Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Supplying survey team with survey equipments for Construction layout, traversing, cross section of
cricks, monitoring hydrographical survey, quantity survey, area and volumes calculation and report
preparations at RIL, Hazaria for Reliance Industries Limited on behalf of M.S. Associates, Mumbai
during 01-10-1995 to 30-09-1997.
Supply of survey team with survey equipments for Topographical & Construction layout, traversing,
manual data to computerized format, preparing drawing in AutoCAD format, monitoring
hydrographical survey at RPL, Jamnagar for Reliance Petroleum Limited on behalf of Larsen &
Tubro Limited (through M.S. Associates), Mumbai during 01-04-1997 to 30-04-1999.
Supplying survey team with survey equipments for Topographical & Construction layout,
traversing, cross section, area calculation, etc. Preparing drawing in AutoCAD format at MRPL,
Mangalore on behalf of M.S. Associates, Mumbai during 15-02-1997 to 31-03-1999.
Supplying of survey team with survey equipments for Topographical, Construction layout,
monitoring hydrographical survey, area and volumes calculation and report preparations, computation
of data, preparing project report, method statement & drawings at DPC, Chiplun for Enron on behalf
of Larsen & Tubro Limited, Mumbai during 01-12-1999 to 15-04-2001.
Topography survey, contour survey area calculation, volumes calculation, preparing drawing, projects
reports preparation in hill terrain of Amby Valley project of Sahara India Housing Ltd. in Lonavala,
Maharashtra covering about 2000 acres of area, through M.S. Associates.
TUNNEL
Supply of survey teams for Delhi Metro Rail Corporation (DMRC) on behalf of International Metro
Civil Contractor (a joint venture of DYWIDAG - L&T – SAMSUNG – IRCON – SHIMIZU) the
contract for MC1B includes the construction of approx. 6.6 kms underground railway with 6 stations.
Out of which 4.1 kms are twin-tube running tunnels and underground station building constructions.
The remaining 2.5 kms will be constructed in open cut. Altogether 1 TBM shield and 2 EPBM will be
brought into use. The tunnels have an internal diameter of 5.7 m. ORIMAN is responsible for
construction surveying and the machine guidance as well as the optional 3D-deformation
measurements in the NATM areas. In addition to this, ORIMAN is also responsible for the measuring-
technique equipment for the geo-technical.
Instrumentation is a part of the contract, we are conducting engineering survey for traversing by total
station, bench mark fixing by digital level, 3D monitoring for buildings & lines, stakeouts for various
construction job & tunnel survey. Area calculation, preparing drawing, report by using various software
like Route fixing, alignment of tunnel, tunnel guiding (VMT Germany system used) and ring fixing.
Thirteen teams from 16-05-2001 to 31-03-2005.
Tunnel
For D.M.R.C. Delhi (Work done at Khyber Pass Depot – sys-2)
Alignment centre line marking on Soffit of property deck area at Khyber Pass Depot. Clearly visible
painted in black colour continues line. Centerline of turnout and cross over marked clearly indicating
the toe points, marking of chainage at 25m intervals on Soffit of property deck painted in Red colour.
DGPS point fixing, traversing, bench mark fixing for AMEL (Airport Metro Express Line) is 26 kms.
For Kalindee Rail Nirman (Engineers) Ltd. (sys-3)
Fixed control points along the proposed alignment, marking of the control point alignment at every 3.5
meters/ gauge frame location, marking the offset of centre line at every 7 metres in straight & curve,
offset in every 3.5 metres, leveling by digital level & as built for tunnel rail line, fixing alignment at
yard, casting concrete pillars, fixing control points, leveling with auto & digital level.
For Simplex Concrete (India) Ltd. – Dwarka Line
We are supplying survey teams for Delhi Metro Rail Corporation, conducting engineering survey for
traversing by total station, bench mark fixing and stake outs for various construction job for over the
ground metro railway line (Dwarka site) with survey equipment.
For Larsen & Tubro Limited (I.T. Park, Shastri Park)
Construction layout, boundary fixing, road layout, leveling, verticality, traversing by total station,
bench mark fixing, stake outs for various construction jobs at I.T. Park site, Delhi.
For M/s Larsen & Tubro Limited (Mandi house)
Supply of survey team at Mandi House Station. We are conducting engineering survey for traversing by
total station, bench mark fixing by digital level, 3D monitoring for buildings & lines, stakeouts for
various construction job & tunnel survey. Area calculation, preparing drawing, report by using various
software from March 2005 to 1st November 2006.
For M/s Larsen & Tubro Limited (Udyog Bhawan)
Suply of survey teams for Udyog Bhawan site. We are conducting engineering survey for
Triangulations by total station, bench mark fixing by digital level, 3D monitoring for buildings & lines,
stakeouts for various construction job. Area calculation, preparing drawing, report by using various
software from 15th November 2006 to March 2007.
ITD CEM-Cementation JV
Supply of survey teams for Delhi Metro Rail Corporation on behalf of ITD Cem-Cementation JV, the
contract includes the construction of approx 7.3 km underground railway with 3 stations. Of this, 5.3
km are twin-tube running tunnels and underground station building constructions. The remaining 2 km
will be constructed in open cut. OMSE is responsible for comprises in the construction survey and the
machine guidance as well as the optical 3D deformation of measurements in the NATM areas, in
addition to the measuring technique equipment for the geotechnical.