REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


CAMARINES NORTE DISTRICT ENGINEERING OFFICE
F. PIMENTEL AVE. PASIG, DAET, CAMARINES NORTE REGION V

CADD BY :
PROJECT TITLE / LOCATION : SHEET CONTENT : SUBMITTED BY : RECOMMENDING APPROVAL : APPROVED : SET NO. : SHEET NO. :
REPUBLIC OF THE PHILIPPINES Ar. Zhieg
· COVER PAGE
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS COMPLETION OF PREPARED/ DESIGNED BY :
PDS 1
DONNA JEAN T. LACSON, uap
OFFICE OF THE DISTRICT ENGINEER MULTI-PURPOSE BUILDING ARCHITECT/ SPECIAL AGENT I
CP 1
(PHASE - III 11.00m x 15.00) AGNES B. VILLALUZ VICTORIO F. CORPORAL RICARDO R. GUTIERREZ
PASIG, DAET, CAMARINES NORTE REGION V
CHECKED BY :
ENGINEER III ASST. DISTRICT ENGINEER 1 1 1
ELMER CEZAR A. ZALETA, uap DISTRICT ENGINEER
BRGY. MALAGUIT, PARACALE, CAMARINES NORTE CHIEF, PLANNING & DESIGN SECTION
ARCHITECT II
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
TABLE OF CONTENT
SUMMARY OF QUANTITIES
OFFICE OF THE BUILDING OFFICIAL
ITEM DESCRIPTION UNIT QUANTITIES ARCHITECTURAL
A. EARTHWORKS AS-PLAN

801(1) REMOVAL OF STRUCTURES AND OBSTRUCTION l.s 1.00 1 PERSPECTIVE


A 2
803(1)a STRUCTURAL EXCAVATION cu.m 35.20 SITE DEVELOPMENT PLAN
1 6 LOCATION PLAN
804(1)a EMBANKMENT (FROM STRUCTURE EXCAVATION) cu.m 28.81
SUMMARY OF QUANTITIES
804(4) GRAVEL FILL FOR COLUMN FOOTING cu.m 3.20
B. CONCRETE WORKS 2
A 2 FLOOR PLAN
900(1)b2 STRUCTURAL CONCRETE (FOOTING) cu.m 5.60
2 6
FOUNDATION PLAN LINE AND GRADE
902(1)a1 REINFORCING STEEL (COLUMN FOOTING) kgs 305.89 ROOF PLAN
900(1)b4 STRUCTURAL CONCRETE (COLUMNS) cu.m 3.19 ROOF FRAMING PLAN
902(1)a1 REINFORCING STEEL (COLUMNS) kgs 630.72

900(1)b6 STRUCTURAL CONCRETE (BEAMS AND CB) cu.m 3.47 3


A 3 TYPICAL SIDE ELEVATION
902(1)a1 REINFORCING STEEL (BEAMS AND CB) kgs 695.54 3 6 SECTION THRU "A" AND "B"
SPOT DETAIL PARAPET MASONRY
C. FORMS AND FALSEWORKS
903(1) FORMS AND FALSEWORKS l.s 1.00
D. MASONRY WORKS STRUCTURAL
1046(2)a CEMENT FLOOR FINISH sq.m 23.95
E. 1 LAND USE AND ZONING
ROOF FRAMING AND ROOFING WORKS S 3
GENERAL CONSTRUCTION NOTES
1047(2)b STRUCTURAL STEEL (TRUSSES) kgs 1,928.10 4 6
1047(2)c STRUCTURAL STEEL (PURLINS) kgs 1,035.72
2
1047(3)b METAL STRUCTURE ACCESSORIES (SAGRODS) pcs. 37.00 S 3 FOUNDATION PLAN
5 6 ROOF FRAMING PLAN
1047(4) METAL STRUCTURE ACCESSORIES (CROSS BRACING) kgs 113.76

1014(1)a2 PRE-PAINTED METAL SHEETS sq.m 181.92


F. 3 STEEL TRUSS DETAILS
FINISHING WORKS S 3 STEEL STRUT DETAILS
1027(1) CEMENT PLASTER FINISH sq.m 21.90 6 6 SPOT DETAILS "A", "B", "C" AND
G. SAFETY AND HEALTH "D"
DETAIL OF RC BEAM ARCHITECTURAL
B.7 SAFETY AND HEALTH PROGRAM month 2.00
COLUMN FOOTING DETAILS
STANDARD
PERSPECTIVE MULTI-PURPOSE MODEL
(REFER TO DETAILED PLANS)
TYPICAL TRUSS ANCHORAGE

N
N

W E STRUCTURAL

1 2
W E
11.00
S 5.50 5.50 1.00
1.00

HEALTH

DAY CARE
CENTER
S
CENTER STAGE

THIS SITE SANITARY

Bagong-bayan Gumaus
Luklukan Norte
Casalugan
JOSE PANGANIBAN Bagumbayan
SLOPE
Motherlode Pob. Sur
Pob. Norte
EXISTING COVERED EXISTING EXISTING PROPOSED Plaridel Palanas
COURT COVERED COURT COVERED COURT COVERED COURT PARACALE Bacal
( PHASE - II ) ( PHASE - I ) ( PHASE - II ) ( PHASE - III )
Parang ELECTRICAL
Tugos Malaguit Labnig
Sta. Rosa Norte
Manlucugan
SLOPE
Nakalaya Tawig
Sta. Rosa Sur Tabas
Aguit-it
Mangcasay Mampungo
Capacuan Calaburnay
Pinagbirayan
San Rafael Talusan Malaki
Matango
Batobalani Dagang Sabang
Pinagbirayan Munti
Maybato
Cagbalogo
MECHANICAL
Dalnac Dancalan

