CONTROL DE ASENTAMIENTO EN OBRA (01/10/2019)

SLUMP (pulg) HORA INICIO DE MEZCLA


CONCRETO F'C=280 PLANTA IN - SITU PLANTA IN - SITU

TANDA 01 6 1/4" 6" 8:30 9:15


TANDA 02 5 3/4" 4 1/4" 9:30 10:13
TANDA 03 6" 5 1/4" 10:40 11:05
TANDA 04 6 1/4" 5 1/2" 11:40 12:27
TANDA 05 6 1/4" 5 1/2" 13:00 13:49
TANDA 06 6 1/2" 5 1/2" 14:00 14:20
TANDA 07 6 1/2" 6 3/4" 15:20 16:00
TANDA 08 6 1/2" 6" 16:20 16:40
TANDA 09 4 3/4" 6 1/2" 17:20 18:05
CONTROL DE ASENTAMIENTO EN OBRA (02/10/2019)
SLUMP (pulg) HORA INICIO DE MEZCLA TIPO MIXER
CONCRETO F'C=280 PLANTA IN - SITU PLANTA IN - SITU CAPACIDAD

TANDA 01 6 3/4" 6 3/4" 9:25 9:50 8M3


TANDA 02 7" 6 3/4" 10:50 11:08 7M3
TANDA 03 6 1/2" 5 1/2" 11:20 11:48 8M3
TANDA 04 6 1/2" 12:00 12:27 7M3
TANDA 05 6 1/4" 6 1/4" 12:15 13:49 8M3
TANDA 06 6 1/2" 6" 13:13 13:36 7M3
TANDA 07 6" 6 3/4" 14:05 14:25 8M3
TANDA 08 6 1/2" 5 1/2" 14:30 14:52 7M3
TANDA 09 5 3/4" 6" 16:15 16:37 8M3
TANDA 10 6 1/2" 6 1/4" 16:40 17:01 7M3
TANDA 11 5" 4 1/2" 18:00 18:30 8M3