Centro Nacional de Despacho de Carga (CNDC)

Informe de Operación del SIN (Sistema Interconectado Nacional)


Fecha: 05/11/2019

Resumen de Producción de Energía Neta (MWh) del 05/11/2019 Balance de Energía Neta (MWh) del 05/11/2019
Real Programado Energía Día Mes Año
Agente GGD
Día Mes Año Día Mes Año Interconexión Neta -20.7 -473.5 -5,665.9
PCG1 0.0 0.0 6,741.9 0.0 0.0 4,639.3 AMY-L9030 1,361.1 4,341.2 58,788.2
PCG2 0.0 0.0 5,200.0 0.0 0.0 1,804.5 TCPI-L9150 770.7 5,835.2 156,881.2
PCG3 0.0 0.0 5,817.2 0.0 0.0 7,306.6 LNI-L9040 782.5 4,266.6 58,528.0
PCG4 0.0 0.0 1,822.7 0.0 0.0 339.9 SND-L9090 373.9 2,558.3 16,907.3
PCG5 0.0 0.0 834.1 0.0 0.0 601.7 Generación 9,099.4 41,929.7 3536,061.5
PCG6 0.0 17.8 15,926.7 0.0 0.0 20,151.3 No Servida 13.2 135.3 10,342.8
PCG7 0.0 39.9 43,784.1 0.0 179.3 56,567.2 Demanda Neta 12,400.9 59,066.3 3837,509.0
ALBANISA PCG8 0.0 0.0 15,446.3 0.0 0.0 14,492.9
PCG9 0.0 5.6 66,883.1 0.0 0.0 58,818.6
PCG 0.0 63.4 162,455.9 0.0 179.3 164,721.9 Comportamiento de la Demanda (MW) del 05/11/2019
PHC1 0.0 0.0 38.7 0.0 0.0 282.3 Potencia Máxima Día Mes Año
PHC2 0.0 6.0 983.2 0.0 0.0 107.9 Real 638.7 638.7 717.5
PHC 0.0 6.0 1,022.0 0.0 0.0 390.2 Fecha y Hora 05/11/2019 18:00 05/11/2019 18:00 29/04/2019 14:00
ABR 427.3 1,423.3 109,803.6 490.5 6,434.7 145,876.4 Calculada 638.7 639.7 717.5
TOTAL 427.3 1,492.7 273,281.5 490.5 6,614.0 310,988.5 Fecha y Hora 05/11/2019 18:00 04/11/2019 19:00 29/04/2019 14:00
AMAYO 1 AMY1 638.6 1,986.7 131,593.2 510.0 7,652.8 139,677.9 Programado 645.4 705.2 727.2
AMAYO 2 AMY2 368.8 1,490.7 84,525.5 302.0 5,133.1 88,817.8 Fecha y Hora 05/11/2019 19:00 11/2019 04/2019
BLUE POWER PBP 534.8 1,920.5 130,836.7 500.6 7,243.2 145,015.4
EOLO EOL 660.1 2,298.9 143,140.1 626.1 10,267.0 165,913.3 Resumen del Mercado Eléctrico Regional (MER) del 05/11/2019
EEC 927.8 31,777.0 319,801.0 Real
739.6 3,252.6 306,145.8 Agente
EEC EEC20 255.6 7,200.0 64,854.2 Día Mes Año
TOTAL 739.6 3,252.6 306,145.8 1,183.4 38,977.0 384,655.2 Resumen de Ventas (MWh)
EGERSA EGR 0.0 0.0 93,360.8 0.0 8,640.0 63,607.7 DISNORTE 0.00 0.00 74.22
PNI1 636.7 3,322.4 207,641.3 607.6 24,534.0 200,906.0 DISSUR 0.00 0.00 76.58
