FLUJO DE POTENCIA A DEMANDA MÁXIMA

ETAP
Project: Sistema de Bombeo Page: 1
12.6.0H
Location: Date: 10-28-2016
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: SistemadeBombeo Config.: Normal

Electrical Transient Analyzer Program

Load Flow Analysis

Loading Category (1): Design

Generation Category (1): Design

Load Diversity Factor: None

Swing V-Control Load Total


Number of Buses: 9 0 29 38

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total


Number of Branches: 11 0 0 18 0 0 29

Method of Solution: Adaptive Newton-Raphson Method

Maximum No. of Iteration: 99

Precision of Solution: 0.0001000

System Frequency: 50.00 Hz

Unit System: Metric

Project Filename: SistemadeBombeo

Output Filename: C:\Users\Eperez\Desktop\Etap\Demanda Máxima\ETAP


1260\Demanda-Máxima\Untitled.lfr
ETAP
Project: Sistema de Bombeo Page: 2
12.6.0H
Location: Date: 10-28-2016
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: SistemadeBombeo Config.: Normal

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual


ETAP
Project: Sistema de Bombeo Page: 3
12.6.0H
Location: Date: 10-28-2016
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: SistemadeBombeo Config.: Normal

Bus Input Data

Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

BARRA 0 23.000 1 100.0 0.0

BARRA 1 23.000 1 100.0 0.0

BARRA 2 23.000 1 100.0 0.0

BARRA 3 23.000 1 100.0 0.0

BARRA 4 23.000 1 100.0 0.0

BARRA 5 23.000 1 100.0 0.0

BARRA 6 23.000 1 100.0 0.0

BARRA 7 23.000 1 100.0 0.0

BARRA 8 23.000 1 100.0 0.0

BARRA 9 23.000 1 100.0 0.0

Barra A 3.450 1 100.0 0.0 0.000 -0.400

Barra B 3.450 1 100.0 0.0 0.000 -0.400

Bus1 23.000 1 100.0 0.0

Bus2 23.000 1 100.0 0.0

Bus3 3.450 1 100.0 0.0

Bus4 3.450 1 100.0 0.0

Bus5 3.300 1 100.0 0.0 0.971 0.462

Bus6 3.300 1 95.7 0.0 0.971 0.462

Bus7 3.300 1 100.0 0.0 0.971 0.462

Bus8 3.450 1 100.0 0.0

Bus9 0.400 1 100.0 0.0

Bus10 0.380 8 100.0 0.0 0.185 0.110

Bus11 0.380 2 100.0 0.0 0.185 0.110

Bus13 0.380 4 100.0 0.0 0.185 0.110

Bus14 0.380 5 100.0 0.0 0.185 0.110

Bus15 0.380 9 100.0 0.0 0.185 0.110

Bus16 0.380 6 100.0 0.0 0.185 0.110

Bus17 0.380 7 100.0 0.0 0.185 0.110

Bus18 0.380 3 100.0 0.0 0.185 0.110

CCM-01 0.400 1 100.0 0.0

CCM-02 0.400 1 100.0 0.0

CCM-03 0.400 1 100.0 0.0

CCM-04 0.400 1 100.0 0.0


ETAP
Project: Sistema de Bombeo Page: 4
12.6.0H
Location: Date: 10-28-2016
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: SistemadeBombeo Config.: Normal

Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

CCM-05 0.400 1 100.0 0.0

CCM-06 0.400 1 100.0 0.0

CCM-07 0.400 1 100.0 0.0

CCM-08 0.400 1 100.0 0.0

CCM-SS/AA 0.400 1 100.0 0.0 0.170 0.105 0.043 0.026

Total Number of Buses: 38 4.563 2.370 0.043 -0.774 0.000 0.000 0.000 0.000

Generation Bus Voltage Generation Mvar Limits


ID kV Type Sub-sys % Mag. Angle MW Mvar % PF Max Min

BARRA 0 23.000 Swing 1 100.0 0.0

Bus10 0.380 Swing 8 100.0 0.0

Bus11 0.380 Swing 2 100.0 0.0

Bus13 0.380 Swing 4 100.0 0.0

Bus14 0.380 Swing 5 100.0 0.0

Bus15 0.380 Swing 9 100.0 0.0

Bus16 0.380 Swing 6 100.0 0.0

Bus17 0.380 Swing 7 100.0 0.0

Bus18 0.380 Swing 3 100.0 0.0

0.000 0.000
ETAP
Project: Sistema de Bombeo Page: 5
12.6.0H
Location: Date: 10-28-2016
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: SistemadeBombeo Config.: Normal

Line/Cable Input Data

Ohms or Siemens/1000 m per Conductor (Cable) or per Phase (Line)

Line/Cable Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

CABLE N°1 25MCUS1 2/0 55.0 0.0 1 75 0.337952 0.325350

CABLE N°2 25MCUS1 2/0 55.0 0.0 1 75 0.337952 0.325350

CABLE N°3 5,0MCUS1 500 20.0 0.0 2 75 0.098425 0.143810

CABLE N°4 5,0MCUS1 500 20.0 0.0 2 75 0.098425 0.143810

CABLE N°5 5,0MCUS1 4/0 60.0 0.0 1 75 0.213255 0.159394

CABLE N°6 5,0MCUS1 4/0 55.0 0.0 1 75 0.213255 0.159394

CABLE N°7 5,0MCUS1 4/0 30.0 0.0 1 75 0.213255 0.159394

CABLE N°8 5,0MCUS1 1/0 35.0 0.0 1 75 0.419948 0.173611

CABLE N°9 1,0NCUN1 4/0 45.0 0.0 2 75 0.654938 0.568679

LINEA 0-4 123 1100.0 0.0 1 20 0.555281 0.392158 0.0000030

LINEA 2-1 123 600.0 0.0 1 75 0.627043 0.392171 0.0000030

LINEA 3-2 123 432.0 0.0 1 75 0.627043 0.392171 0.0000030

LINEA 4-5 123 750.0 0.0 1 75 0.627043 0.392171 0.0000030

LINEA 5-3 123 1525.0 0.0 1 75 0.627043 0.392171 0.0000030

LINEA 5-9 123 2670.0 0.0 1 75 0.627043 0.392171 0.0000030

LINEA 7-6 123 867.0 0.0 1 75 0.627043 0.392171 0.0000030

LINEA 9-7 123 1286.0 0.0 1 75 0.627043 0.392171 0.0000030

LINEA 9-8 123 864.0 0.0 1 75 0.627043 0.392171 0.0000030

Line / Cable resistances are listed at the specified temperatures.


ETAP
Project: Sistema de Bombeo Page: 6
12.6.0H
Location: Date: 10-28-2016
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: SistemadeBombeo Config.: Normal

