 152.60
11+360 3.930 0.045 3.885 77.20 100.36 2.60 95.72 154.40
11+380 4.000 0.065 3.935 78.20 101.66 2.60 97.02 156.40
11+400 3.970 0.085 3.885 78.20 101.66 2.60 97.02 156.40

29
ALTERNATIVA # 1
LINEA SECUNDARIA

VOLUMEN
TERRENO RASANTE DIFERIENCIA PLANTILLA RELLENO
CADENAMIENTO AREA (M2) EXCAVACION ADEME (M2)
NATURAL HIDRAULICA ALTURA (M3) (M3)
(M3)

11+420 3.830 0.105 3.725 76.10 98.93 2.60 94.29 152.20


11+440 3.780 0.125 3.655 73.80 95.94 2.60 91.30 147.60
11+460 3.810 0.145 3.665 73.20 95.16 2.60 90.52 146.40
11+480 4.020 0.165 3.855 75.20 97.76 2.60 93.12 150.40
11+500 4.120 0.185 3.935 77.90 101.27 2.60 96.63 155.80
11+520 3.840 0.205 3.635 75.70 98.41 2.60 93.77 151.40
11+540 3.780 0.225 3.555 71.90 93.47 2.60 88.83 143.80
11+560 3.840 0.245 3.595 71.50 92.95 2.60 88.31 143.00
11+580 3.980 0.265 3.715 73.10 95.03 2.60 90.39 146.20
11+600 4.030 0.285 3.745 74.60 96.98 2.60 92.34 149.20
11+620 4.010 0.305 3.705 74.50 96.85 2.60 92.21 149.00
11+640 4.010 0.325 3.685 73.90 96.07 2.60 91.43 147.80
11+660 3.910 0.345 3.565 72.50 94.25 2.60 89.61 145.00
11+680 3.830 0.365 3.465 70.30 91.39 2.60 86.75 140.60
11+700 3.830 0.385 3.445 69.10 89.83 2.60 85.19 138.20
11+720 3.840 0.405 3.435 68.80 89.44 2.60 84.80 137.60
11+740 3.860 0.425 3.435 68.70 89.31 2.60 84.67 137.40
11+760 3.940 0.445 3.495 69.30 90.09 2.60 85.45 138.60
11+780 4.060 0.465 3.595 70.90 92.17 2.60 87.53 141.80
11+800 4.120 0.485 3.635 72.30 93.99 2.60 89.35 144.60
11+820 4.180 0.505 3.675 73.10 95.03 2.60 90.39 146.20
11+840 4.300 0.525 3.775 74.50 96.85 2.60 92.21 149.00
11+860 4.300 0.545 3.755 75.30 97.89 2.60 93.25 150.60
11+880 4.300 0.565 3.735 74.90 97.37 2.60 92.73 149.80
11+900 4.200 0.585 3.615 73.50 95.55 2.60 90.91 147.00
11+920 4.260 0.605 3.655 72.70 94.51 2.60 89.87 145.40
11+940 4.270 0.625 3.645 73.00 94.90 2.60 90.26 146.00
11+960 4.210 0.645 3.565 72.10 93.73 2.60 89.09 144.20
11+980 4.210 0.665 3.545 71.10 92.43 2.60 87.79 142.20
12+000 4.020 0.685 3.335 68.80 89.44 2.60 84.80 137.60
12+020 3.970 0.705 3.265 66.00 85.80 2.60 81.16 132.00
12+040 3.890 0.725 3.165 64.30 83.59 2.60 78.95 128.60
12+060 3.940 0.756 3.184 63.49 82.54 2.60 78.68 126.98
12+080 4.140 0.816 3.324 65.08 84.60 2.60 80.75 130.16
12+100 4.350 0.876 3.474 67.98 88.37 2.60 84.52 135.96
12+120 4.340 0.936 3.404 68.78 89.41 2.60 85.56 137.56
12+140 4.260 0.996 3.264 66.68 86.68 2.60 82.83 133.36