GEOSA PNI2 632.4 3,188.8 89,710.1 600.0 12,952.0 93,599.0 TOTAL 0.00 0.00 150.80
TOTAL 1,269.1 6,511.2 297,351.4 1,207.6 37,486.0 294,505.0 Resumen de Compras (MWh)
GESARSA GSR 0.0 0.0 0.0 0.0 0.0 0.0 BLUEFIELDS 2,016.00 10,080.00 163,987.81
GREEN POWER MTL 0.0 0.0 136,825.5 0.0 20,880.0 175,872.0 CCN 24.94 29.94 5,008.07
HPA1 95.8 1,357.8 17,711.6 DISNORTE 529.37 3,119.88 52,927.81
HIDRO 269.3 1,485.1 26,391.6
HPA2 90.0 1,357.8 17,711.6 DISSUR 529.37 3,119.88 53,246.58
PANTASMA
TOTAL 269.3 1,485.1 26,391.6 185.8 2,715.6 35,423.2 HOLCIM 0.00 0.00 1,292.77
IHSA PHD 75.0 491.4 15,331.0 0.0 1,876.4 20,801.6 MULUKUKU 56.10 301.05 6,688.14
PCA1 0.0 0.0 95.3 0.0 3,546.4 3,546.4 SIUNA 153.11 824.08 13,770.23
PCA2 0.0 0.0 0.0 0.0 3,546.4 3,546.4 TOTAL 3,308.89 17,474.83 296,921.41
PCA 0.0 0.0 95.3 0.0 7,092.8 7,092.8
PCA-PCF PCF1 0.0 67.5 39,867.2 110.0 2,069.6 45,690.8
PCF2 6.1 354.4 31,989.7 30.0 2,069.6 45,690.8
PCF 6.1 421.8 71,857.0 140.0 4,139.1 91,381.7
TOTAL 6.1 421.8 71,952.3 140.0 11,231.9 98,474.5
PEN3 770.7 3,930.0 245,996.5 864.0 24,163.0 278,483.0
PENSA PEN4 699.5 3,523.2 206,682.4 744.0 21,096.0 242,887.0
TOTAL 1,470.2 7,453.2 452,678.9 1,608.0 45,259.0 521,370.0
PHL1 0.0 0.0 36,198.6 0.0 1,263.2 25,823.6
PHL PHL2 0.0 0.0 13,006.4 0.0 1,263.2 25,823.6
TOTAL 0.0 0.0 49,205.0 0.0 2,526.4 51,647.2
AGSA PMN 1,495.8 7,613.8 497,594.8 1,219.0 36,762.0 520,393.9
PLB1 0.0 0.0 0.0 0.0 0.0 0.0
PLB2 0.0 0.0 0.0 0.0 0.0 0.0
PLB 0.0 0.0 0.0 0.0 0.0 0.0
PMG3 0.0 0.0 0.0 0.0 0.0 0.0
PLB-PMG
PMG4 5.2 61.1 9,461.6 4.9 0.0 6,963.0
PMG5 5.2 60.9 12,372.3 54.2 1,393.9 11,322.3
PMG 10.4 122.0 21,833.9 59.1 1,393.9 18,285.3 Generación por Tipo del 05/11/2019
TOTAL 10.4 122.0 21,833.9 59.1 1,393.9 18,285.3
BIOMASA
CENSA CEN 166.9 761.7 174,620.2 187.6 14,113.0 149,267.8 0.06%
MONTE ROSA MTR 0.0 0.0 133,650.5 0.0 13,680.0 153,360.0
NSEL NSL 5.1 5.1 95,117.2 15.2 14,400.0 133,528.0
PMT1 333.5 1,995.7 124,803.3 408.0 10,685.3 133,595.1
PMT2 0.0 0.0 0.0 0.0 0.0 0.0
PMT
PMT3 138.5 711.3 43,068.6 139.2 4,002.7 44,029.9 EOLICO
TOTAL 472.0 2,707.0 167,872.0 547.2 14,688.0 177,625.0 28.90%
SOLARIS PSL 79.6 349.0 18,754.5 56.5 2,449.2 24,645.6
TPC TPC 410.5 1,566.2 213,999.2 498.8 24,960.0 296,169.1 BIOMASA