SITE DEVELOPMENT PLAN LOCATION MAP


SCALE NTS SCALE NTS

CADD BY :
PROJECT TITLE / LOCATION : SHEET CONTENT : SUBMITTED BY : RECOMMENDING APPROVAL : APPROVED : SET NO. : SHEET NO. :
REPUBLIC OF THE PHILIPPINES Ar. Zhieg
· PERSPECTIVE
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS COMPLETION OF · SITE DEVELOPMENT PLAN
PREPARED/ DESIGNED BY :
PDS 1
DONNA JEAN T. LACSON, uap A 3
OFFICE OF THE DISTRICT ENGINEER MULTI-PURPOSE BUILDING · LOCATION MAP
ARCHITECT/ SPECIAL AGENT I
(PHASE - III 11.00m x 15.00) · SUMMARY OF QUANTITIES AGNES B. VILLALUZ VICTORIO F. CORPORAL RICARDO R. GUTIERREZ
PASIG, DAET, CAMARINES NORTE REGION V
CHECKED BY :
ENGINEER III ASST. DISTRICT ENGINEER 1 1 6
ELMER CEZAR A. ZALETA, uap DISTRICT ENGINEER
BRGY. MALAGUIT, PARACALE, CAMARINES NORTE CHIEF, PLANNING & DESIGN SECTION
ARCHITECT II
0.40mm. THK
STANDARD RIDGE ROLL
1 2
0.40mm. THK. HI-RIB
PRE-PAINTED ROOFING PANEL 11.00
5.50 5.50
APEX OF TRUSS

2.50
TOP OF BEAM

5.00
EXISTING
COVERED COURT PROPOSED COVERED COURT
FINISH FLOOR LINE ( PHASE I - II ) ( PHASE - III )

FRONT AND REAR ELEVATION


SCALE 1:100mts

1 2
Y 1 Y1 2 1 2
11.00
11.00 5.50 5.50 1.00 11.00
5.50 5.50 1.00 5.50 5.50
1.00
LINE OF ROOF

1.00
B B B
C1F1 C1F1

SLOPE

EXISTING EXISTING EXISTING


13.55

13.55

13.55
COVERED COURT PROPOSED COVERED COURT COVERED COURT
15.00

15.00

15.00
COVERED COURT
( PHASE I - II ) ( PHASE - III ) ( PHASE I - II ) ( PHASE I - II )

X
SLOPE

C1F1

C1F1
A' A' A'
1.45

1.45

1.45
ED
ER CE
A A A V
CO TRA
N
1.00

EN

FLOOR PLAN ROOF PLAN FOUNDATION PLAN


SCALE 1:100mts SCALE 1:100mts SCALE 1:100mts

CADD BY :
PROJECT TITLE / LOCATION : SHEET CONTENT : SUBMITTED BY : RECOMMENDING APPROVAL : APPROVED : SET NO. : SHEET NO. :
REPUBLIC OF THE PHILIPPINES Ar. Zhieg
· FLOOR PLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS COMPLETION OF · ROOF PLAN PREPARED/ DESIGNED BY :
PDS 2
· FRONT AND REAR ELEVATION DONNA JEAN T. LACSON, uap A 3
OFFICE OF THE DISTRICT ENGINEER MULTI-PURPOSE BUILDING · SECTION THRU "Y" ARCHITECT/ SPECIAL AGENT I
(PHASE - III 11.00m x 15.00) AGNES B. VILLALUZ VICTORIO F. CORPORAL RICARDO R. GUTIERREZ
PASIG, DAET, CAMARINES NORTE REGION V
CHECKED BY :
ENGINEER III ASST. DISTRICT ENGINEER 1 2 6
ELMER CEZAR A. ZALETA, uap DISTRICT ENGINEER
BRGY. MALAGUIT, PARACALE, CAMARINES NORTE CHIEF, PLANNING & DESIGN SECTION
ARCHITECT II
0.40mm. THK. HI-RIB PRE-PAINTED
ROOFING PANEL
0.40mm. THK
STANDARD RIDGE ROLL 1 2
A' B 5.50
11.00
5.50
APEX OF TRUSS APEX OF TRUSS

2.50
2.50
TOP OF BEAM TOP OF BEAM

5.00
5.00
SEE STRUT DETAIL
PAINTED FINISH
SEE STRUT DETAIL
SEE TRUSS DETAIL EXISTING
PLASTERED FINISH COVERED COURT PROPOSED COVERED COURT
FINISH FLOOR LINE FINISH FLOOR LINE ( PHASE I - II ) ( PHASE - III )
BASKETBALL COURT

SECTION THRU "Y1" SECTION THRU "X"


SCALE 1:100mts SCALE 1:100mts

5.46
0.40mm. THK. HI-RIB PRE-PAINTED 0.40mm. THK
100mm THK MASONRY WALL 100mm THK MASONRY WALL ROOFING PANEL STANDARD RIDGE ROLL
PAINTED FINISH PAINTED FINISH

