03.02.03 CAMA DE ARENA e = 0.10 1.00 11.40 7.90 0.10 9.01 9.01 M2
0.4.04 CIMIENTO PARA FONDO DE CIMENTACIÓN P = 0.10 C:A 1:10 1.00 11.40 7.90 0.10 9.01 9.01 M2
5.02 COLUMNAS:
MORTERO EN COLUMNAS F´c = 210 kg/cm2
COLUMNAS: C -1, C - 2, C - 3: 0.30 X 0.30 4.02 M3
C -1 4.00 0.30 0.30 4.92 1.77
C-2 4.00 0.30 0.30 3.57 1.29
C-3 3.00 0.30 0.30 3.57 0.96
8.00 CIELORRASO
8.01 CIELORRASO DE FIBROCEMENTO 1.00 11.40 7.90 90.06 90.06 M2
10.00 CONTRAZÓCALOS
10.01 CONTRAZÓCALOS 3.22 M2
EJE: A; 2 - 3 1.00 4.70 0.10 0.47
EJE: 4; A - B 1.00 8.05 0.10 0.81
EJE: 1; A - B 1.00 8.05 0.10 0.81
EJE: B; 1 - 4 1.00 11.40 0.10 1.14
11.00 ZÓCALOS
11.01 ZÓCALOS 5.23 M2
EJE: A; 2 - 3 1.00 4.80 0.10 0.48
EJE: 1; A - B 1.00 2.00 1.40 2.80
EJE: 4; A - B 1.00 8.10 0.10 0.81
EJE: B; 1 - 4 1.00 11.40 0.10 1.14
12.00 CUBIERTAS
12.01 CALAMINA CORRUGADA 1.00 12.00 9.66 115.92 115.92 M2
15.00 CERRAJERIA
HOJA DE METRADO
OBRA: AULA ATE - 102
PROPIETARIO: UNIVERSIDAD CIENTÍFICA DEL PERÚ
FECHA: 10/10/2017
UBICACIÓN: AV. ABELARDO QUIÑONES KM 2
ELABORADO POR: HUAMAN EUNOFRE, DIANA ANA
Item DESCRIPCIÓN FACTOR CANTIDAD LARGO ANCHO ALTO PARCIAL TOTAL UNIDAD
1.00 OBRAS PROVISIONALES
2.00 TRABAJOS PRELIMINARES
15.01 BISAGRAS: 3 1/2" X 3 1/2"; 4 UNIDADES / HOJA DE PUERTA X 4 UNID 1.00 8.00 PAR
26.00 ARTEFACTOS
26.01 LAMPARAS DOBLES DE 40 WATTS 9.00 UNID
HOJA DE METRADO
OBRA: AULA ATE - 102
PROPIETARIO: UNIVERSIDAD CIENTÍFICA DEL PERÚ
FECHA: 10/10/2017
UBICACIÓN: AV. ABELARDO QUIÑONES KM 2
ELABORADO POR: HUAMAN EUNOFRE, DIANA ANA
Item DESCRIPCIÓN FACTOR CANTIDAD LARGO ANCHO ALTO PARCIAL TOTAL UNIDAD
1.00 OBRAS PROVISIONALES
2.00 TRABAJOS PRELIMINARES
HOJA DE METRADO
OBRA: AULA ATE - 102
PROPIETARIO: UNIVERSIDAD CIENTÍFICA DEL PERÚ
FECHA: 10/10/2017
UBICACIÓN: AV. ABELARDO QUIÑONES KM 2
ELABORADO POR: HUAMAN EUNOFRE, DIANA ANA
Item DESCRIPCIÓN FACTOR CANTIDAD LARGO ANCHO ALTO PARCIAL TOTAL UNIDAD
1.00 OBRAS PROVISIONALES
2.00 TRABAJOS PRELIMINARES
HOJA DE METRADO
OBRA: AULA ATE - 102
PROPIETARIO: UNIVERSIDAD CIENTÍFICA DEL PERÚ
FECHA: 10/10/2017
UBICACIÓN: AV. ABELARDO QUIÑONES KM 2
ELABORADO POR: HUAMAN EUNOFRE, DIANA ANA
Item DESCRIPCIÓN FACTOR CANTIDAD LARGO ANCHO ALTO PARCIAL TOTAL UNIDAD
1.00 OBRAS PROVISIONALES
2.00 TRABAJOS PRELIMINARES
HOJA DE METRADO
OBRA: AULA ATE - 102
PROPIETARIO: UNIVERSIDAD CIENTÍFICA DEL PERÚ