TOTAL 9,099.4 41,929.7 3536,061.5 9,337.5 328,948.5 3970,044.1 TERMICO BUNKER EOLICO
44.97% GEOTERMICO

HIDROELECTRICO
Resumen de Producción de Energía Neta (MWh) por Tipo del 05/11/2019
SOLAR
Real Programado
Tipo Recurso TERMICO BUNKER
Día Mes Año Día Mes Año
BIOMASA 5.1 5.1 458,954.0 15.2 57,600.0 526,367.7
EOLICO 2,629.7 9,120.2 599,899.1 2,429.2 36,730.8 685,300.8 GEOTERMICO
GEOTERMICO 1,942.2 10,160.2 620,550.9 2,155.2 59,947.0 698,995.0 21.34%
HIDROELECTRICO 350.4 2,398.3 162,879.8 325.8 18,350.3 206,346.6
SOLAR 79.6 349.0 18,754.5 56.5 2,449.2 24,645.6
TERMICO BUNKER 4,092.4 19,891.0 1674,001.2 4,355.6 153,871.2 1827,998.2 SOLAR
TERMICO DIESEL 0.0 6.0 1,022.0 0.0 0.0 390.2 0.87% HIDROELECTRICO
TOTAL 9,099.4 41,929.7 3536,061.5 9,337.5 328,948.5 3970,044.1 3.85%