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift

ID Phase MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

T1 3-Phase 5.000 23.000 3.450 6.40 12.00 0 0 0 0 0 6.4001 Dyn 0.000

T2 3-Phase 5.000 23.000 3.450 6.40 12.00 0 0 0 0 0 6.4001 Dyn 0.000

TD1 3-Phase 0.750 23.000 0.400 4.80 5.00 0 0 0 0 0 4.8000 Dyn 0.000

TD2 3-Phase 0.750 23.000 0.400 4.80 5.00 0 0 0 0 0 4.8000 Dyn 0.000

TD3 3-Phase 0.750 23.000 0.400 4.80 5.00 0 0 0 0 0 4.8000 Dyn 0.000

TD4 3-Phase 0.750 23.000 0.400 4.80 5.00 0 0 0 0 0 4.8000 Dyn 0.000

TD5 3-Phase 0.750 23.000 0.400 4.80 5.00 0 0 0 0 0 4.8000 Dyn 0.000

TD6 3-Phase 0.750 23.000 0.400 4.80 5.00 0 0 0 0 0 4.8000 Dyn 0.000

TD7 3-Phase 0.750 23.000 0.400 4.80 5.00 0 0 0 0 0 4.8000 Dyn 0.000

TD8 3-Phase 0.750 23.000 0.400 4.80 5.00 0 0 0 0 0 4.8000 Dyn 0.000

TF-SS/AA 3-Phase 0.300 3.450 0.400 5.00 5.00 0 0 0 -2.500 0 5.0000 Dyn 0.000
ETAP
Project: Sistema de Bombeo Page: 7
12.6.0H
Location: Date: 10-28-2016
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: SistemadeBombeo Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

T1 2W XFMR Bus1 Bus3 10.63 127.56 128.00

T2 2W XFMR Bus2 Bus4 10.63 127.56 128.00

TD1 2W XFMR BARRA 1 CCM-01 125.51 627.57 640.00

TD2 2W XFMR BARRA 2 CCM-02 125.51 627.57 640.00

TD3 2W XFMR BARRA 3 CCM-03 125.51 627.57 640.00

TD4 2W XFMR BARRA 4 CCM-04 125.51 627.57 640.00

TD5 2W XFMR BARRA 5 CCM-05 125.51 627.57 640.00

TD6 2W XFMR BARRA 6 CCM-06 125.51 627.57 640.00

TD7 2W XFMR BARRA 7 CCM-07 125.51 627.57 640.00

TD8 2W XFMR BARRA 8 CCM-08 125.51 627.57 640.00

TF-SS/AA 2W XFMR Bus8 Bus9 318.69 1593.44 1625.00

CABLE N°1 Cable BARRA 0 Bus1 0.35 0.34 0.49

CABLE N°2 Cable BARRA 0 Bus2 0.35 0.34 0.49

CABLE N°3 Cable Bus3 Barra A 0.83 1.21 1.46

CABLE N°4 Cable Bus4 Barra B 0.83 1.21 1.46

CABLE N°5 Cable Barra A Bus5 10.75 8.03 13.42

CABLE N°6 Cable Barra A Bus6 9.85 7.37 12.30

CABLE N°7 Cable Barra B Bus7 5.38 4.02 6.71

CABLE N°8 Cable Barra B Bus8 12.35 5.11 13.36

CABLE N°9 Cable Bus9 CCM-SS/AA 921.01 799.70 1219.75

LINEA 0-4 Line BARRA 0 BARRA 4 11.55 8.15 14.14 0.0017311

LINEA 2-1 Line BARRA 1 BARRA 2 7.11 4.45 8.39 0.0009442

LINEA 3-2 Line BARRA 2 BARRA 3 5.12 3.20 6.04 0.0006799

LINEA 4-5 Line BARRA 4 BARRA 5 8.89 5.56 10.49 0.0011803

LINEA 5-3 Line BARRA 5 BARRA 3 18.08 11.31 21.32 0.0023999

LINEA 5-9 Line BARRA 9 BARRA 5 31.65 19.79 37.33 0.0042019

LINEA 7-6 Line BARRA 6 BARRA 7 10.28 6.43 12.12 0.0013644

LINEA 9-7 Line BARRA 7 BARRA 9 15.24 9.53 17.98 0.0020238

LINEA 9-8 Line BARRA 9 BARRA 8 10.24 6.41 12.08 0.0013597


ETAP
Project: Sistema de Bombeo Page: 8
12.6.0H
Location: Date: 10-28-2016
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: SistemadeBombeo Config.: Normal

VFD Input Data

AC Rating
MVA kV FLA Input Operating Output
Bypass
ID Output Input Output Input Output % EFF % PF V/Hz % Frequency Hz % Imax Switch

