PRESUPUESTO
VALORIZACION VALORIZACION VALORIZACION VALORIZACION VALORIZACION VALORIZACION VALORIZACION VALORIZACION
DESCRIPCION VALOR
N⁰ 01 DIC 16 N⁰ 02 ABR 17 N⁰ 03 MAY 17 N⁰ 04 JUN 17 N⁰ 05 JUL 17 N⁰ 06 AGO 17 N⁰ 07 SET 17 N⁰ 08 OCT 17
REFERNCIAL E.T
VAL. BRUTA OBRAS (VB) 2,868,593.05 290,644.82 181,712.01 197,618.80 579,347.26 367,521.44 652,269.97 95,849.09 197,249.17
IGV 18% 516,346.75 52,316.07 32,708.16 35,571.38 104,282.51 66,153.86 117,408.59 17,252.84 35,504.85
VAL. BRUTA TOTAL (VB) 3,384,939.80 342,960.89 214,420.17 233,190.18 683,629.77 433,675.30 769,678.56 113,101.93 232,754.02
10.13% 6.33% 6.89% 20.20% 12.81% 22.74% 3.34% 6.88%
ACUMULADO SALDO POR
VALORIZADO VALORIZAR
2,562,212.55 306,380.48
461,198.26 55,148.49
3,023,410.81 361,528.97
89.32% 10.68%
COMPARA
CONTRATISTA/S
PRESUPUESTO
ITEM DESCRIPCION VALORIZ. N° 1
PRECIO PPTO.
UNID. METRADO
UNITARIO S/.
MET.
F. P UNICA
01 OBRAS PROVISIONALES 30,931.44
01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 8.5 x 3.5 m u 1 1111.14 1,111.14 1.00
01.02 MOVILIZACION Y DESMOVILIZACIÓN DE MAQUINARIAS glb 1.00 2542.38 2,542.38 0.50
01.03 LIMPIEZA DE TERRENO MANUAL m2 14665.55 0.62 9,092.64 14,665.55
01.04 TRAZO Y REPLANTEO PRELIMINAR m2 14665.55 1.24 18,185.28 14,665.55
02 CONSTRUCCION DE PISTAS Y VEREDAS 2,099,018.92
02.01 CONSTRUCCION DE PAVIMENTO RIGIDO 1,581,210.72
02.01.01 TRAZO Y REPLANTEO EN PAVIMENTACION m2 10667.50 1.61 17,174.68
02.01.02 CORTE DE TERRENO A NIVEL DE SUBRASANTE m3 10102.83 11.03 111,434.21 7,700.92
02.01.03 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO m3 12628.53 14.05 177,430.85 9,626.15
02.01.04 PERFILADO Y COMPACTADO
MEJORAMIENTO DE SUB-RASANTE
DE SUBRASANTE CONGRANULAR
CON MATERIAL EQUIPO E=0.3 M m2 10667.50 2.5 26,668.75
02.01.05 MEJORAMIENTO DE SUBRASANTE CON MATERIAL GRANULAR E=0.8 M m2 5328.00 20.62 109,863.36
02.01.06 m2 327.08 49.05 16,043.27
02.01.07 m2 10667.50 17.42 185,827.85
02.01.08 ENCOFRADO Y DESENCOFRADO DE PAVIMENTOS m 7237.05 13.95 100,956.85
02.01.09 CONCRETO f 'c=210 kg/cm2 PARA PAVIMENTOS, E=0.20m m2 5196.76 88.79 461,420.32
02.01.10 CONCRETO f 'c=210 kg/cm2 + 30%PM PARA PAVIMENTOS, E=0.20m m2 4782.93 67.94 324,952.26
02.01.11 CURADO DE CONCRETO m2 9979.70 1.99 19,859.60
COMPARA
CONTRATISTA/S
PRESUPUESTO
ITEM DESCRIPCION VALORIZ. N° 1
PRECIO PPTO.
UNID. METRADO
UNITARIO S/.
MET.
