Project Name : ABC PROJECT INSPECTION AND TEST PLAN


Project No. : 123-45-67 m Ref. No. : P07-F06a / Rev. 0 / Feb. 2012 (ITP)
Client Proj. Manager Consultant Contractor

PLASTERING WORKS
gr

ing bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bu

Verifying Party (Legend): Verification Codes :


SC = Subcontractor H = Hold Point - Mandatory - work cannot proceed until inspection activity has been signed-off by relevant party. ITP Ref. No : Rev.
MC = Main Contractor W = Witness Point - Veryfying Party to witness. Evidence of witness shall be by signature of relevant Inspection Report.
CT = Consultant R = Review - Inspection and Test documentation to be presented to Consultant or PM for review. Date Prepared :
PM = Client or PM S = Surveillance - Monitoring of work activities, NO report required.

Item Reference Documents Frequency / Characteristics to Verifying Party


Activity Description Acceptance Criteria / Standard Requirements Verifying Documents
No. (Specs/Procedures/Dwgs) be Verified SC MC CT PM
• Clean from oil, dust and loose particles
• Concrete surface shall be chipped to 3 mm depth to
remove laitance or sprayed with a slurry coat of one part of
QCS section 24 part 2.9 Sufrace rough to receive
cement and two parts of sand with water
Project specification section 24 plastering
### 1 Surface Preparation • Completion of MEP conduits and fixtures. Records/ Reports /RFI NA H W S
2.3.5 MEP clearence
• Installation of Plaster accessories, such as metal lath .
Plastering acessories
stops, beads
• As per approved Method statement.

• Mortar shall be mixed only as and when required


• Shall be mixed in the relevant proportions
• Consistency of mix
2 Plaster mixing QCS section 24 part 2.10 • As indicated in QCS section 24 part 2.10 table 2.1 Records/ Reports /RFI NA H R/S S
• Render mix shall be used within 1 hours of mixing

• All plastering accessories and MEP conduits and fixtures


shall be completed prior to plastering apllication
• Shall be applied as per approved method statement
• The first undercoat applied to metal lathing is to be well
Plasatering Application - Base coat QCS section24 part 2.10.2
• Thickness of mix worked into the lath to ensure that• the material is
2 ( First coat) Project specification section 24 Records/ Reports /RFI NA H R/S S
• Uniformity completely embedded.
2.3.5
• Thickness of coat shall not be less than 8mm or more than
13 mm in any part of masonry or concrete surface
• Trowel apply and scour to form a key for the second coat.

Inspection Test Plan (ITP)AEB - Construction Supervision Department Quality Forms Page 1 of 7 Form No.: P07-F06a / Rev. 0 / Feb. 2012gr
Project Logo
Project Name : ABC PROJECT INSPECTION AND TEST PLAN
Project No. : 123-45-67 m Ref. No. : P07-F06a / Rev. 0 / Feb. 2012 (ITP)
Client Proj. Manager Consultant Contractor

PLASTERING WORKS
gr

ing bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bu

Verifying Party (Legend): Verification Codes :


SC = Subcontractor H = Hold Point - Mandatory - work cannot proceed until inspection activity has been signed-off by relevant party. ITP Ref. No : Rev.
MC = Main Contractor W = Witness Point - Veryfying Party to witness. Evidence of witness shall be by signature of relevant Inspection Report.
CT = Consultant R = Review - Inspection and Test documentation to be presented to Consultant or PM for review. Date Prepared :
PM = Client or PM S = Surveillance - Monitoring of work activities, NO report required.

