Documentos de Académico
Documentos de Profesional
Documentos de Cultura
EN LOS ACCESOS:
PA14 AV. LA CULTURA M2 1.00 94.46
PA16 CALLE 16 M2 1.00 47.47
PA17 CALLE 19 M2 1.00 38.91
PA18- CALLE 21 M2 1.00 37.61
PA19- AV. 22 DE JULIO M2 1.00 4.18
AV. HUAROCHIRI 2
MARTILLO1 M2 1.00 2.10
MARTILLO2 M2 1.00 2.40
M2 1.00 2.59
JR LAS PLANICIES
MARTILLO1 M2 1.00 4.73
M2 1.00 2.19
MARTILLO2 M2 1.00 4.30
M2 1.00 2.13
HOJA DE METRADOS
VEREDAS
VILLA LA OROYA MZ D M2 1.00
ESTACIONAMIENTOS M2 1.00 30.13
RAMPAS DE ESTACIONAMIENTO
JARDINERAS M2 4.00
SARDINELES SUMERGIDOS
EJES
SS1 M2 2.00
SS2 M2 2.00
HOJA DE METRADOS
MOVIMIENTO DE TIERRAS
DEMOLICION DE PAVIMENTO FLEXIBLE E= 2”
02.00.00 (INC.CORTE) M2
02.01.00
DEMOLICION DE PAVIMENTO FLEXIBLE (DPF)
ACCESOS
PA16 CALLE 16 M2 1.00 47.47
PA17 CALLE 19 M2 1.00 38.91
PA18- CALLE 21 M2 1.00 37.61
PA19- AV. 22 DE JULIO M2 1.00 4.18
EN LOS ACCESOS:
MZ C M3 1
AV. HUAROCHIRI M3 1
JARDINERAS M3 4.00
MURO DE MANPOSTERIA
EJE 03 M3 1.00 269.05
VEREDAS
VEREDAS
VILLA LA OROYA MZ D M2 1.00
ESTACIONAMIENTOS M2 1.00
HOJA DE METRADOS
RAMPAS EN MARTILLOS
AV. HUAROCHIRI 2
MARTILLO1 M2 1.00 2.10
MARTILLO2 M2 1.00 2.40
M2 1.00 2.59
JR LAS PLANICIES
MARTILLO1 M2 1.00 4.73
M2 1.00 2.19
MARTILLO2 M2 1.00 4.30
M2 1.00 2.13
JR LAS CASCADAS
MARTILLO1 M2 1.00 2.00
M2 1.00 2.04
MARTILLO2 M2 1.00 2.20
M2 1.00 4.23
JR LOS PRADOS
MARTILLO1 M2 1.00 1.81
M2 1.00 1.81
MARTILLO2 M2 1.00 1.79
M2 1.00 1.86
03.00.00 PAVIMENTO
EJE 02 M2 1.00
EJE 01 M2 1.00
EJE 02 M2 1.00
EJE 07 M2 1.00
HOJA DE METRADOS
EJE 01 M2 1.00
EJE 02 M2 1.00
EJE 01 M2 1.00
EJE 02 M2 1.00
EJE 07 M2 1.00
EJE A M2 1
JR. LOS PRADOS M2 1 60.19
JR. LAS CASCADAS M2 1 56.85
JR LAS PLANICIES M2 1 62.66
CALLE1 M2 1 86.19
HOJA DE METRADOS
EJE 01 M2 1
EJE 03 M2 1
04.00.00 SARDINELES
SARDINEL SUMERGIDO
EJES 1,2,3,4,5,6 Y 7
SS1 M2 2.00
SS2 M2 2.00
SARDINEL PERALTADO
EN JARDINERAS M2 4.00
EJES 1,2,3,4,5,6 Y 7
SS1 M3 2.00
SS2 M3 2.00
SARDINEL PERALTADO
VEREDAS
VILLA LA OROYA MZ D M2 1.00
ESTACIONAMIENTOS M2 1.00 30.13
EN MARTILLOS
RAMPAS EN MARTILLOS
AV. HUAROCHIRI 2
MARTILLO1 M2 1.00 2.10
MARTILLO2 M2 1.00 2.40
M2 1.00 2.59
JR LAS PLANICIES
MARTILLO1 M2 1.00 4.73
M2 1.00 2.19
MARTILLO2 M2 1.00 4.30
M2 1.00 2.13
JR LAS CASCADAS
MARTILLO1 M2 1.00 2.00
M2 1.00 2.04
MARTILLO2 M2 1.00 2.20
M2 1.00 4.23
VEREDAS
VILLA LA OROYA MZ D M2 2.00
ESTACIONAMIENTOS M2 2.00
HOJA DE METRADOS
MZC M2 1.00
ESTACIONAMIENTOS M2 2.00
MZ A, I M2 1.00
ESTACIONAMIENTOS M2 2.00
MZ E M2 1.00
ESTACIONAMIENTOS 2.00
MZ C M2 1.00
ESTACIONAMIENTOS 2.00
VILLA LA OROYA
VEREDAS
VILLA LA OROYA MZ D M2 1.00
HOJA DE METRADOS
MZC M2 1.00
ESTACIONAMIENTOS M2 1.00
MZ A, I M2 1.00
ESTACIONAMIENTOS M2 1.00
RAMPAS DE ESTACIONAMIENTO
JARDINERAS M2 4 3.14
05.06.00
SARDINEL DE VEREDA DE CONCRETO F´C=175 KG/CM2 M
VEREDAS
VILLA LA OROYA MZ D M2 2.00
MZC M2 1.00
VILLA LA OROYA
CALLE 1 M2 1.00
M2 1.00
MARTILLOS
07.00.00 SEÑALIZACIÓN
HOJA DE METRADOS
PUENTE 2
ZAPÁTA + MURO DE CONCRETO+ 2.00
PUENTE 2
CIMIENTOS
ZAPATAS KG Ø
KG 2.00 5/8"
KG 2.00 5/8"
KG 2.00 1/2"
KG 2.00 1/2"
HOJA DE METRADOS
PUENTE 2
ZAPATAS M2 4.00 0.50
09.00.00 INTERFERENCIAS
0.00
1.00 1.00 0.00
1.00 1.00
0.00 0.00
663.12
94.46
47.47
38.91
37.61
4.18
16.94
31.56
29.69
30.07
16.50
27.77
2.10
2.40
2.59
4.73
2.19
4.30
2.13
OS
2.00
2.04
2.20
4.23
128.17
47.47
38.91
37.61
4.18
13.35
5.00 0.30 13.35
159.58
59.40
0.45 42.51
0.45 21.36
0.45 17.51
0.45 16.92
0.45 1.88
24.46
173.52
1.70 8.90 30.26
1.70 8.90 30.26
-10.10
-10.10
266.83
OS
16.94
31.56
29.69
30.07
16.50
27.77
2.10
2.40
2.59
4.73
2.19
4.30
2.13
2.00
2.04
2.20
4.23
1.81
1.81
1.79
1.86
462.81
ESP.