- 0% - 0.00% - 0% - 0% - 0% 2,115.90
- - - - -
- 0% - 0.00% - 0% 727.50 989.40 36% 252.60 343.54 12% 456.16
- 0% - 0.00% - 0% 43.65 1,542.59 18% 15.16 535.75 6% 62.20
- 0% - 0.00% - 0% 727.50 1,731.45 36% 252.60 601.19 12% 452.26
- 0% - 0.00% - 0% 54.56 766.57 26% 18.95 266.25 9% 77.75
- 0% - 0.00% - 0% 355.29 12,470.68 25% 265.53 9,320.10 19% 78.05
- 0% - 0.00% - 0% 37.56 12,490.95 35% 12.58 4,183.60 12% 23.69
- 0% - 0.00% - 0% 109.13 217.17 8% 78.87 156.95 6% 729.87
- 0% - 0.00% - 0% - 0% - 0% 33.75
- - - - -
- 0% 3,972.43 6,395.61 87.60% - 0% - 0% - 0% 290.03
- 0% 897.14 31,704.93 65.94% - 0% - 0% - 0% 310.92
- 0% 1,121.43 15,756.09 65.94% - 0% - 0% - 0% 388.64
- 0% - 0.00% - 0% 256.93 351.99 6% 369.04 505.58 8% 1,361.13
- 0% - 0.00% - 0% 158.27 1,318.39 3% 369.14 3,074.94 8% 1,283.01
- 0% - 0.00% - 0% 64.00 892.80 2% 103.05 1,437.55 2% 1,663.94
- 0% - 0.00% - 0% 253.21 10,771.55 6% 361.18 15,364.60 9% 1,352.97
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% 253.21 503.89 6% 361.18 718.75 9% 1,352.97
- 0% - 0.00% - 0% - 0% - 0% 331.89
- - - - -
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- - - - -
ATIVO DE VALORIZACIONES MENSUALES RECALC
UPERVISOR CONTRATISTA/SUPERVISOR CONTRATISTA/SUPERVISOR CONTRATISTA/SUPERVISOR CONTRATISTA/SUPERVISOR CONTRATIST
DIC 2017 VALORIZ. N° 2 ABRIL 2017 VALORIZ. N° 3 MAYO 2017 VALORIZ. N° 4 JUNIO 2017 VALORIZ. N°5 JULIO 2017 VALORIZ. N°
IZ. S/. % MET. VALORIZ. S/. % MET. VALORIZ. S/. % MET. VALORIZ. S/. % MET. VALORIZ. S/. % MET. VA
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- - - - -
- - - - -
- 0% - 0.00% 406.00 2,107.14 76% - 0% - 0% 124.32
- 0% - 0.00% - 0% 149.88 5,296.76 51% - 0% 106.55
- 0% - 0.00% - 0% 211.61 503.63 40% 208.39 495.97 39% 110.32
- 0% - 0.00% - 0% 187.35 2,632.27 51% - 0% 133.18
- 0% - 0.00% - 0% 149.24 2,093.84 28% 270.76 3,798.76 51% 110.32
- 0% - 0.00% - 0% 19.39 6,666.48 8% 157.23 54,057.25 65% 51.64
- 0% - 0.00% - 0% 91.42 4,070.93 4% 984.20 43,826.43 46% 859.39
- 0% - 0.00% - 0% 1,651.87 8,160.24 17% 4,022.69 19,872.09 41% 1,653.76
- 0% - 0.00% - 0% - 0% - 0% 991.40
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% 13.66 381.66 10% 106.59 2,978.12 76% 15.80
- 0% - 0.00% - 0% 110.34 219.58 7% 984.20 1,958.56 63% 446.09
- - - - -
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
ATIVO DE VALORIZACIONES MENSUALES RECALC
UPERVISOR CONTRATISTA/SUPERVISOR CONTRATISTA/SUPERVISOR CONTRATISTA/SUPERVISOR CONTRATISTA/SUPERVISOR CONTRATIST
DIC 2017 VALORIZ. N° 2 ABRIL 2017 VALORIZ. N° 3 MAYO 2017 VALORIZ. N° 4 JUNIO 2017 VALORIZ. N°5 JULIO 2017 VALORIZ. N°