A' B
APEX OF TRUSS
1.50

2.50
TOP OF BEAM

5.00
SEE STRUT DETAIL
SEE TRUSS DETAIL
PLASTERED FINISH
FINISH FLOOR LINE
BASKETBALL COURT

SPOT DETAILS (PARAPET WALL) RIGHT SIDE ELEVATION


SCALE 1:30mts
SCALE 1:100mts

CADD BY :
PROJECT TITLE / LOCATION : SHEET CONTENT : SUBMITTED BY : RECOMMENDING APPROVAL : APPROVED : SET NO. : SHEET NO. :
REPUBLIC OF THE PHILIPPINES Ar. Zhieg
· FOUNDATION PLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS COMPLETION OF · SECTION THRU "X" PREPARED/ DESIGNED BY :
PDS 3
· SECTION THRU "Y1" DONNA JEAN T. LACSON, uap A 3
OFFICE OF THE DISTRICT ENGINEER MULTI-PURPOSE BUILDING · RIGHT SIDE ELEVATION ARCHITECT/ SPECIAL AGENT I
(PHASE - III 11.00m x 15.00) AGNES B. VILLALUZ VICTORIO F. CORPORAL RICARDO R. GUTIERREZ
PASIG, DAET, CAMARINES NORTE REGION V
CHECKED BY :
ENGINEER III ASST. DISTRICT ENGINEER 1 3 6
ELMER CEZAR A. ZALETA, uap DISTRICT ENGINEER
BRGY. MALAGUIT, PARACALE, CAMARINES NORTE CHIEF, PLANNING & DESIGN SECTION
ARCHITECT II
GENERAL CONSTRUCTION NOTES
GENERAL NOTES NOTES ON REINFORCEMENT NOTES ON COLUMNS
1. IN THE INTERPRETATION OF THE DRAWING, INDICATED DIMENSIONS SHALL GOVERN 1. UNLESS OTHERWISE NOTED IN PLANS, THE STRENGTH OF REINFORCING BARS SHALL BE: 1. PROVIDE EXTRA SETS OF TIES AT 100mm OC FOR TIED COLUMN REINFORCEMENT ABOVE AND
AND DISTANCES AND SIZES SHALL NOT BE SCALED FOR CONSTRUCTION PURPOSES. BELOW BEAM - COLUMN CONNECTIONS FOR A DISTANCE FROM FACE OF CONNECTION
A. FOOTINGS, FOOTING BEAMS AND GIRDERS -------------- fy = 275 mpa ( 40,000 psi ) NOTE:
B. COLUMNS AND SHEAR WALLS ------------------------------- fy = 275 mpa ( 40,000 psi ) EQUAL TO THE GREATER OF THE OVERALL THICKNESS OF COLUMN, 1 / 6 THE CLEAR HEIGHT
2. IN REFERENCE TO THE DRAWING, SEE ARCHITECTURAL DRAWINGS FOR DEPRESSIONS PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED
OF COLUMN OR 450mm.
IN FLOOR SLABS, OPENINGS IN THE WALLS AND SLABS, INTERIOR PARTITIONS, LOCATION C. BEAMS AND GIRDER -------------------------------------------- fy = 275 mpa ( 40,000 psi ) IMPLEMENTING RULES AND REGULATION OF R.A. 9184, APPROVAL
2. COLUMN TIES SHALL BE PROTECTED EVERYWHERE BY A COVERING OF CONCRETE CAST
OF DRAWING ETC. BY AUTHORIZED DPWH OFFICIALS OF DETAILED ENGINEERING
D. NON-LOAD BEARING WALL PARTITION, BEDDED SLABS, FLOOR & ROOF SLABS, MONOLITHICALLY WITH THE CORE WITH THE MINIMUM THICKNESS OF 40mm AND NOT LESS
THAN 40 TIMES THE MAXIMUM SIZE OF COARSE AGGREGATE IN MILLIMETERS. SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTS NEITHER
3. IN CASE OF DISCREPANCIES AS TO THE LAYOUT, DIMENSIONS, AND ELEVATION BETWEEN PARAPET, CATCH BASIN, SIDE WALK ------------------------- fy = 227.5 mpa ( 33,000 psi )
3. WHERE COLUMNS CHANGE SIZE, VERTICAL REINFORCEMENTS SHALL BE OFFSET AT A SLOPE DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE
THE STRUCTURAL PLANS AND ARCHITECTURAL DRAWINGS, THE CONTRACTOR SHALL NOTIFY 2. ALL REINFORCING BARS SIZE 10mm OR LARGER SHALL BE DEFORMED IN ACCORDANCE WITH TECHNICAL INTEGRITY OF THE SURVEYS AND DESIGN NOR
OF NOT MORE THAN 1 IN 6 AND EXTRA 10mm TIES AT 100mm SHALL BE PROVIDED THRU OUT
BOTH THE STRUCTURAL ENGINEER AND THE ARCHITECT. ASTM A 706. BARS SMALLER THAN 10mm MAY PLAIN. TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING
THE OFFSET REGION
3. SPLICES SHALL BE SECURELY WIRED TOGETHER & SHALL LAP OR EXTEND IN ACCORDANCE 4. UNLESS OTHERWISE INDICATED IN THE PLANS , LAP SPLICES FOR VERTICAL COLUMN OFFICIALS.
4. ALL CONCRETE WORK SHALL BE DONE IN ACCORDANCE WITH THE ACI. 318 95 BUILDING WITH TABLE A. & TABLE B ( TABLE OF LAP SPLICE & ANCHORAGE LENGTH ) UNLESS OTHERWISE REINFORCEMENT SHALL BE MADE WITHIN THE CENTER HALF OF COLUMN HEIGHT, AND THE
CODE REQUIREMENTS FOR REINFORCED CONCRETE AND ALL STRUCTURAL STEEL WORK SHOWN ON DRAWINGS, SPLICES SHALL BE STAGGERED WHENEVER POSSIBLE. THE DESIGN CONSULTANT SHALL BE HELD FULLY
SPLICE LENGTH SHALL NOT BE LESS THAN 40 BAR ∅. WELDING OR APPROVED MECHANICAL
ACCORDING WITH AISC SPECIFICATION ( 9th EDITION ) IN SO FAR AS THEY DO NOT CONFLICT DEVICES MAY BE USED PROVIDED THAT NOT MORE THAN ALTERNATE BARS ARE WELDED OR RESPONSIBLE FOR THE FAILURE OF THE FACILITY / IES /
WITH THE LOCAL BUILDING CODE REQUIREMENT. MECHANICALLY SPLICED AT ANY LEVEL AND THE VERTICAL DISTANCES BETWEEN THESE STRUCTURES DUE TO FAULTY DESIGN EXCEPT FOR THE CHANGES
WELDS OR SPLICES OF ADJACENT BAR IS NOT LESS THAN 600mm MADE WITHOUT THE CONFORMITY OF THE CONSULTANTS.
5. ACI REFERS TO AMERICAN CONCRETE INSTITUTE, AISC TO AMERICAN INSTITUTE OF STEEL NOTES ON CONCRETE SLABS
CONSTRUCTION AND ASTM TO AMERICAN SOCIETY FOR TESTING MATERIALS.
1. ALL SLAB REINFORCEMENTS SHALL BE 20mm CLEAR MINIMUM FROM BOTTOM AND FROM
6. CONSTRUCTION NOTES AND TYPICAL DETAILS APPLY TO ALL DRAWINGS UNLESS OTHERWISE H NOTES ON BEAMS AND GIRDERS
TOP OF SLAB.
SHOWN OR NOTED. MODIFY TYPICAL DETAILS AS DIRECTED TO MEET SPECIAL CONDITION. CROSS-TIE

