RESUMEN DE PAGOS REALIZADOS POR LA EJECUCIÓN DE OBRA

PRESUPUESTO
VALORIZACION VALORIZACION VALORIZACION VALORIZACION VALORIZACION VALORIZACION VALORIZACION VALORIZACION
DESCRIPCION VALOR
N⁰ 01 DIC 16 N⁰ 02 ABR 17 N⁰ 03 MAY 17 N⁰ 04 JUN 17 N⁰ 05 JUL 17 N⁰ 06 AGO 17 N⁰ 07 SET 17 N⁰ 08 OCT 17
REFERNCIAL E.T

VAL. BRUTA OBRAS (VB) 2,868,593.05 290,644.82 181,712.01 197,618.80 579,347.26 367,521.44 652,269.97 95,849.09 197,249.17
IGV 18% 516,346.75 52,316.07 32,708.16 35,571.38 104,282.51 66,153.86 117,408.59 17,252.84 35,504.85
VAL. BRUTA TOTAL (VB) 3,384,939.80 342,960.89 214,420.17 233,190.18 683,629.77 433,675.30 769,678.56 113,101.93 232,754.02
10.13% 6.33% 6.89% 20.20% 12.81% 22.74% 3.34% 6.88%
ACUMULADO SALDO POR
VALORIZADO VALORIZAR

2,562,212.55 306,380.48
461,198.26 55,148.49
3,023,410.81 361,528.97
89.32% 10.68%
COMPARA
CONTRATISTA/S
PRESUPUESTO
ITEM DESCRIPCION VALORIZ. N° 1
PRECIO PPTO.
UNID. METRADO
UNITARIO S/.
MET.

F. P UNICA
01 OBRAS PROVISIONALES 30,931.44
01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 8.5 x 3.5 m u 1 1111.14 1,111.14 1.00
01.02 MOVILIZACION Y DESMOVILIZACIÓN DE MAQUINARIAS glb 1.00 2542.38 2,542.38 0.50
01.03 LIMPIEZA DE TERRENO MANUAL m2 14665.55 0.62 9,092.64 14,665.55
01.04 TRAZO Y REPLANTEO PRELIMINAR m2 14665.55 1.24 18,185.28 14,665.55
02 CONSTRUCCION DE PISTAS Y VEREDAS 2,099,018.92
02.01 CONSTRUCCION DE PAVIMENTO RIGIDO 1,581,210.72
02.01.01 TRAZO Y REPLANTEO EN PAVIMENTACION m2 10667.50 1.61 17,174.68
02.01.02 CORTE DE TERRENO A NIVEL DE SUBRASANTE m3 10102.83 11.03 111,434.21 7,700.92
02.01.03 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO m3 12628.53 14.05 177,430.85 9,626.15
02.01.04 PERFILADO Y COMPACTADO
MEJORAMIENTO DE SUB-RASANTE
DE SUBRASANTE CONGRANULAR
CON MATERIAL EQUIPO E=0.3 M m2 10667.50 2.5 26,668.75
02.01.05 MEJORAMIENTO DE SUBRASANTE CON MATERIAL GRANULAR E=0.8 M m2 5328.00 20.62 109,863.36
02.01.06 m2 327.08 49.05 16,043.27
02.01.07 m2 10667.50 17.42 185,827.85
02.01.08 ENCOFRADO Y DESENCOFRADO DE PAVIMENTOS m 7237.05 13.95 100,956.85
02.01.09 CONCRETO f 'c=210 kg/cm2 PARA PAVIMENTOS, E=0.20m m2 5196.76 88.79 461,420.32
02.01.10 CONCRETO f 'c=210 kg/cm2 + 30%PM PARA PAVIMENTOS, E=0.20m m2 4782.93 67.94 324,952.26
02.01.11 CURADO DE CONCRETO m2 9979.70 1.99 19,859.60
COMPARA
CONTRATISTA/S
PRESUPUESTO
ITEM DESCRIPCION VALORIZ. N° 1
PRECIO PPTO.
UNID. METRADO
UNITARIO S/.
MET.

