UNIDADES

UNIDAD DE DE
INSUMOS (MANO DE OBRA-MATERIALES-EQUIPOS+HERRAMIENTAS) TRABAJO ASIGNACIO
N
OBRAS PROVISIONALES 2264.23
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS 40.00
MOVILIZACION Y DESMOVILIZACION 40.00 1.00
TRAZO Y REPLANTEO AL INICIO Y DURANTE LA EJECUCION DE OBRA 1277.33
OFICIAL 390.40 0.98
PEON 390.40 0.98
TOPOGRAFO 390.40 0.98
ESTACION TOTAL 106.13 0.27
MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL 400.00
MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL 400.00 1.00
LIMPIEZA DEL TERRENO MANUAL 514.88
OPERARIO 46.77 0.10
PEON 468.12 0.99
SERVICIOS HIGIENICOS PORTÁTILES 32.00
SC ALQUILER DE SERVICIOS HIGIÉNICOS PORTÁTILES (BAÑOS QUÍMICOS) 32.00 4.00
PARA EL PERSONAL DE OBRA
OBRAS PRELIMINARES 2649.57
DESMONTAJE DE SISTEMA DE DRENAJE DE LAVADO 24.00
SC DESMONTAJE DE SISTEMA DE DRENAJE DE LAVADO 24.00 1.00
DEMOLICION DE LOSA DE CONCRETO 1126.62
OFICIAL 102.42 0.98
PEON 716.93 6.89
MARTILLO NEUMATICO DE 29 kg 102.42 0.98
COMPRESORA NEUMATICA 250 - 330 PCM - 87 HP 102.42 0.98
PUNTA ACERO HEXAGONAL ROMPE PAVIMENTO 102.42 0.98
DEMOLICION DE ESTRUCTURAS EXISTENTE 89.78
OPERARIO 2.18 0.05
OFICIAL 21.90 0.55
PEON 43.80 1.10
MARTILLO PERFORADOR (para compresora) 21.90 0.55
ELIMINACION DE MATERIAL EXCEDENTE 1409.17
PEON 704.47 1.96
CARGADOR SOBRE LLANTAS DE 125 HP 2.5 YD3 352.35 0.98
CAMION VOLQUETE 4x2 210-280 HP 8 M3 352.35 0.98
MOVIMIENTO DE TIERRAS 3332.80
EXCAVACION MANUAL EN TERRENO NORMAL 460.27
PEON 460.27 1.98
CONFORMACION Y COMPACTACION DE LA SUBRASANTE 1524.90
PEON 873.13 3.90
RODILLO LISO VIBRATORIO AUTOPROPULSADO 7- 9 ton 217.25 0.97
MOTONIVELADORA DE 125 HP 217.25 0.97
CAMION CISTERNA 4x2 (AGUA) 2 000 GAL. 217.25 0.97
BASE DE AFIRMADO H=0.30 m 1347.63
OPERARIO 450.00 1.87
PEON 224.42 0.94
MATERIAL GRANULAR DE RIO (SELECCIONADO) 0.00 492.13
RODILLO LISO VIBR AUTOP 101-135 HP 10-12 TON 224.42 0.94
MOTONIVELADORA DE 125 HP 224.42 0.94
CAMION CISTERNA 4x2 (AGUA) 2 000 GAL. 224.42 0.94
CONCRETO 4455.07
ACERO CORRUGADO fy= 4200 kg/cm2 472.55
OPERARIO 157.52 0.98
OFICIAL 157.52 0.98
ALAMBRE NEGRO N° 16 0.00 353.05
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 0.00 11763.63
CIZALLA ELECTRICA 157.52 0.98
CONCRETO PREMEZCLADO f'c=315 kg/cm2 1739.30
OPERARIO 24.52 0.10
OFICIAL 489.93 1.98
PEON 979.88 3.95
CONCRETO PREMEZCLADO f'c= 315 kg/cm2 0.00 533.40
SERVICIO DE BOMBA PARA CONCRETO PREMEZCLADO 0.00 284.46
VIBRADOR DE CONCRETO 4 HP 1.35" 244.98 0.99
ENCOFRADO Y DESENCOFRADO NORMAL 300.23
OFICIAL 100.07 0.96
PEON 200.15 1.92
ALAMBRE NEGRO N° 16 0.00 53.00
CLAVOS PARA MADERA CON CABEZA DE 3" 0.00 22.60
MADERA TORNILLO 0.00 527.53
ACERO LISO DOWEL 6M X 5/8'' 69.58
OFICIAL 6.33 0.08
PEON 63.25 0.79
ACERO LISO EN VARILLAS DE 5/8" X 6 m 0.00 356.27
SOLADO DE CONCRETO de 2'' 1873.40
OPERARIO 156.12 0.98
OFICIAL 312.23 1.95
PEON 1248.93 7.81
GASOLINA 84 OCTANOS 0.00 7.32
HORMIGON 0.00 6.51
CEMENTO PORTLAND TIPO I (42.5 kg) 0.00 28.98
MEZCLADORA DE CONCRETO DE 9 - 11 P3 156.12 0.98
VARIOS 117809.08
CORTE CON DISCO EN JUNTAS 14.03
OPERARIO 12.48 0.52
DISCO DE CORTE 0.00 148.20
CORTADORA DE CONCRETO 14" 1.57 0.07
SELLADO DE JUNTAS DE DILATACION Y CORTE, Y AISLAMIENTO CON 49800.00
MASILLA DE POLIURETANO