350mm MAX.
2. UNLESS OTHERWISE SHOWN, REINFORCEMENT IN CONTINUOUS SLAB SHALL BE CUT AS 1. UNLESS , OTHERWISE NOTED IN PLANS, CAMBER ALL BEAMS AND GIRDER AT
FOLLOWS. LEAST 6mm∅ FOR EVERY 4.50m OF SPAN, EXCEPT CANTILEVERS FOR WHICH THE
7. SHOP DRAWINGS WITH ERECTION AND PLACING DIAGRAMS OF ALL STRUCTURAL STEEL,
MISCELLANEOUS IRON, PRE-CAST CONCRETE, ETC. SHALL BE SUBMITTED FOR ENGINEERS CAMBER SHALL BE AS NOTED IN PLANS OR AS ORDERED BY THE ENGINEER BUT

10
APPROVAL BEFORE FABRICATION. IN NO CASE LESS THAN 20mm FOR EVERY 3.0m OF FREE SPAN.

H
mi
L1 L2

n.
8. CONTRACTOR SHALL NOTE AND PROVIDE ALL MISCELLANEOUS CURBS, SILLS, STOOLS, 2. TYPICAL BARS BENDING AND CUTTING DETAILS SHALL BE AS SHOWN IN FIG. B - 1
L1/3 L1/3 L2/3
EQUIPMENT'S AND MECHANICAL BASES THAT ARE REQUIRED BY THE ARCHITECTURAL, TOP BAR TOP BAR
ELECTRICAL AND MECHANICAL DRAWINGS.
LAP SPLICES ARE ALLOWED
9. ALL RESULTS OF MATERIAL TESTING FOR CONCRETE, REINFORCING BARS & STRUCTURAL ONLY IN THIS PORTION

CONF. REINF.
L1/6 BOTTOM BAR L1/5 L2/5 BOTTOM BAR JOINT HOOP SPACE @ "2Sh" WHEN THERE ARE
STEEL MUST BE NOTED & APPROVED BY THE STRUCTURAL DESIGNER. BEAMS HAVING WIDTH OF AT LEAST ONE-HALF THE L1 L2 L3

D
COLUMN WIDTH & DEPTHS NOT LESS THAN THREE L2/3 L2/3 L3/3 L3/3
NOTES ON CONCRETE MIXES & PLACING QUARTERS OF THE DEEPEST BEAM THAT FRAME 2D 2D 2D 2D 2D

JOINT REINF.CONF. REINF. PER SCHEDULE CONF. REINF.JOINT REINF.


TYPICAL BAR BENDING AND CUTTING DETAILS FOR SLABS INTO FOUR SIDES OF THE COLUMN. ALL OTHER
LOCATION CONDITIONS USE HOOP @ "Sh" CENTER

1. ALL CONCRETE SHALL DEVELOP A MINIMUM COMPRESSIVE STRENGTH AT THE END OF


TWENTY EIGHT ( 28) DAYS W/ CORRESPONDING MAXIMUM SIZE AGGREGATE & SLUMPS AS L2/5 L2/5 L3/5 L3/6

0.96
FOLLOW. 3. IF SLABS ARE REINFORCED BOTHWAYS BARS ALONG THE SHORTER SPAN SHALL BE PLACED

Sh
D
28 DAYS STRENGTH BELOW THOSE ALONG THE LONG SPAN AT THE CENTER AND OVER THE LONGER SPAN BOTTOM BARS WEB BARS
MAXIMUM SIZE OF MAXIMUM SLUMP 2-12mm∅ SIDE BARS
AGGREGATE FOR REINFORCING BARS NEAR THE SUPPORTS. THE SPACING OF THE BARS AT THE COLUMN TOP BARS
FOR COL. BAR SPLICES SEE TABLE OF MIN. LAP

COLUMN TIES AS
ALL OTHERS, INCLUDING STRIPS SHALL NOT BE MORE THAN ONE AND A HALF ( 1 21 ) SLAB THICKNESS
SUSPENDED SLABS 4000 psi ( 27.6 mpa ) 20mm 100mm SPLICE LENGTH OF COLUMN REINFORCEMENT
4. TEMPERATURE BARS FOR SLAB SHALL BE GENERALLY PLACED NEAR THE FACE IN TENSION (SPACING OF TIES ALONG THIS REGION SHALL NOT
COLUMNS 4000 psi ( 27.6 MPA ) 20mm 100mm AND SHALL NOT BE LESS THAN 0.0025 x GROSS CROSS-SECTIONAL AREA ( Ag ) OF THE SLAB BE LESS THAN 100mm)
BEAMS, SLABS 4000 psi ( 27.6 MPA ) 20mm 100mm ( SEE SCHEDULE BELOW )
TABLE "A" TABLE "B"
TENSION BARS COMPRESSION BARS
SLAB ON FILL 3000 psi ( 27.6 MPA ) 20mm 100mm EMBEDMENT LENGTHS AND LAPPED EMBEDMENT LENGTHS AND LAPPED