30
ALTERNATIVA # 1
LINEA SECUNDARIA

VOLUMEN
TERRENO RASANTE DIFERIENCIA PLANTILLA RELLENO
CADENAMIENTO AREA (M2) EXCAVACION ADEME (M2)
NATURAL HIDRAULICA ALTURA (M3) (M3)
(M3)

12+160 4.350 1.056 3.294 65.58 85.25 2.60 81.40 131.16


12+180 4.200 1.116 3.084 63.78 82.91 2.60 79.06 127.56
12+200 4.070 1.176 2.894 59.78 77.71 2.60 73.86 119.56
12+220 4.050 1.236 2.814 57.08 74.20 2.60 70.35 114.16
12+240 3.780 1.296 2.484 52.98 68.87 2.60 65.02 105.96
12+260 3.970 1.356 2.614 50.98 66.27 2.60 62.42 101.96
12+280 3.930 1.416 2.514 51.28 66.66 2.60 62.81 102.56
12+300 3.940 1.476 2.464 49.78 64.71 2.60 60.86 99.56
12+320 3.840 1.536 2.304 47.68 33.38 1.40 31.35 0.00
12+340 3.720 1.596 2.124 44.28 31.00 1.40 28.97 0.00
12+360 3.640 1.656 1.984 41.08 28.76 1.40 26.73 0.00
12+380 3.970 1.716 2.254 42.38 29.67 1.40 27.64 0.00
12+400 3.870 1.776 2.094 43.48 30.44 1.40 28.41 0.00
12+420 3.670 1.836 1.834 39.28 27.50 1.40 25.47 0.00
12+440 3.660 1.896 1.764 35.98 25.19 1.40 23.16 0.00
12+460 3.700 1.956 1.744 35.08 24.56 1.40 22.53 0.00
12+480 3.780 2.016 1.764 35.08 24.56 1.40 22.53 0.00
12+500 3.830 2.076 1.754 35.18 24.63 1.40 22.60 0.00
12+520 3.900 2.136 1.764 35.18 24.63 1.40 22.60 0.00
12+540 3.960 2.196 1.764 35.28 24.70 1.40 22.67 0.00
12+560 3.920 2.256 1.664 34.28 24.00 1.40 21.97 0.00
12+580 3.870 2.316 1.554 32.18 22.53 1.40 20.50 0.00
12+600 3.780 2.376 1.404 29.58 20.71 1.40 18.68 0.00
12+620 3.680 2.436 1.244 26.48 18.54 1.40 16.51 0.00
12+640 3.590 2.496 1.094 23.38 16.37 1.40 14.34 0.00
12+660 3.770 2.556 1.214 23.08 16.16 1.40 14.13 0.00
12+680 3.780 2.616 1.164 23.78 16.65 1.40 14.62 0.00
12+700 3.780 2.676 1.104 22.68 15.88 1.40 13.85 0.00
12+720 3.790 2.736 1.054 21.58 15.11 1.40 13.08 0.00
12+740 3.750 2.796 0.954 20.08 14.06 1.40 12.03 0.00

TOTALES 15,772.15 527.80 14,824.63 20,511.60

VOLUMEN
TERRENO RASANTE DIFERIENCIA PLANTILLA RELLENO
CADENAMIENTO AREA (M2) EXCAVACION ADEME (M2)
NATURAL HIDRAULICA ALTURA (M3) (M3)
(M3)

31
LINEA
MADRINA (M2)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

32
LINEA
MADRINA (M2)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

33
LINEA
MADRINA (M2)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

34
LINEA
MADRINA (M2)

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

35
LINEA
MADRINA (M2)

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

36
LINEA
MADRINA (M2)

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

37
LINEA
MADRINA (M2)

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

2,940.00

LINEA
MADRINA (M2)

38
ALTERNATIVA # 1
ARENERO

VOLUMEN
TERRENO RASANTE DIFERIENCIA PLANTILLA RELLENO
CADENAMIENTO AREA (M2) EXCAVACION ADEME (M2)
NATURAL HIDRAULICA ALTURA (M3) (M3)
(M3)