IZ. S/. % MET. VALORIZ. S/. % MET. VALORIZ. S/. % MET. VALORIZ. S/. % MET. VALORIZ. S/. % MET. VA
- - - - -
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- - - - -
747.04 20% 0.20 747.04 20.00% 0.20 747.04 20% 0.20 747.04 20% 0.10 373.52 10% 0.10
183.36 20% 0.20 183.36 20.00% 0.20 183.36 20% 0.20 183.36 20% 0.10 91.68 10% 0.10
- 0% 1.00 262.43 25.00% 1.00 262.43 25% 1.00 262.43 25% - 0% 1.00
955.43 20% 6,110.70 3,910.85 40.00% - - 0% - 0% - 0% 3,138.47
- 0% - 0.00% - - 0% - 0% - 0%
- 0% 1.00 240.87 16.67% 1.00 240.87 17% - 0% 1.00 240.87 17% 3.00
- - - - -
- - - - -
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- - - - -
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
734.63 158,010.45 171,842.37 503,780.23 319,583.86 5
009.79 15,010.99 16,325.03 47,859.12 30,360.47
OBRA : "CONSTRUCCION DE PISTAS Y VEREDAS EN LA ASOCIACION PRIMAVER - CANAAN BAJO DEL DISTRITO DE ANDRES AVELINO
LUGAR ASOC. PRIMAVERA - CANAAN BAJO - ANDRES AVELINO CACERES - HUAMNGA - AYACUCHO
CONTRATISTA : CONSORCIO PRIMAVERA
SUPERVISIÓN : OBRAS & PROYECTOS CORPORACION INGENIEROS SAC
PRESUPUESTO CONTRACTUAL : S/. 3'384,939.80
PARALIZACION : 113 DIAS CALENDARIOS
AMP. DE PLAZO N° 01 : 113 DIAS CALENDARIOS
AMP. DE PLAZO N° 02 : 17 DIAS CALENDARIOS
AMP. DE PLAZO N° 03 : 10 DIAS CALENDARIOS
AMP. DE PLAZO N° 04 : 10 DIAS CALENDARIOS
AMP. DE PLAZO N° 05 : 12 DIAS CALENDARIOS
2.00 ADICIONAL DE OBRA CON PRECIOS PACTADOS N° 01 33,254.51 33,254.51 100.00% 0.00
13,472.79 41.60
38.35% 88,321.61 99.69% 272.71 0.31%
RESUMEN DE CONSOLIDADO DE VALORIZACIONES DE ADICIONALES D
LIQUIDACION DE OBRA
OBRA : "CONSTRUCCION DE PISTAS Y VEREDAS EN LA ASOCIACION PRIMAVER - CANAAN BAJO DEL DISTRITO DE ANDRES AVELINO CAC
AYACUCHO"
LUGAR ASOC. PRIMAVERA - CANAAN BAJO - ANDRES AVELINO CACERES - HUAMNGA - AYACUCHO JEFE DE SUPERVISIÓN
CONTRATISTA : CONSORCIO PRIMAVERA RESIDENTE DE OBRA
SUPERVISIÓN : OBRAS & PROYECTOS CORPORACION INGENIEROS SAC PLAZO EJECUCION
PRESUPUESTO CONTRACTUAL : S/. 3'384,939.80 FECHA DE INICIO
PARALIZACION : 113 DIAS CALENDARIOS FECHA DE PARALIZACIO
AMP. DE PLAZO N° 01 : 113 DIAS CALENDARIOS TERMINO DE AMP. N° 01
AMP. DE PLAZO N° 02 : 17 DIAS CALENDARIOS TERMINO DE AMP. N° 02
AMP. DE PLAZO N° 03 : 10 DIAS CALENDARIOS TERMINO DE AMP. N° 03
AMP. DE PLAZO N° 04 : 10 DIAS CALENDARIOS TERMINO DE AMP. N° 04
AMP. DE PLAZO N° 05 : 12 DIAS CALENDARIOS TERMINO PLAZO CONTR
2.00 ADICIONAL DE OBRA CON PRECIOS PACTADOS N° 01 22,192.90 22,192.90 100.00% 22,192.90
EJECUTADO SALDO
338.94
98.95% 2,221.94 1.19%