Documentos de Académico
Documentos de Profesional
Documentos de Cultura
OBRA: CREACION DEL CENTRO DE ATENCION INTEGRAL A POBLACIONES VULNERABLES AFECTADAS POR VIOLENCIA FAMILIAR EN EL DEPARTAMENTO DE TACNA
PARTIDA: ACERO GRADO 60
EJECUTA: MOISES ANCCO NINA
PERIODO: DEL 01/07/2019 AL 15/07/2019
ANTERIOR VALORIZACION 7
PRECIO
DIAMETR CANT.
ITEM PESO TOTAL KG. UNITARIO PARCIAL METRADO MONTO METRADO
O VARILLAS (S/.)
ø CANT KG. s/ s/ s/ CANT KG. s/ CANT KG.
1 ø 5/8 1850 13.97 25844.50 0.80508 20807.01 1640.00 22910.80 18445.14 230.00 3213.10
2 ø 1/2 3075 8.95 27521.25 0.80508 22156.94 2403.00 21506.85 17314.84 571.00 5110.45
3 ø 3/8 4144 5.04 20885.76 0.80508 16814.81 3550.00 17892.00 14404.58 634.00 3195.36
4 ø 1/4 2950 2.25 6637.50 0.80508 5343.75 2150.00 4837.50 3894.60 510.00 1147.50
5 #16 2000 1.00 2000.00 0.80508 1610.17 500.00 500.00 402.54 - 0.00
SUB TOTAL S/66,732.68 SUB TOTAL 54461.69 SUB TOTAL
IGV (18%) S/12,011.88 IGV (18%) 9803.10 IGV (18%)
TOTAL S/78,744.56 TOTAL 64264.79 TOTAL
ADENDA 01
ANTERIOR VALORIZACION 02
PRECIO
TOTAL KG. UNITARIO PARCIAL METRADO MONTO METRADO
ITEM DESCRIPCION (S/.)
CANT KG. s/ CANT KG.
1 SOBRECIMIENTO ARMADO 213.87 0.211864 S/. 45.31 - 106.94 22.66 106.94
2 COLUMNETAS Y VIGUETAS 10825.94 0.211864 S/. 2,293.63 5412.97 1146.82 5412.97
SUB TOTAL S/. 1,169.47 SUB TOTAL
IGV (18%) S/. 210.50 IGV (18%)
TOTAL S/. 1,379.98 TOTAL
DEPARTAMENTO DE TACNA
s/ CANT KG s/ CANT KG s/
2586.82 1870.00 26123.90 21031.95 -20.00 -279.40 -224.94
4114.35 2974.00 26617.30 21429.18 101.00 903.95 727.76
2572.54 4184.00 21087.36 16977.11 -40.00 -201.60 -162.31
923.83 2660.00 5985.00 4818.43 290.00 652.50 525.32
0.00 500.00 500.00 402.54 1500.00 1500.00 1207.63
S/. 10,197.53 SUB TOTAL S/. 64,659.22 SUB TOTAL S/. 2,073.46
S/. 1,835.56 IGV (18%) S/. 11,638.66 IGV (18%) S/. 373.22
S/. 12,033.09 TOTAL S/. 76,297.88 TOTAL S/. 2,446.68
s/ CANT KG s/ CANT KG s/
S/. 22.66 - 213.87 S/. 45.31 - 0.00 0.00
S/. 1,146.82 0.00 10825.94 S/. 2,293.63 0.00 0.00 0.00
S/. 1,169.47 SUB TOTAL S/. 2,338.94 SUB TOTAL S/. 0.00
S/. 210.50 IGV (18%) S/. 421.01 IGV (18%) S/. 0.00
S/. 1,379.98 TOTAL S/. 2,759.95 TOTAL S/. 0.00
OBRA: CREACION DEL CENTRO DE ATENCION I
PARTIDA: ACERO GRADO 60
EJECUTA: MOISES ANCCO NINA
PERIODO: DEL 16/05/2019 AL 31/05/2019
CANT.
ITEM DIAMETRO VARILLAS
UND
1 ø 5/8 1850
2 ø 1/2 2600
3 ø 3/8 4100
4 ø 1/4 2650
5 #16 2000
VALORIZACIÓN 03
REACION DEL CENTRO DE ATENCION INTEGRAL A POBLACIONES VULNERABLES AFECTADAS POR VIOLENCIA FAMILIAR EN EL DEPARTAMENTO DE TACNA
CERO GRADO 60
MOISES ANCCO NINA
EL 16/05/2019 AL 31/05/2019
ANTERIOR VALORIZACIÓN 04 ACUMULADO
PRECIO TOTAL EN
PESO TOTAL KG. UNITARIO METRADO MONTO METRADO MONTO METRADO
SOLES
(S/.)
KG KG s/ s/ CANT KG. s/ CANT KG. s/ KG.
13.97 25844.5 0.80508 20807.01 0.00 0.00 0.00 201.00 2807.97 S/ 2,260.65 2807.97
8.95 23270 0.80508 18734.32 0.00 0.00 0.00 480.00 4296.00 S/ 3,458.64 4296.00
5.04 20664 0.80508 16636.27 0.00 0.00 0.00 450.00 2268.00 S/ 1,825.93 2268.00
2.25 5962.5 0.80508 4800.32 0.00 0.00 0.00 420.00 945.00 S/ 760.81 945.00
1.00 2000 0.80508 1610.17 0.00 0.00 0.00 500.00 500.00 S/ 402.54 500.00
SUB TOTAL S/62,588.09 SUB TOTAL 0.00 SUB TOTAL S/ 8,708.58 SUB TOTAL
IGV (18%) S/11,265.86 IGV (18%) 0.00 IGV (18%) S/ 1,567.54 IGV (18%)
TOTAL S/73,853.95 TOTAL 0.00 TOTAL S/10,276.12 TOTAL
ACUMULADO SALDO
s/ KG s/
S/ 2,260.65 23036.53 S/ 18,546.36
S/ 3,458.64 18974.00 S/ 15,275.68
S/ 1,825.93 18396.00 S/ 14,810.34
S/ 760.81 5017.50 S/ 4,039.51
S/ 402.54 1500.00 S/ 1,207.63
S/ 8,708.58 SUB TOTAL S/ 53,879.52
S/ 1,567.54 IGV (18%) S/ 9,698.31
S/10,276.12 TOTAL S/63,577.83
VALORIZACIÓN 09
OBRA: CREACION DEL CENTRO DE ATENCION INTEGRAL A POBLACIONES VULNERABLES AFECTADAS POR VIOLENCIA FAMILIAR EN EL DEPARTAMENTO DE TACNA
PARTIDA: ACERO GRADO 60
EJECUTA: MOISES ANCCO NINA
PERIODO: DEL 19/08/2019 AL 31/08/2019
ANTERIOR VALORIZACION 9
PRECIO
DIAMETR CANT.