Fuente SIIMEM (Sistema de Información Integrado de la Planeación y Administración del Mercado Eléctrico Mayorista) Página 1/4 06/11/2019 08:11
Precio Promedio (US$/Bbl.) Combustible (Miles Gls.) del 05/11/2019

Combustible Día Año Consumo* Recibido Precio


GGD Inventario
Bunker 46.8 56.1 Día Mes Año Día Mes Año (US$/Bbl.)**
Diesel 76.3 76.3 BUNKER 271.4 1,326.6 107,122.1 475.3 1,513.9 112,096.7 10,964.4 38.0
CEN 11.3 52.3 10,887.9 39.0 45.8 10,466.7 791.6 46.9
Disponibilidad y Costo Variable Semanal hasta EEC 45.0
44.0 200.9 18,974.5 0.0 0.0 20,392.9 2,564.2
11/06/2019 07:00 EEC20 45.0
Instalada Real Costo GSR 0.0 0.0 0.0 0.0 0.0 0.0 64.6 45.1
GGD
MW US$/MWh PCG1 0.0 0.0 371.4 0.0 0.0 527.9 249.3 47.3
ABR 41.6 24.8 0.0 PCG2 0.0 0.0 257.2 0.0 0.0 328.6 236.9 47.6
AMY1 41.9 27.0 0.0 PCG3 0.0 0.0 291.3 0.0 0.0 473.0 497.4 47.0
AMY2 24.3 15.0 0.0 PCG4 0.0 0.0 79.2 47.6
0.0 0.0 206.3 239.6
CEN 57.0 48.0 84.7 PCG5 0.0 0.0 35.3 47.6
EEC 53.5 50.0 79.4 PCG6 0.0 0.4 915.9 46.1
5.9 17.6 3,741.8 713.0
EEC20 21.3 21.3 76.2 PCG7 0.0 1.2 2,515.4 46.1
EGR 35.0 0.0 21.7 PCG8 0.0 0.0 841.9 0.0 0.0 1,031.4 457.6 45.2
EOL 46.2 30.8 0.0 PCG9 0.0 0.0 3,928.4 0.0 0.0 3,661.8 475.6 45.9
GSR 5.4 0.0 80.0 PCG 0.0 1.5 9,235.9 5.9 17.6 9,970.8 2,869.5 46.7
HPA1 7.2 0.0 76.2 PMG3 0.0 0.0 0.0 0.0 0.0 630.2 48.5
HPA2 7.2 6.5 76.2 PMG4 0.3 4.0 604.8 0.0 0.0 547.9 179.0 48.5
MTL 42.5 0.0 44.7 PMG5 0.4 4.1 820.5 0.0 0.0 65.2 48.5
MTR 38.5 0.0 50.0 PMG 0.7 8.1 1,425.3 0.0 0.0 1,243.2 179.0 48.5
NSL 33.0 0.0 34.2 PNI1 50.2 261.9 16,362.8 47.0
91.0 544.9 24,228.3 611.5
PBP 41.6 21.4 0.0 PNI2 51.6 260.0 7,313.0 47.0
PCA1 25.0 0.0 0.0 PNI 101.7 521.8 23,675.9 91.0 544.9 24,228.3 611.5 47.0
PCA2 25.0 0.0 0.0 TPC 25.2 96.2 13,145.7 56.3 114.6 14,221.4 1,094.7 47.8
PCF1 25.0 21.7 76.7 PMN 88.4 445.8 29,776.9 283.1 791.0 31,573.3 2,789.2 47.1
PCF2 25.0 21.7 76.7 DIESEL 2.6 14.5 1,632.7 14.8 14.8 1,421.8 417.8 76.3
PCG1 19.2 19.2 87.4 PCG1 0.0 0.0 79.5 0.0 0.0 59.1 39.9 76.3
PCG2 19.2 19.2 87.8 PCG2 0.0 0.0 90.8 0.0 0.0 81.2 24.8 76.3
PCG3 19.2 18.8 87.0 PCG3 0.0 0.0 89.5 0.0 0.0 75.5 12.1 76.3
PCG4 19.2 19.2 90.0 PCG4 0.0 0.0 43.2 76.3
0.0 0.0 66.4 25.8
PCG5 18.6 18.6 90.5 PCG5 0.0 0.0 22.3 76.3
PCG6 12.9 9.7 77.4 PCG6 0.0 0.9 121.2 76.3
7.4 7.4 422.1 39.7
PCG7 38.0 31.3 81.8 PCG7 0.0 1.7 347.5 76.3
PCG8 25.3 24.5 80.8 PCG8 0.0 0.0 173.1 0.0 0.0 147.7 40.0 76.3
PCG9 45.3 37.0 79.9 PCG9 0.0 0.5 446.0 7.4 7.4 391.1 32.0 76.3
PCHN 15.0 PCG 0.0 3.2 1,413.2 14.8 14.8 1,243.0 214.2 76.3
PEN3 36.0 36.0 132.2 PHC2 0.0 0.5 69.6 0.0 0.0 73.9 111.6 76.3
PEN4 36.0 31.0 128.4 PHC1 0.0 0.0 3.3 76.3
PHC1 15.0 13.3 156.1 PHC 0.0 0.5 72.8 76.3
0.0 0.0 0.0 50.4
PHC2 45.0 39.5 156.1 PLB1 0.0 0.0 0.0 76.3
PHL1 8.8 0.0 100.0 PLB2 0.0 0.0 0.0 76.3
PHL2 8.8 0.0 100.0 PLB 0.0 0.0 0.0 0.0 0.0 0.0 50.4 76.3
PLB1 23.0 0.0 256.7 PMG4 0.0 0.0 0.0 0.0 0.0 0.0 3.8 76.3
PLB2 35.0 0.0 193.4 PMG 0.0 0.0 0.0 0.0 0.0 0.0 3.8 76.3
PMG3 42.0 0.0 108.8 PMN 2.6 10.9 146.7 0.0 0.0 104.8 37.7 76.3
PMG4 5.5 5.2 87.3 * El Consumo totaliza el consumo por Generacion y Calentamiento.
PMG5 5.5 5.2 86.0 ** El Precio incluye el Cargo de Transporte.
PMN 140.0 138.3 80.6
PMT1 30.0 17.0 103.8 Información de Despejes del 06/11/2019
PMT2 30.0 0.0 103.8 Agente Lugar de Trabajo Desde Hasta
PMT3 7.0 5.8 103.8 DISNORTE Subestación PCA PCA L4010 06/11/2019 05:00 06/11/2019 12:00
PNI1 50.0 50.0 90.0 DISNORTE Subestación PCA PCA L4010, PCA L4020 06/11/2019 05:00 06/11/2019 12:00
PNI2 50.0 50.0 93.1 ENATREL Transformador de Potencia PCA 138 TR5 06/11/2019 05:00 06/11/2019 12:00
PSL 12.4 2.2 0.0 AGSA Unidad Generadora (Termoeléctrica) PMN 13.8 U8 06/11/2019 15:00 06/11/2019 15:59
TPC 50.9 50.9 79.4 TPC Unidad Generadora (Termoeléctrica) PTP 13.8 U2 06/11/2019 22:10 06/11/2019 23:00
TOTAL 1,458.7 930.1 ---