FECHA: 10/10/2017
UBICACIÓN: AV. ABELARDO QUIÑONES KM 2
ELABORADO POR: HUAMAN EUNOFRE, DIANA ANA
Item DESCRIPCIÓN FACTOR CANTIDAD LARGO ANCHO ALTO PARCIAL TOTAL UNIDAD
1.00 OBRAS PROVISIONALES
2.00 TRABAJOS PRELIMINARES
HOJA DE METRADO
OBRA: AULA ATE - 102
PROPIETARIO: UNIVERSIDAD CIENTÍFICA DEL PERÚ
FECHA: 10/10/2017
UBICACIÓN: AV. ABELARDO QUIÑONES KM 2
ELABORADO POR: HUAMAN EUNOFRE, DIANA ANA
Item DESCRIPCIÓN FACTOR CANTIDAD LARGO ANCHO ALTO PARCIAL TOTAL UNIDAD
1.00 OBRAS PROVISIONALES
2.00 TRABAJOS PRELIMINARES
HOJA DE METRADO
OBRA: AULA ATE - 102
PROPIETARIO: UNIVERSIDAD CIENTÍFICA DEL PERÚ
FECHA: 10/10/2017
UBICACIÓN: AV. ABELARDO QUIÑONES KM 2
ELABORADO POR: HUAMAN EUNOFRE, DIANA ANA
Item DESCRIPCIÓN FACTOR CANTIDAD LARGO ANCHO ALTO PARCIAL TOTAL UNIDAD
1.00 OBRAS PROVISIONALES
2.00 TRABAJOS PRELIMINARES
HOJA DE METRADO
OBRA: AULA ATE - 102
PROPIETARIO: UNIVERSIDAD CIENTÍFICA DEL PERÚ
FECHA: 10/10/2017
UBICACIÓN: AV. ABELARDO QUIÑONES KM 2
ELABORADO POR: HUAMAN EUNOFRE, DIANA ANA
Item DESCRIPCIÓN FACTOR CANTIDAD LARGO ANCHO ALTO PARCIAL TOTAL UNIDAD
1.00 OBRAS PROVISIONALES
2.00 TRABAJOS PRELIMINARES
HOJA DE METRADO
OBRA: AULA ATE - 102
PROPIETARIO: UNIVERSIDAD CIENTÍFICA DEL PERÚ
FECHA: 10/10/2017
UBICACIÓN: AV. ABELARDO QUIÑONES KM 2
ELABORADO POR: HUAMAN EUNOFRE, DIANA ANA
Item DESCRIPCIÓN FACTOR CANTIDAD LARGO ANCHO ALTO PARCIAL TOTAL UNIDAD
1.00 OBRAS PROVISIONALES
2.00 TRABAJOS PRELIMINARES
HOJA DE METRADO
OBRA: AULA ATE - 102
PROPIETARIO: UNIVERSIDAD CIENTÍFICA DEL PERÚ
FECHA: 10/10/2017
UBICACIÓN: AV. ABELARDO QUIÑONES KM 2
ELABORADO POR: HUAMAN EUNOFRE, DIANA ANA
Item DESCRIPCIÓN FACTOR CANTIDAD LARGO ANCHO ALTO PARCIAL TOTAL UNIDAD
1.00 OBRAS PROVISIONALES
2.00 TRABAJOS PRELIMINARES
HOJA DE METRADO
OBRA: AULA ATE - 102
PROPIETARIO: UNIVERSIDAD CIENTÍFICA DEL PERÚ
FECHA: 10/10/2017
UBICACIÓN: AV. ABELARDO QUIÑONES KM 2
ELABORADO POR: HUAMAN EUNOFRE, DIANA ANA
Item DESCRIPCIÓN FACTOR CANTIDAD LARGO ANCHO ALTO PARCIAL TOTAL UNIDAD
1.00 OBRAS PROVISIONALES
2.00 TRABAJOS PRELIMINARES
HOJA DE METRADO
OBRA: AULA ATE - 102
PROPIETARIO: UNIVERSIDAD CIENTÍFICA DEL PERÚ
FECHA: 10/10/2017
UBICACIÓN: AV. ABELARDO QUIÑONES KM 2
ELABORADO POR: HUAMAN EUNOFRE, DIANA ANA
Item DESCRIPCIÓN FACTOR CANTIDAD LARGO ANCHO ALTO PARCIAL TOTAL UNIDAD
