Está en la página 1de 3

2,a

DIKETAHUI
P = 64 Ag = 16260
Fy = 250 fu = 410
lh = 2.75 m
lv = 2.7 m profil 250
Lh = 22 m

PENYELESAIAN
EMA = 0
-RB 22 + 64 (2,75+5,5+8,25+11+13,75+16,5+19,25)
22 -RB = 4928
-RB = 224

EMD = 0
SAB * 2.7 - 224 * 2.75
2.7 SAB 616
SAB 228.1481

Tu = 1.2 228.1481 + 1.6 228.1481


= 273.7778 + 365.037
= 638.8148 ton

275
= 36.76471 < 250
7.48

0.9 * 250 * 2* 16260

= 731.7

An = 2* 16260 = 32520 mm2


Ambil U = 0.85
0.75 * 410 * 0.85 * 32520 =
849.9915 ton > Tu 638.8148
7 4

1 2.75 2.75
2 2.75 5.5
3 2.75 8.25
4 2.75 11
5 2.75 13.75
6 2.75 16.5
7 2.75 19.25
8 2.75 22
99
6336

250 35

849.9915

También podría gustarte