02.01.12 JUNTAS ASFALTICAS m 3871.56 7.64 29,578.72


02.02 CONSTRUCCION DE SARDINEL 109,756.28
02.02.01 TRAZO, NIVELACION Y REPLANTEO EN SARDINEL m 2037.30 1.36 2,770.73
02.02.02 EXCAVACION MANUAL DE ZANJAS PARA SARDINEL m3 244.48 35.34 8,639.92
02.02.03 NIVELACION Y COMPACTACION MANUAL DE ZANJA PARA SARDINEL m 2037.30 2.38 4,848.77
02.02.04 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO m3 210.10 14.05 2,951.91
02.02.05 ENCOFRADO Y DESENCOFRADO NORMAL EN SARDINEL m2 1426.11 35.1 50,056.46
02.02.06 CONCRETO F'c=175 KG/CM2 EN SARDINEL m3 106.96 332.56 35,570.62
02.02.07 CURADO DE CONCRETO m2 1426.11 1.99 2,837.96
02.02.08 JUNTAS ASFALTICAS m 272.24 7.64 2,079.91
02.03 CONSTRUCCION DE VEREDAS 408,051.92
02.03.01 TRAZO Y REPLANTEO EN VEREDAS m2 4534.91 1.61 7,301.21
02.03.02 EXCAVACION MANUAL EN MATERIAL COMPACTO A NIVEL SUB RASANTE m3 1360.47 35.34 48,079.01
02.03.03 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO m3 1700.59 14.05 23,893.29
02.03.04 PERFILADO Y COMPACTADO DE SUB-RASANTE CON EQUIPO MENOR m2 4533.41 1.37 6,210.77
02.03.05 CONFORMACION Y COMPACTACION DE BASE E=0.10 m - VEREDAS m2 4533.41 8.33 37,763.31
02.03.06 ENCOFRADO Y DESENCOFRADO DE VEREDAS m 4128.69 13.95 57,595.23
02.03.07 CONCRETO F'c=175 KG/CM2 EN VEREDAS, E=0.1 M m2 4082.93 42.54 173,687.84
02.03.08 ENCOFRADO Y DESENCOFRADO EN MARTILLO m 282.71 16.1 4,551.63
02.03.09 CONCRETO F'c=175 KG/CM2 EN MARTILLO - INCLUYE ACABADO m2 125.05 42.54 5,319.63
02.03.10 SUMINISTRO Y COLOCACION DE ADOQUINES DE 20x10x8 cm m2 236.46 90.56 21,413.82
02.03.11 CURADO DE CONCRETO m2 4241.20 1.99 8,439.99
02.03.12 JUNTAS ASFALTICAS
RAMPA EN CONCRETO SIMPLE FC=175 Kg/m2 m 1146.72 7.64 8,760.94
02.03.13 3,439.25
02.03.13.01 CONCRETO F'c=175 KG/CM2 EN RAMPA m2 33.22 43.06 1,430.45
02.03.13.02 ENCOFRADO Y DESENCOFRADO DE RAMPA m 144.00 13.95 2,008.80
02.03.14 1,596.00
COMPARA
CONTRATISTA/S
PRESUPUESTO
ITEM DESCRIPCION VALORIZ. N° 1
PRECIO PPTO.
UNID. METRADO
UNITARIO S/.
MET.

