PROYECTO: “MEJORAMIENTO DEL SERVICIO DE LA AV.

HUAMAN EN EL DISTRITO DE TRUJILLO, PROVINCIA DE TRUJILLO - LA


LIBERTAD”

PLAN I LLA D E M E T RAD O S

UNIDAD : UNIDAD :
PARTIDA: REPLANTEO EN ACERAS, SARDINELES, JARDIN Y CARPETA ASFALTICA m² ml
DIMENSIONES VECES QUE ÁREA LONG.
LONGITUD ANCHO SE REPITE ( m² ) ( ml)
DESCRIPCION
(m) (m) (4 (5
(1) (2) (3) (1) x (2) x (3) (1) x (3)
CARRIL DERECHO (INICIO HASTA AV. LA PERLA)
LADO DERECHO
ACERA: V-01 AREA CAD: 105.486 1.00 105.49 447.28
ACERA: V-02 AREA CAD: 341.792 1.00 341.79
5.26
MARTILLO: M1 AREA CAD: 5.258 1.00 5.26
7.02
RAMPA: R1 AREA CAD: 1.229 1.00 1.23
RAMPA: R2 AREA CAD: 1.262 1.00 1.26
RAMPA: R3 AREA CAD: 1.469 1.00 1.47
RAMPA: R4 AREA CAD: 1.504 1.00 1.50
RAMPA: R5 AREA CAD: 1.552 1.00 1.55
100.13
JARDIN: J-01 AREA CAD: 8.362 1.00 8.36
JARDIN: J-02 AREA CAD: 29.848 1.00 29.85
JARDIN: J-03 AREA CAD: 61.922 1.00 61.92
133.21
SARDINEL: S-01 10.397 1.00 10.40
SARDINEL: S-02 38.096 1.00 38.10
SARDINEL: S-03 84.72 1.00 84.72

CARRIL DERECHO (AV. LA PERLA HASTA LA AV. LA MARINA)


LADO DERECHO 936.58
ACERA: V-03 AREA CAD: 347.860 1.00 347.86
ACERA: V-04 AREA CAD: 480.198 1.00 480.20
ACERA: V-05 AREA CAD: 108.521 1.00 108.52
9.83
RAMPA: R6 AREA CAD: 1.594 1.00 1.59
RAMPA: R7 AREA CAD: 1.666 1.00 1.67
RAMPA: R8 AREA CAD: 1.643 1.00 1.64
RAMPA: R9 AREA CAD: 1.672 1.00 1.67
RAMPA: R10 AREA CAD: 1.648 1.00 1.65
RAMPA: R11 AREA CAD: 1.609 1.00 1.61
253.36
JARDIN: J-04 AREA CAD: 6.053 1.00 6.05
JARDIN: J-05 AREA CAD: 141.347 1.00 141.35
JARDIN: J-06 AREA CAD: 9.510 1.00 9.51
JARDIN: J-07 AREA CAD: 54.607 1.00 54.61
JARDIN: J-08 AREA CAD: 10.933 1.00 10.93
JARDIN: J-09 AREA CAD: 30.907 1.00 30.91
312.35
SARDINEL: S-04 13.240 1.00 13.24
SARDINEL: S-05 166.570 1.00 166.57
SARDINEL: S-06 13.02 1.00 13.02
SARDINEL: S-07 64.00 1.00 64.00
SARDINEL: S-08 14.86 1.00 14.86
SARDINEL: S-09 40.66 1.00 40.66

SEPARADOR CENTRAL (INICIO HASTA AV. LA MARINA)


