Está en la página 1de 4

Karnaphuli Water Supply Project Phase 2

P&ID for Chlorine Neutralization System Doc No.:

KARNAPHULI WATER SUPPLY


PROJECT PHASE 2

P&ID
for
Chlorine Neutralization System

CONTRACT No. KWSP2/W-1

(Construction of Intake Facilities, Water Treatment Plant, Reservoir and Elevated Tank)

A 28 July 2019 For Approval Jahangir SM Lee GH Lee


Rev Date Description Orig. by Chk’d by App By Remarks
References
Chittagong Water Supply & Spec. Tag No.

Sewerage Authority (CWASA)

DWG No.

Kolon Global Corporation


Kubota Construction Co., Ltd
ISSUE PURPOSE
NJS Consultants Co., Ltd INFORMATION

(NJS) REVIEW
ACCEPTANCE x
CONST.

REV
DEPARTMENT
DOCUMENT NO. NO

A
Karnaphuli Water Supply Project Phase 2
P&ID for Chlorine Neutralization System Doc No.:

TABLE OF CONTENTS

1. GENERAL ................................................................................................................................................ 3
2. DRAWINGS.............................................................................................................................................. 4

Page 2 of 4
Karnaphuli Water Supply Project Phase 2
P&ID for Chlorine Neutralization System Doc No.:

1. GENERAL

This is the contractor’s submission of “Drawings for Chlorine Neutralization System.”

2. DRAWINGS

Page 3 of 4
Karnaphuli Water Supply Project Phase 2
P&ID for Chlorine Neutralization System Doc No.:

Page 4 of 4

También podría gustarte