Sh
SPLICES IN MILLIMETERS SPLICES IN MILLIMETERS

D
BAR SIZE fc' = 20.7MPa (3000psi) fc' = 20.7MPa (4000psi) BAR SIZE fc' = 20.7MPa (3000psi) fc' = 20.7MPa (4000psi)
2. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS SCHEDULE OF MINIMUM SLAB REINFORCEMENT (DEFORMED) EMBEDMENT LAPPED (DEFORMED) EMBEDMENT LAPPED
EMBEDMENT LAPPED EMBEDMENT LAPPED
SUSPENDED SLABS ------------------------------------------------------------------ 20mm NOTE:
THICKNESS MINIMUM TEMPERATURE BARS 10mmØ 300 300 300 300 10mmØ 225 300 200 300
SLAB ON GRADE ----------------------------------------------------------------------- 40mm ALL CONCRETE REINF. DETAIL SHOULD BE
WALLS ABOVE GRADE --------------------------------------------------------------- 25mm 100mm 10mm∅ @ 250mm EACH WAY DONE IN ACCORDANCE WITH THE LATEST 12mmØ 300 300 300 300 12mmØ 275 300 250 300
BEAM STIRRUPS AND COLUMN TIES ----------------------------------------------- 40mm

CONF. REINF.
125mm 10mm∅ @ 225mm EACH WAY EDITION OF ACI DETAILING MANUAL. 16mmØ 300 400 300 400 16mmØ 350 400 325 400
WHERE CONCRETE IS EXPOSED TO 20mmØ 20mmØ
400 550 350 500 450 500 475 500

D
EARTH BUT POURED AGAINST FORMS -------------------------------------------- 50mm 150mm 10mm∅ @ 185mm EACH WAY
25mmØ 25mmØ
WHERE CONCRETE IS DEPOSITED 600 800 550 750 550 625 550 625
175mm 10mm∅ @ 150mm EACH WAY 28mmØ 28mmØ
750 1000 650 850 625 675 625 675
DIRECTLY AGAINST THE EARTH ----------------------------------------------------- 75mm
3. CONCRETE SHALL BE DEPOSITED IN ITS FINAL POSITION WITHOUT SEGREGATION. 200mm 10mm∅ @ 140mm EACH WAY 32mmØ 950 1300 850 1100 32mmØ 700 775 700 775
RE-HANDLING OR PLACING SHALL BE DONE PREFERABLY WITH BUGGIES, BUCKETS OR TYPICAL COLUMN ELEVATION SHOWING
WHEELBARROWS, NO CHUTES WILL BE ALLOWED EXCEPT TO TRANSFER CONCRETE FROM
HOPPER TO BUGGIES, WHEELBARROWS OR BUCKETS IN WHICH CASE THEY SHALL NOT EXCEED DOWELS AND TIES SPACING 3. IF THE BEAM REINFORCING BARS END IN A WALL THE CLEAR DISTANCE FROM THE BAR TO THE
SIX ( 6 ) METERS IN AGGREGATE LENGTH. FARTHER FACE OF THE WALL NOT BE LESS THAN 25mm. EMBEDMENT LENGTH SHALL BE AS
4. NO DEPOSITING OF CONCRETE SHALL BE ALLOWED WITHOUT THE USE OF VIBRATORS SHOWN IN A TABLE "A" FOR TENSION BARS AND TABLE "B" FOR COMPRESSION BARS UNLESS
LAP SPACE LENGTH: SPECIFIED IN PLAN. TOP BAR SHALL NOT BE SPLICED WITHIN THE COLUMN. AT LEAST TWO
UNLESS AUTHORIZED IN WRITING BY THE DESIGNERS AND ONLY FOR UNUSUAL CONDITIONS
5. UNLESS OTHERWISE NOTED IN THE PLANS ALL BEDDED SLABS SHALL BE REINFORCED WITH AT ANY LEVEL NO MORE THAN ALTERNATE BARS SHOULD BE SPLICED MIN. STIRRUPS SHALL BE PROVIDED AT ALL SPLICES.
WHERE VIBRATIONS IS EXTREMELY DIFFICULT TO ACCOMPLISH.
10mm∅ AT 250mm O.C EACH WAY TO CENTER OF SLAB AND CONSTRUCTION JOINTS FOR SAME DISTANCE BETWEEN TWO ADJACENT BARS SPLICES SHALL BE 600mm.
5. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS, SHALL BE PROPERLY POSITIONED & SHALL NOT BE LESS THAN 3.65 METER APART
SECURED IN PLACE PRIOR TO PLACING OF CONCRETE. 4. IF THERE ARE TWO OR MORE LAYERS OF REINFORCING BARS, USE 25mm ∅ BAR SEPARATORS
SPACED AT 1.0m ON CENTER IN NO CASE SHALL THERE BE LESS THAN TWO
6. ALL CONCRETE SHALL BE KEPT MOIST FOR A MINIMUM OF SEVEN ( 7 ) CONSECUTIVE DAYS 6. PROVIDE EXTRA REINFORCEMENTS FOR CORNER SLAB ( TWO ADJACENT DISCONTINUOUS
( 2 ) SEPARATORS BETWEEN TWO LAYERS OF BARS.
IMMEDIATELY AFTER POURING BY THE USE OF WET BURLAP, FOG SPRAYING, CURING EDGES ) AS SHOWN BELOW.
COMPOUNDS OR OTHER APPROVED METHODS. TYPICAL DETAIL OF COLUMN LAP SPLICE AND
7. CONCRETE SLAB REINFORCEMENTS SHALL BE PROPERLY SUPPORTED WITH 10mm∅ STEEL 5. MINIMUM CONCRETE PROTECTION FOR REINFORCING BARS OR STEEL SHAPES BE AS
7. STRIPPING OF FORMS AND SHORES : CHAIR OR APPROVED EQUIVALENT SPACED AT 1.0 METER ON CENTER BOTHWAYS EXTERIOR GIRDER TO COLUMN CONNECTION SHOWN IN FIG. B - 2 UNLESS SPECIFIED ELSEWHERE.
FOUNDATION -------------------------------------------------------------------------- 24 hrs.
SUSPENDED SLAB EXCEPT WHEN ----------------------------------------------- 8 days A
ADDITIONAL LOADS ARE IMPOSED
WALLS --------------------------------------------------------------------------------- 24 days ∅12 x 1000 LONG @
MID-DEPTH OF SLAB b
BEAMS --------------------------------------------------------------------------------- 24 days DOWN INTO EDGE BEAM. EXTENDED
4-∅ 12@ 1800 LONG TOP BARS BEND @ EACH CORNER LAP SPLICE LENGTH:
COLUMNS ----------------------------------------------------------------------------- 24 days
BARS MINIMUM OF 1200 ( 4'-0" ) INTO BARS. 1-∅12 TOP & AT ANY LEVEL NO MORE THAN