0+000 4.069 0.740


0+020 4.240 0.780 3.460 34.60 44.98 2.60 41.12 69.20
0+040 4.200 0.820 3.380 68.40 88.92 2.60 85.06 136.80
0+060 4.190 0.860 3.330 67.10 87.23 2.60 83.37 134.20
0+080 4.290 0.900 3.390 67.20 87.36 2.60 83.50 134.40
0+100 4.320 0.940 3.380 67.70 88.01 2.60 84.15 135.40
0+120 4.130 0.980 3.150 65.30 84.89 2.60 81.03 130.60
0+140 4.030 1.020 3.010 61.60 80.08 2.60 76.22 123.20
0+160 4.000 1.060 2.940 59.50 77.35 2.60 73.49 119.00
0+180 3.970 1.100 2.870 58.10 75.53 2.60 71.67 116.20
0+200 4.000 1.140 2.860 57.30 74.49 2.60 70.63 114.60
0+220 4.025 1.180 2.845 57.05 74.17 2.60 70.31 114.10
0+240 4.000 1.220 2.780 56.25 73.13 2.60 69.27 112.50
0+260 4.000 1.260 2.740 55.20 71.76 2.60 67.90 110.40
0+280 4.030 1.300 2.730 54.70 71.11 2.60 67.25 109.40
0+300 4.010 1.340 2.670 54.00 70.20 2.60 66.34 108.00
0+320 4.000 1.380 2.620 52.90 68.77 2.60 64.91 105.80
0+340 4.000 1.420 2.580 52.00 67.60 2.60 63.74 104.00
0+360 4.050 1.460 2.590 51.70 67.21 2.60 63.35 103.40
0+380 3.960 1.500 2.460 50.50 65.65 2.60 61.79 101.00
0+400 3.970 1.540 2.430 48.90 34.23 1.40 32.20 0.00
0+420 3.940 1.580 2.360 47.90 33.53 1.40 31.50 0.00
0+440 3.860 1.620 2.240 46.00 32.20 1.40 30.17 0.00
0+460 3.830 1.660 2.170 44.10 30.87 1.40 28.84 0.00
0+480 3.800 1.700 2.100 42.70 29.89 1.40 27.86 0.00
0+500 3.810 1.740 2.070 41.70 29.19 1.40 27.16 0.00
0+520 3.770 1.780 1.990 40.60 28.42 1.40 26.39 0.00
0+540 3.800 1.820 1.980 39.70 27.79 1.40 25.76 0.00
0+560 3.820 1.860 1.960 39.40 27.58 1.40 25.55 0.00
0+580 3.820 1.900 1.920 38.80 27.16 1.40 25.13 0.00
0+600 3.740 1.940 1.800 37.20 26.04 1.40 24.01 0.00
0+620 3.730 1.980 1.750 35.50 24.85 1.40 22.82 0.00
0+640 3.680 2.020 1.660 34.10 23.87 1.40 21.84 0.00
0+660 3.700 2.060 1.640 33.00 23.10 1.40 21.07 0.00
0+680 3.670 2.100 1.570 32.10 22.47 1.40 20.44 0.00
0+700 3.580 2.140 1.440 30.10 21.07 1.40 19.04 0.00
0+720 3.450 2.180 1.270 27.10 18.97 1.40 16.94 0.00

39
ALTERNATIVA # 1
ARENERO

VOLUMEN
TERRENO RASANTE DIFERIENCIA PLANTILLA RELLENO
CADENAMIENTO AREA (M2) EXCAVACION ADEME (M2)
NATURAL HIDRAULICA ALTURA (M3) (M3)
(M3)