Fuera de servicio por resolución del INE


Mantenimiento
Reducción por restricción de Planta
Generación no despachable
Reducción por calidad y seguridad
Fuera de Servicio y Disponible en Stanby Frio
Control de AGC
Indisponibilidad o Restricción del Recurso de Generación

Fuente SIIMEM (Sistema de Información Integrado de la Planeación y Administración del Mercado Eléctrico Mayorista) Página 2/4 06/11/2019 08:11
Centro Nacional de Despacho de Carga (CNDC)
Informe de Operación del SIN (Sistema Interconectado Nacional)
Fecha: 05/11/2019

Balance Hidrológico

05/11/2019
Embalse APANAS ASTURIAS LA VIRGEN PANTASMA LARREYNAGA UNIDAD
Generación Programada 0.000 140.000 185.850 0.000 MWh
N/A
Generación Real 0.000 6.120 269.280 0.000 MWh
Consumo de Agua 0.000 0.300 0.010 0.290 0.000 MMC
Volumen no Turbinado 0.000 N/A MMC
Nivel Programado 954.413 N/A m.s.n.m
Nivel Inicial 954.560 927.590 439.660 842.530 682.360 m.s.n.m
Volumen Inicial 342.180 6.830 22.610 0.740 0.150 MMC
Aporte Natural 1.070 0.350 0.080 0.000 0.000 MMC
Extracción 0.000 0.000 0.000 -0.180 0.000 MMC
Aporte Bombeo 0.300 N/A MMC
Aporte Total 1.370 0.350 0.080 -0.180 0.000 MMC
Nivel Final 954.590 927.610 439.670 841.770 682.440 m.s.n.m
Volumen Final 343.550 6.880 22.670 0.280 0.150 MMC
Derrame 0.000 0.000 0.000 0.000 0.000 MMC
nov-19
Generación Programada 0.000 788.000 961.970 0.000 MWh
N/A
Generación Real 0.000 421.830 1,485.090 0.000 MWh
Consumo de Agua 0.000 2.740 0.880 1.590 0.000 MMC
Volumen no Turbinado 0.000 N/A MMC
Aporte Natural 5.900 2.650 0.940 1.100 0.010 MMC
Extracción 0.000 0.000 0.000 -0.180 0.000 MMC
Aporte Bombeo 2.740 N/A MMC
Aporte Total 8.650 2.650 0.940 0.920 0.010 MMC
Derrame 0.000 0.000 0.000 0.000 0.000 MMC
2019
Generación Programada 0.000 59,719.380 18,499.460 46,436.490 MWh
N/A
Generación Real 95.310 71,856.950 26,391.550 49,204.980 MWh
Consumo de Agua 0.160 11.120 149.810 27.940 223.900 MMC
Volumen no Turbinado 212.850 N/A MMC
Aporte Natural 120.640 86.350 161.130 30.820 224.110 MMC
Extracción -94.360 -0.660 0.000 -2.150 -0.170 MMC
Aporte Bombeo 11.120 N/A MMC
Aporte Total 37.400 162.810 173.280 29.230 223.940 MMC
Derrame 0.000 77.120 12.140 0.560 0.000 MMC
*MMC = Millones de Metros Cúbico = 1,000,000 m3 N/A (No Aplica)

Niveles de Operación Iniciales de APANAS (m.s.n.m)


11/2019 11/2018
Dia MAX MIN PROM PROG REAL HISTORICO
1 955.507 953.51 954.508 954.403 954.4 956.46
2 955.513 953.520 954.517 954.405 954.440 956.460
3 955.520 953.530 954.525 954.408 954.480 956.460
4 955.527 953.540 954.533 954.411 954.540 956.480
5 955.533 953.550 954.542 954.413 954.560 956.490
6 955.540 953.560 954.550 954.416 954.590 956.490
7 955.547 953.570 954.558 954.419 956.480
8 955.553 953.580 954.567 954.421 956.480
9 955.560 953.590 954.575 954.424 956.480
10 955.567 953.600 954.583 954.427 956.480
11 955.573 953.610 954.592 954.429 956.470
12 955.580 953.620 954.600 954.432 956.470
13 955.587 953.630 954.608 954.435 956.470
14 955.593 953.640 954.617 954.437 956.460
15 955.600 953.650 954.625 954.440 956.460
16 955.607 953.660 954.633 954.443 956.450
17 955.613 953.670 954.642 954.445 956.440
18 955.620 953.680 954.650 954.448 956.440
19 955.627 953.690 954.658 954.451 956.430
20 955.633 953.700 954.667 954.453 956.420
21 955.640 953.710 954.675 954.456 956.410
22 955.647 953.720 954.683 954.459 956.400
23 955.653 953.730 954.692 954.461 956.400
24 955.660 953.740 954.700 954.464 956.400
25 955.667 953.750 954.708 954.467 956.390
26 955.673 953.760 954.717 954.469 956.380
27 955.680 953.770 954.725 954.472 956.370
28 955.687 953.780 954.733 954.475 956.360
29 955.693 953.790 954.742 954.477 956.340
30 955.700 953.800 954.750 954.480 956.340

Fuente SIIMEM (Sistema de Información Integrado de la Planeación y Administración del Mercado Eléctrico Mayorista) Página 3/4 06/11/2019 08:11
Niveles de Operación Iniciales del Embalse de Apanás NOVIEMBRE/2019
957.00

956.50

956.00

955.50

955.00
m.s.n.m.

954.50

954.00

953.50

953.00

952.50

952.00
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
MAX MIN PROM PROG REAL 11/2018

Curva de Demanda y Despacho de Generación del 05/11/2019


700
638.71

600

500

400
Potencia (MW)

300

200

100

0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Tiempo (Hrs.)
ABR AMY1 AMY2 EOL PBP PSL NSL EEC20 HPA1

HPA2 PCF2 EEC TPC PMN CEN PMG5 PMG4 PNI1

PNI2 PMT1 PMT3 PEN4 PEN3 PHD COMPRA BLUEFIELDS COMPRA CCN COMPRA DISNORTE

COMPRA DISSUR COMPRA MULUKUKU COMPRA SIUNA Desvío Demanda Calculada Demanda Real

Hora Notas
18:00 Demanda Máxima 638.71 MW.

Fuente SIIMEM (Sistema de Información Integrado de la Planeación y Administración del Mercado Eléctrico Mayorista) Página 4/4 06/11/2019 08:11