SEMITRAILER TRAILER
2S3 3S1/3S2 >=3S3 2T2 2T3 3T2 3T3 TOTAL %
3 0.2%
3 0.2%
2 0.1%
2 0.1%
2 0.1%
2 0.1%
1 0.1%
1 0.1%
3 0.2%
3 0.2%
7 0.4%
5 0.3%
22 1.4%
16 1.0%
1 174 11.1%
1 170 10.8%
86 5.5%
80 5.1%
117 7.5%
119 7.6%
96 6.1%
98 6.3%
98 6.3%
96 6.1%
112 7.1%
115 7.3%
113 7.2%
119 7.6%
86 5.5%
90 5.7%
116 7.4%
111 7.1%
100 6.4%
102 6.5%
112 7.1%
115 7.3%
121 7.7%
126 8.0%
81 5.2%
82 5.2%
55 3.5%
52 3.3%
34 2.2%
34 2.2%
19 1.2%
21 1.3%
8 0.5%
6 0.4%
1 1568 100.0%
1 1568 100.0%
2 3136
0.06% 100.0%
CION VEHICULAR
12/16/2015 UBICACION: COCHOAPAN EL GRANDE
SEMITRAILER TRAILER
2S3 3S1/3S2 >=3S3 2T2 2T3 3T2 3T3 TOTAL %
3 0.2%
3 0.2%
2 0.1%
2 0.1%
2 0.1%
2 0.1%
1 0.1%
1 0.1%
3 0.2%
3 0.2%
7 0.4%
5 0.3%
22 1.4%
16 1.0%
1 174 11.1%
1 170 10.8%
86 5.5%
80 5.1%
117 7.5%
119 7.6%
96 6.1%
98 6.3%
98 6.3%
96 6.1%
112 7.1%
115 7.3%
113 7.2%
119 7.6%
86 5.5%
90 5.7%
116 7.4%
111 7.1%
100 6.4%
102 6.5%
112 7.1%
115 7.3%
121 7.7%
126 8.0%
81 5.2%
82 5.2%
55 3.5%
52 3.3%
34 2.2%
34 2.2%
19 1.2%
21 1.3%
8 0.5%
6 0.4%
1 1568 100.0%
1 1568 100.0%
2 3136
0.06% 100.0%
CION VEHICULAR
12/17/2015 UBICACION: COCHOAPAN EL GRANDE
SEMITRAILER TRAILER
2S3 3S1/3S2 >=3S3 2T2 2T3 3T2 3T3 TOTAL %
6 0.3%
8 0.4%
3 0.2%
4 0.2%
6 0.3%
5 0.3%
3 0.2%
2 0.1%
3 0.2%
3 0.2%
8 0.4%
8 0.4%
52 2.7%
49 2.5%
1 177 9.1%
151 7.8%
155 7.9%
152 7.8%
123 6.3%
135 7.0%
134 6.9%
1 137 7.1%
100 5.1%
95 4.9%
109 5.6%
109 5.6%
161 8.3%
165 8.5%
169 8.7%
173 8.9%
149 7.6%
143 7.4%
139 7.1%
137 7.1%
144 7.4%
137 7.1%
113 5.8%
117 6.0%
78 4.0%
90 4.6%
57 2.9%
61 3.1%
33 1.7%
34 1.8%
18 0.9%
19 1.0%
10 0.5%
8 0.4%
1 1950 100.0%
1 1942 100.0%
2 3892
0.05% 100.0%
CION VEHICULAR
12/18/2015 UBICACION: COCHOAPAN EL GRANDE
SEMITRAILER TRAILER
2S3 3S1/3S2 >=3S3 2T2 2T3 3T2 3T3 TOTAL %
6 0.3%
8 0.4%
3 0.2%
4 0.2%
6 0.3%
5 0.3%
3 0.2%
2 0.1%
3 0.2%
3 0.2%
8 0.4%
8 0.4%
52 2.7%
49 2.5%
1 177 9.1%
151 7.8%
155 7.9%
152 7.8%
123 6.3%
135 7.0%
134 6.9%
1 137 7.1%
100 5.1%
95 4.9%
109 5.6%
109 5.6%
161 8.3%
165 8.5%
169 8.7%
173 8.9%
149 7.6%
143 7.4%
139 7.1%
137 7.1%
144 7.4%
137 7.1%
113 5.8%
117 6.0%
78 4.0%
90 4.6%
57 2.9%
61 3.1%
33 1.7%
34 1.8%
18 0.9%
19 1.0%
10 0.5%
8 0.4%
1 1950 100.0%
1 1942 100.0%
2 3892
0.05% 100.0%
CION VEHICULAR
12/19/2015 UBICACION: COCHOAPAN EL GRANDE
SEMITRAILER TRAILER
2S3 3S1/3S2 >=3S3 2T2 2T3 3T2 3T3 TOTAL %
6 0.3%
8 0.4%
3 0.2%
4 0.2%
6 0.3%
5 0.3%
3 0.2%
2 0.1%
3 0.2%
3 0.2%
8 0.4%
8 0.4%
52 2.7%
49 2.5%
1 177 9.1%
151 7.8%
155 7.9%
152 7.8%
123 6.3%
135 7.0%
134 6.9%
1 137 7.1%
100 5.1%
95 4.9%
109 5.6%
109 5.6%
161 8.3%
165 8.5%
169 8.7%
173 8.9%
149 7.6%
143 7.4%
139 7.1%
137 7.1%
144 7.4%
137 7.1%
113 5.8%
117 6.0%
78 4.0%
90 4.6%
57 2.9%
61 3.1%
33 1.7%
34 1.8%
18 0.9%
19 1.0%
10 0.5%
8 0.4%
1 1950 100.0%
1 1942 100.0%
2 3892
0.05% 100.0%
CION VEHICULAR
12/20/2015 UBICACION: COCHOAPAN EL GRANDE
SEMITRAILER TRAILER
2S3 3S1/3S2 >=3S3 2T2 2T3 3T2 3T3 TOTAL %
