Está en la página 1de 6
- D Full Displacement Pile System Process and equipment PROCESS DESCRIPTION 3/2010 | FDP Full Displace- Pet SCL) advancing a displacemar the groune with a rotary a both torque and crowd force. ‘Ths precondition forthe cucsecstul deployment are modern rotary arling ngs cffaing high lavels of torque, downward thrust and retraction force, a6 wall asa tall toreion-resletant dri mast. The technique is ideally suited fora wide ‘organic soils, so lang as the soil is displaceable, The folowing general rule of thumb apples: ction, tis possible to aril hough thinner non isplaceable formations or socket isplacement piles into these Advantages of the Displacement Pile System High Bearing Capacity Displacement ofthe volume of so nt the surounding so formation produces a highly donsifed body of el. Tis sfiect results nan Increase in shaft rcton and base resstance (in reiation tthe nominal camete). Soil Displacement Pile Reduced Concrete Consumption Compared with other auger bored piling systems, concrete verbreak is signticanty lower, High Level of Productivity ‘The productivity af pile installation is Minimal Amount of Spoil Material During dling and pushing the displacement tool into the ground, the digplaced volume of soi ie pushed fully into the surrounding soll materta by the displacement body. In te absence of soll being conveyed tothe surface, this system I suited particulary well for operating in contaminated soils ‘Tho absonce of any significant amounts of spol alo provides | A grester freedom of manoauvrabiity on site fr the cling i, Continuous conveyance Df poll wth CFA. (asa comparison) Negligible conveyance fof spoil wth FOP Vibration-free Installation Process Driling the displacement toa! into the ground by the rotary ring technique with aditional downward thrust does not induce vibrations on agjacent builings, Deon pendent on oP + Pile diameter | + Torque and crond force ofthe as} ating rs as i + Density ofthe subsoil * Dispiaceabilty ofthe subsoil 7a * Capacity of he onerete pump ah Exam FOP Fite 439m Dating down s5min Conerating 75min Fepostion & set up 3min Total ime 18min Max. daily production 36 Piles (420 m) Tay Was Pray ip Way May May May May Sig May May May May Ray Tag Thay Ep ap Minutes FDP Full Displacement Pile System ~ Bauer Maschinen GmbH, www. bauerde Standard Technique Ld ELA: some oe = a WSS SES FDP - Standard Technique Operating Sequence Step: Positioning and setting up criling rig over ple position. ‘step: Driling ofthe displacement tot into the ground by rotating and pushing of the tool. The sols loosened by the starter auger and then pushed laterally into the surrounding soll by the displacement body. Steps: Stop 4: ‘riling downto the final depth. The installation depth is ‘On reaching the final deptn the displacement tool is limited by the height ofthe dil mast, butt can be extracted and concrete is simultaneously pumped ‘extended by between 6 ~ 10 m, depending onthe type: through the hollow dill stem into the void created by the ‘frig, by using a ko extension. tool. During extraction, the displacement tools rotated In drlling direction and densities any soll material that ‘may have fallen into the bore or any loosened borehole wall areas with the counter rotating ight section above the dieplacamant ody. Stops: The reinforcement cage Is pushed into the fresh concrete supported. if necessary, by a small vibrator. FOP Full Displacement Pile Systern ~ Baver Maschinen GmbH, www: bauerde sl FDP - Standard Technique placement Tool Post-densification during extraction Counter-rtating fight on a conical body for densification cf any loose soil areas during extraction of tha tool Stabilisation Cylindrical displacement body for stabilisation Of the displaced sci material sation Conical shape ofthe hollow stem induces horizontal forees in tho soil onvayed upwarde Sy the ight (horizontal densification energy) Loosening Toso i ossted by the starter auger section rd comneyedupwarce byte night FP Ful Displacement Pls System ~ Bauer Maschinen GmbH, wirwebsuerde

También podría gustarte