VDF-1 0.217 0.400 0.380 300.70 329.79 100.00 96.00 100,00 100.0 50.0 150.0 No
VDF-2 0.217 0.400 0.380 300.70 329.79 100.00 96.00 100,00 100.0 50.0 150.0 No
VDF-3 0.217 0.400 0.380 300.70 329.79 100.00 96.00 100,00 100.0 50.0 150.0 No
VDF-4 0.217 0.400 0.380 300.70 329.79 100.00 96.00 100,00 100.0 50.0 150.0 No
VDF-5 0.217 0.400 0.380 300.70 329.79 100.00 96.00 100,00 100.0 50.0 150.0 No
VDF-6 0.217 0.400 0.380 300.70 329.79 100.00 96.00 100,00 100.0 50.0 150.0 No
VDF-7 0.217 0.400 0.380 300.70 329.79 100.00 96.00 100,00 100.0 50.0 150.0 No
VDF-8 0.217 0.400 0.380 300.70 329.79 100.00 96.00 100,00 100.0 50.0 150.0 No
ETAP
Project: Sistema de Bombeo Page: 9
12.6.0H
Location: Date: 10-28-2016
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: SistemadeBombeo Config.: Normal

LOAD FLOW REPORT

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

* BARRA 0 23.000 100.000 0.0 4.631 1.257 0 0 Bus1 1.949 0.587 51.1 95.8

Bus2 1.191 0.231 30.4 98.2

BARRA 4 1.490 0.439 39.0 95.9

BARRA 1 23.000 99.496 -0.1 0 0 0 0 BARRA 2 -0.185 -0.056 4.9 95.7

CCM-01 0.185 0.056 4.9 95.7

BARRA 2 23.000 99.512 -0.1 0 0 0 0 BARRA 1 0.186 0.055 4.9 95.8

BARRA 3 -0.371 -0.112 9.8 95.7

CCM-02 0.185 0.056 4.9 95.7

BARRA 3 23.000 99.535 -0.1 0 0 0 0 BARRA 2 0.371 0.111 9.8 95.8

BARRA 5 -0.557 -0.167 14.7 95.8

CCM-03 0.185 0.056 4.9 95.7

BARRA 4 23.000 99.792 0.0 0 0 0 0 BARRA 0 -1.488 -0.439 39.0 95.9

BARRA 5 1.302 0.383 34.1 95.9

CCM-04 0.185 0.056 4.9 95.7

BARRA 5 23.000 99.655 -0.1 0 0 0 0 BARRA 4 -1.300 -0.383 34.1 95.9

BARRA 3 0.557 0.165 14.6 95.9

BARRA 9 0.558 0.161 14.6 96.1

CCM-05 0.185 0.056 4.9 95.7

BARRA 6 23.000 99.355 -0.1 0 0 0 0 BARRA 7 -0.185 -0.056 4.9 95.7

CCM-06 0.185 0.056 4.9 95.7

BARRA 7 23.000 99.378 -0.1 0 0 0 0 BARRA 6 0.186 0.055 4.9 95.9

BARRA 9 -0.371 -0.111 9.8 95.8

CCM-07 0.185 0.056 4.9 95.7

BARRA 8 23.000 99.422 -0.1 0 0 0 0 BARRA 9 -0.185 -0.056 4.9 95.7

CCM-08 0.185 0.056 4.9 95.7

BARRA 9 23.000 99.445 -0.1 0 0 0 0 BARRA 5 -0.557 -0.165 14.7 95.9

BARRA 7 0.371 0.110 9.8 95.9

BARRA 8 0.186 0.055 4.9 95.9

Barra A 3.450 99.042 -1.4 0 0 0.000 -0.392 Bus3 -1.944 -0.533 340.7 96.4

Bus5 0.972 0.463 182.0 90.3

Bus6 0.972 0.463 181.9 90.3

Barra B 3.450 99.573 -0.9 0 0 0.000 -0.397 Bus4 -1.189 -0.212 203.0 98.5

Bus7 0.972 0.462 180.9 90.3

Bus8 0.217 0.146 44.0 83.1

Bus1 23.000 99.991 0.0 0 0 0 0 BARRA 0 -1.949 -0.587 51.1 95.8

Bus3 1.949 0.587 51.1 95.8


ETAP
Project: Sistema de Bombeo Page: 10
12.6.0H
Location: Date: 10-28-2016
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: SistemadeBombeo Config.: Normal

