- D Full Displacement Pile System
Process and equipment
PROCESS DESCRIPTION 3/2010| FDP Full Displace-
Pet SCL)
advancing a displacemar
the groune with a rotary a
both torque and crowd force.
‘Ths precondition forthe cucsecstul
deployment are modern rotary arling ngs
cffaing high lavels of torque, downward
thrust and retraction force, a6 wall asa tall
toreion-resletant dri mast.
The technique is ideally suited fora wide
‘organic soils, so lang as the soil is
displaceable, The folowing general rule of
thumb apples:
ction, tis
possible to aril hough thinner non
isplaceable formations or socket
isplacement piles into theseAdvantages of the Displacement Pile System
High Bearing Capacity
Displacement ofthe volume of so nt the surounding so
formation produces a highly donsifed body of el. Tis
sfiect results nan Increase in shaft rcton and base
resstance (in reiation tthe nominal camete).
Soil Displacement Pile
Reduced Concrete Consumption
Compared with other auger bored piling systems, concrete
verbreak is signticanty lower,
High Level of Productivity
‘The productivity af pile installation is
Minimal Amount of Spoil Material
During dling and pushing the displacement tool into the
ground, the digplaced volume of soi ie pushed fully into the
surrounding soll materta by the displacement body. In te
absence of soll being conveyed tothe surface, this system I
suited particulary well for operating in contaminated soils
‘Tho absonce of any significant amounts of spol alo provides |
A grester freedom of manoauvrabiity on site fr the cling i,
Continuous conveyance
Df poll wth CFA.
(asa comparison)
Negligible conveyance
fof spoil wth FOP
Vibration-free Installation Process
Driling the displacement toa! into the ground by the rotary
ring technique with aditional downward thrust does not
induce vibrations on agjacent builings,
Deon
pendent on
oP
+ Pile diameter |
+ Torque and crond force ofthe as}
ating rs as i
+ Density ofthe subsoil
* Dispiaceabilty ofthe subsoil 7a
* Capacity of he onerete pump ah
Exam
FOP Fite 439m
Dating down s5min
Conerating 75min
Fepostion & set up 3min
Total ime 18min
Max. daily production 36 Piles
(420 m)
Tay Was Pray ip Way May May May May Sig May May May May Ray Tag Thay Ep ap
Minutes
FDP Full Displacement Pile System ~ Bauer Maschinen GmbH, www. bauerdeStandard Technique
Ld
ELA:
some
oe = a
WSS SESFDP - Standard Technique
Operating Sequence
Step:
Positioning and setting up criling rig over ple position.
‘step:
Driling ofthe displacement tot into the ground by
rotating and pushing of the tool. The sols loosened by
the starter auger and then pushed laterally into the
surrounding soll by the displacement body.
Steps: Stop 4:
‘riling downto the final depth. The installation depth is ‘On reaching the final deptn the displacement tool is
limited by the height ofthe dil mast, butt can be extracted and concrete is simultaneously pumped
‘extended by between 6 ~ 10 m, depending onthe type: through the hollow dill stem into the void created by the
‘frig, by using a ko extension. tool. During extraction, the displacement tools rotated
In drlling direction and densities any soll material that
‘may have fallen into the bore or any loosened borehole
wall areas with the counter rotating ight section above
the dieplacamant ody.
Stops:
The reinforcement cage Is pushed into the fresh
concrete supported. if necessary, by a small vibrator.
FOP Full Displacement Pile Systern ~ Baver Maschinen GmbH, www: bauerdesl
FDP - Standard Technique
placement Tool
Post-densification during extraction
Counter-rtating fight on a conical body for densification
cf any loose soil areas during extraction of tha tool
Stabilisation
Cylindrical displacement body for stabilisation
Of the displaced sci material
sation
Conical shape ofthe hollow stem induces
horizontal forees in tho soil onvayed upwarde
Sy the ight (horizontal densification energy)
Loosening
Toso i ossted by the starter auger section
rd comneyedupwarce byte night
FP Ful Displacement Pls System ~ Bauer Maschinen GmbH, wirwebsuerde