ITEM PESO TOTAL KG. UNITARIO PARCIAL METRADO MONTO METRADO
O VARILLAS (S/.)
ø CANT KG. s/ s/ s/ CANT KG. s/ CANT KG.
1 ø 5/8 1850 13.97 25844.50 0.80508 20807.01 1799.00 25132.03 20109.70 0.00 0.00
2 ø 1/2 3175 8.95 28416.25 0.80508 22877.49 3135.00 28058.25 21436.39 34.00 304.30
3 ø 3/8 4310 5.04 21722.40 0.80508 17488.37 4280.00 21571.20 16356.29 6.00 30.24
4 ø 1/4 2950 2.25 6637.50 0.80508 5343.75 2891.00 6504.75 4773.15 35.00 78.75
5 #16 2000 1.00 2000.00 0.80508 1610.17 1000.00 1000.00 402.54 - 0.00
SUB TOTAL S/68,126.79 SUB TOTAL 63078.07 SUB TOTAL
IGV (18%) S/12,262.82 IGV (18%) 11354.05 IGV (18%)
TOTAL S/80,389.62 TOTAL 74432.12 TOTAL
DEPARTAMENTO DE TACNA
s/ CANT KG s/ CANT KG s/
0.00 1799.00 25132.03 20109.70 51.00 712.47 697.32
244.99 3169.00 28362.55 21681.38 6.00 53.70 1196.11
24.35 4286.00 21601.44 16380.64 24.00 120.96 1107.73
63.40 2926.00 6583.50 4836.55 24.00 54.00 507.20
0.00 1000.00 1000.00 402.54 1000.00 1000.00 1207.63
332.73 SUB TOTAL S/. 63,410.80 SUB TOTAL S/. 4,715.99
S/. 59.89 IGV (18%) S/. 11,413.94 IGV (18%) S/. 848.88
S/. 392.63 TOTAL S/. 74,824.75 TOTAL S/. 5,564.87
VALORIZACIÓN 07
OBRA: CREACION DEL CENTRO DE ATENCION INTEGRAL A POBLACIONES VULNERABLES AFECTADAS POR VIOLENCIA FAMILIAR EN EL DEPARTAMENTO DE TACNA
PARTIDA: ACERO GRADO 60
EJECUTA: MOISES ANCCO NINA
PERIODO: DEL 01/07/2019 AL 15/07/2019
ANTERIOR VALORIZACION 7
PRECIO
DIAMETR CANT.
ITEM PESO TOTAL KG. UNITARIO PARCIAL METRADO MONTO METRADO
O VARILLAS (S/.)
ø CANT KG. s/ s/ s/ CANT KG. s/ CANT KG.
1 ø 5/8 1850 13.97 25844.50 0.80508 20807.01 1640.00 22910.80 18445.14 148.00 2067.56
2 ø 1/2 3175 8.95 28416.25 0.80508 22877.49 2403.00 21506.85 17314.84 572.00 5119.40
3 ø 3/8 4244 5.04 21389.76 0.80508 17220.57 3550.00 17892.00 14404.58 481.00 2424.24
4 ø 1/4 2950 2.25 6637.50 0.80508 5343.75 2150.00 4837.50 3894.60 485.00 1091.25
5 #16 2000 1.00 2000.00 0.80508 1610.17 500.00 500.00 402.54 - 0.00
SUB TOTAL S/67,858.99 SUB TOTAL 54461.69 SUB TOTAL
IGV (18%) S/12,214.62 IGV (18%) 9803.10 IGV (18%)
TOTAL S/80,073.61 TOTAL 64264.79 TOTAL
ADENDA 01
ANTERIOR VALORIZACION 02
PRECIO
TOTAL KG. UNITARIO PARCIAL METRADO MONTO METRADO
ITEM DESCRIPCION (S/.)
CANT KG. s/ CANT KG.
1 SOBRECIMIENTO ARMADO 213.87 0.211864 S/. 45.31 106.94 106.94 22.66 106.94
2 COLUMNETAS Y VIGUETAS 10825.94 0.211864 S/. 2,293.63 5412.97 5412.97 1146.82 5412.97
SUB TOTAL S/. 1,169.47 SUB TOTAL
IGV (18%) S/. 210.50 IGV (18%)
TOTAL S/. 1,379.98 TOTAL
DEPARTAMENTO DE TACNA
s/ CANT KG s/ CANT KG s/
1664.56 1788.00 24978.36 20109.70 62.00 866.14 697.32
4121.55 2975.00 26626.25 21436.39 200.00 1790.00 1441.10
1951.72 4031.00 20316.24 16356.29 213.00 1073.52 864.27
878.55 2635.00 5928.75 4773.15 315.00 708.75 570.60
0.00 500.00 500.00 402.54 1500.00 1500.00 1207.63
8616.38 SUB TOTAL S/. 63,078.07 SUB TOTAL S/. 4,780.92
S/. 1,550.95 IGV (18%) S/. 11,354.05 IGV (18%) S/. 860.57
S/. 10,167.33 TOTAL S/. 74,432.12 TOTAL S/. 5,641.49
s/ CANT KG s/ CANT KG s/
S/. 22.66 - 213.87 S/. 45.31 - 0.00 0.00
S/. 1,146.82 0.00 10825.94 S/. 2,293.63 0.00 0.00 0.00
S/. 1,169.47 SUB TOTAL S/. 2,338.94 SUB TOTAL S/. 0.00
S/. 210.50 IGV (18%) S/. 421.01 IGV (18%) S/. 0.00
S/. 1,379.98 TOTAL S/. 2,759.95 TOTAL S/. 0.00
OBRA: CREACION DEL CENTRO DE ATENCION I
PARTIDA: ACERO GRADO 60
EJECUTA: MOISES ANCCO NINA
PERIODO: DEL 16/05/2019 AL 31/05/2019
CANT.
ITEM DIAMETRO VARILLAS
UND
1 ø 5/8 1850
2 ø 1/2 2600
3 ø 3/8 4100
4 ø 1/4 2650
5 #16 2000
VALORIZACIÓN 03
REACION DEL CENTRO DE ATENCION INTEGRAL A POBLACIONES VULNERABLES AFECTADAS POR VIOLENCIA FAMILIAR EN EL DEPARTAMENTO DE TACNA
CERO GRADO 60
MOISES ANCCO NINA
EL 16/05/2019 AL 31/05/2019
ANTERIOR VALORIZACIÓN 04 ACUMULADO
PRECIO TOTAL EN
PESO TOTAL KG. UNITARIO METRADO MONTO METRADO MONTO METRADO
SOLES
(S/.)
KG KG s/ s/ CANT KG. s/ CANT KG. s/ KG.