463.95
94.46
47.47
38.91
37.61
4.18
4,133.22
62.66
86.19
110.68
118.92
0.00
94.46
47.47
38.91
37.61
4.18
62.66
86.19
110.68
118.92
0.00
94.46
47.47
38.91
37.61
4.18
4,133.22
62.66
86.19
110.68
118.92
0.00
94.46
47.47
38.91
37.61
4.18
8,089.40
0.00
94.46
153.16
19.37
317.04
OS
16.94
31.56
29.69
30.07
16.50
27.77
35.34
22.14
2.10
2.40
2.59
4.73
2.19
4.30
2.13
2.00
2.04
2.20
4.23
235.15
185.77
2,025.04
2,025.04
627.93
165.24
56.00 112.00
30.64 30.64
22.60 22.60
343.16
30.94 30.94
39.94 39.94
43.42 43.42
18.78 18.78
16.18 16.18
29.10 29.10
28.66 28.66
30.25 30.25
22.37 22.37
28.25 28.25
OS
269.87
106.23 0.20
18.59
31.76
54.13
12.86
16.94
31.56
29.69
30.07
16.50
27.77
113.00
AREA 164.17
0.35 17.50
0.35 146.67
PERIMETRO 281.43
0.60 30.00
0.60 251.43
PERIMETRO 469.05
1.00 50.00
1.00 419.05
OS
0.00
0.00
0.00
0.00
OS
34.52
1.000 8.36 16.72
1.000 8.90 17.80
32.70
3,837.84
179.11
8.41 16.82
8.41 17.66
8.90 23.14
8.41 29.86
8.41 33.64
8.50 17.00
8.50 17.85
2.00
0.20
0.00
-1.00
5.00
0.00
0.00 0.00
Obra :
Propietario :
CODIGO
01.00.00
01.01.00
01.02.00
01.03.00
01.04.00
02.00.00
02.01.00
02.02.00
02.03.00
02.04.00
02.05.00
02.06.00
02.07.00
02.08.00
03.00.00
03.01.00
03.02.00
03.03.00
03.04.00
03.05.00
04.00.00
04.01.00
04.02.00
04.03.00
04.04.00
05.01.00
05.01.00
05.02.00
05.03.00
05.04.00
05.05.00
05.06.00
05.07.00
05.08.00
05.09.00
05.10.00
06.01.00
06.01.00
06.02.00
06.03.00
06.04.00
06.05.00
06.06.00
07.00.00
07.01.00
07.02.00
07.03.00
07.04.00
08.00.00
08.01.00
08.02.00
08.03.00
08.04.00
09.00.00
09.01.00
09.02.00
09.03.00
09.04.00
09.05.00
09.06.00
09.07.00
RESUMEN DE METRADOS
DESCRIPCION
GLB 0.00
MES 1.00
UND 0.00
M2 663.12
M2 128.17
M3 13.35
M3 159.58
M3 24.46
M3 173.52
M2 (10.10)
M2 266.83
M2 462.81
M2 463.95
M2 4,133.22
M2 1,583.05
M2 4,133.22
M2 8,089.40
M2 153.16
M3 19.37
KG 29.48
M2 0.00
M2 317.04
M2 235.15
M2 185.77
M2 2,025.04
M2 627.93
M 165.24
M 343.16
M2 269.87
M2 0.00
M 0.00
M3 113.00
M3 164.17
M2 281.43
M2 469.05
M2 0.00
M 0.00
M 0.00
M 0.00
M 0.00
M2 0.00
M2 34.52
M3 32.70
KG 3,837.84
M2 179.11
UND 2.00
GLB 0.20
GLB 0.00
UND (1.00)
UND 5.00
M 0.00
GBL 0.00
PLANILLA DE METRADOS - EXPLANACIONES
AV. EL FERROCARRIL EJE 02
VOLT. CORTE
SUB TOTAL 59.40
0.00
0.00
VOL. T. RELLENO
0.00