Está en la página 1de 26

DOSIFICACIONES PARA MORTEROS

CEMENTO CAL ARENA AGUA


MORTERO
TON TON M3 M3
1:3 0.51 - 0.98 0.275
1:5 0.36 - 1.1 0.261
1:1:4 0.3 0.15 0.97 0.28
1:1:6 0.25 0.125 1.05 0.279
1:1:8 0.215 0.1 1.09 0.278

CIMBRAS
3 1/2 * 3 1/2 * 8´
POLIN
0.10 * 0.10 * 2.44

1 5/8´ * 3 1/2 * 8´
BARROTE
0.05 * 0.10 * 8´

4´´ * 1´´ * 8´
DUELA
0.10 * 0.025 * 2.44

CHAFLAN 1´´ * 1´´ * 8´

TARIMA 0.5 * 1.00 * 0.07

3 1/2 * 8´´ * 8´
VIGA
0.10 * 0.20 * 8´

10´´ * 1´´ * 8´
0.25 * 0.025 * 2.44
TABLA
12´´ * 1´´ * 8´
0.30 * 0.025 * 2.44

CLAVO
CLAVO 2 1/2 " 1.025 15 0.015375 0.026314
CLAVO 4" 2.16 90 0.1944 0.332716

DESMOLDANTE
1 LT 10 M2

CIMBRADO DE LOSA DE VIGUETA Y BOVEDILLA


PARA UN AREA VIRTUAL DE 4.00 X 4.00 (16.00 M2)
POLINES 15 2.44 ML
VIGAS 5 20 ML 8.197 PZAS
DUELA 30 0.4 4.918 PZAS
DUELA
20 2.44 ML 8.197 PZAS
CONTRAVENTEO
CLAVO 1/2" 240 2.16 0.518 KG
HABILITADO
POLINES 0.938 PZAS / M2
VIGAS 0.512 PZA / M2
DUELA 0.820 PZA / M2
CLAVO 1/2" 0.032 KG / M2
CUADRILLA 1 OFICIAL CARPINTERO+ PEON
RENDIMIENTOS
MINIMO NORMAL MAXIMO
POR JORNADA
0.05 18 20 21

HABILITADO DE CIMBRAR PARA LOSAS MAC


PARA UN AREA VIRTUAL D
HABILITADO DE ACERO
CUADRILLA 1 OFICIAL FIERRERO + AYUDANTE O PEON + 10% M.I.
ACERO ALAMBRE RENDIMIENTO
CIM 1 0.043 0.00715
1/4" EST 1 0.043 0.00725
CIM 1 0.018 0.00552
3/8" EST 1 0.022 0.715
CIM 1 0.02 0.00552
1/2" EST 1 0.02 0.0055
CIM 1
5/8" EST 1 0.028 0.0715
CIM 1 0.028 0.04
3/4" EST 1 0.028 0.036
R PARA LOSAS MACIZAS, NERVADAS Y RETICULARES
UN AREA VIRTUAL DE 4.00 X 4.00 (16.00 M2)

POR CADA LINEA


POLIN 5 PZAS 2.44 ML (PUNTALES)
5 PZAS 0.4 ML (ARRASTRES)

PUNTALES 5 2.44 = 12.2 PZAS


ARRASTRES 5 0.4 = 0.82 PZAS

VIGA 4 2.44 = 1.64 PZAS

DUELA CONTRAVIENTO 4 2.44 1.64 PZAS


FIJOS 4 2.44 1.64 PZAS

CLAVOS 10 CLAVOS POR LINEA 5 LINEAS 50 2.16 0.108

PARA 16 M2 PARA 1 M2
POR LINEA LINEAS 1 LINEA
POLIN 13.02 5 65.10 4.07
VIGA 1.64 5 8.20 0.51
DUELA 3.28 5 16.39 1.02
CLARO 0.11 5 0.54 0.03
TARIMAS 32.00 PZAS 2.00

CUADRILLA 1 OFICIAL CARPINTERO+ PEON


RENDIMIENTOS
NORMAL
POR JORNADA
0.1 10

DESPERDICIO 5-10% 8%
RASTRES)

KG
ZAPATA CORRIDA

CALCULO DEL ACERO

CONTRATRABE
VARILLAS DISTANCIADESPERDICIO (8%)
VARILLA No. 3 (3/8) 5 1 1.08

ZAPATA
VARILLAS DISTANCIADESPERDICIO (8%)
4 1 1.08
PARRILLA (VARILLA No. 3 o de 3/8) 5 0.85 1.08
ESTRIBO (VARILLA No. 2 o de 1/4) 6.6666666667 1.2 1.08

CALCULO DEL CONCRETO

CONTRATRABE (f´c=200 kg/cm2


DESPERDICIO (5%)DISTANCIA b
1.05 1 0.2

ZAPATA (f´c=200 kg
DESPERDICIO (5%)DISTANCIA B
1.05 1 0.15

PLANTILLA (f´c=100 k
DESPERDICIO (5%)DISTANCIA b
1.05 1 0.7

CIMBRA

CONTRATRABE
DESPERDICIO (3%)DISTANCIA ESPESOR
1.03 1 0.1

ZAPATA
DESPERDICIO (3%)DISTANCIA ESPESOR
1.03 1 0.25
RIDA

ACERO

CONTRATRABE
PESO VARILLA (KG/ML)PESO DE ACERO A UTILIZAR (KG)
0.554 2.9916

ZAPATA
PESO VARILLA (KG/ML)PESO DE ACERO A UTILIZAR (KG)
0.554 2.39328
0.554 2.54286
0.254 2.19456

TOTAL 7.92774 Acero de 3/8


TOTAL 2.19456 Acero de 1/4

O DEL CONCRETO

NTRATRABE (f´c=200 kg/cm2)