0+740 3.580 2.220 1.360 26.30 18.41 1.40 16.38 0.00


0+760 3.550 2.260 1.290 26.50 18.55 1.40 16.52 0.00
0+780 3.550 2.300 1.250 25.40 17.78 1.40 15.75 0.00
0+800 3.570 2.340 1.230 24.80 17.36 1.40 15.33 0.00
0+820 3.570 2.380 1.190 24.20 16.94 1.40 14.91 0.00
0+840 3.570 2.420 1.150 23.40 16.38 1.40 14.35 0.00
0+860 3.470 2.460 1.010 21.60 15.12 1.40 13.09 0.00
0+880 3.440 2.500 0.940 19.50 13.65 1.40 11.62 0.00
0+900 3.330 2.540 0.790 17.30 12.11 1.40 10.08 0.00
0+920 3.270 2.580 0.690 14.80 10.36 1.40 8.33 0.00
0+940 3.270 2.620 0.650 13.40 9.38 1.40 7.35 0.00
0+960 3.230 2.660 0.570 12.20 8.54 1.40 6.51 0.00
0+980 3.330 2.700 0.630 12.00 8.40 1.40 6.37 0.00
1+000 3.340 2.740 0.600 12.30 8.61 1.40 6.58 0.00

TOTALES 2,071.25 92.80 1,935.12 2,182.20

VOLUMEN
TERRENO RASANTE DIFERIENCIA PLANTILLA RELLENO
CADENAMIENTO AREA (M2) EXCAVACION ADEME (M2)
NATURAL HIDRAULICA ALTURA (M3) (M3)
(M3)

40
LINEA
MADRINA (M2)

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

41
LINEA
MADRINA (M2)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

380.00

LINEA
MADRINA (M2)

42
ALTERNATIVA # 1
HERRADURA

VOLUMEN
TERRENO RASANTE DIFERIENCIA PLANTILLA RELLENO
CADENAMIENTO AREA (M2) EXCAVACION ADEME (M2)
NATURAL HIDRAULICA ALTURA (M3) (M3)
(M3)

2+700 4.210 3.410 0.800


2+720 4.255 3.390 0.865 16.65 11.66 1.40 8.84 0.00
2+740 4.188 3.370 0.818 16.83 11.78 1.40 8.97 0.00
2+760 4.160 3.350 0.810 16.28 11.40 1.40 8.58 0.00
2+780 4.120 3.330 0.790 16.00 11.20 1.40 8.39 0.00
2+800 4.141 3.310 0.831 16.21 11.35 1.40 8.53 0.00
2+820 4.201 3.290 0.911 17.42 12.19 1.40 9.38 0.00
2+840 4.291 3.270 1.021 19.32 13.52 1.40 10.71 0.00
2+860 4.351 3.250 1.101 21.22 14.85 1.40 12.04 0.00
2+880 4.380 3.230 1.150 22.51 15.76 1.40 12.94 0.00
2+900 4.310 3.210 1.100 22.50 15.75 1.40 12.94 0.00
2+920 4.189 3.190 0.999 20.99 14.69 1.40 11.88 0.00
2+940 4.020 3.170 0.850 18.49 12.94 1.40 10.13 0.00
2+960 4.011 3.150 0.861 17.11 11.98 1.40 9.16 0.00
2+980 4.080 3.130 0.950 18.11 12.68 1.40 9.86 0.00
3+000 4.081 3.110 0.971 19.21 13.45 1.40 10.63 0.00
3+020 4.111 3.090 1.021 19.92 13.94 1.40 11.13 0.00
3+040 4.181 3.070 1.111 21.32 14.92 1.40 12.11 0.00
3+060 4.211 3.050 1.161 22.72 15.90 1.40 13.09 0.00
3+080 4.271 3.030 1.241 24.02 16.81 1.40 14.00 0.00
3+100 4.301 3.010 1.291 25.32 17.72 1.40 14.91 0.00
3+120 4.330 2.990 1.340 26.31 18.42 1.40 15.60 0.00
3+140 4.280 2.970 1.310 26.50 18.55 1.40 15.74 0.00
3+160 4.230 2.950 1.280 25.90 18.13 1.40 15.32 0.00
3+180 4.190 2.930 1.260 25.40 17.78 1.40 14.97 0.00
3+200 4.212 2.910 1.302 25.62 17.93 1.40 15.12 0.00
3+220 4.380 2.890 1.490 27.92 19.54 1.40 16.73 0.00
3+240 4.260 2.870 1.390 28.80 20.16 1.40 17.35 0.00
3+260 4.261 2.850 1.411 28.01 19.61 1.40 16.79 0.00
3+280 4.321 2.830 1.491 29.02 20.31 1.40 17.50 0.00
3+300 4.381 2.810 1.571 30.62 21.43 1.40 18.62 0.00
3+320 4.451 2.790 1.661 32.32 22.62 1.40 19.81 0.00
3+340 4.590 2.770 1.820 34.81 24.37 1.40 21.55 0.00
3+360 4.590 2.750 1.840 36.60 25.62 1.40 22.81 0.00
3+380 4.540 2.730 1.810 36.50 25.55 1.40 22.74 0.00
3+400 4.500 2.710 1.790 36.00 25.20 1.40 22.39 0.00
3+420 4.409 2.690 1.719 35.09 24.56 1.40 21.75 0.00