13.97 25844.5 0.80508 20807.01 0.00 0.00 0.00 201.00 2807.97 S/ 2,260.65 2807.97
8.95 23270 0.80508 18734.32 0.00 0.00 0.00 480.00 4296.00 S/ 3,458.64 4296.00
5.04 20664 0.80508 16636.27 0.00 0.00 0.00 450.00 2268.00 S/ 1,825.93 2268.00
2.25 5962.5 0.80508 4800.32 0.00 0.00 0.00 420.00 945.00 S/ 760.81 945.00
1.00 2000 0.80508 1610.17 0.00 0.00 0.00 500.00 500.00 S/ 402.54 500.00
SUB TOTAL S/62,588.09 SUB TOTAL 0.00 SUB TOTAL S/ 8,708.58 SUB TOTAL
IGV (18%) S/11,265.86 IGV (18%) 0.00 IGV (18%) S/ 1,567.54 IGV (18%)
TOTAL S/73,853.95 TOTAL 0.00 TOTAL S/10,276.12 TOTAL
ACUMULADO SALDO
s/ KG s/
S/ 2,260.65 23036.53 S/ 18,546.36
S/ 3,458.64 18974.00 S/ 15,275.68
S/ 1,825.93 18396.00 S/ 14,810.34
S/ 760.81 5017.50 S/ 4,039.51
S/ 402.54 1500.00 S/ 1,207.63
S/ 8,708.58 SUB TOTAL S/ 53,879.52
S/ 1,567.54 IGV (18%) S/ 9,698.31
S/10,276.12 TOTAL S/63,577.83
ADENDA
OBRA: CREACION DEL CENTRO DE ATENCION INTEGRAL A POBLACIONES VULNERABLES AFECTADAS POR VIOLENCIA FAMILIAR EN EL DEPARTAMENTO DE TACNA
PARTIDA: COLUMNETAS Y VIGUETAS
EJECUTA: MOISES ANCCO NINA
PERIODO: DEL 01/07/2019 AL 17/07/2019
PRECIO
ITEM DESCRIPCION TOTAL KG. UNITARIO PARCIAL METRADO MONTO METRADO MONTO METRADO
(S/.)
CANT KG s/ s/ CANT KG. s/ CANT KG. s/ CANT
1 SOBRECIMIENTO ARMADO 213.87 0.21186 45.31 - 0.00 0.00
2 COLUMNETAS Y VIGUETAS 10825.94 0.21186 2293.63 - 0.00 0.00
SUB TOTAL S/2,338.94 SUB TOTAL 0.00 SUB TOTAL 0.00
IGV (18%) S/421.01 IGV (18%) 0.00 IGV (18%) 0.00
TOTAL S/2,759.95 TOTAL 0.00 TOTAL 0.00
ADENDA 01
TO DE TACNA
METRADO MONTO METRADO MONTO METRADO MONTO METRADO monto METRADO MONTO METRADO
METRADO MONTO
KG s/
0.00 0.00
0.00 0.00
SUB TOTAL 0.00
IGV (18%) 0.00
TOTAL 0.00
0.00
VALORIZACIÓN 03
OBRA: CREACION DEL CENTRO DE ATENCION INTEGRAL A POBLACIONES VULNERABLES AFECTADAS POR VIOLENCIA FAMILIAR EN EL DEPARTAMENT
PARTIDA: ACERO GRADO 60
EJECUTA: MOISES ANCCO NINA
PERIODO: DEL 16/05/2019 AL 31/05/2019
ANTERIOR
PRECIO
CANT. TOTAL EN
ITEM DIAMETRO PESO TOTAL KG. UNITARIO METRADO MONTO
VARILLAS SOLES
(S/.)
UND KG KG s/ s/ CANT KG. s/
1 ø 5/8 1850 13.97 25844.5 0.80508 20807.01 0.00 0.00 0.00
2 ø 1/2 2600 8.95 23270 0.80508 18734.32 0.00 0.00 0.00
3 ø 3/8 4100 5.04 20664 0.80508 16636.27 0.00 0.00 0.00
4 ø 1/4 2650 2.25 5962.5 0.80508 4800.32 0.00 0.00 0.00
5 #16 2000 1.00 2000 0.80508 1610.17 0.00 0.00 0.00
SUB TOTAL S/62,588.09 SUB TOTAL 0.00
IGV (18%) S/11,265.86 IGV (18%) 0.00
TOTAL S/73,853.95 TOTAL 0.00
03
ENCIA FAMILIAR EN EL DEPARTAMENTO DE TACNA
DESCRIPCION
MONTO VALORIZADO A
AMORTIZACION DE ADELANTO B
SUB TOTAL
IGV 18%
TOTAL
S/. 332.73
S/. 0.00
S/. 332.73
S/. 332.73
S/. 59.89
S/. 392.63
OBRA: CREACION DEL CENTRO DE ATENCION INTEGRAL A POBLACIONES VULNERABLES AFECTADAS POR VIOLENCIA FAMILIAR EN EL DEPARTAMENTO DE TACNA
PARTIDA: ENCOFRADO Y DESENCOFRADO
EJECUTA: CONSTRUCTORA VILCA S.A.C.