1.00 OBRAS PROVISIONALES
2.00 TRABAJOS PRELIMINARES
HOJA DE METRADO
OBRA: AULA ATE - 102
PROPIETARIO: UNIVERSIDAD CIENTÍFICA DEL PERÚ
FECHA: 10/10/2017
UBICACIÓN: AV. ABELARDO QUIÑONES KM 2
ELABORADO POR: HUAMAN EUNOFRE, DIANA ANA
Item DESCRIPCIÓN FACTOR CANTIDAD LARGO ANCHO ALTO PARCIAL TOTAL UNIDAD
1.00 OBRAS PROVISIONALES
2.00 TRABAJOS PRELIMINARES
HOJA DE METRADO
OBRA: AULA ATE - 102
PROPIETARIO: UNIVERSIDAD CIENTÍFICA DEL PERÚ
FECHA: 10/10/2017
UBICACIÓN: AV. ABELARDO QUIÑONES KM 2
ELABORADO POR: HUAMAN EUNOFRE, DIANA ANA
Item DESCRIPCIÓN FACTOR CANTIDAD LARGO ANCHO ALTO PARCIAL TOTAL UNIDAD
1.00 OBRAS PROVISIONALES
2.00 TRABAJOS PRELIMINARES
HOJA DE METRADO
OBRA: AULA ATE - 102
PROPIETARIO: UNIVERSIDAD CIENTÍFICA DEL PERÚ
FECHA: 10/10/2017
UBICACIÓN: AV. ABELARDO QUIÑONES KM 2
ELABORADO POR: HUAMAN EUNOFRE, DIANA ANA
Item DESCRIPCIÓN FACTOR CANTIDAD LARGO ANCHO ALTO PARCIAL TOTAL UNIDAD
1.00 OBRAS PROVISIONALES
2.00 TRABAJOS PRELIMINARES
HOJA DE METRADO
OBRA: AULA ATE - 102
PROPIETARIO: UNIVERSIDAD CIENTÍFICA DEL PERÚ
FECHA: 10/10/2017
UBICACIÓN: AV. ABELARDO QUIÑONES KM 2
ELABORADO POR: HUAMAN EUNOFRE, DIANA ANA
Item DESCRIPCIÓN FACTOR CANTIDAD LARGO ANCHO ALTO PARCIAL TOTAL UNIDAD
1.00 OBRAS PROVISIONALES
2.00 TRABAJOS PRELIMINARES
HOJA DE METRADO
OBRA: AULA ATE - 102
PROPIETARIO: UNIVERSIDAD CIENTÍFICA DEL PERÚ
FECHA: 10/10/2017
UBICACIÓN: AV. ABELARDO QUIÑONES KM 2
ELABORADO POR: HUAMAN EUNOFRE, DIANA ANA
Item DESCRIPCIÓN FACTOR CANTIDAD LARGO ANCHO ALTO PARCIAL TOTAL UNIDAD
1.00 OBRAS PROVISIONALES
2.00 TRABAJOS PRELIMINARES
HOJA DE METRADO
OBRA: AULA ATE - 102
PROPIETARIO: UNIVERSIDAD CIENTÍFICA DEL PERÚ
FECHA: 10/10/2017
UBICACIÓN: AV. ABELARDO QUIÑONES KM 2
ELABORADO POR: HUAMAN EUNOFRE, DIANA ANA
Item DESCRIPCIÓN FACTOR CANTIDAD LARGO ANCHO ALTO PARCIAL TOTAL UNIDAD
1.00 OBRAS PROVISIONALES
2.00 TRABAJOS PRELIMINARES
HOJA DE METRADO
OBRA: AULA ATE - 102
PROPIETARIO: UNIVERSIDAD CIENTÍFICA DEL PERÚ
FECHA: 10/10/2017
UBICACIÓN: AV. ABELARDO QUIÑONES KM 2
ELABORADO POR: HUAMAN EUNOFRE, DIANA ANA
Item DESCRIPCIÓN FACTOR CANTIDAD LARGO ANCHO ALTO PARCIAL TOTAL UNIDAD
1.00 OBRAS PROVISIONALES
2.00 TRABAJOS PRELIMINARES
HOJA DE METRADO: MORTERO ARMADO
OBRA: AULA ATE: 102
PROPIETARIO: UNIVERSIDAD CIENTÍFICA DEL PERÚ
FECHA: 11/24/2017