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus2 23.000 99.995 0.0 0 0 0 0 BARRA 0 -1.191 -0.230 30.4 98.2

Bus4 1.191 0.230 30.4 98.2

Bus3 3.450 99.065 -1.4 0 0 0 0 Barra A 1.945 0.534 340.7 96.4

Bus1 -1.945 -0.534 340.7 96.4

Bus4 3.450 99.586 -0.9 0 0 0 0 Barra B 1.189 0.212 203.0 98.5

Bus2 -1.189 -0.212 203.0 98.5

Bus5 3.300 103.395 -1.4 0 0 0.971 0.462 Barra A -0.971 -0.462 182.0 90.3

Bus6 3.300 103.407 -1.4 0 0 0.971 0.462 Barra A -0.971 -0.462 181.9 90.3

Bus7 3.300 104.025 -0.9 0 0 0.971 0.462 Barra B -0.971 -0.462 180.9 90.3

Bus8 3.450 99.539 -0.9 0 0 0 0 Barra B -0.217 -0.146 44.0 83.1

Bus9 0.217 0.146 44.0 83.1 -2.500

Bus9 0.400 99.110 -2.6 0 0 0 0 CCM-SS/AA 0.215 0.135 369.9 84.7

Bus8 -0.215 -0.135 369.9 84.7

CCM-01 0.400 98.913 -0.7 0 0 0.185 0.054 BARRA 1 -0.185 -0.054 281.2 96.0

VDF-1 0.185 0.054 281.2 96.0

CCM-02 0.400 98.929 -0.7 0 0 0.185 0.054 BARRA 2 -0.185 -0.054 281.2 96.0

VDF-2 0.185 0.054 281.2 96.0

CCM-03 0.400 98.952 -0.7 0 0 0.185 0.054 BARRA 3 -0.185 -0.054 281.1 96.0

VDF-3 0.185 0.054 281.1 96.0

CCM-04 0.400 99.211 -0.7 0 0 0.185 0.054 BARRA 4 -0.185 -0.054 280.4 96.0

VDF-4 0.185 0.054 280.4 96.0

CCM-05 0.400 99.072 -0.7 0 0 0.185 0.054 BARRA 5 -0.185 -0.054 280.8 96.0

VDF-5 0.185 0.054 280.8 96.0

CCM-06 0.400 98.771 -0.7 0 0 0.185 0.054 BARRA 6 -0.185 -0.054 281.6 96.0

VDF-6 0.185 0.054 281.6 96.0

CCM-07 0.400 98.794 -0.7 0 0 0.185 0.054 BARRA 7 -0.185 -0.054 281.5 96.0

VDF-7 0.185 0.054 281.5 96.0

CCM-08 0.400 98.839 -0.7 0 0 0.185 0.054 BARRA 8 -0.185 -0.054 281.4 96.0

VDF-8 0.185 0.054 281.4 96.0

CCM-SS/AA 0.400 96.022 -2.9 0 0 0.209 0.130 Bus9 -0.209 -0.130 369.9 85.0

VDF-1 0.380 100.000 0.0 0.185 0.110 0 0 Bus10 0.185 0.110 326.8 86.0

VDF-2 0.380 100.000 0.0 0.185 0.110 0 0 Bus11 0.185 0.110 326.8 86.0

VDF-3 0.380 100.000 0.0 0.185 0.110 0 0 Bus18 0.185 0.110 326.8 86.0

VDF-4 0.380 100.000 0.0 0.185 0.110 0 0 Bus13 0.185 0.110 326.8 86.0

VDF-5 0.380 100.000 0.0 0.185 0.110 0 0 Bus14 0.185 0.110 326.8 86.0

VDF-6 0.380 100.000 0.0 0.185 0.110 0 0 Bus15 0.185 0.110 326.8 86.0

VDF-7 0.380 100.000 0.0 0.185 0.110 0 0 Bus16 0.185 0.110 326.8 86.0
ETAP
Project: Sistema de Bombeo Page: 11
12.6.0H
Location: Date: 10-28-2016
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: SistemadeBombeo Config.: Normal