1124.55
SARDINEL : S-10 10.300 1.00 10.30
SARDINEL : S-11 31.850 1.00 31.85
SARDINEL : S-12 31.670 1.00 31.67
SARDINEL : S-13 107.650 1.00 107.65
SARDINEL : S-14 105.490 1.00 105.49
SARDINEL : S-15 45.900 1.00 45.90
SARDINEL : S-16 48.390 1.00 48.39
SARDINEL : S-17 6.750 1.00 6.75
SARDINEL : S-18 31.400 1.00 31.40
SARDINEL : S-19 31.610 1.00 31.61
SARDINEL : S-20 10.130 1.00 10.13
SARDINEL : S-21 10.650 1.00 10.65
SARDINEL : S-22 164.800 1.00 164.80
SARDINEL : S-23 164.720 1.00 164.72
SARDINEL : S-24 9.150 1.00 9.15
SARDINEL : S-25 7.350 1.00 7.35
SARDINEL : S-26 61.490 1.00 61.49
SARDINEL : S-27 60.950 1.00 60.95
SARDINEL : S-28 1.740 1.00 1.74
SARDINEL : S-29 4.240 1.00 4.24
SARDINEL : S-30 5.590 1.00 5.59
SARDINEL : S-31 172.730 1.00 172.73
66.34
MARTILLO: M-2 AREA CAD: 15.275 1.00 15.28
MARTILLO: M-3 AREA CAD: 14.606 1.00 14.61
MARTILLO: M-4 AREA CAD: 16.513 1.00 16.51
MARTILLO: M-5 AREA CAD: 10.984 1.00 10.98
MARTILLO: M-6 AREA CAD: 8.967 1.00 8.97
19.88
RAMPA: R12 AREA CAD: 1.563 1.00 1.56
RAMPA: R13 AREA CAD: 1.550 1.00 1.55
RAMPA: R14 AREA CAD: 1.519 1.00 1.52
RAMPA: R15 AREA CAD: 1.663 1.00 1.66
RAMPA: R16 AREA CAD: 1.606 1.00 1.61
RAMPA: R17 AREA CAD: 1.588 1.00 1.59
RAMPA: R18 AREA CAD: 1.548 1.00 1.55
RAMPA: R19 AREA CAD: 1.556 1.00 1.56
RAMPA: R20 AREA CAD: 1.829 1.00 1.83
RAMPA: R21 AREA CAD: 1.954 1.00 1.95
RAMPA: R22 AREA CAD: 1.976 1.00 1.98
RAMPA: R23 AREA CAD: 1.529 1.00 1.53
83.22
PASE PEATONAL: P-01 AREA CAD: 8.217 1.00 8.22
PASE PEATONAL: P-02 AREA CAD: 8.761 1.00 8.76
PASE PEATONAL: P-03 AREA CAD: 6.880 1.00 6.88
PASE PEATONAL: P-04 AREA CAD: 8.174 1.00 8.17
PASE PEATONAL: P-05 AREA CAD: 8.198 1.00 8.20
PASE PEATONAL: P-06 AREA CAD: 8.377 1.00 8.38
PASE PEATONAL: P-07 AREA CAD: 7.126 1.00 7.13
PASE PEATONAL: P-08 AREA CAD: 2.303 1.00 2.30
PASE PEATONAL: P-09 AREA CAD: 2.270 1.00 2.27
PASE PEATONAL: P-10 AREA CAD: 22.909 1.00 22.91
3513.93
JARDIN:J-10 AREA CAD: 221.908 1.00 221.91
JARDIN:J-11 AREA CAD: 700.813 1.00 700.81
JARDIN:J-12 AREA CAD: 188.326 1.00 188.33
JARDIN: J-13 AREA CAD: 145.500 1.00 145.50
JARDIN: J-14 AREA CAD: 1160.817 1.00 1160.82
JARDIN: J-15 AREA CAD: 257.710 1.00 257.71
JARDIN: J-16 AREA CAD: 1.345 1.00 1.35
JARDIN: J-17 AREA CAD: 330.546 1.00 330.55
JARDIN: J-18 AREA CAD: 506.960 1.00 506.96
PROYECTO: “MEJORAMIENTO DEL SERVICIO DE LA AV. HUAMAN EN EL DISTRITO DE TRUJILLO, PROVINCIA DE TRUJILLO - LA
LIBERTAD”