UBICACIÓN: AV. ABELARDO QUIÑONES KM - 2
ELABORADO: DIANA HUAMAN EUNOFRE
Elemento: Mortero Encofrado Fierro Longitud Total ( m ) Peso Total ( Kg )
. Partida N° Medidas Total Medidas Total 1/2"
Cantidad de Diam 1/4" 3/8"
Descripción Cant. Long. x Ø 1/4" 3/8" 1/2" (0.994
Elementos L A H m3 L A H m2 Ø" (0.25 Kg/m) (0.56 Kg/m) Kg/m)
1.00 OBRAS PROVISIONALES - - - - - -
2.00 TRABAJOS PRELIMINARES - - - - - -
3.00 MOVIIENTO DE TERRA - - - - - -
3.01 EXCAVACIONES - - - - - -
3.01.01 EXCAVACIONES DE ZANJAS PARA ZAPATAS, Z -1 Y Z - 2 13.82 - - - - - -
EJE: 1; A - B 2.00 1.20 1.20 1.20 3.46 - - - - - -
EJE: 2; A - B 2.00 1.20 1.20 1.20 3.46 - - - - - -
EJE: 3; A - B 2.00 1.20 1.20 1.20 3.46 - - - - - -
EJE: 4; A - B 2.00 1.20 1.20 1.20 3.46 - - - - - -
- - - - - -
03.01.02 ECAVACIÓN DE ZANJA PARA CIMIENTO CORRIDO 8.86 - - - - - -
EJE: 1; A - B 1.00 7.00 0.40 0.60 1.68 - - - - - -
EJE: 2; A - B 1.00 7.00 0.40 0.60 1.68 - - - - - -
EJE: A; 1 - 2 1.00 2.73 0.40 0.60 0.66 - - - - - -
EJE: A; 2 - 3 1.00 2.70 0.60 0.60 0.97 - - - - - -
EJE: A; 3 - 4 1.00 2.70 0.60 0.60 0.97 - - - - - -
EJE: B; 1 - 2 1.00 2.71 0.60 0.60 0.98 - - - - - -
EJE: B; 2 - 3 1.00 2.69 0.60 0.60 0.97 - - - - - -
EJE: B; 3 - 4 1.00 2.66 0.60 0.60 0.96 - - - - - -
- - - - - -
9.01 - - - - - -
03.02.03 CAMA DE ARENA E= 0.10 1.00 11.40 7.90 0.10 9.01 - - - - - -
- - - - - -
4.00 MORTERO SIMPLE - - - - - -
4.01 MORTERO EN P/SOLADO DE ZAPATAS E = 0.10 1.15 - - - - - -
EJE: 1; A - B 2.00 1.20 1.20 0.10 0.29 - - - - - -
EJE: 2; A - B 2.00 1.20 1.20 0.10 0.29 - - - - - -
EJE: 3; A - B 2.00 1.20 1.20 0.10 0.29 - - - - - -
EJE: 4; A - B 2.00 1.20 1.20 0.10 0.29 - - - - - -
- - - - - -
4.02 MORTERO PARA CIMIENTO CORRIDO C:A. 1:8 10.67 - - - - - -
EJE: 1; A - B 1.00 7.90 0.40 0.60 1.90 - - - - - -
EJE: 2; A - B 1.00 7.90 0.40 0.60 1.90 - - - - - -
EJE: A; 1 - 2 1.00 3.60 0.40 0.60 0.86 - - - - - -
EJE: A; 2 - 3 1.00 3.60 0.60 0.60 1.30 - - - - - -
EJE: A; 3 - 4 1.00 3.60 0.40 0.60 0.86 - - - - - -
EJE: B; 1 - 2 1.00 3.58 0.60 0.60 1.29 - - - - - -
EJE: B; 2 - 3 1.00 3.54 0.60 0.60 1.27 - - - - - -
EJE: B; 3 - 4 1.00 3.58 0.60 0.60 1.29 - - - - - -
- - - - - -
4.03 MORTERO PARA SOBRE CIMIENTO: C:A. 1:6 2.13 - - - - - -
EJE: 1; A - B 1.00 7.90 0.20 0.30 0.47 - - - - - -
EJE: 2; A - B 1.00 7.90 0.20 0.30 0.47 - - - - - -