PERIODO: DEL 21/07/2019 AL 31/07/2019
VALORIZACIÓN 01 VALORIZACIÓN 02
VALORIZACIÓN 01 VALORIZACIÓN 02
ITEM DESCRIPCION METRADO PARCIAL TOTAL METRADO MONTO METRADO
CERCO PERIMETRICO
SOBRECIMIENTOS,NORMAL 42.98 29.66102 1274.83 0.00% S/. - 0.00%
COLUMENTAS Y VIGUETAS 30.15 29.66102 894.28 0.00% S/. - 0.00%
AREA DE CIRCULACION
SARDINELES 29.5 16.94915 500.00 0.00% S/. - 0.00%
RAMPA ENCOFRADO CARAVISTA 3.58 38.13559 136.53 0.00% S/. - 0.00%
GRADAS, ENCOFRADO Y DES NORMAL 2.02 29.66102 59.92 0.00% S/. - 0.00%
INSTALACION DE AREAS VERDES
SARDINEL PERALTADO, CARAVISTA 39.96 38.13559 1523.90 0.00% S/. - 0.00%
PLAZOLETA CENTRAL
PISOS, ENCOFRADO NORMAL 5.8 29.66102 172.03 0.00% S/. - 0.00%
SARDINEL PERALTADO, CARAVISTA 5.28 38.13559 201.36 0.00% S/. - 0.00%
BANCA, ENFORADO CARAVISTA 4.17 38.13559 159.03 0.00% S/. - 0.00%
MURO DE CONTENCION FRENTE A B1
VALORIZACIÓN 03
1 OBRA: CREACION DEL CENTRO DE ATENCION INTEGRAL A POBLACIONES VULNERABLES AFECTADAS POR VIOLENCIA FAMILIAR EN EL DEPARTAMENTO DE TACNA
2 PARTIDA: ENCOFRADO Y DESENCOFRADO
3 EJECUTA: EDGAR VILCA
4 PERIODO: :DEL 16/05/2019 AL 31/05/2019
ANTERIOR VALORIZACIÓN 03
ITEM DESCRIPCION METRADO PARCIAL TOTAL EN SOLES METRADO MONTO METRADO
M2 s/ s/ METRADO % s/ METRADO %
1 ZAPATA ENCO. Y DESENC. 189.24 16.94915 3207.46 189.24 1.00 S/ 3,207.46 0.00 0%
2 COLUMNA ENCOF. Y DESEN. NORMAL 126.28 29.66102 3745.59 118.82 0.00 7.46 6%
3 COLUMNA ENCOF. Y DESEN. CARAVISTA 1336.1 38.13559 50952.97 361.09 0.27 S/ 13,770.38 139.38 10%
4 VIGAS ENCOF. Y DESENCOFRADO CARAVISTA 1061.46 38.13559 40479.41 0.00 0.00 S/ - 226.05 21%
5 CIMIENTO ENCO. Y DESENC.NORMAL 514.82 29.66102 15270.08 50.44 0.10 S/ 1,496.10 250.85 49%
6 SOBRECIMIENTO ENCOF Y DESENC. NORMAL 376.85 29.66102 11177.75 0.00 0.00 S/ - 89.65 24%
7 VIGUETAS ENCOF. Y DESENC. NORMAL
1128.44 29.66102 33470.68 0.00 0.00 S/ - 0.00 0.00
8 COLUMNETAS ENCOF. Y DESENC. NORMAL
9 LOSA ALIGERADA ENCO. Y DESENCO. NORMAL 1496.67 29.66102 44392.75 0.00 0% S/ - 331.80 22%
10 TANQUE CISTERNA 97.36 38.13559 3712.88 97.36 100% S/ 3,712.88 0.00 0%
SUB TOTAL S/206,409.58 SUB TOTAL 22186.82 SUB TOTAL
IGV (18%) S/37,153.72 IGV (18%) 3993.63 IGV (18%)
TOTAL S/243,563.30 TOTAL 26180.45 TOTAL
B1 B2 B3 B4 B5 O. COMPLE. TOTAL
ZAPATAS
COLUMNA CARAVISTA 347.82 139.86 240.72 165.3 193.83 13.39 1100.92
VIGA CARAVISTA 306.14 139.86 240.72 165.3 193.83 15.61 1061.46
CIMIENTO NORMAL 100 100 100 100 100 14.82 514.82
SOBRCIMIENTO NORMAL 117.65 48.18 57.57 63.16 47.31 42.98 376.85
VIGUETA NORMAL
COLUMNETA NORMAL 325.07 149.96 136.27 327.71 148.53 40.9
LOSA ALIGERADA 440.68 211.21 305.28 291.57 230.57 17.26
TANQUE CISTERNA 97.36
ESCALERA
MESON DE CONCRETO
RAMPA
PISO Y VEREDA CARAVISTA
ADOQUINES CARAVISTA
GRADA
SARDINELES CARAVISTA
BANCAS CARAVISTAS
VALORIZACIÓN 07
RTAMENTO DE TACNA
S/. 3,524.32 7.46 0.59% S/. 221.27 121.78 9.71% 3612.12 95.91 7.64% 2844.79 42.63 0.00
S/. - 331.80 22.17% S/. 9,841.53 291.42 0.19 8643.81 238.12 15.91% 7062.88 319.04 0.21
S/. - 0.00 0.00% S/. - 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00
S/. - 0.00 0.00% S/. - 0.00 0.00 0.00 99.21 49.61% 2942.67 0.00 0.00
S/. 17,768.64 SUB TOTAL S/. 34,098.26 SUB TOTAL S/30,975.55 SUB TOTAL S/32,028.90 SUB TOTAL
S/. 3,198.36 IGV (18%) S/. 6,137.69 IGV (18%) S/5,575.60 IGV (18%) S/5,765.20 IGV (18%)
S/. 20,967.00 TOTAL S/. 40,235.95 TOTAL S/36,551.15 TOTAL S/37,794.10 TOTAL
RTAMENTO DE TACNA
s/ M2 s/ M2 s/
S/ - 189.24 S/ 3,207.46 0.00 S/ -
S/ 221.27 126.28 S/ 221.27 0.00 S/ 3,524.32
S/ 5,315.34 500.47 S/ 19,085.72 835.63 S/ 31,867.25
S/ 8,620.55 226.05 S/ 8,620.55 835.41 S/ 31,858.86
S/ 7,440.47 301.29 S/ 8,936.57 213.53 S/ 6,333.52
S/ 2,659.11 89.65 S/ 2,659.11 287.20 S/ 8,518.64
9463.05 85.88 0.00 2547.29 1266.26 78.87% 37558.56 198.54 13.27% 5888.90 1464.80 92.13%
0.00 0.00 0.00 0.00 97.36 100.00% 3712.88 0.00 0.00% 0.00 97.36 100.00%
0.00 26.43 0.00 783.94 125.64 49.61% 3726.61 26.43 13.22% 783.94 152.07 62.82%
S/25,971.06 SUB TOTAL S/15,140.68 SUB TOTAL S/. 163,925.59 SUB TOTAL S/. 30,808.39 SUB TOTAL
S/4,674.79 IGV (18%) S/2,725.32 IGV (18%) S/. 29,506.61 IGV (18%) S/. 5,545.51 IGV (18%)
S/30,645.85 TOTAL S/17,866.00 TOTAL S/. 193,432.20 TOTAL S/. 36,353.90 TOTAL
0.00 0.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00%
0.00 0.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00%
0.00 0.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00%
0.00 0.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00%
0.00 0.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00%
0.00 0.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00%
0.00 0.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00%
0.00 0.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00%
0.00 0.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00%
0.00 0.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00%
0.00 0.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00%
0.00 0.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00%
0.00 0.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00%
0.00 0.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00%
ACUMULADO SALDO
ACUMULADO SALDO
MONTO METRADO MONTO
CERCO PERIMETRICO
SOBRECIMIENTOS,NORMAL 42.98 29.66102 1274.83 0.00 0.00% 0.00 42.98
COLUMENTAS Y VIGUETAS 30.15 29.66102 894.28 0.00 0.00% 0.00 30.15
AREA DE CIRCULACION
SARDINELES 29.5 16.94915 500.00 0.00 0.00% 0.00 29.50
RAMPA ENCOFRADO CARAVISTA 3.58 38.13559 136.53 0.00 0.00% 0.00 3.58
GRADAS, ENCOFRADO Y DES NORMAL 2.02 29.66102 59.92 0.00 0.00% 0.00 2.02
INSTALACION DE AREAS VERDES
SARDINEL PERALTADO, CARAVISTA 39.96 38.13559 1523.90 0.00 0.00% 0.00 39.25
PLAZOLETA CENTRAL
PISOS, ENCOFRADO NORMAL 5.8 29.66102 172.03 0.00 0.00% 0.00
SARDINEL PERALTADO, CARAVISTA 5.28 38.13559 201.36 0.00 0.00% 0.00 5.28
BANCA, ENFORADO CARAVISTA 4.17 38.13559 159.03 0.00 0.00% 0.00
MURO DE CONTENCION FRENTE A B1
SOBRECIMIENTOS ENCOFRADO CARAVISTA 14.82 29.66102 439.58 0.00 0.00% 0.00 14.82
COLUMNAS, CARAVISTA 13.39 38.13559 510.64 0.00 0.00% 0.00 13.39
VIGAS, CARAVISTA 15.61 38.13559 595.30 0.00 0.00% 0.00 15.61
LOSA ALIGERADA, NORMAL 17.26 29.66102 511.95 0.00 0.00% 0.00 17.26
COLUMNETAS Y VIGUETAS 10.75 29.66102 318.86 0.00 0.00% 0.00 10.75
SUB TOTAL S/7,298.18 SUB TOTAL S/0.00
IGV (18%) S/1,313.67 IGV (18%) S/0.00
TOTAL S/8,611.85 TOTAL S/0.00
VALORIZACIÓN 10 ACUMULADO SALDO
METRADO monto METRADO MONTO METRADO MONTO
OBRA: CREACION DEL CENTRO DE ATENCION INTEGRAL A POBLACIONES VULNERABLES AFECTADAS POR VIOLENCIA FAMILIAR EN EL DEPARTAMENTO DE TACNA
PARTIDA: ENCOFRADO Y DESENCOFRADO
EJECUTA: CONSTRUCTORA VILCA S.A.C.