Item Reference Documents Frequency / Characteristics to Verifying Party


Activity Description Acceptance Criteria / Standard Requirements Verifying Documents
No. (Specs/Procedures/Dwgs) be Verified SC MC CT PM

• Shall be applied matching with the Approved mock up


• Shall not be less than 5 mm or more than 10 mm
• Uniformity of surface • To be applied atleast onday after the appliaction of base
QCS section24 part 2.10.2
• Finishing of plaster caot
3 Plastering Application - Final coat Project specification section 24 Records/ Reports /RFI NA R R S
• Thickness • The surface of the finish coat is to be smooth, true and
2.3.5
free from waviness, irregularities or blemishes with straight,
level or plumb angles

• Curing shall be maintained for 3 days


• All plaster shall be protected from premature / uneven
4 Curing and Protection QCS sction 13 part 5.15 .Curing Time Records/ Reports /RFI NA R R S
drying until set

• Finished surface to be flush with ground, corner beads,


• Final finished surface outlet boxes etc.
Project specification section 24 • Free from cracks, blisters and • Free from cracks and display straight arises and true
5 Final inspection prior painting Records/ Reports /RFI NA H H S
2.3.6 discoloration angles
• Free from trowel marks and blemishes

Prepared by (Contractor) : Reviewed and Approved by (AEB Discipline Engineer) : Noted by (AEB-PM or RE):
Name : VINODH.P Name : Name :

Signature : Date : Signature : Date : Signature : Date :

Inspection Test Plan (ITP)AEB - Construction Supervision Department Quality Forms Page 2 of 7 Form No.: P07-F06a / Rev. 0 / Feb. 2012gr
Project Logo
Project Name :
Project No. :

Client

arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab eng

Verifying Party (Legend): Verification Codes :


SC = Subcontractor H = Hold Point
MC = Main Contractor W = Witness Point
CT = Consultant R = Review
PM = Client or PM S = Surveillance

Item No. Activity Description

1 MATERIAL
1.1
1.2
1.3
1.4
2 EXECUTION
2.1 Surface preparation and Setting out
2.2 Mortar Mixing for block work
2.3 Laying of block work
2.4 Curing and Protection
Project Name : ABC PROJECT
Project No. : 123-45-67

Proj. Manager

ering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engin

- Mandatory - work cannot proceed until inspection activity has been signed-off by relevant party.
Witness Point - Veryfying Party to witness. Evidence of witness shall be by signature of relevant Inspection Report.
- Inspection and Test documentation to be presented to Consultant or PM for review.
Surveillance - Monitoring of work activities, NO report required.

Reference Documents
Fr
(Specs/Procedures/Dwgs)

QCS section 13 part 5.3.1 • Surface area cleaning


Approved Shop drawings • Setting
Type of out
Mixing.
QCS section 13 part 2.2 • Ratio of mix…and characteristic strength.
Project specification section 13 part 1.3.4 • Mortar filling for Hollow block.
Approved Shop Drawing • Block wall shall be reinforced as indicated on drawing.
QCS sction 13 part 5.15 Drying of joints
Form Ref. No. : P07-F06a / Rev. 0 / Feb. 2012

Consultant Contractor

ring bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engine

-off by relevant party.


evant Inspection Report.

Frequency / Characteristics to be Verified

acteristic strength.
w block.
forced as indicated on drawing.
/ Rev. 0 / Feb. 2012
INSPECTION AND TEST

CONCRETE WO
gr

ng bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau

ITP Ref. No :

Date Prepared :

Acceptance Criteria / Standard Requirements Verifying Documents


SC

Material submittal
NA
Material Test certficates
Material Test Cetrficate NA
Manufacturers Test cetficates NA
Material inspection NA
• Area must be need sound cleaning.
•Shall
Line,belength
mixedand angles
in the etc…as
relevant per AFC drawing.
proportions Records/ Reports /RFI NA
As indicated in QCS
• All connections between block walls or partitions and concrete or steel Records/ Reports /RFI NA
Mortar
columnsshall
are be used
to be within 2 at
reinforced hours of mixing
maximum 400 mm centers by means of Records/ Reports /RFI NA
stainless steelbe
• Curing shall or maintained
zinc coatedfor
expanded
3 days metal Records/ Reports /RFI NA
ECTION AND TEST PLAN (ITP)

CONCRETE WORKS

g bureau arab engineering bureau

Rev.

Verifying Party
SC MC CT PM

NA H R/S R/S
NA R R S
NA R R S
NA W R S

NA H W S
NA W S S
NA H W S
NA W S S