PLAN I LLA D E M E T RAD O S


CARRIL IZQUIERDO (INICIO HASTA AV. LA PERLA)
3.21
RAMPA: R-24 AREA CAD: 1.608 1.00 1.61
RAMPA: R-25 AREA CAD: 1.603 1.00 1.60
448.58
ACERA: V-06 AREA CAD: 448.585 1.00 448.58
279.10
JARDIN: J-19 AREA CAD: 27.522 1.00 27.52
JARDIN: J-20 AREA CAD: 80.237 1.00 80.24
JARDIN: J-21 AREA CAD: 88.292 1.00 88.29
JARDIN: J-22 AREA CAD: 44.326 1.00 44.33
JARDIN: J-23 AREA CAD: 38.725 1.00 38.72
250.56
SARDINEL : S-32 3.82 1.00 3.82
SARDINEL : S-33 32.95 1.00 32.95
SARDINEL : S-34 93.90 1.00 93.90
SARDINEL : S-35 45.09 1.00 45.09
SARDINEL : S-36 36.64 1.00 36.64
SARDINEL : S-37 38.16 1.00 38.16

CARRIL IZQUIERDO(AV. LA PERLA HASTA ABRAHAM LINCON)


522.66
ACERA: V-07 AREA CAD: 113.030 1.00 113.03
ACERA: V-08 AREA CAD: 409.628 1.00 409.63
12.67
RAMPA: R-26 AREA CAD: 2.874 1.00 2.87
RAMPA: R-27 AREA CAD: 2.835 1.00 2.84
RAMPA: R-28 AREA CAD: 1.646 1.00 1.65
RAMPA: R-29 AREA CAD: 1.813 1.00 1.81
RAMPA: R-30 AREA CAD: 1.624 1.00 1.62
RAMPA: R-31 AREA CAD: 1.874 1.00 1.87
137.44
JARDIN: J-24 AREA CAD: 7.624 1.00 7.62
JARDIN: J-25 AREA CAD: 93.515 1.00 93.51
JARDIN: J-26 AREA CAD: 36.300 1.00 36.30
168.52
SARDINEL: S-38 5.20 1.00 5.20
SARDINEL: S-39 8.73 1.00 8.73
SARDINEL: S-40 154.59 1.00 154.59

CARRIL IZQUIERDO (ABRAHAM LINCON HASTA LA AV. LA MARINA)


347.53
ACERA: V-09 AREA CAD: 169.286 1.00 169.29
ACERA: V-10 AREA CAD: 178.241 1.00 178.24
6.02
RAMPA: R-32 AREA CAD: 1.594 1.00 1.59
RAMPA: R-33 AREA CAD: 1.662 1.00 1.66
RAMPA: R-34 AREA CAD: 1.672 1.00 1.67
RAMPA: R-35 AREA CAD: 1.096 1.00 1.10
51.26
JARDIN: J-27 AREA CAD: 51.259 1.00 51.26
149.54
SARDINEL: S-41 6.44 1.00 6.44
SARDINEL: S-42 59.84 1.00 59.84
SARDINEL: S-43 5.10 1.00 5.10
SARDINEL: S-44 3.88 1.00 3.88
SARDINEL: S-45 50.85 1.00 50.85
SARDINEL: S-46 23.43 1.00 23.43

PAVIMENTO FLEXIBLE:

LADO DERECHO: 4580.84


CARRIL DERECHO: 1ER TRAMO AREA CAD: 1799.139 1.00 1799.14
CARRIL DERECHO: 2DO TRAMO AREA CAD: 1460.496 1.00 1460.50
CARRIL DERECHO: 3ER TRAMO AREA CAD: 1321.210 1.00 1321.21

LADO IZQUIERDO:
3928.97
CARRIL IZQUIERDO: 4TO TRAMO AREA CAD: 1981.855 1.00 1981.86
CARRIL IZQUIERDO: 5TO TRAMO AREA CAD: 1499.805 1.00 1499.80
CARRIL IZQUIERDO: 6TO TRAMO AREA CAD: 447.312 1.00 447.31

INTERSECCION: 3322.24
INTERSECCION:(AV. LA PERLA Y AV. HU AREA CAD: 3322.236 1.00 3322.24

CANAL
157.11
CANAL: 157.109 1.00 157.11

CERCOS PERIMETRALES
474.55
CERCO PERIMETRICO : C-01 374.102 1.00 374.10
CERCO PERIMETRICO : C-02 61.240 1.00 61.24
CERCO PERIMETRICO : C-03 39.210 1.00 39.21
REPLANTEO DE ELEMENTOS DE UNA
VIA - AV. HUAMAN
CARRIL DERECHO SEPARADOR CENTRAL

INICIO-AV. LA LA PERLA- AV.