3 0.5%
2 0.3%
2 0.3%
2 0.3%
3 0.5%
2 0.3%
5 0.8%
3 0.5%
6 1.0%
3 0.5%
7 1.2%
5 0.8%
14 2.4%
15 2.5%
30 5.1%
30 5.0%
55 9.3%
58 9.7%
44 7.4%
48 8.1%
60 10.1%
64 10.8%
77 13.0%
73 12.3%
67 11.3%
69 11.6%
40 6.7%
37 6.2%
45 7.6%
46 7.7%
31 5.2%
30 5.0%
31 5.2%
31 5.2%
35 5.9%
35 5.9%
16 2.7%
18 3.0%
12 2.0%
12 2.0%
4 0.7%
4 0.7%
4 0.7%
4 0.7%
2 0.3%
4 0.7%
1 0.2%
0 0.0%
594 100.0%
595 100.0%
1189
100.0%
CION VEHICULAR
12/21/2015 UBICACION: COCHOAPAN EL GRANDE
SEMITRAILER TRAILER
2S3 3S1/3S2 >=3S3 2T2 2T3 3T2 3T3 TOTAL %
3 0.5%
2 0.3%
2 0.3%
2 0.3%
3 0.5%
2 0.3%
5 0.8%
3 0.5%
6 1.0%
3 0.5%
7 1.2%
5 0.8%
14 2.4%
15 2.5%
30 5.1%
30 5.0%
55 9.3%
58 9.7%
44 7.4%
48 8.1%
60 10.1%
64 10.8%
77 13.0%
73 12.3%
67 11.3%
69 11.6%
40 6.7%
37 6.2%
45 7.6%
46 7.7%
31 5.2%
30 5.0%
31 5.2%
31 5.2%
35 5.9%
35 5.9%
16 2.7%
18 3.0%
12 2.0%
12 2.0%
4 0.7%
4 0.7%
4 0.7%
4 0.7%
2 0.3%
4 0.7%
1 0.2%
0 0.0%
594 100.0%
595 100.0%
1189
100.0%
CLASIFICACION VEHICULAR (METODO AASTHO)
SEMITRAILER TRAILER
2S3 3S1/3S2 >=3S3 2T2 2T3 3T2 3T3 TOTAL %
2 3 10174 50.1%
2 3 10152 49.9%
4 6 20326
0.02% 0.03% 100.0%
0.57143 0.85714 2903.71
1 1
0.57143 0.85714 2903.71
1 1 2908
CALCULO DEL ESAL PARA PAVIMENTO RIGIDO (METODO AASHTO)
ESTACION: C-1
PROYECTO: "PAVIMENTACION DE CONCRETO HIDRULICO EN LA COL. CENTRO CALLE SIN NOMBRE"
UBICACIÓN: COCHOAPAN EL GRANDE
1) CONFIABILIDAD
NIVELES DE CONFIABILIDAD R
TIPO DE CARRETERA
Suburbanas Rurales
Autopista Regional 85 - 99.9 80 - 99.9
Troncales 80 - 99 75 - 95
Colectoras 80 - 95 50 - 80
R= 80 %
TIPO ( So )
Pavimentos Rígidos 0.30 - 0.40
Construcción Nueva 0.35
En Sobre Capas 0.40
So = 0.32
DETERMINACION DEL MODULO DE REACCION EFECTIVO DE LA SUBRASANTE
ESTACION: C-1
PROYECTO:
"PAVIMENTACION DE CONCRETO HIDRULICO EN LA COL. CENTRO CALLE SIN NOMBRE"
Ecuación de Kentucky
(regresión exponencial)
MR = 1910 (CBR)^0.68
MR = 14646.4969 psi = 101.06 Mpa
(regresión polinómica 2°) Solo para CBR < 55 %
MR = -7.5 CBR ^2 + 800 CBR + 1820
MR = 15220 psi = 105.02 Mpa
En el monograma
2) METODO AASHTO
1) PERDIDA DE SERVICIABILIDAD
Pt = 2 seviciabilidad final
INDICE DE SERVICIABILIDAD INICIAL INDICE DE SERVICIABILIDAD FINAL
Po = 4.5 para pavimentos rigidos Pt = 2.5 o más para caminos muy importantes
Po = 4.2 para pavimentos flexibles Pt = 2.0 para caminos de transito menor
ΔPSI = Po - Pt = 2.5
2) DRENAJE
CALIDAD DEL DRENAJE TIEMPO QUE TARDA EL AGUA EN SER EVACUADA
Exelente 2 horas
Bueno 1 día
Mediano 1 semana
Malo 1 mes
Muy malo el agua no evacua
Cd = 0.90
J= 3.00
DATOS:
K= 46.84 Mpa/m So = 0.32
Ec = 21495 Mpa R= 80 % =>
S'c = Mr = 3.77 Mpa Pt = 2
J= 3.00 ΔPSI = 2.5
Cd = 0.90 W80 = 7.44
D= ???
D= 245.00
OK
MULA AASHTO
ZR = -0.841
x 10 ^ 6
mm por tanteo
mm
25 CM
+ -0.2779520236
DETERMINACION DEL ESPESOR DE PAVIMENTO POR EL ABACO AASHTO
ESTACION: C-1
PROYECTO: "PAVIMENTACION DE CONCRETO HIDRULICO EN LA COL. CENTRO CALLE SIN NOMBRE"