02.03.14.01 CONCRETO f 'c=210 kg/cm2 m3 1.26 343.81 433.20


02.03.14.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 18.72 39.93 747.49
02.03.14.03 ACERO fy=4200 kg/cm2 GRADO 60 kg 84.07 4.94 415.31
03 SISTEMA DE EVACUACIÓN PLUVIAL (CUNETA) 292,708.75
03.01 CONSTRUCCIÓN DE CUNETA 278,250.99
03.01.01 TRAZO Y REPLANTEO EN CUNETA m2 534.96 5.19 2,776.44
03.01.02 EXCAVACION MANUAL EN MATERIAL COMPACTADO m3 294.23 35.34 10,398.09
03.01.03 NIVELACION Y COMPACTACION MANUAL DE ZANJA PARA CUNETA m2 534.96 2.38 1,273.20
03.01.04 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO m3 367.79 14.05 5,167.45
03.01.05 SOLADO CONCRETO f'c=100 kg/cm2, h=10 cm m2 534.96 14.03 7,505.49
03.01.06 CONCRETO f 'c=210 kg/cm2 m3 243.58 343.81 83,745.24
03.01.07 ENCOFRADO Y DESENCOFRADO DE CUNETA m2 2124.67 44.53 94,611.56
03.01.08 ACERO fy=4200 kg/cm2 GRADO 60 kg 9732.81 4.94 48,080.08
03.01.09 SOLAQUEO DE INTERIORES DE CUNETA m2 1031.71 11.45 11,813.08
03.01.10 JUNTAS ASFALTICAS m 764.23 7.64 5,838.72
03.01.11 JUNTA WATER STOP DE 6" m 140.11 27.94 3,914.67
03.01.12 CURADO DE CONCRETO m2 1571.34 1.99 3,126.97
03.02 CONSTRUCCION DE ALCANTARILLA DE EVACUACIÓN PLUVIAL 14,457.76
03.02.01 TRAZO Y REPLANTEO EN ALCANTARILLA DE EVACUACIÓN PLUVIAL m2 18.20 5.19 94.46
03.02.02 EXCAVACION MANUAL EN MATERIAL COMPACTADO m3 21.84 35.34 771.83
03.02.03 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO m3 27.30 14.05 383.57
03.02.04 SOLADO PARA ESTRUCTURAS DE CONCRETO, E=7.50CMS, C:H, 1:12 m2 15.60 16.53 257.87
03.02.05 CONCRETO f 'c=210 kg/cm2 m3 11.10 343.81 3,816.29
03.02.06 ENCOFRADO Y DESENCOFRADO DE ALCANTARILLA m2 73.28 39.93 2,926.07
03.02.07 ACERO fy=4200 kg/cm2 GRADO 60 kg 1123.66 4.94 5,550.88
03.02.08 SOLAQUEO DE INTERIORES DE ALCANTARILLA m2 44.00 11.45 503.80
03.02.09 CURADO DE CONCRETO m2 76.88 1.99 152.99
COMPARA
CONTRATISTA/S
PRESUPUESTO
ITEM DESCRIPCION VALORIZ. N° 1
PRECIO PPTO.
UNID. METRADO
UNITARIO S/.
MET.

04 AREAS VERDES 9,755.46


04.01 PREPARACION DE TERRENO PARA AREA VERDE m2 527.06 1.55 816.94
04.02 SUMINISTRO Y COLOCACION DE TIERRA NEGRA PARA AREA VERDE m2 527.06 6.53 3,441.70
04.03 SEMBRADO DE GRASS PARA AREA VERDE m2 527.06 9.31 4,906.93
04.04 PLANTAS ORNAMENTALES PARA AREA VERDE u 53.00 11.13 589.89
05 MITIGACION AMBIENTAL Y SEGURIDAD 27,465.03
05.01 EQUIPO DE PROTECCION COLECTIVA glb 1.00 3735.2 3,735.20 0.20
05.02 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.00 916.8 916.80 0.20
05.03 CHARLAS DE CAPACITACION EN SEGURIDAD Y SALUD u 4.00 262.43 1,049.72
05.04 RIEGO EN OBRA DURANTE LA EJECUCION m2 15276.76 0.64 9,777.13 3,055.35
05.05 LIMPIEZA GENERAL DE OBRA m2 15276.76 0.69 10,540.96
05.06 INSTALACION DE CONTENEDORES DE RESIDUOS SOLIDOS u 6.00 240.87 1,445.22
06 SEÑALIZACIONES 34,549.14
06.01 SEÑALIZACIÓN VERTICAL
SEÑALES PREVENTIVAS 9,592.29
06.01.01 SEÑALES INFORMATIVAS u 6.00 355.27 2,131.62
06.01.02 SEÑALES REGULADORAS u 19.00 355.27 6,750.13
06.01.03 u 2.00 355.27 710.54
06.02 SEÑALIZACIÓN HORIZONTAL 24,956.85
06.02.01 m 4067.07 2.4 9,760.97
06.02.02 m 764.23 2.4 1,834.15
06.02.03 SEÑALES DE CRUCEDE
GIBAS (REDUCTOR PEATONAL Y SENTIDOS DE VÍA
VELOCIDAD) m2 712.80 11.03 7,862.18
06.02.04 m2 34.68 158.58 5,499.55
COSTO DIRECTO 2,494,428.74
GASTOS GENERALES 9.5% 236,970.73
GASTOS SUPERV. 4%
UTILIDAD 5.5% 137,193.58
SUB TOTAL 2,868,593.05
COMPARA
CONTRATISTA/S
PRESUPUESTO
ITEM DESCRIPCION VALORIZ. N° 1
PRECIO PPTO.
UNID. METRADO
UNITARIO S/.
MET.