DESCRIPCION DE PARTIDA UND
PERLA LA MARINA
INICIO HASTA AV. LA MARINA

JARDIN M2 100.13 253.36 3513.93


ACERA M2 447.28 936.58 0.00
MARTILLO M2 5.26 0.00 66.34
SARDINEL ML 133.21 312.35 1124.55
PASE PEATONAL M2 0.00 0.00 83.22
RAMPA M2 7.02 9.83 19.88
CARPETA M2 4580.84 3322.24
CANAL ML 0.00 157.11
CERCO PERIMETRICO ML 374.10 0.00
EPARADOR CENTRAL CARRILL IZQUIERDO
TOTAL
INICIO-AV. LA LA PERLA- ABRA. LINC.-
CIO HASTA AV. LA MARINA
PERLA ABRAH. LINC. LA MARINA
3513.93 279.10 137.44 51.26 4335.21
0.00 448.58 522.66 347.53 2702.63
66.34 0.00 0.00 0.00 71.60
1124.55 250.56 168.52 149.54 2138.73
83.22 0.00 0.00 0.00 83.22
19.88 3.21 12.67 6.02 58.63
3322.24 3928.97 11832.05
157.11 0.00 157.11
0.00 100.45 474.55
PROYECTO: MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD EN LAS CALLES DEL SECTOR SAN
MIGUEL EN EL DISTRITO DE TRUJILLO, PROVINCIA DE TRUJILLO - LA LIBERTAD

