MEDIDAS

MOVIMIENTO DE TIERRAS N DE VECES LARGO ANCHO ALTURA


EXCAVACIONES SIMPLES
ZAPATAS
Z-1 eje 11 entre ac 2 1 1 1.4
Z-1 EJE2A 1 1 1 1.4
Z-1 EJE 3C 1 1 1 1.4
Z-2 EJE 11 ENRTE B 1 1 1 1.4
Z-2 EJE 2 ENTRE AC 2 1 1 1.4
Z- 3EJE 2B 1 1 1 1.4
Z- 4 EJE 2B 1 1 1.63 1.4
CIMIENTOS CORRIDOS
VERTICALES
CC1 EJE AC ENTRE 12 2 3 0.4 0.8
CC1 EJE 2 ENTRE AB 1 1.85 0.4 0.8
CC1 EJE 3 ENTRE BC 1 1.13 0.4 0.8
CC1 EJE 2" ENTRE AB 1 1.03 0.4 0.8
HORIZONTALES
EJEAC ENTRE 12 2 2 0.4 0.8
EJEA ENTRE 2,2" 1 0.78 0.4 0.8
EJE C ENTRE 2-3 1 2 0.4 0.8
EJE B ENTRE 2-2" 1 1.38 0.4 0.8
PRACIAL TOTAL UND

2.8 13.482 M3
1.40 M3
1.40 M3
1.4 M3
2.8
1.4 M3
2.282

1.92 5.81
0.59
0.36
0.33

1.28
0.25
0.64
0.44 19.30 m3
CONCRETO SIMPLE N DE VECES LARGO ANCHO ALTURA
SOLADOS 1:12
Z-1.Z-2,Z-3 8 1 1
Z-4 1 1 1.63
CIMIENTO CORRIDO 1:10+30% P.G

CIMIENTOS CORRIDOS
VERTICALES
CC1 EJE AC ENTRE 12 2 3 0.4 0.8
CC1 EJE 2 ENTRE AB 1 1.85 0.4 0.8
CC1 EJE 3 ENTRE BC 1 1.13 0.4 0.8
CC1 EJE 2" ENTRE AB 1 1.03 0.4 0.8
HORIZONTALES
EJEAC ENTRE 12 2 2 0.4 0.8
EJEA ENTRE 2,2" 1 0.78 0.4 0.8
EJE C ENTRE 2-3 1 2 0.4 0.8
EJE B ENTRE 2-2" 1 1.38 0.4 0.8
PRACIAL TOTAL UND

8 9.63 M2
1.63 M2
M3
M3

M3

1.92 5.81
0.59
0.36
0.33

1.28
0.25
0.64
0.44 15.44 m3