t
8. THE CONTRACTOR SHALL SUBMIT THE SCHEDULE OF POURING AND THE LOCATION OF THE
BOTTOM BARS ALTERNATE BARS SHOULD BE MAIN REINFORCEMENT
CONSTRUCTION JOINTS TO THE STRUCTURAL ENGINEER AT LEAST ( 4 ) DAYS PRIOR TO THE SPLICED. MIN. DISTANCE BET. see note
4-∅12 BOTTOM BARS WEB BARS

t or 1/4D
WITHIN CENTER
POURING FOR APPROVAL.
400

ht
1-∅12 EA. TWO ADJACENT BARS SPLICES see note

HALF OF "H"

t
9. THE CONTRACTOR SHALL FURNISH AND MAINTAIN ADEQUATE FORMS AND SHORING UNTIL TOP & BOTTOM SHALL BE 600mm. SLEEVES FOR UTILITY
THE CONCRETE MEMBERS HAVE ATTAINED THEIR WORKING CONDITION AND STRENGTH PIPES MAX 1/5D

D
L/4
0

SLAB
38mm
0

OPENING TOP BARS @ SUPPORT (CONT.) 0.025m∅ SEPARATOR


6

NOTES ON FOOTINGS CLEAR see note PROVIDE 3-10∅ EXTRA STIRR.


REQ'D. BOTT. BARS @ SUPPORT EACH SIDE OF SLEEVES

JT. REINF.
400

1. FOOTINGS ARE DESIGNED FOR AN ALLOWABLE SOIL BEARING PRESSURE OF 96 kpa


0

1-∅12 EA.
0

( 2000 psf ). CONTRACTOR SHALL REPORT TO THE ENGINEER, IN WRITING, THE ACTUAL TOP & BOTTOM

D
6

SOIL CONDITION UNCOVERED AND CONFIRM ACTUAL BEARING CAPACITY OF SOIL BEFORE
DEPOSITING CONCRETE. INTO TWO WAY SLAB EXTEND SECTION "A" 6. WHEN A BEAM CROSSES A GIRDER, REST BEAM ON TOP OF GIRDER BARS, BEAM
BARS UP TO BEAM SUPPORT REINFORCING BAR SHALL BE SYMMETRICAL ABOUT CENTER LINE WHENEVER POSSIBLE.
2. FOOTINGS SHALL REST AT LEAST 15800mm BELOW NATURAL GRADE LINE UNLESS OMIT TRIMMER BARS WHERE
6

OTHERWISE INDICATED IN PLANS. NO FOOTING SHALL REST ON FILL. OPENING IS FRAMED BY BEAM BOTTOM BARS AT 7. GENERALLY NO SPLICES SHALL BE PERMITTED AT POINTS WHERE CRITICAL BENDING
0

SPLICE
0

MID SPAN STRESSES OCCUR, SPLICES WHERE NO PERMITTED SHALL BE INDICATED IN THE TABLE "A"
3. MINIMUM CONCRETE PROTECTION FOR REINFORCEMENTS SHALL BE 75mm CLEAR TYPICAL SLAB AND "B" WELDED SPLICES SHALL BE DEVELOP IN TENSION AT LEAST 125% OF THE
TYPICAL CORNER SLAB DETAIL EXTRA TOP BARS
FOR CONCRETE DEPOSITED THE GROUND AND 50mm FOR CONCRETE OPENING DETAIL SPECIFIED YIELD STRENGTH OF THE BAR. NOT MORE THAN 50% OF THE BARS AT ANY ONE
DEPOSITED AGAINST A FORMWORK. @ SUPPORT SECTION IS ALLOWED TO BE SPLICED THEREIN.
CADD BY :
PROJECT TITLE / LOCATION : SHEET CONTENT : SUBMITTED BY : RECOMMENDING APPROVAL : APPROVED : SET NO. : SHEET NO. :
REPUBLIC OF THE PHILIPPINES Ar. Zhieg
· GENERAL CONSTRUCTION NOTES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS COMPLETION OF PREPARED/ DESIGNED BY :
PDS 1
DONNA JEAN T. LACSON, uap S 3
OFFICE OF THE DISTRICT ENGINEER MULTI-PURPOSE BUILDING ARCHITECT/ SPECIAL AGENT I
(PHASE - III 11.00m x 15.00) AGNES B. VILLALUZ VICTORIO F. CORPORAL RICARDO R. GUTIERREZ
PASIG, DAET, CAMARINES NORTE REGION V
CHECKED BY :
ENGINEER III ASST. DISTRICT ENGINEER 1 4 6
ELMER CEZAR A. ZALETA, uap DISTRICT ENGINEER
BRGY. MALAGUIT, PARACALE, CAMARINES NORTE CHIEF, PLANNING & DESIGN SECTION
ARCHITECT II
0.30
0.30
16mm.Ø PLAIN BAR CROSS
BRACE w/ STD. TURN BUCKLE
1 2 2 - 16mmØ, 300mm LONG
16mm.Ø PLAIN BAR CROSS
BRACE w/ STD. TURN BUCKLE
12mm.Ø THREADED SAGROD
ANCHOR BOLTS w/ STD. 2 ∠ - 5.0mm. THK. x
w/ STD. NUTS & WASHERS 11.00 65mm. x 65mm TOP &