IMP. IGV 18% 516,346.75


TOTAL PPTO 3,384,939.80
ATIVO DE VALORIZACIONES MENSUALES RECALC
UPERVISOR CONTRATISTA/SUPERVISOR CONTRATISTA/SUPERVISOR CONTRATISTA/SUPERVISOR CONTRATISTA/SUPERVISOR CONTRATIST
DIC 2017 VALORIZ. N° 2 ABRIL 2017 VALORIZ. N° 3 MAYO 2017 VALORIZ. N° 4 JUNIO 2017 VALORIZ. N°5 JULIO 2017 VALORIZ. N°
IZ. S/. % MET. VALORIZ. S/. % MET. VALORIZ. S/. % MET. VALORIZ. S/. % MET. VALORIZ. S/. % MET. VA

111.14 100% - 0.00% - 0% - 0% - 0%


271.19 50% - 0.00% - 0% - 0% - 0%
092.64 100% - 0.00% - 0% - 0% - 0%
185.28 100% - 0.00% - 0% - 0% - 0%
- - - - -
- - - - -
- 0% - 0.00% - - 0% 4,930.16 7,937.56 46% 1,585.61 2,552.83 15% 2,848.45
941.15 76% 116.40 1,283.89 1.15% 215.51 2,377.08 2% - 0% - 0% 13.24
247.41 76% 145.50 2,044.28 1.15% 269.39 3,784.89 2% - 0% - 0% 16.55
- 0% 10,116.25 25,290.63 94.83% - 0% - 0% - 0% -
- 0% 3,404.00 70,190.48 63.89% 676.00 13,939.12 13% - 0% - 0% 572.76
- 0% - 0.00% - 0% - 0% - 0% 324.66
- 0% - 0.00% 8,507.49 148,200.44 80% - 0% - 0% 1,181.40
- 0% - 0.00% - - 0% 4,048.11 56,471.13 56% 980.85 13,682.86 14% 1,940.15
- 0% - 0.00% - - 0% 996.09 88,442.83 19% 1,385.29 122,999.90 27% 2,447.24
- 0% - 0.00% - - 0% 3,913.64 265,892.70 82% 191.47 13,008.47 4% 390.65
- 0% - 0.00% - - 0% 4,909.73 9,770.36 49% 1,576.76 3,137.75 16% 2,837.89
ATIVO DE VALORIZACIONES MENSUALES RECALC
UPERVISOR CONTRATISTA/SUPERVISOR CONTRATISTA/SUPERVISOR CONTRATISTA/SUPERVISOR CONTRATISTA/SUPERVISOR CONTRATIST
DIC 2017 VALORIZ. N° 2 ABRIL 2017 VALORIZ. N° 3 MAYO 2017 VALORIZ. N° 4 JUNIO 2017 VALORIZ. N°5 JULIO 2017 VALORIZ. N°
IZ. S/. % MET. VALORIZ. S/. % MET. VALORIZ. S/. % MET. VALORIZ. S/. % MET. VALORIZ. S/. % MET. VA