EJE: A; 1 - 2 1.00 - - - - - -
EJE: A; 2 - 3 1.00 3.60 0.20 0.30 0.22 - - - - - -
EJE: A; 3 - 4 1.00 - - - - - -
EJE: B; 1 - 2 1.00 3.58 0.30 0.30 0.32 - - - - - -
EJE: B; 2 - 3 1.00 3.54 0.30 0.30 0.32 - - - - - -
EJE: B; 3 - 4 1.00 3.58 0.30 0.30 0.32 - - - - - -
- - - - - -
- - - - - -
4.04 CIMIENTO PARA FONDO DE CIMENTACIÓN P = 0.10 C:A. 1:10 1.00 11.40 7.90 0.10 9.01 - - - - - -
- - - - - -
5.00 MORTERO ARMADO - - - - - -
5.01 ZAPATAS - - - - - -
5.01.02 MORTERO EN ZAPATA: F´c = 210 kg/cm2 4.61 - - - - - -
Z-1 6.00 1.20 1.20 0.40 3.46 - - - - - -
Z-2 2.00 1.20 1.20 0.40 1.15 - - - - - -
- - - - - -
5.01.03 ACERO ø ½; Fy = 4200 KG/M 8.00 1/2" 14.00 1.05 - 14.70 - - 116.89
5.02 COLUMNAS
5.02.01 MORTERO EN COLUMNAS: F´c = 210 kg/cm2 - - - - -
COLUMNAS: C - 1, C - 2 y C - 3: 0.30 X 0.30 4.02 - - - - - -
C-1 4.00 0.30 0.30 4.92 1.77 - - - - -
C-2 4.00 0.30 0.30 3.57 1.29 - - - - - -
C-3 3.00 0.30 0.30 3.57 0.96 - - - - - -
LONGITUD TOTAL : 250.00 M. M3. LONG. M3. LONG. M3. LONG. M3. M3. M3.
Totales de Movimiento de Tierras (m3.): 0.00 0.00 0.00 0.00 184.40 70.00 184.40 760.82 576.42
Volumen
ESTACA AREA DE AREA DE Tipo MATERIAL SUELTO MATERIAL ARCILLA MATERIA ORGANICA disponible VOLUMEN RELLENO
METROS CORTE RELLENO Suelo para el RELLENO TRANSP.
relleno
0 0 #VALUE! #VALUE! #VALUE!
- - - 3.00 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
10.00 - - 3.00 - 10.00 #VALUE! #VALUE!
20.00 - - 3.00 - 10.00 #VALUE! #VALUE!
30.00 - 2.71 3.00 - 10.00 #VALUE! 13.55 #VALUE!
40.00 - 2.72 3.00 - 10.00 #VALUE! 27.15 #VALUE!
50.00 - 2.00 3.00 - 10.00 #VALUE! 23.60 #VALUE!
60.00 - 2.04 3.00 - 10.00 #VALUE! 20.20 #VALUE!
70.00 - 2.37 3.00 - 10.00 #VALUE! 22.05 #VALUE!
80.00 - 2.60 3.00 - 10.00 #VALUE! 24.85 #VALUE!
90.00 - 3.18 3.00 - 10.00 #VALUE! 28.90 #VALUE!
100.00 - 2.67 3.00 - 10.00 #VALUE! 29.25 #VALUE!
110.00 - 2.70 3.00 - 10.00 #VALUE! 26.85 #VALUE!
120.00 - 2.07 3.00 - 10.00 #VALUE! 23.85 #VALUE!
130.00 - 2.36 3.00 - 10.00 #VALUE! 22.15 #VALUE!
140.00 - 2.36 3.00 - 10.00 #VALUE! 23.60 #VALUE!
150.00 - 1.62 3.00 - 10.00 #VALUE! 19.90 #VALUE!
160.00 - 2.26 3.00 - 10.00 #VALUE! 19.40 #VALUE!
170.00 - 2.63 3.00 - 10.00 #VALUE! 24.45 #VALUE!
180.00 - 3.57 3.00 - 10.00 #VALUE! 31.00 #VALUE!
190.00 3.25 7.02 3.00 16.25 10.00 #VALUE! 52.95 #VALUE!