PERIODO: DEL 01/07/2019 AL 15/07/2019
ANTERIOR VALORIZACIÓN 06
MONTO VALORIZADO ( A ) A
AMORTIZACION DE ADELANTO ( B ) B
SALDO VALORIZADO ( C ) (A-B) C (A-B)
MONTO RETENIDO 4% (4% DE C) 4% C
MONTO TOTAL A PAGAR TOTAL
VALORIZACIÓN 03
M2 s/ s/
1 ZAPATA ENCO. Y DESENC. 189.24 16.94915 3207.46
2 COLUMNA ENCOF. Y DESEN. NORMAL 126.28 29.66102 3745.59
3 COLUMNA ENCOF. Y DESEN. CARAVISTA 1336.1 38.13559 50952.97
4 VIGAS ENCOF. Y DESENCOFRADO CARAVISTA 1061.46 38.13559 40479.41
5 CIMIENTO ENCO. Y DESENC.NORMAL 514.82 29.66102 15270.08
6 SOBRECIMIENTO ENCOF Y DESENC. NORMAL 376.85 29.66102 11177.75
7 VIGUETAS ENCOF. Y DESENC. NORMAL
1128.44 29.66102 33470.68
8 COLUMNETAS ENCOF. Y DESENC. NORMAL
9 LOSA ALIGERADA ENCO. Y DESENCO. NORMAL 1496.67 29.66102 44392.75
10 TANQUE CISTERNA 97.36 38.13559 3712.88
SUB TOTAL S/206,409.58
IGV (18%) S/37,153.72
TOTAL S/243,563.30
B1 B2 B3 B4
ZAPATAS
COLUMNA CARAVISTA 347.82 139.86 240.72 165.3
VIGA CARAVISTA 306.14 139.86 240.72 165.3
CIMIENTO NORMAL 100 100 100 100
SOBRCIMIENTO NORMAL 117.65 48.18 57.57 63.16
VIGUETA NORMAL
COLUMNETA NORMAL 325.07 149.96 136.27 327.71
LOSA ALIGERADA 440.68 211.21 305.28 291.57
TANQUE CISTERNA
ESCALERA
MESON DE CONCRETO
RAMPA
PISO Y VEREDA CARAVISTA
ADOQUINES CARAVISTA
GRADA
SARDINELES CARAVISTA
BANCAS CARAVISTAS
NTO DE TACNA
S/30,645.85
S/. 5,208.15
S/. 25,437.70
S/. 1,018.00
S/. 24,419.70
36551.15
5208.15
#REF!
#REF! -
#REF!
#REF!
CONSORCIO HATUN WASI
DESCRIPCION
MONTO VALORIZADO A
AMORTIZACION DE ADELANTO B
SUB TOTAL
IGV 18%
TOTAL
S/. 6,940.04
S/. 4,399.86
S/. 2,540.18
S/. 2,540.18
S/. 457.23
S/. 2,997.42
VIGUETA Y
COLUMNET
SOBRECIMIENTO A COLUMNAS VIGAS LOSA ESCALERA MESON
92.86 11.4 223.2 155.42 236.43 18.07 15.8
24.79 5.48 124.62 150.72 204.25
11.4
B1
1.83
141.47
145.89
7.5
117.65 324.97 347.82 306.14 440.68 18.07 15.8
28.34 91.91 148.48 77.54 117.68 7.17
19.84 46.68 54.18 62.32 93.53
B2 8.05 2.75
0.57
56.8 141.34 202.66 139.86 211.21 0 7.17
57.57 16.9 118.67 81.2 97.25 36.24 4.74
7.75 60.32 79.76 98.66
7.75 60.32 79.76 109.37
19.29
9.28
B3 9.48
30.03
14.79
15.75
5.25
57.57 136.27 239.31 240.72 305.28 36.24 4.74
63.16 15.18 109.62 50.21 85.88 32.31 6.48
12.4 50.46 48.88 85.88
12.4 50.46 50.91 85.88
153.39 29.58 15.3 34.03
37.32
36.96
B4
17.01
18.64
8.7
8.7
7.01
63.16 327.71 240.12 165.3 291.67 32.31 6.48
40.71 55.27 181.44 86.19 120.59 23.83
6.6 61.21 55.68 53.82 54.99
B5 29.65 55.68 53.82 54.99
2.4
47.31 148.53 292.8 193.83 230.57 0 23.83
342.49 1078.82 1322.71 1045.85 1479.41 86.62 58.02
VALORIZACIÓN 07
OBRA: CREACION DEL CENTRO DE ATENCION INTEGRAL A POBLACIONES VULNERABLES AFECTADAS POR VIOLENCIA FAMILIAR EN EL DEPARTAMENTO DE TACNA
PARTIDA: INSTALACCIONES ELECTRICAS
EJECUTA: IDEL CARPIO LOPEZ
PERIODO: DEL 19/08/2019 AL 31/08/2019
VALORIZACION 6 ANTERIOR
ITEM DESCRIPCION UND CANTIDAD PRECIO COSTO
MONTOMETRADO %
1 TABLERO GENERAL UND 1 S/. 300.00 S/. 300.00### 0.67 67%
2 TABLERO DE DISTRIBUCION UND 12 S/. 200.00 S/. 2,400.00### 5.00 42%
3 SUBTABLERO DE DISTRIBUCION UND 6 S/. 200.00 S/. 1,200.00### 6.00 100%
4 SALIDA PARA CENTRO DE LUZ UND 348 S/. 27.00 S/. 9,396.00### 182.11 52%
SALIDAS PARA INTERRUPTORES SIMPLES, DOBLES Y DE
5 UND 149 S/. 27.00 S/. 4,023.00### 85.11 57%
CONMUTACION
6 SALIDA PARA TOMACORRIENTES UND 319 S/. 27.00 S/. 8,613.00### 144.22 45%
7 SALIDA P/TOMACORRIENTES ESTABILIZADOS UND 54 S/. 27.00 S/. 1,458.00### 39.00 72%
8 SALIDA PARA LUZ DE EMERGENCIA UND 51 S/. 27.00 S/. 1,377.00### 30.70 60%
SALIDA PARA SISTEMA DE ALARMAS Y SENSOR
9 UND 58 S/. 20.00 S/. 1,160.00### 44.00 76%
DETECTOR DE HUMO
10 SALIDA PARA TV CABLE Y AUDIO UND 63 S/. 20.00 S/. 1,260.00### 28.00 44%
11 CAJAS DE PASE UND 89 S/. 15.00 S/. 1,335.00### 26.67 30%
12 ALIMENTACION DE SUBESTACION A TABLERO GENERAL ML 8 S/. 10.00 S/. 80.00### 0.00 0%
ALIMENTADORES DE TABLERO GENERAL A TABLEROS
13 ML 375 S/. 8.00 S/. 3,000.00### 68.00 18%
DE DISTRIBUCION Y SUB TABLEROS DE DISTR.