- 0% - 0.00% - 0% - 0% - 0% 2,115.90
- - - - -
- 0% - 0.00% - 0% 727.50 989.40 36% 252.60 343.54 12% 456.16
- 0% - 0.00% - 0% 43.65 1,542.59 18% 15.16 535.75 6% 62.20
- 0% - 0.00% - 0% 727.50 1,731.45 36% 252.60 601.19 12% 452.26
- 0% - 0.00% - 0% 54.56 766.57 26% 18.95 266.25 9% 77.75
- 0% - 0.00% - 0% 355.29 12,470.68 25% 265.53 9,320.10 19% 78.05
- 0% - 0.00% - 0% 37.56 12,490.95 35% 12.58 4,183.60 12% 23.69
- 0% - 0.00% - 0% 109.13 217.17 8% 78.87 156.95 6% 729.87
- 0% - 0.00% - 0% - 0% - 0% 33.75
- - - - -
- 0% 3,972.43 6,395.61 87.60% - 0% - 0% - 0% 290.03
- 0% 897.14 31,704.93 65.94% - 0% - 0% - 0% 310.92
- 0% 1,121.43 15,756.09 65.94% - 0% - 0% - 0% 388.64
- 0% - 0.00% - 0% 256.93 351.99 6% 369.04 505.58 8% 1,361.13
- 0% - 0.00% - 0% 158.27 1,318.39 3% 369.14 3,074.94 8% 1,283.01
- 0% - 0.00% - 0% 64.00 892.80 2% 103.05 1,437.55 2% 1,663.94
- 0% - 0.00% - 0% 253.21 10,771.55 6% 361.18 15,364.60 9% 1,352.97
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% 253.21 503.89 6% 361.18 718.75 9% 1,352.97
- 0% - 0.00% - 0% - 0% - 0% 331.89
- - - - -
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- - - - -
ATIVO DE VALORIZACIONES MENSUALES RECALC
UPERVISOR CONTRATISTA/SUPERVISOR CONTRATISTA/SUPERVISOR CONTRATISTA/SUPERVISOR CONTRATISTA/SUPERVISOR CONTRATIST
DIC 2017 VALORIZ. N° 2 ABRIL 2017 VALORIZ. N° 3 MAYO 2017 VALORIZ. N° 4 JUNIO 2017 VALORIZ. N°5 JULIO 2017 VALORIZ. N°
IZ. S/. % MET. VALORIZ. S/. % MET. VALORIZ. S/. % MET. VALORIZ. S/. % MET. VALORIZ. S/. % MET. VA

- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- - - - -
- - - - -
- 0% - 0.00% 406.00 2,107.14 76% - 0% - 0% 124.32
- 0% - 0.00% - 0% 149.88 5,296.76 51% - 0% 106.55
- 0% - 0.00% - 0% 211.61 503.63 40% 208.39 495.97 39% 110.32
- 0% - 0.00% - 0% 187.35 2,632.27 51% - 0% 133.18
- 0% - 0.00% - 0% 149.24 2,093.84 28% 270.76 3,798.76 51% 110.32
- 0% - 0.00% - 0% 19.39 6,666.48 8% 157.23 54,057.25 65% 51.64
- 0% - 0.00% - 0% 91.42 4,070.93 4% 984.20 43,826.43 46% 859.39
- 0% - 0.00% - 0% 1,651.87 8,160.24 17% 4,022.69 19,872.09 41% 1,653.76
- 0% - 0.00% - 0% - 0% - 0% 991.40
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% 13.66 381.66 10% 106.59 2,978.12 76% 15.80
- 0% - 0.00% - 0% 110.34 219.58 7% 984.20 1,958.56 63% 446.09
- - - - -
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
ATIVO DE VALORIZACIONES MENSUALES RECALC
UPERVISOR CONTRATISTA/SUPERVISOR CONTRATISTA/SUPERVISOR CONTRATISTA/SUPERVISOR CONTRATISTA/SUPERVISOR CONTRATIST
DIC 2017 VALORIZ. N° 2 ABRIL 2017 VALORIZ. N° 3 MAYO 2017 VALORIZ. N° 4 JUNIO 2017 VALORIZ. N°5 JULIO 2017 VALORIZ. N°
IZ. S/. % MET. VALORIZ. S/. % MET. VALORIZ. S/. % MET. VALORIZ. S/. % MET. VALORIZ. S/. % MET. VA