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

VDF-8 0.380 100.000 0.0 0.185 0.110 0 0 Bus17 0.185 0.110 326.8 86.0

* Indicates a voltage regulated bus (voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
ETAP
Project: Sistema de Bombeo Page: 12
12.6.0H
Location: Date: 10-28-2016
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: SistemadeBombeo Config.: Normal

Bus Loading Summary Report

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus10 0.380 0.215 86.0 326.8

Bus11 0.380 0.215 86.0 326.8

Bus13 0.380 0.215 86.0 326.8

Bus14 0.380 0.215 86.0 326.8

Bus15 0.380 0.215 86.0 326.8

Bus16 0.380 0.215 86.0 326.8

Bus17 0.380 0.215 86.0 326.8

Bus18 0.380 0.215 86.0 326.8

BARRA 0 23.000 0 0 0 0 0 0 0 0 4.798 96.5 120.4

BARRA 1 23.000 0 0 0 0 0 0 0 0 0.194 95.7 4.9

BARRA 2 23.000 0 0 0 0 0 0 0 0 0.387 95.7 9.8

BARRA 3 23.000 0 0 0 0 0 0 0 0 0.581 95.8 14.7

BARRA 4 23.000 0 0 0 0 0 0 0 0 1.551 95.9 39.0

BARRA 5 23.000 0 0 0 0 0 0 0 0 1.356 95.9 34.1

BARRA 6 23.000 0 0 0 0 0 0 0 0 0.194 95.7 4.9

BARRA 7 23.000 0 0 0 0 0 0 0 0 0.387 95.8 9.8

BARRA 8 23.000 0 0 0 0 0 0 0 0 0.194 95.7 4.9

BARRA 9 23.000 0 0 0 0 0 0 0 0 0.581 95.9 14.7

Barra A 3.450 2000.0 0 0 0 -0.392 0 0 0 0 2.154 90.3 363.9 18.2

Barra B 3.450 2000.0 0 0 0 -0.397 0 0 0 0 1.336 89.0 224.5 11.2

Bus1 23.000 0 0 0 0 0 0 0 0 2.036 95.8 51.1

Bus2 23.000 0 0 0 0 0 0 0 0 1.213 98.2 30.4

Bus3 3.450 0 0 0 0 0 0 0 0 2.017 96.4 340.7

Bus4 3.450 0 0 0 0 0 0 0 0 1.208 98.5 203.0

Bus5 3.300 0.971 0.462 0 0 0 0 0 0 1.075 90.3 182.0

Bus6 3.300 0.971 0.462 0 0 0 0 0 0 1.075 90.3 181.9

Bus7 3.300 0.971 0.462 0 0 0 0 0 0 1.075 90.3 180.9

Bus8 3.450 0 0 0 0 0 0 0 0 0.262 83.1 44.0

Bus9 0.400 0 0 0 0 0 0 0 0 0.254 84.7 369.9

CCM-01 0.400 800.0 0.185 0.054 0 0 0 0 0 0 0.193 96.0 281.2 35.2

CCM-02 0.400 800.0 0.185 0.054 0 0 0 0 0 0 0.193 96.0 281.2 35.1

CCM-03 0.400 800.0 0.185 0.054 0 0 0 0 0 0 0.193 96.0 281.1 35.1

CCM-04 0.400 800.0 0.185 0.054 0 0 0 0 0 0 0.193 96.0 280.4 35.0

CCM-05 0.400 800.0 0.185 0.054 0 0 0 0 0 0 0.193 96.0 280.8 35.1

CCM-06 0.400 800.0 0.185 0.054 0 0 0 0 0 0 0.193 96.0 281.6 35.2

CCM-07 0.400 800.0 0.185 0.054 0 0 0 0 0 0 0.193 96.0 281.5 35.2


ETAP
Project: Sistema de Bombeo Page: 13
12.6.0H
Location: Date: 10-28-2016
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: SistemadeBombeo Config.: Normal