43
ALTERNATIVA # 1
HERRADURA

VOLUMEN
TERRENO RASANTE DIFERIENCIA PLANTILLA RELLENO
CADENAMIENTO AREA (M2) EXCAVACION ADEME (M2)
NATURAL HIDRAULICA ALTURA (M3) (M3)
(M3)

3+440 4.269 2.670 1.599 33.18 23.23 1.40 20.41 0.00


3+460 4.130 2.650 1.480 30.79 21.55 1.40 18.74 0.00
3+480 4.131 2.630 1.501 29.81 20.87 1.40 18.05 0.00
3+500 4.200 2.610 1.590 30.91 21.64 1.40 18.82 0.00
3+520 4.162 2.590 1.572 31.62 22.13 1.40 19.32 0.00
3+540 4.332 2.570 1.762 33.34 23.34 1.40 20.52 0.00
3+560 4.518 2.550 1.968 37.30 26.11 1.40 23.30 0.00
3+580 4.230 2.530 1.700 36.68 25.68 1.40 22.86 0.00
3+600 4.181 2.510 1.671 33.71 23.60 1.40 20.78 0.00
3+620 4.241 2.490 1.751 34.22 23.95 1.40 21.14 0.00
3+640 4.270 2.470 1.800 35.51 24.86 1.40 22.04 0.00
3+660 4.281 2.450 1.831 36.31 25.42 1.40 22.60 0.00
3+680 4.381 2.430 1.951 37.82 26.47 1.40 23.66 0.00
3+700 4.450 2.410 2.040 39.91 27.94 1.40 25.12 0.00
3+720 4.451 2.390 2.061 41.01 28.71 1.40 25.89 0.00
3+740 4.538 2.370 2.168 42.29 29.60 1.40 26.79 0.00
3+760 4.174 2.350 1.824 39.92 27.94 1.40 25.13 0.00
3+780 4.760 2.330 2.430 42.54 29.78 1.40 26.96 0.00
3+800 4.720 2.310 2.410 48.40 33.88 1.40 31.07 0.00
3+820 4.710 2.290 2.420 48.30 33.81 1.40 31.00 0.00
3+840 4.640 2.270 2.370 47.90 33.53 1.40 30.72 0.00
3+860 4.611 2.250 2.361 47.31 33.12 1.40 30.30 0.00
3+880 4.650 2.230 2.420 47.81 33.47 1.40 30.65 0.00
3+900 4.630 2.210 2.420 48.40 33.88 1.40 31.07 0.00
3+920 4.540 2.190 2.350 47.70 33.39 1.40 30.58 0.00
3+940 4.510 2.170 2.340 46.90 32.83 1.40 30.02 0.00
3+960 4.500 2.150 2.350 46.90 32.83 1.40 30.02 0.00
3+980 4.430 2.130 2.300 46.50 32.55 1.40 29.74 0.00
4+000 4.421 2.110 2.311 46.11 32.28 1.40 29.46 0.00
4+020 4.470 2.090 2.380 46.91 32.84 1.40 30.02 0.00
4+040 4.382 2.070 2.312 46.92 32.84 1.40 30.03 0.00
4+060 4.640 2.050 2.590 49.02 63.73 2.60 59.08 98.04
4+080 4.610 2.030 2.580 51.70 67.21 2.60 62.57 103.40
4+100 4.491 2.010 2.481 50.61 65.79 2.60 61.15 101.22
4+120 4.601 1.990 2.611 50.92 66.20 2.60 61.55 101.84
4+140 4.650 1.970 2.680 52.91 68.78 2.60 64.14 105.82
4+160 4.601 1.950 2.651 53.31 69.30 2.60 64.66 106.62