- - - - -
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- - - - -
747.04 20% 0.20 747.04 20.00% 0.20 747.04 20% 0.20 747.04 20% 0.10 373.52 10% 0.10
183.36 20% 0.20 183.36 20.00% 0.20 183.36 20% 0.20 183.36 20% 0.10 91.68 10% 0.10
- 0% 1.00 262.43 25.00% 1.00 262.43 25% 1.00 262.43 25% - 0% 1.00
955.43 20% 6,110.70 3,910.85 40.00% - - 0% - 0% - 0% 3,138.47
- 0% - 0.00% - - 0% - 0% - 0%
- 0% 1.00 240.87 16.67% 1.00 240.87 17% - 0% 1.00 240.87 17% 3.00
- - - - -
- - - - -
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- - - - -
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
- 0% - 0.00% - 0% - 0% - 0%
734.63 158,010.45 171,842.37 503,780.23 319,583.86 5
009.79 15,010.99 16,325.03 47,859.12 30,360.47

900.40 8,690.57 9,451.33 27,707.91 17,577.11


644.82 181,712.01 197,618.73 579,347.26 367,521.44 6
ATIVO DE VALORIZACIONES MENSUALES RECALC
UPERVISOR CONTRATISTA/SUPERVISOR CONTRATISTA/SUPERVISOR CONTRATISTA/SUPERVISOR CONTRATISTA/SUPERVISOR CONTRATIST
DIC 2017 VALORIZ. N° 2 ABRIL 2017 VALORIZ. N° 3 MAYO 2017 VALORIZ. N° 4 JUNIO 2017 VALORIZ. N°5 JULIO 2017 VALORIZ. N°
IZ. S/. % MET. VALORIZ. S/. % MET. VALORIZ. S/. % MET. VALORIZ. S/. % MET. VALORIZ. S/. % MET. VA

316.07 32,708.16 35,571.37 104,282.51 66,153.86 1


960.89 214,420.17 233,190.10 683,629.77 433,675.30 7
10.13% 6.33% 6.89% 20.20% 12.81%
RESUMEN DE CONSOLIDADO DE VALORIZACIONES DE ADIC
LIQUIDACION DE OBRA

OBRA : "CONSTRUCCION DE PISTAS Y VEREDAS EN LA ASOCIACION PRIMAVER - CANAAN BAJO DEL DISTRITO DE ANDRES AVELINO
LUGAR ASOC. PRIMAVERA - CANAAN BAJO - ANDRES AVELINO CACERES - HUAMNGA - AYACUCHO
CONTRATISTA : CONSORCIO PRIMAVERA
SUPERVISIÓN : OBRAS & PROYECTOS CORPORACION INGENIEROS SAC
PRESUPUESTO CONTRACTUAL : S/. 3'384,939.80
PARALIZACION : 113 DIAS CALENDARIOS
AMP. DE PLAZO N° 01 : 113 DIAS CALENDARIOS
AMP. DE PLAZO N° 02 : 17 DIAS CALENDARIOS
AMP. DE PLAZO N° 03 : 10 DIAS CALENDARIOS
AMP. DE PLAZO N° 04 : 10 DIAS CALENDARIOS
AMP. DE PLAZO N° 05 : 12 DIAS CALENDARIOS

MES AGOSTO MES SETIEMRE


PPTO
ITEM VALORIZACION
APROBADO
MONTO SIN IGV % MONTO SIN IGV

ADICIONAL DE OBRA CON PRECIOS


1.00 41,825.42 12,798.43 30.60% 28,795.88
REFERENCIALES N° 01

2.00 ADICIONAL DE OBRA CON PRECIOS PACTADOS N° 01 33,254.51 33,254.51 100.00% 0.00

PARCIAL 75,079.93 46,052.94 61.34% 28,795.88

IGV 18% 13,514.39 8,289.53 5,183.26


TOTAL 88,594.32 54,342.47 61.34% 33,979.14
ORIZACIONES DE ADICIONALES DE OBRA N° 01
IDACION DE OBRA

O DEL DISTRITO DE ANDRES AVELINO CACERES DORREGARA - HUAMANGA - AYACUCHO"