RCB
5.50 5.50 1.00 NUTS & WASHERS 2.5mm x 150 x 50mm. G.I L.C PURLINS
BOTTOM CHORD SPACED @ ±0.82m. O.C. w/ 50mm. x 50mm.
1.00 ANGULAR CLEATS VERTICALLY WELD

CB

CB

0.30
RCB-1 RCB-1

0.40
RCB RCB
CB CB

10mm. THK x 300 x 400mm MS

STEEL TRUSS - 1

STEEL TRUSS - 2
CB
BASEPLATE w/ 2-16mmØ BOLT HOLE
FULLY WELD TO 2 -
CONCRETE COLUMN 16mm.Ø RSB DOWEL
TYP. TRUSS ANCHORAGE DETAILS
SCALE 1:20mts

SPOT DETAILS "C"


SCALE 1:10mts 12mm.Ø THREADED SAGROD (STAGGERED) w/
STANDARD NUTS & WASHERS
14.55

EXISTING SEE STRUT DIAGRAM


COVERED COURT STEEL STRUT STEEL STRUT 0.40mm. THK 12mm.Ø THREADED SAGROD 0.40mm. THK. HI-RIB 1030
15.00

STD. RIDGE ROLL w/ STD. NUTS & WASHER PRE-PAINTED ROOFING PANEL
( PHASE I - II ) 0.40mm. THK. HIB-RIB 1030 1.00
PRE-PAINTED ROOFING PANEL

STEEL TRUSS - 1

STEEL TRUSS - 2

0.30
2.5mm.THK x 150 x 50mm.
G.I. L.C PURLINS

A'

CB
12mm.Ø THREADED SAGROD
1
R CB- w/ STD. NUTS & WASHER
1.45

RCB-1
A SPOT DETAILS
CB

2 ∠ - 5.0mm. THK. x 65mm. 4 ∠ - 5.0mm. THK. x 65mm. x 65mm. SCALE 1:10mts


x 65mm TOP & BOTTOM CHORD ANGLE BAR KING POST (FULLY WELD)

2.50mm. THK. x 150 x 50mm. G.I.


LC-PURLINS SP. @ ± 0.88m. O.C. w/ SPOT DETAILS "A" NAT. GRADE LINE
50mm.x 50mm. ANGULAR CLEATS SCALE 1:20mts

ROOF FRAMING PLAN


SCALE 1:100mts
2 ∠ - 5.0mm. THK. x 65mm. x 65mm TOP
& BOTTOM CHORD ( FULLY WELD ) 8-16mm. Ø VERTICAL BARS w/ 10mm. Ø LATERAL (FIRST LAYER)

1.65
2.5mm. THK. x 150 x 50mm. & INNER LOOP TIES (SECOND LAYER) SPACED @ 3-50mm.,
0.05 G.I. L.C PURLINS 3-100mm., 3-150mm., & REST @ 200mm. O.C. BOTHWAYS
2.5mm.THK x 150mm x
NOTE: 50mm.G.I. PURLINS 50mm. x 50mm. ANGULAR
CLEATS VERTICALLY WELD 11-16mm. Ø BASEBARS SPACED
CROSS BRACE & TURN BUCKLE SHOULD @ 0.185m. O.C. BOTHWAYS
0.075
BE PLACED ON TOP OF STEEL TRUSS

0.15

0.35
SECTION

0.075
TOP VIEW
NOTE:
ANGULAR CLEATS SHOULD BE 0.20m. THK. BOULDER BEDDING
WELD VERTICALLY TO AVOID TWISTING
SPOT DETAILS 8-16mm. Ø VERTICAL BARS w/ 10mm. Ø LATERAL (FIRST LAYER)
SECTION/ELEVATION
SCALE 1:10mts & INNER LOOP TIES (SECOND LAYER) SPACED @ 3-50mm.,
3-100mm., 3-150mm., & REST @ 200mm. O.C. BOTHWAYS

0
.5
0
L 11-16mm. Ø BASEBARS SPACED
L/4 2-16mm. Ø 1-16mm. Ø L/4 @ 0.185m. O.C. BOTHWAYS
0.30 0.30
7 - 16mm ∅ DOWEL,
TOP BARS EXTRA-CUT BARS 1.00m EXTENDED

0.30
2.00
S M
1-16mm
4-16mm 4-16mm
0.40

0.40

CB CB

0.075
2-16mm 2-16mm
1-16mm
@ SUPPORT @ MIDSPAN 1-16mm. Ø 2-16mm. Ø
L/5 L/5
SECTIONS EXTRA-CUT BARS BOTTOM BARS 0.40 0.075
2.00
10mm. Ø STIRRUPS SPACED @ 3-50mm., 3-100mm., PLAN ( C1F1 )
3-150mm., & REST @ 200mm. ON CENTER BOTHWAYS
DETAIL OF COLUMN FOOTING
DETAIL OF RC-BEAM (RCB-2) SCALE 1:30mts
SCALE 1:20mts

CADD BY :
PROJECT TITLE / LOCATION : SHEET CONTENT : SUBMITTED BY : RECOMMENDING APPROVAL : APPROVED : SET NO. : SHEET NO. :
REPUBLIC OF THE PHILIPPINES Ar. Zhieg
· ROOF FRAMING PLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS COMPLETION OF · SPOT DETAILS
PREPARED/ DESIGNED BY :
PDS 2
· TYPICAL TRUSS ANCHORAGE DETAILS DONNA JEAN T. LACSON, uap S 3
OFFICE OF THE DISTRICT ENGINEER MULTI-PURPOSE BUILDING · COLUMN FOOTING DETAILS ARCHITECT/ SPECIAL AGENT I
(PHASE - III 11.00m x 15.00) AGNES B. VILLALUZ VICTORIO F. CORPORAL RICARDO R. GUTIERREZ
PASIG, DAET, CAMARINES NORTE REGION V
CHECKED BY :
ENGINEER III ASST. DISTRICT ENGINEER 1 5 6
ELMER CEZAR A. ZALETA, uap DISTRICT ENGINEER
BRGY. MALAGUIT, PARACALE, CAMARINES NORTE CHIEF, PLANNING & DESIGN SECTION
ARCHITECT II
5.90 7.50 1.00
2@0.30m. = 0.60m 4@0.50m. = 2.00m 4@0.787m. = 3.15m 2@0.50m. = 1.00m 3@0.65m = 1.95