44
ALTERNATIVA # 1
HERRADURA

VOLUMEN
TERRENO RASANTE DIFERIENCIA PLANTILLA RELLENO
CADENAMIENTO AREA (M2) EXCAVACION ADEME (M2)
NATURAL HIDRAULICA ALTURA (M3) (M3)
(M3)

4+180 4.630 1.930 2.700 53.51 69.56 2.60 64.92 107.02


4+200 4.610 1.910 2.700 54.00 70.20 2.60 65.56 108.00
4+220 4.600 1.890 2.710 54.10 70.33 2.60 65.69 108.20
4+240 4.502 1.870 2.632 53.42 69.45 2.60 64.80 106.84
4+260 4.682 1.850 2.832 54.64 71.03 2.60 66.39 109.28
4+280 4.989 1.830 3.159 59.91 77.88 2.60 73.24 119.82
4+300 4.810 1.810 3.000 61.59 80.07 2.60 75.43 123.18
4+320 4.690 1.790 2.900 59.00 76.70 2.60 72.06 118.00
4+340 4.670 1.770 2.900 58.00 75.40 2.60 70.76 116.00
4+360 4.660 1.750 2.910 58.10 75.53 2.60 70.89 116.20
4+380 4.621 1.730 2.891 58.01 75.41 2.60 70.77 116.02
4+400 4.670 1.710 2.960 58.51 76.06 2.60 71.42 117.02
4+420 4.660 1.690 2.970 59.30 77.09 2.60 72.45 118.60
4+440 4.640 1.670 2.970 59.40 77.22 2.60 72.58 118.80
4+460 4.600 1.650 2.950 59.20 76.96 2.60 72.32 118.40
4+480 4.580 1.630 2.950 59.00 76.70 2.60 72.06 118.00
4+500 4.560 1.610 2.950 59.00 76.70 2.60 72.06 118.00
4+520 4.550 1.590 2.960 59.10 76.83 2.60 72.19 118.20
4+540 4.540 1.570 2.970 59.30 77.09 2.60 72.45 118.60
4+560 4.530 1.550 2.980 59.50 77.35 2.60 72.71 119.00
4+580 4.520 1.530 2.990 59.70 77.61 2.60 72.97 119.40
4+600 4.530 1.510 3.020 60.10 78.13 2.60 73.49 120.20
4+620 4.520 1.490 3.030 60.50 78.65 2.60 74.01 121.00
4+640 4.501 1.470 3.031 60.61 78.79 2.60 74.15 121.22
4+660 4.551 1.450 3.101 61.32 79.72 2.60 75.07 122.64
4+680 4.580 1.430 3.150 62.51 81.26 2.60 76.62 125.02
4+700 4.580 1.410 3.170 63.20 82.16 2.60 77.52 126.40
4+720 4.590 1.390 3.200 63.70 82.81 2.60 78.17 127.40
4+740 4.550 1.370 3.180 63.80 82.94 2.60 78.30 127.60
4+760 4.550 1.350 3.200 63.80 82.94 2.60 78.30 127.60
4+780 4.540 1.330 3.210 64.10 83.33 2.60 78.69 128.20
4+800 4.560 1.310 3.250 64.60 83.98 2.60 79.34 129.20
4+820 4.530 1.290 3.240 64.90 84.37 2.60 79.73 129.80
4+840 4.500 1.270 3.230 64.70 84.11 2.60 79.47 129.40
4+860 4.450 1.250 3.200 64.30 83.59 2.60 78.95 128.60
4+880 4.420 1.230 3.190 63.90 83.07 2.60 78.43 127.80
4+900 4.321 1.210 3.111 63.01 81.91 2.60 77.27 126.02