h VOLUMEN (M3)
0.4 0.084

ZAPATA (f´c=200 kg/cm2)


b h VOLUMEN (M3)
0.1 0.25 0.065625

TOTAL 0.149625 f'c=200 kg/cm2

PLANTILLA (f´c=100 kg/cm2)


h VOLUMEN (M3)
0.05 0.03675

TOTAL 0.03675 f'c=100 kg/cm2

CIMBRA

CONTRATRABE
PIEZAS AREA (M2)
2 0.206

ZAPATA
PIEZAS AREA (M2)
2 0.515

TOTAL 0.721
MURO DE CONTENCIÓN

PARRILLA EN AMBOS SENTIDOS


VARILLAS DISTANCIA VERTICAL DISTANCIA HORIZONTALDESPERDICIO
VARILLA No. 3 (3/8) 6.66666667 2 2 1.08

CONCRETO
LARGO ALTO ESPESOR DESPERDICIO
F'C=200 KG/CM2 1 1 0.15 1.05

CIMBRA
LARGO ALTO PIEZAS AREA (M2)
1 1 2 2
ÓN

MBOS SENTIDOS
PESO VARILLA (KG/ML)PESO DE ACERO A UTILIZAR (KG)
0.554 15.9552

CRETO
VOLUMEN (M3)
0.1575
TRABE

CALCULO DEL ACERO

VARILLAS DISTANCIADESPERDICIO (8%)


VARILLA No. 4 (1/2) 5 1 1.08

VARILLA No. 3 (3/8) ESTRIBOS 5 1.3 1.08

CONCRETO
LARGO ALTO ESPESOR
F'C=200 KG/CM2 1 0.4 0.25

CIMBRA
LARGO ANCHO AREA (M2)
FONDO 1 0.5 0.5
LARGO ALTO PIEZAS
FRONTERA (CACHETES) 1 0.4 2
TOTAL
TRABE

O DEL ACERO

PESO VARILLA (KG/ML)PESO DE ACERO A UTILIZAR (KG)


0.998 5.3892

0.554 3.88908

NCRETO
DESPERDICIO VOLUMEN (M3)
1.05 0.105

AREA (M2)
0.8
1.3
MURO DE TABIQUE ROJO RECOCIDO DE #14 DE 6X12X26 C/MORTER

TABIQUE

BASE ALTURA ESPESOR


0.26 0.06 0.12

MORTERO

BASE ALTURA ESPESOR


0.12 0.06 0.01
0.12 0.01 1

CUADRILLA 1 OFICIAL+1 PEON+10% M.I.

RENDIMIENTO 0.10
ACABADO APARENTE 0.14 1/7
ABIQUE ROJO RECOCIDO DE #14 DE 6X12X26 C/MORTERO CEM-CAL-ARENA 1:1:6

TABIQUE

ESPESOR MORTERO EN AMBOS SENTIDOSÁREA CON MORTERO TABIQUES EN 1 M2


0.01 0.0189 52.9100529101

MORTERO

DESPERDICIO VOLUMEN (M3) VOLUMEN (M3)


1.05 0.0000756 0.0039944016
1.05 0.00126 0.0179928
TOTAL 0.022

CUADRILLA 1 OFICIAL+1 PEON+10% M.I.


DESPERDICIO TABIQUES
1.05 55.55556

M3
MURO DE TABIQUE DE CONCRETO DE 10X14X28 C/MORTERO CEM-CAL-ARE

TABIQUE

BASE ALTURA ESPESOR


0.28 0.1 0.14

MORTERO

BASE ALTURA ESPESOR


0.14 0.1 0.01
0.14 0.01 1

CUADRILLA 1 OFICIAL+1 PEON+10% M.I.

ACABADO APARENTE 0.125 1/8


E DE CONCRETO DE 10X14X28 C/MORTERO CEM-CAL-ARENA 1:1:6 ACABADO APARENTE

TABIQUE

ESPESOR MORTERO EN AMBOS SENTIDOSÁREA CON MORTERO TABIQUES EN 1 M2


0.01 0.0319 31.3479623824

MORTERO

DESPERDICIO VOLUMEN (M3) VOLUMEN (M3)


1.05 0.000147 0.0046099935
1.05 0.00147 0.0133623
TOTAL 0.018

CUADRILLA 1 OFICIAL+1 PEON+10% M.I.


RENTE

DESPERDICIO TABIQUES
1.05 32.91536

M3
APLANADOS DE YESO

MURO

ANCHO LARGO ESPESORDESPERDICIO


MORTERO YESO (M3) 1 1 0.02 1.1
SI VA A UNA ALTURA DE 2.50 MTS ANDAMIO 0.10

CUADRILLA 1 OFICIAL YESERO+1 PEON+10% M.I.

RENDIMIENTO 0.083 A 0.067

PLAFON

ANCHO LARGO ESPESORDESPERDICIO


MORTERO YESO (M3) 1 1 0.02 1.1
SI VA A UNA ALTURA DE 2.50 MTS ANDAMIO 0.20

CUADRILLA 1 OFICIAL YESERO+1 PEON+10% M.I.

RENDIMIENTO 0.125
TOTAL (M2)
0.022

10% M.I.

TOTAL (M2)
0.022

10% M.I.