0.40mm. THK. HI-RIBPRE-PAINTED


ROOFING PANEL
12mm.Ø THREADED SAGROD APEX OF ROOF TRUSS
w/ STD. NUTS & WASHERS
TEKSCREW 50mm. w/ NEOPRENE

2.5mm. THK. x 150 x 50mm. G.I. C-PURLINS SP. @ ± 6.26


0.85m. O.C. w/ 50mm.x 50mm. ANGULAR CLEATS 9.07
9.00
2∠ -5.0mm. THK. x 50mm. x 50mm. SEE SPOT DETAIL "A"
ANGLE BAR WEB MEMBER

2.50
2 ∠ -5.0mm. THK. x 65mm. x 65mm.
ANGLE BAR TOP & BOTTOM CHORD
10mm. THK x 300 x 400mm. MS
BASEPLATE w/ 2-16mmØ BOLT HOLE 5.7
2
DETAIL OF STEEL TRUSS 7.23
SCALE 1:30mts

0.90

±1.55

±1.12

0.40 0.20
TOP OF RCB

4-4.0mm. THK. x 65mm. x 65mm.


ANGLE BAR (FULLY WELD)

0.10
CB FULLY WELD TO
2-16mm. Ø RSB DOWEL
2-16mmØ, 300mm LONG ANCHOR
BOLTS w/ STD. NUTS. & WASHERS
4-16mm. Ø MAIN RSB w/ 10mm. Ø LATERAL TIES
SP. @ 3-50mm & REST @ 100mm. ON CENTER
8-16mm. Ø VERT. BARS w/ 10mm. Ø LATERAL AND
INNER LOOP TIES SPACED @ 3-50mm., 3-100mm.,
3-150mm., & REST @ 200mm. O.C. BOTHWAYS

7.50 7.50 1.00


2@0.30m. = 0.60m 4@0.50m. = 2.00m 4@0.787m. = 3.15m 2@0.50m. = 1.00m 3@0.65m = 1.95

0.40mm. THK. HI-RIBPRE-PAINTED


ROOFING PANEL
12mm.Ø THREADED SAGROD APEX OF ROOF TRUSS
w/ STD. NUTS & WASHERS
TEKSCREW 50mm. w/ NEOPRENE

2.5mm. THK. x 150 x 50mm. G.I. C-PURLINS SP. @ ± 9.07


0.85m. O.C. w/ 50mm.x 50mm. ANGULAR CLEATS 9.00
2∠ -5.0mm. THK. x 50mm. x 50mm. SEE SPOT DETAIL "A"
ANGLE BAR WEB MEMBER

2.50
2 ∠ -5.0mm. THK. x 65mm. x 65mm.
ANGLE BAR TOP & BOTTOM CHORD
10mm. THK x 300 x 400mm. MS
BASEPLATE w/ 2-16mmØ BOLT HOLE 7.23 DETAIL OF STEEL TRUSS 7.23
SCALE 1:30mts

±1.12

0.40 0.20
TOP OF RCB

DESIGN CRITERIA:
2∠ - 65mm. x 65mm. ANGLE 1 - 50mm. x 50mm. ANGLE
i. LIVE LOAD ___________________________________1000Pa
BAR TOP & BOTTOM CHORD BAR WEB MEMBER
ii. ALLOWABLE STRESSER
5.50
1. CONCRETE
a. FOR FOOTING, BEAMS AND SLABS 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.94 0.50
fc" = 20 MPa
2. CONCRETE MASONRY UNITS
0.30

(LOAD BEARING CHB)


fm' = 6.90 MPa, fM = 2.41 MPa
3. REINFORCING STEEL BARS
FOR BARS SMALLER THAN 16mmØ
fy = 230 MPa 2 ∠ - 5.0mm. THK. x 65mm.
4. ASSUMED ALLOWABLE BEARING CAPACITY x 65mm TOP & BOTTOM CHORD
Y = 100KPa
NOTE: DETAIL OF STEEL STRUT
SCALE 1:20mts
· WATER TABLE IS 1500 BELOW GROUND LEVEL.
SLOPE DIRECTION OF FLOOR DRAIN
CADD BY :
PROJECT TITLE / LOCATION : SHEET CONTENT : SUBMITTED BY : RECOMMENDING APPROVAL : APPROVED : SET NO. : SHEET NO. :
REPUBLIC OF THE PHILIPPINES Ar. Zhieg
· STEEL TRUSS DETAILS I AND II
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS COMPLETION OF · STEEL STRUT DETAILS
PREPARED/ DESIGNED BY :
PDS 3
DONNA JEAN T. LACSON, uap S 3
OFFICE OF THE DISTRICT ENGINEER MULTI-PURPOSE BUILDING ARCHITECT/ SPECIAL AGENT I
(PHASE - III 11.00m x 15.00) AGNES B. VILLALUZ VICTORIO F. CORPORAL RICARDO R. GUTIERREZ
PASIG, DAET, CAMARINES NORTE REGION V
CHECKED BY :
ENGINEER III ASST. DISTRICT ENGINEER 1 6 6
ELMER CEZAR A. ZALETA, uap DISTRICT ENGINEER
BRGY. MALAGUIT, PARACALE, CAMARINES NORTE CHIEF, PLANNING & DESIGN SECTION
ARCHITECT II