14 ALIMENTADORES DE TG A T.D.T. Y T.E. ML 60 S/. 10.00 S/. 600.00### 40.00 67%
15 CIRCUITO PARA TERMA ELECTRICA UND 1 S/. 300.00 S/. 300.00### 0.33 33%
16 SALIDA PARA DATA, WIFI Y CAMARAS DE VIGILANCIA UND 60 S/. 20.00 S/. 1,200.00### 59.00 98%
17 ELECTROBOMBA EN RADARES UND 1 S/. 600.00 S/. 600.00### 0.17 17%
18 POZO Y SISTEMA DE PUESTA A TIERRA UND 7 S/. 550.00 S/. 3,850.00### 7.00 100%
19 SALIDA PARA INTERCOMUNICADORES Y TELEFONOS UND 10 S/. 20.00 S/. 200.00### 9.50 95%
20 BUZON DE PASE DE 70 X 60 X 65 X 47 UND 4 S/. 150.00 S/. 600.00### 1.00 25%
21 SALIDA PARA TERMA DE 6K=22v UND 1 S/. 250.00 S/. 250.00### 0.00 0%
22 SISTEMA ELECTRICO PARA ELEVADOR UND 1 S/. 350.00 S/. 350.00### 0.57 57%
EL DEPARTAMENTO DE TACNA
S/. 2,298.00 25.00 17% S/. 675.00 110.11 74% S/. 2,973.00 38.89 S/. 1,050.00
S/. 3,894.00 61.00 19% S/. 1,647.00 205.22 64% S/. 5,541.00 113.78 S/. 3,072.00
S/. 1,053.00 0.00 0% S/. - 39.00 72% S/. 1,053.00 15.00 S/. 405.00
S/. 829.00 10.00 20% S/. 270.00 40.70 80% S/. 1,099.00 10.30 S/. 278.00
S/. 880.00 0.00 0% S/. - 44.00 76% S/. 880.00 14.00 S/. 280.00
S/. 560.00 0.00 0% S/. - 28.00 44% S/. 560.00 35.00 S/. 700.00
S/. 400.00 0.00 0% S/. - 26.67 30% S/. 400.00 62.33 S/. 935.00
S/. - 0.00 0% S/. - 0.00 0% S/. - 8.00 S/. 80.00
S/. 544.00 0.00 0% S/. - 68.00 18% S/. 544.00 307.00 S/. 2,456.00
S/. 400.00 16.00 27% S/. 160.00 56.00 93% S/. 560.00 4.00 S/. 40.00
S/. 100.00 0.00 0% S/. - 0.33 33% S/. 100.00 0.67 S/. 200.00
S/. 1,180.00 0.00 0% S/. - 59.00 98% S/. 1,180.00 1.00 S/. 20.00
S/. 100.00 0.00 0% S/. - 0.17 17% S/. 100.00 0.83 S/. 500.00
S/. 3,850.00 0.00 0% S/. - 7.00 100% S/. 3,850.00 0.00 S/. -
S/. 190.00 0.00 0% S/. - 9.50 95% S/. 190.00 0.50 S/. 10.00
S/. 150.00 0.00 0% S/. - 1.00 25% S/. 150.00 3.00 S/. 450.00
S/. - 0.00 0% S/. - 0.00 0% S/. - 1.00 S/. 250.00
S/. 200.00 0.00 0% S/. - 0.57 57% S/. 200.00 0.43 S/. 150.00
S/. 100.00 0.00 0% S/. - 5.00 1% S/. 100.00 372.00 S/. 7,440.00
S/. 24,045.00 SUBTOTAL S/. 4,318.00 SUBTOTAL S/. 28,363.00 SUBTOTAL S/. 22,729.00
S/. 4,328.10 IGV(18%) S/. 777.24 IGV(18%) S/. 5,105.34 IGV(18%) S/. 4,091.22
S/. 28,373.10 TOTAL S/. 5,095.24 TOTAL S/. 33,468.34 TOTAL S/. 26,820.22
CONSORCIO HATUN WASI
DESCRIPCION
MONTO VALORIZADO A
AMORTIZACION DE ADELANTO B
SUB TOTAL
IGV 18%
TOTAL
S/. 4,318.00
S/. 423.73
S/. 3,894.27
S/. 3,894.27
S/. 700.97
S/. 4,595.24
VALORIZACIÓN 07
OBRA: CREACION DEL CENTRO DE ATENCION INTEGRAL A POBLACIONES VULNERABLES AFECTADAS POR VIOLENCIA FAMILIAR EN EL DEPARTAMENTO DE TACNA
PARTIDA: INSTALACIONES SANITARIAS
EJECUTA: IDEL CARPIO LOPEZ
PERIODO: DEL 19/08/2019 AL 31/08/2019
ANTERIOR
ITEM DESCRIPCION UND CANTIDAD PRECIO COSTO
METRADO %
1 SALIDADE DESAGUE PTO 209 S/. 35.00 S/. 7,315.00 194 93%
EXCAVACION DE ZANJA
2 TUBERIA DE Ø 6" m 26 S/. 5.00 S/. 130.00 26 100%
3 TUBERIA DE Ø 4" m 113 S/. 5.00 S/. 565.00 95 84%
5 COSTRUCCION DE CAJA DE REGISTRO DE 0.3X0.6 SIN TAPA UND 18 S/. 60.00 S/. 1,080.00 14 78%
9 SALIDA DE AGUA FRIA, CALIENTE PARA SANITARIOS Y DUCHAS PTO 140 S/. 35.00 S/. 4,900.00 103 74%
10 INSTALACIONES DE LLAVES DE PASO DE Ø 1", Ø 3/4" UND 38 S/. 35.00 S/. 1,330.00 2 5%
11 INSTALACION DE LLAVES DE MEZCLADORAS DE DUCHA UND 21 S/. 80.00 S/. 1,680.00 0 0%
INTALACIONES DE APARATOS SANITARIOS CON SUS
12 UND 84 S/. 60.00 S/. 5,040.00 0 0%
RESPECTIVOS WC, OVALINES Y URINARIOS
INSTALACIONES DE LAVADEROS Y LAVAPLATOS CON
13 UND 12 S/. 60.00 S/. 720.00 0 0%
ACCESORIOS
DEPARTAMENTO DE TACNA
S/. 3,605.00 45 32% S/. 1,575.00 148 S/. 5,180.00 -8 S/. -280.00
DESCRIPCION
MONTO VALORIZADO A
AMORTIZACION DE ADELANTO B
SUB TOTAL
IGV 18%
TOTAL
S/. 3,605.00
S/. 423.73
S/. 3,181.27
S/. 3,181.27
S/. 572.63
S/. 3,753.90
VALORIZACION N°06
OBRA :CREACION DEL CENTRO DE ATENCION INTEGRAL A POBLACIONES VULNERABLES AFECTADAS POR VIOLENCIA FAMILIAR EN EL DEPARTAMENTO DE TACNA