JEFE DE SUPERVISIÓN ING. RUBEN CANGANA GUTIERREZ
RESIDENTE DE OBRA ING. VIDAL E. CANALES DIAZ
PLAZO EJECUCION 150 DIAS CALENDARIO
FECHA DE INICIO 14-Dec-16
FECHA DE PARALIZACION 1-Jan-17 24-Apr-17
TERMINO DE AMP. N° 01 2-Sep-17
TERMINO DE AMP. N° 02: 19-Sep-17
TERMINO DE AMP. N° 03: 29-Sep-17
TERMINO DE AMP. N° 04: 9-Oct-17
TERMINO PLAZO CONTRACTUAL 21-Oct-17

MES SETIEMRE TOTAL EJECUTADO SALDO

% MONTO SIN IGV % MONTO SIN IGV %

68.85% 41,594.31 99.45 % 231.11 0.55 %

0.00% 33,254.51 100.00 % 0.00 0.00 %

38.35% 74,848.82 99.69 % 231.11 0.31 %

13,472.79 41.60
38.35% 88,321.61 99.69% 272.71 0.31%
RESUMEN DE CONSOLIDADO DE VALORIZACIONES DE ADICIONALES D
LIQUIDACION DE OBRA

OBRA : "CONSTRUCCION DE PISTAS Y VEREDAS EN LA ASOCIACION PRIMAVER - CANAAN BAJO DEL DISTRITO DE ANDRES AVELINO CAC
AYACUCHO"
LUGAR ASOC. PRIMAVERA - CANAAN BAJO - ANDRES AVELINO CACERES - HUAMNGA - AYACUCHO JEFE DE SUPERVISIÓN
CONTRATISTA : CONSORCIO PRIMAVERA RESIDENTE DE OBRA
SUPERVISIÓN : OBRAS & PROYECTOS CORPORACION INGENIEROS SAC PLAZO EJECUCION
PRESUPUESTO CONTRACTUAL : S/. 3'384,939.80 FECHA DE INICIO
PARALIZACION : 113 DIAS CALENDARIOS FECHA DE PARALIZACIO
AMP. DE PLAZO N° 01 : 113 DIAS CALENDARIOS TERMINO DE AMP. N° 01
AMP. DE PLAZO N° 02 : 17 DIAS CALENDARIOS TERMINO DE AMP. N° 02
AMP. DE PLAZO N° 03 : 10 DIAS CALENDARIOS TERMINO DE AMP. N° 03
AMP. DE PLAZO N° 04 : 10 DIAS CALENDARIOS TERMINO DE AMP. N° 04
AMP. DE PLAZO N° 05 : 12 DIAS CALENDARIOS TERMINO PLAZO CONTR

MES OCTUBRE EJECUTADO


PPTO
ITEM VALORIZACION
APROBADO
MONTO SIN IGV % MONTO SIN IGV

ADICIONAL DE OBRA CON PRECIOS REFERENCIALES N°


1.00 157,793.31 155,910.31 98.81% 155,910.31
01

2.00 ADICIONAL DE OBRA CON PRECIOS PACTADOS N° 01 22,192.90 22,192.90 100.00% 22,192.90

PARCIAL 179,986.21 178,103.21 98.95% 178,103.21

IGV 18% 32,397.52 32,058.58 32,058.58


TOTAL 212,383.73 210,161.79 98.95% 210,161.79
RIZACIONES DE ADICIONALES DE OBRA N° 02
CION DE OBRA

AAN BAJO DEL DISTRITO DE ANDRES AVELINO CACERES DORREGARA - HUAMANGA -

JEFE DE SUPERVISIÓN ING. RUBEN CANGANA GUTIERREZ


RESIDENTE DE OBRA ING. VIDAL E. CANALES DIAZ
150 DIAS CALENDARIO
FECHA DE INICIO 14-Dec-16
FECHA DE PARALIZACION 1-Jan-17 24-Apr-17
TERMINO DE AMP. N° 01 : 2-Sep-17
TERMINO DE AMP. N° 02: 19-Sep-17
TERMINO DE AMP. N° 03: 29-Sep-17
TERMINO DE AMP. N° 04: 9-Oct-17
TERMINO PLAZO CONTRACTUAL : 21-Oct-17

EJECUTADO SALDO

% MONTO SIN IGV %

98.81 % 1,883.00 1.19 %

100.00 % 0.00 0.00 %

98.95 % 1,883.00 1.19 %

338.94
98.95% 2,221.94 1.19%