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

CCM-08 0.400 800.0 0.185 0.054 0 0 0 0 0 0 0.193 96.0 281.4 35.2

CCM-SS/AA 0.400 800.0 0.170 0.105 0.039 0.024 0 0 0 0 0.246 85.0 369.9 46.2

* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).

# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
ETAP
Project: Sistema de Bombeo Page: 14
12.6.0H
Location: Date: 10-28-2016
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: SistemadeBombeo Config.: Normal

Branch Loading Summary Report

Transformer
CKT / Branch Cable & Reactor
Ampacity Loading Capability Loading (input) Loading (output)

ID Type (Amp) Amp % (MVA) MVA % MVA %

CABLE N°1 Cable 240.31 51.10 21.27

CABLE N°2 Cable 240.31 30.45 12.67

CABLE N°3 Cable 864.88 340.69 39.39

CABLE N°4 Cable 864.88 202.99 23.47

CABLE N°5 Cable 226.89 181.96 80.20

CABLE N°6 Cable 226.89 181.93 80.19

CABLE N°7 Cable 226.89 180.85 79.71

CABLE N°8 Cable 219.63 43.99 20.03

CABLE N°9 Cable 696.95 369.93 53.08

T1 Transformer 6.250 2.036 32.6 2.017 32.3

T2 Transformer 6.250 1.213 19.4 1.208 19.3

TD1 Transformer 0.750 0.194 25.8 0.193 25.7

TD2 Transformer 0.750 0.194 25.8 0.193 25.7

TD3 Transformer 0.750 0.194 25.8 0.193 25.7

TD4 Transformer 0.750 0.194 25.8 0.193 25.7

TD5 Transformer 0.750 0.194 25.8 0.193 25.7

TD6 Transformer 0.750 0.194 25.8 0.193 25.7

TD7 Transformer 0.750 0.194 25.8 0.193 25.7

TD8 Transformer 0.750 0.194 25.8 0.193 25.7

TF-SS/AA Transformer 0.500 0.262 52.3 0.254 50.8

* Indicates a branch with operating load exceeding the branch capability.


ETAP
Project: Sistema de Bombeo Page: 15
12.6.0H
Location: Date: 10-28-2016
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: SistemadeBombeo Config.: Normal