PARTIDA : ALBAÑILERIA
V
SUBCONTRATIST:COLLAF CONTRATISTAS GENERALES S.A.C. A
EJECUTA :CONSORCIO HATUN WASI L
O
PERIODO : DEL 19/08/2019 AL 31/08/2019 R
BLOQUE 1,2 Y 4 I
M
Z
EC ANTERIOR
TI
ITEM ESPECIFICACIONES UND METRADO PRECIO PARCIAL PRECIO TOTAL R O METRADO MONTO
A
N
1 MUROS DE ARCILLA DE CABEZA M2 460.69 S/. 28.00 S/. 12,899.32### D 66.58 S/. 1,864.24
2 MUROS DE ARCILLA DE SOGA M2 1480.37 S/. 15.00 S/. 22,205.55### O
1 541.07 S/. 8,116.05
3 TARRAJEO EN MUROS M2 3113.52 S/. 15.00 S/. 46,702.80### 1734.85 S/. 26,022.75
MURO INTERIOR M2 2003.38
MURO EXTERIOR M2 663.42
PRIMARIO Y RAYADO M2 446.72
4 FONDO DE ESCALERA M2 55.93 S/. 15.00 S/. 838.95 ### 4.56 S/. 68.40
5 TARRAJEO DE CIELO RASO M2 807.55 S/. 15.00 S/. 12,113.25### 693.64 S/. 10,404.65
6 DERRAMES ML 715.20 S/. 9.00 S/. 6,436.80 ### 0.00 S/. 0.00
TOTAL S/. 101,196.67
SUBTOTALTOTAL S/. 46,476.09
47169.21
MENTO DE TACNA
DESCRIPCION
MONTO VALORIZADO A
RETENCION (5%) B
SUB TOTAL
S/. 11,021.23
S/. 551.06
S/. 10,470.17
S/. 10,470.17
cielo raso tarrajeo de muro
bloque 1 253.82
bloque 4
1er nivel 55.78 eje 4-5
volado frontal 10.41 eje 4b
sh damas 4
cocienta
9.1
guardiania eje 4-6
pasadizo 22.42
volado posterior 13.85 eje 4-6
eje 4-7
sh varones 4
EJE 4B
eje 1-4
eje 1-2
EJE 1-A
ESCALERA
2DO NIVEL}
tarrajeo de muro 326.65
TOTAL B4 72.57
altura ANCHO
SE RESTAN VENTANAS Y PEUSRTA
guardiania int 3.6 2.93 10.55 10.55
3.2 4.25 13.6 9.475
guardiania ext 3.6 6.5 23.4 19.73
Y COCINETA 39.75
RDE DE ESCALERA 3.5 4.3 15.05
3.5 4.3 15.05
30.1
EJE 2- A 6.06
de 2-1 a 2-2 2.47 1.9 4.69
de 2-2 a 2-3 2.74 0 0.00
de 2-3 a 2-4 2.1 0 0.00
de 2-4 a 2-5 1.44 0.95 1.37
6.06
EJE 2-C 21.72 TOTAL
de 2-2 a columnete despues
de 2-3 4.78 0.95 4.54
de 2-4 a 2-5 2.52 0.95 2.39
(2-A/2-B)//(2-1/2-B) 14.79 14.79
base altura
EJE 2-C
desde 2-2 a 2-3 4.5 2.75 12.38
BLOQUE 5
EJE 5-A ANCHO ALTURA
DE 5-4 5-5 2.17 1.6 3.47
1 2.5 2.50
5.97
EJE 1-2
AREA 1 (1-B A 1-C 5.05 5.05
43.36
FONDO DE ESCALERA
1 1.2 3.8 4.56
BLOQUE 4
545.29
VALORIZACION N°04
OBRA :CREACION DEL CENTRO DE ATENCION INTEGRAL A POBLACIONES VULNERABLES AFECTADAS POR VIOLENCIA FAMILIAR EN EL DEPARTAMENTO DE TACNA
PARTIDA : ALBAÑILERIA
V
SUBCONTRATIST:AVCOC E.I.R.L. A
EJECUTA :CONSORCIO HATUN WASI L
O
PERIODO : DEL 17/08/2019 AL 31/08/2019 R
I
M
Z
EC ANTERIOR
TI
ITEM ESPECIFICACIONES UND METRADO PRECIO PARCIAL PRECIO TOTAL R O METRADO MONTO
A
N
1 MUROS DE ARCILLA DE CABEZA M2 0.00 S/. 28.00 S/. 0.00 ### D 0.00 S/. 0.00
2 MUROS DE ARCILLA DE SOGA M2 0.00 S/. 15.00 S/. 0.00 ### O
1 0.00 S/. 0.00
3 TARRAJEO EN MUROS M2 2258.12 S/. 15.00 S/. 33,871.80### 1094.74 S/. 16,421.05
MURO INTERIOR M2 1354.28
MURO EXTERIOR M2 768.39
PRIMARIO Y RAYADO M2 141.42
4 FONDO DE ESCALERA M2 24.78 S/. 15.00 S/. 371.70 ### 0.00 S/. 0.00
5 TARRAJEO DE CIELO RASO M2 376.42 S/. 15.00 S/. 5,646.30 ### 338.81 S/. 5,082.15
6 DERRAMES ML 473.35 S/. 8.00 S/. 3,786.80 ### 0.00 S/. 0.00
SUBTOTAL S/. 43,676.60
SUBTOTAL
SUBTOTAL S/. 21,503.20
TAMENTO DE TACNA
MURO DE ALBAÑILERIA
ALACENA
BLOQUE 5
CIELO RASO
1ER NIVEL 111.77
ALMACEN 4.46
DEPOSITO DE MUEBREL 7.43
LIMPIEZA 2.64
PASADIZO 10.30
COCINA 15.12
S.H. DAMAS 3 5.46
S.H. VARONES 3 5.11
COMEDOR 61.25
EN GENERAL 58.71
477.67
MUROS 451.52 118.32
TECHO 122.87
MURO
BLOQUE 5 BASE ALTURA
EJE 5-A
DE 5-2 A 5-3 2.6 3.95 10.27
7.96 7.96
EJE 5-B
DE 5-3 A 5-4 2.6 3.95 10.27
DE 5-4 A 5-5 1.12 3.95 4.42
EJE 5-2
DE 5-A A 5-B 2.25 3.95 8.89
DE 5-B A 5-C 6.25 3.95 24.69
EJE 5-5
DE 5-B A 5-C L 7.2 3.85 27.72
83.95
LOSA
BLOQUE 5
5-A 5-B Y 5-1 5-2 2.5 2.95 7.38
5-B 5-C Y 5-1 5-2 6.25 1.48 9.22
X Y
5-2 Y 5-3 DESSDE 5-A A 5- 8.75 2.8 24.50
5-3 Y 5-4 DESSDE 5-A A 5- 8.75 2.8 24.50
5-4 Y 5-5 DESSDE 5-B A 5- 6.25 4.22 26.38
91.97
CONSORCIO HATUN WASI
SR AVCOC E.I.R.L.