45
ALTERNATIVA # 1
HERRADURA

VOLUMEN
TERRENO RASANTE DIFERIENCIA PLANTILLA RELLENO
CADENAMIENTO AREA (M2) EXCAVACION ADEME (M2)
NATURAL HIDRAULICA ALTURA (M3) (M3)
(M3)

4+920 4.350 1.190 3.160 62.71 81.52 2.60 76.88 125.42


4+940 4.331 1.170 3.161 63.21 82.17 2.60 77.53 126.42
4+960 4.421 1.150 3.271 64.32 83.62 2.60 78.97 128.64
4+980 4.450 1.130 3.320 65.91 85.68 2.60 81.04 131.82
5+000 4.431 1.110 3.321 66.41 86.33 2.60 81.69 132.82
5+020 4.471 1.090 3.381 67.02 87.13 2.60 82.48 134.04
5+040 4.510 1.070 3.440 68.21 88.67 2.60 84.03 136.42
5+060 4.501 1.050 3.451 68.91 89.58 2.60 84.94 137.82
5+080 4.570 1.030 3.540 69.91 90.88 2.60 86.24 139.82
5+100 4.580 1.010 3.570 71.10 92.43 2.60 87.79 142.20
5+120 4.560 0.990 3.570 71.40 92.82 2.60 88.18 142.80
5+140 4.520 0.970 3.550 71.20 92.56 2.60 87.92 142.40
5+160 4.470 0.950 3.520 70.70 91.91 2.60 87.27 141.40
5+180 4.470 0.930 3.540 70.60 91.78 2.60 87.14 141.20
5+200 4.480 0.910 3.570 71.10 92.43 2.60 87.79 142.20
5+220 4.480 0.890 3.590 71.60 93.08 2.60 88.44 143.20
5+240 4.460 0.870 3.590 71.80 93.34 2.60 88.70 143.60
5+260 4.481 0.850 3.631 72.21 93.87 2.60 89.23 144.42
5+280 4.550 0.830 3.720 73.51 95.56 2.60 90.92 147.02
5+300 4.560 0.810 3.750 74.70 97.11 2.60 92.47 149.40
5+320 4.520 0.790 3.730 74.80 97.24 2.60 92.60 149.60
5+340 4.501 0.770 3.731 74.61 96.99 2.60 92.35 149.22
5+360 4.540 0.750 3.790 75.21 97.77 2.60 93.13 150.42
5+380 4.471 0.730 3.741 75.31 97.90 2.60 93.26 150.62
5+400 4.500 0.710 3.790 75.31 97.90 2.60 93.26 150.62
5+420 4.521 0.690 3.831 76.21 99.07 2.60 94.43 152.42
5+440 4.560 0.670 3.890 77.21 100.37 2.60 95.73 154.42
5+460 4.540 0.650 3.890 77.80 101.14 2.60 96.50 155.60

TOTALES 7,383.19 278.40 6,865.07 9,053.60

VOLUMEN
TERRENO RASANTE DIFERIENCIA PLANTILLA RELLENO
CADENAMIENTO AREA (M2) EXCAVACION ADEME (M2)
NATURAL HIDRAULICA ALTURA (M3) (M3)
(M3)

46
LINEA
MADRINA (M2)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

47
LINEA
MADRINA (M2)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20.00
20.00
20.00
20.00
20.00
20.00

48
LINEA
MADRINA (M2)

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

49
LINEA
MADRINA (M2)

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00

1,420.00

LINEA
MADRINA (M2)

50

También podría gustarte