Branch Losses Summary Report

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

CABLE N°1 1.949 0.587 -1.949 -0.587 0.1 0.1 100.0 100.0 0.01

CABLE N°2 1.191 0.231 -1.191 -0.230 0.1 0.0 100.0 100.0 0.00

LINEA 0-4 1.490 0.439 -1.488 -0.439 2.8 0.2 100.0 99.8 0.21

LINEA 2-1 -0.185 -0.056 0.186 0.055 0.0 -0.9 99.5 99.5 0.02

TD1 0.185 0.056 -0.185 -0.054 0.5 2.4 99.5 98.9 0.58

LINEA 3-2 -0.371 -0.112 0.371 0.111 0.1 -0.6 99.5 99.5 0.02

TD2 0.185 0.056 -0.185 -0.054 0.5 2.4 99.5 98.9 0.58

LINEA 5-3 -0.557 -0.167 0.557 0.165 0.6 -2.0 99.5 99.7 0.12

TD3 0.185 0.056 -0.185 -0.054 0.5 2.4 99.5 99.0 0.58

LINEA 4-5 1.302 0.383 -1.300 -0.383 1.6 -0.1 99.8 99.7 0.14

TD4 0.185 0.056 -0.185 -0.054 0.5 2.4 99.8 99.2 0.58

LINEA 5-9 0.558 0.161 -0.557 -0.165 1.1 -3.5 99.7 99.4 0.21

TD5 0.185 0.056 -0.185 -0.054 0.5 2.4 99.7 99.1 0.58

LINEA 7-6 -0.185 -0.056 0.186 0.055 0.0 -1.3 99.4 99.4 0.02

TD6 0.185 0.056 -0.185 -0.054 0.5 2.4 99.4 98.8 0.58

LINEA 9-7 -0.371 -0.111 0.371 0.110 0.2 -1.9 99.4 99.4 0.07

TD7 0.185 0.056 -0.185 -0.054 0.5 2.4 99.4 98.8 0.58

LINEA 9-8 -0.185 -0.056 0.186 0.055 0.0 -1.3 99.4 99.4 0.02

TD8 0.185 0.056 -0.185 -0.054 0.5 2.4 99.4 98.8 0.58

CABLE N°3 -1.944 -0.533 1.945 0.534 0.3 0.5 99.0 99.1 0.02

CABLE N°5 0.972 0.463 -0.971 -0.462 1.3 0.9 99.0 103.4 0.14

CABLE N°6 0.972 0.463 -0.971 -0.462 1.2 0.9 99.0 103.4 0.13

CABLE N°4 -1.189 -0.212 1.189 0.212 0.1 0.2 99.6 99.6 0.01

CABLE N°7 0.972 0.462 -0.971 -0.462 0.6 0.5 99.6 104.0 0.07

CABLE N°8 0.217 0.146 -0.217 -0.146 0.1 0.0 99.6 99.5 0.03

T1 1.949 0.587 -1.945 -0.534 4.4 52.9 100.0 99.1 0.93

T2 1.191 0.230 -1.189 -0.212 1.6 18.8 100.0 99.6 0.41

TF-SS/AA 0.217 0.146 -0.215 -0.135 2.1 10.7 99.5 99.1 0.43

CABLE N°9 0.215 0.135 -0.209 -0.130 6.0 5.3 99.1 96.0 3.09

28.3 98.4
ETAP
Project: Sistema de Bombeo Page: 16
12.6.0H
Location: Date: 10-28-2016
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: SistemadeBombeo Config.: Normal

Alert Summary Report

% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0

Cable 100.0 95.0

Reactor 100.0 95.0

Line 100.0 95.0

Transformer 100.0 95.0

Panel 100.0 95.0

Protective Device 100.0 95.0

Generator 100.0 95.0

Inverter/Charger 100.0 95.0

Bus Voltage
OverVoltage 105.0 102.0

UnderVoltage 95.0 95.0

Generator Excitation
OverExcited (Q Max.) 100.0 95.0

UnderExcited (Q Min.) 100.0

Marginal Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

Bus5 Bus Over Voltage 3,30 kV 3,41 103.4 3-Phase

Bus6 Bus Over Voltage 3,30 kV 3,41 103.4 3-Phase

Bus7 Bus Over Voltage 3,30 kV 3,43 104.0 3-Phase


ETAP
Project: Sistema de Bombeo Page: 17
12.6.0H
Location: Date: 10-28-2016
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: SistemadeBombeo Config.: Normal

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW Mvar MVA % PF

Source (Swing Buses): 4.631 1.257 4.798 96.51 Lagging

Source (Non-Swing Buses): 0.000 0.000 0.000

Total Demand: 4.631 1.257 4.798 96.51 Lagging

Total Motor Load: 4.563 2.370 5.142 88.75 Lagging

Total Static Load: 0.039 -0.765 0.766 5.12 Leading

Total Constant I Load: 0.000 0.000 0.000

Total Generic Load: 0.000 0.000 0.000

Apparent Losses: 0.028 -0.348

System Mismatch: 0.000 0.000

Number of Iterations: 1