PARTIDA ALBAÑILERIA EN OBRA
PERIODO DEL 19 AL 31 DE AGOSTO
DESCRIPCION
MONTO VALORIZADO A
RETENCION (5%) B
SUB TOTAL
IGV 18%
TOTAL
S/. 11,609.41
S/. 580.47
S/. 11,028.93
S/. 11,028.93
S/. 1,985.21
S/. 13,014.14
VALORIZACION N°03
OBRA :CREACION DEL CENTRO DE ATENCION INTEGRAL A POBLACIONES VULNERABLES AFECTADAS POR VIOLENCIA FAMILIAR EN EL DEPARTAMENTO DE TACNA
PARTIDA : ALBAÑILERIA
SUBCONTRATIST:COLLAF CONTRATISTAS GENERALES S.A.C.
EJECUTA :CONSORCIO HATUN WASI
PERIODO : DEL 01/06/2017 AL 20/06/2017
ANTERIOR
ITEM ESPECIFICACIONES UND METRADO PRECIO PARCIAL PRECIO TOTAL METRADO MONTO
1 MUROS DE ARCILLA DE CABEZA M2 460.69 S/. 28.00 S/. 12,899.32 40.81 S/. 1,142.68
2 MUROS DE ARCILLA DE SOGA M2 2236.41 S/. 15.00 S/. 33,546.15 361.36 S/. 5,420.40
3 TARRAJEO EN MUROS M2 5181.09 S/. 15.00 S/. 77,716.35 0.00 S/. 0.00
MURO INTERIOR M2 3303.87
MURO EXTERIOR M2 1289.08
PRIMARIO Y RAYADO M2 588.14
4 FONDO DE ESCALERA M2 80.71 S/. 15.00 S/. 1,210.65 0.00 S/. 0.00
5 TARRAJEO DE CIELO RASO M2 1177.73 S/. 15.00 S/. 17,665.95 134.84 S/. 2,022.60
6 DERRAMES ML 1183.35 S/. 9.00 S/. 10,650.15 0.00 S/. 0.00
SUBTOTAL S/. 130,244.55 SUBTOTAL S/. 7,276.00
IGV (18%) S/. 23,444.02 IGV (18%) S/. 1,309.68
TOTAL S/. 153,688.57 TOTAL S/. 8,585.68
TARRAJEO DE MURO TARRAJEO TARRAJEO
ASENTADO DE MURO
PRIMARIO Y
RAYADO INTERIOR EXTERIOR DERRAME CIELO RASO ESCALERA
CABEZA SOGA
BLOQUE 1 152.78 471.09 185.01 1025.88 130.15 317 406.50 19.27
BLOQUE 2 - 187.19 38.24 220.97 150.56 193.2 103.00 -
BLOQUE 3 192.89 348.45 28.47 836.59 445.07 259.9 200.40 24.78
BLOQUE 4 115.02 766.28 223.47 702.74 239.98 199.8 235.70 36.66
BLOQUE 5 - 341.11 112.95 463.90 180.59 208.25 214.78 -
CERCO PERIME. - 55.81 - - 142.73 - - -
SUBESTACION - 66.48 - 53.79 - 5.2 17.35 -
TOTAL 460.69 2236.41 588.14 3303.87 1289.08 1183.35 1177.73 80.71
AMENTO DE TACNA
eje 2-A
de 2-1 a 2-2 2.47
de 2-2 a 2-3 2.74
de 2-3 a 2-4 2.1
de 2-4 a 2-5 1.44
eje 2-c
de 2-2 a columnete 4.78
despues de 2-3
de 2-4 a 2-5 2.52
CABEZA 0.00
SOGA 124.22
tado e ladrillos c
PURO MURO DE SOGA BLOQUE 5 bloque 5
2do nivel entre 5-A y volado; 5-1 y
altura area eje 5-A ancho altura area 5-2
2.21 1.26 desde 5-1 a 5-2 2.19 0.98 2.15 entre 5-A y volado; 5-2 y
0.85 2.15 desde 5-2 a 5-3 2.04 0.98 2.00 5-3
2.34 4.66 4.15 entre VOLADO y volado;
8.07 5-3 y 5-4
eje 5-B entre 5-B y volado; 5-4 y
2.31 2.26 desde 5-1 a 5-2 1.32 2.42 3.19 5-5
DESE 5-2 a 5-3 1.17 2.42 2.83
altura area desde 5-3 a 5-4 1.17 1.05 1.23
1.79 1.02 7.25 bloque 2
1er paño
2.31 6.35 eje 5-C 2do paño
2.31 4.97 7.76 0.98 7.60
12.34
altura area eje 5-5
2.94 8.97 desde 5-a a 5-b 1.22 2.42 2.95
0.97 2.10
0.97 1.07 eje 5-4
2.97 5.35 1.74 2.42 4.21
17.48
eje 5-2
2.74 9.64 1.74 2.42 4.21
2.52 10.03
2.52 1.81 total ssoga 30.38
2.52 6.33
18.17
2.35 8.93
2.04 5.30
2.04 5.79
11.10
1.38 3.41
1.28 3.51
1.28 2.69
2.4 3.46
13.06
2.35 11.23
2.35 5.92
224.16
bloque 2
7.9 4.89 38.63
7.9 3.35 26.47