RESUMEN DE PLANILLA DE METRADOS


Item Descripción Und. Metrado
01 OBRAS PROVISIONALES ###
01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y HERRAMIENTAS GLB 1.00
###
01.02 CARTEL DE OBRA DE 6.00x3.60 m. und 1.00
###
02 TRABAJOS PRELIMINARES ###
02.01 DEMOLICION DE VEREDAS DE CONCRETO CON EQUIPO e=0.10 M. m2 1,141.37
###
02.02 DEMOLICION DE SARDINELES, A PULSO m 271.09
###
02.03 TRAZO Y REPLANTEO EN VEREDAS m2 #REF!
###
02.04 TRAZO Y REPLANTEO EN SARDINELES m #REF!
###
02.05 TRAZO Y REPLANTEO EN CALLES Y PASAJES m2 #REF!
###
03 MOVIMIENTO DE TIERRAS ###
03.01 CORTE EN TERRENO NATURAL A NIVEL DE SUB-RASANTE, C/EQUIPO m3 3,397.65
###
03.02 CORTE EN TERRENO NATURAL PARA VEREDAS, e=0.10 m. m2 #REF!
###
03.03 CORTE EN TERRENO NATURAL PARA AREA VERDE e=0.10 m m2 #REF!
###
03.04 EXCAVACION DE ZANJAS PARA SARDINELES DE 0.15 M x 0.40 M. m #REF!
###
03.05 ELIMINACION DE MATERIAL EXCEDENTE C/ESPONJAMIENTO m3 #REF!
###
04 CONCRETO SIMPLE ###
04.01 VEREDAS DE CONCRETO ###
04.01.01 PERFILADO, NIVELACION Y COMPACTACION DE SUB RASANTE P/VEREDAS m2 #REF!
###
04.01.02 BASE GRANULAR PARA VEREDAS, e=10 cm. m2 #REF!
###
04.01.03 VEREDAS: CONCRETO F'c = 175 Kg/cm2; e=0.10 mt. m2 #REF!
###
04.01.04 CURADO DE VEREDAS Y RAMPAS CON CURADOR QUIMICO m2 #REF!
###
04.01.05 JUNTAS DE DILATACION EN VEREDAS CADA CUATRO METROS, e=1/2" m #REF!
###
04.02 SARDINELES DE CONCRETO ###
04.02.01 ENCOFRADO Y DESENCOFRADO NORMAL, ALTURA DE ENCOFRADO HASTA 0.40M m2 #REF!
###
04.02.02 SARDINEL 0.15x0.40 m : CONCRETO f'c=175 Kg/cm2 m #REF!
###
04.02.03 JUNTAS DE DILATACION EN SARDINELES CADA TRES METROS, e=1/2" m #REF!
###
05 PAVIMENTACION ###
05.01 PREPARACION DE LA SUB-RASANTE DEL PAVIMENTO m2 #REF!
###
05.02 SUB-BASE DE GRANULAR, e=15 cm. m2 #REF!
###
05.03 BASE GRANULAR, e=15cm m2 #REF!
###
05.04 BARRIDO Y LIMPIEZA P/LA CARPETA ASFALTICA m2 #REF!
###
05.05 IMPRIMACION ASFALTICA CON MC-30 C/EQUIPO m2 #REF!
###
05.06 CARPETA ASFALTICA EN CALIENTE CON POLIMEROS SBS, e=2" C/EQUIPO. m2 #REF!
###
06 ADOQUINADO EN PASAJES PEATONALES ###
06.01 PREPARACION DE LA SUB-RASANTE m2 #REF!
###
06.02 BASE GRANULAR, e=15cm m2 #REF!
###
06.03 COLOCACION DE CAMA DE ARENA e=0.04 m, PARA ASENTADO DE ADOQUIN m2 #REF!
###
06.04 CONFORMACION DE CAMA DE ARENA PARA ASENTADO DE ADOQUINES m2 #REF!
###
06.05 COLOCACION DE ADOQUINES 0.10*0.20*0.06 m m2 #REF!
###
06.06 SELLADO DE SUPERFICE DE PISO ADOQUINADO m2 #REF!
###
07 SEÑALIZACION ###
07.01 SEÑALIZACION HORIZONTAL ###
07.01.01 PINTADO DE PAVIMENTO - LINEAS Y SIMBOLOS m2 #REF!
###
07.01.02 PINTADO DE PAVIMENTO : LINEAS DISCONTINUAS SEPARADORES DE CARRIL m #REF!
###
07.01.03 PINTURA PARA SARDINELES m #REF!
###
07.02 SEÑALIZACION VERTICAL ###
07.02.01 SEÑAL VERTICAL - CARTEL 0.60 x 0.90 m. und #REF!
###
07.02.02 POSTE METALICO PARA SEÑALIZACION VERTICAL und #REF!
###
08 AREA VERDE ###
08.01 PERFILADO, NIVELACION DE SUB RASANTE PARA AREAS VERDES m2 #REF!
###
08.02 RELLENO CON TIERRA DE CHACRA EN AREAS VERDES e=0.10 mts. (MATERIAL DE PRESTAMO) m2 #REF!
###
08.03 PREPARACION DE TIERRA DE CHACRA INCLUYE FERTIIZANTES m2 #REF!
###
08.04 SEMBRADO DE GRASS NATURAL POR BLOQUES (25x25 CM) m2 #REF!
###
08.05 RIEGO DE GRASS CON MANGUERA m2 #REF!
###
09 OTROS ###
09.01 SUMINISTRO Y COLOCACION DE CAJA DE CONCRETO, MARCO Y TAPA PARA MEDIDOR DE AGUA POTABLE. und #REF!
###
09.02 SUMINISTRO Y COLOCACION DE CAJA DE CONCRETO, MARCO Y TAPA PARA DESAGUE. und #REF!
###
09.03 LEVANTAR NIVEL DE TECHO DE BUZON h.prom=0.30m. und #REF!
###
09.04 BAJAR NIVEL DE TECHO DE BUZON und #REF!
###
09.05 LIMPIEZA DURANTE LA OBRA(Eliminación de Residuos Solidos) m2 #REF!
###
10 IMPACTO AMBIENTAL ###
10.01 RIEGO DE ZONA DE TRABAJO PARA MITIGAR LA CONTAMINACION-POLVO m2 #REF!
###
11 SALUD Y SEGURIDAD EN OBRA ###
11.01 ELABORACION, IMPLEMENTACION Y ADMINSTRACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO GLB 1.00
###
11.02 EQUIPOS DE PROTECCION INDIVIDUAL GLB 1.00
###
11.03 EQUIPOS DE PROTECCION COLECTIVA GLB 1.00
###
11.04 SEÑALIZACION DE SEGURIDAD GLB 1.00
###
11.05 CAPACITACION EN SEGURIDAD Y SALUD EN EL TRABAJO GLB 1.00
###
11.06 RECURSOS PARA RESPUESTA ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL TRABAJO GLB 1.00
###