200.00 2.16 6.36 3.00 27.05 10.00 #VALUE! 66.90 #VALUE!
210.00 2.40 6.00 3.00 22.80 10.00 #VALUE! 61.79 #VALUE!
220.00 4.15 5.83 3.00 32.75 10.00 #VALUE! 59.14 #VALUE!
230.00 4.78 5.58 3.00 44.65 10.00 #VALUE! 57.05 #VALUE!
240.00 1.42 4.78 3.00 31.00 10.00 #VALUE! 51.80 #VALUE!
250.00 0.56 1.31 3.00 9.90 10.00 #VALUE! 30.45 #VALUE!
RELLENO M3.
CON MATERIAL DISPONIBLE 184.40
NECESARIO 760.82
CON MATERIAL PROPIO 184.40
CON MATERIAL TRANSPORTADO 576.42
Pag. 26 de 28
METRADO DE EXPLANACIONES - CORTE Y RELLENO
LONGITUD TOTAL : 250.00 M. M3. LONG. M3. LONG. M3. LONG. M3. M3. M3.
Totales de Movimiento de Tierras (m3.): 0.00 0.00 0.00 0.00 0.00 0.00 0.00 266.00 266.00
Volumen
ESTACA AREA DE AREA DE Tipo MATERIAL SUELTO MATERIAL ARCILLA MATERIA ORGANICA disponible VOLUMEN RELLENO
METROS CORTE RELLENO Suelo para el RELLENO TRANSP.
relleno
0 0 #VALUE! #VALUE! #VALUE!
- - - 3.00 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
10.00 - - 3.00 - 10.00 #VALUE! #VALUE!
20.00 - - 3.00 - 10.00 #VALUE! #VALUE!
30.00 - - 3.00 - 10.00 #VALUE! #VALUE!
40.00 - - 3.00 - 10.00 #VALUE! #VALUE!
50.00 - 0.56 3.00 - 10.00 #VALUE! 2.80 #VALUE!
60.00 - 0.56 3.00 - 10.00 #VALUE! 5.60 #VALUE!
70.00 - 1.40 3.00 - 10.00 #VALUE! 9.80 #VALUE!
80.00 - 1.40 3.00 - 10.00 #VALUE! 14.00 #VALUE!
90.00 - 1.54 3.00 - 10.00 #VALUE! 14.70 #VALUE!
100.00 - 1.54 3.00 - 10.00 #VALUE! 15.40 #VALUE!
110.00 - 1.40 3.00 - 10.00 #VALUE! 14.70 #VALUE!
120.00 - 1.26 3.00 - 10.00 #VALUE! 13.30 #VALUE!
130.00 - 1.40 3.00 - 10.00 #VALUE! 13.30 #VALUE!
140.00 - 1.12 3.00 - 10.00 #VALUE! 12.60 #VALUE!
150.00 - 0.56 3.00 - 10.00 #VALUE! 8.40 #VALUE!
160.00 - 0.70 3.00 - 10.00 #VALUE! 6.30 #VALUE!
170.00 - 0.84 3.00 - 10.00 #VALUE! 7.70 #VALUE!
180.00 - 0.84 3.00 - 10.00 #VALUE! 8.40 #VALUE!
190.00 - 1.40 3.00 - 10.00 #VALUE! 11.20 #VALUE!
200.00 - 2.10 3.00 - 10.00 #VALUE! 17.50 #VALUE!
210.00 - 2.10 3.00 - 10.00 #VALUE! 21.00 #VALUE!
220.00 - 2.10 3.00 - 10.00 #VALUE! 21.00 #VALUE!
230.00 - 2.10 3.00 - 10.00 #VALUE! 21.00 #VALUE!
240.00 - 1.40 3.00 - 10.00 #VALUE! 17.50 #VALUE!
250.00 - 0.56 3.00 - 10.00 #VALUE! 9.80 #VALUE!
Pag. 27 de 28
.. ..
HOJA DE CALCULO - FLETE S/. 3,450.00
Err:509
Puerto Iquitos - Transporte Terrestre: S/. 675.00
Insumo Unidad Cantidad Viaje x 150 bol Costo x Viaje Parcial
Cemento Bol 680.00 5.00 100.00 500.00
Acero Kg - - 0.20 -
Varios Gbl 1.00 - 150.00 150.00
Equipos Gbl 1.00 - 25.00 25.00