SC M. DE O. PARA SELLADO DE JUNTAS Y ASISLAMIENTO CON POLIURETANO 49800.00 1245.00


PINTURA DE PAVIMENTOS O SARDINELES 227.03
OPERARIO 41.28 0.86
PEON 123.83 2.58
PINTURA PARA TRAFICO 0.00 5.26
THINNER CORRIENTE 0.00 5.29
EQUIPO DE PINTURA 61.92 1.29
REPARACION DE CANALETA DE DRENAJE EXISTENTE CON REJILLA 1520.00
SC DE O. PARA REPARACION DE CANALETA DE DRENAJE EXISTENTE CON 1520.00 38.00
REJILLA
REPARACION DE CAJAS DE SEDIMENTACION DE SOLIDOS 16.00
SC REPARACION DE CAJAS DE SEDIMENTACION DE SOLIDOS 16.00 1.00
GEOMEMBRANA IMPERMEABILIZANTE 66000.00
SC GEOMEMBRANA DE POLIETILENO DE 40 MIL(1.00 mm) SELLADA CON 66000.00 825.00
FUSION
REPARACION Y REACONDICIONAMIENTO DE CISTERNA 160.00
SC REPARACION Y REACONDICIONAMIENTO DE CISTERNA 160.00 2.00
REJILLA METALICA ANCHO 0.34 m 72.02
OPERARIO 36.00 0.90
OFICIAL 36.00 0.90
SC REJILLA METALICA PARA CANALETAS R-1 0.00 189.00
INSTALACIONES ELECTRICAS 70035.82
REPLANTEO ELÉCTRICO 8.00
SC REPLANTEO ELECTRICO 8.00 1.00
PUESTA A TIERRA 24.00
SC POZO A TIERRA 24.00 1.00
CAJA DE PASO 256.00
SC CAJA DE PASO TIPO CE-1 256.00 8.00
ACOMETIDA ELECTRICA TUB PVC 2'' 109.20
OPERARIO 54.60 0.98
PEON 54.60 0.98
TUBERIA PVC-SAL 2" X 3 m 0.00 109.51
TUBERIA PVC 1 1/2'' 54.62
OPERARIO 27.32 0.85
PEON 27.32 0.85
TUBERIA PVC-SAP ELECTRICA DE 1½" X 3 m (40 mm) 0.00 220.80
CURVAS PVC-SAP ELECTRICAS 1½" (40 mm) 0.00 36.60
UNIONES PVC-SAP 1½" ELECTRICAS (40 mm) 0.00 62.40
CONEXIONES PVC-SAP 1½" ELECTRICAS (40 mm) 0.00 40.70
PEGAMENTO PARA PVC 0.00 7.68
CABLEADO ELECTRICO 69552.00
SC CABLEADO ELECTRICO 69552.00 1242.00
CONECTORES Y ACCESORIOS DE INSTALACION 32.00
SC CONECTORES Y ACCESORIOS 32.00 1.00
INSTALACIONES SANITARIAS 1013.52
REPLANTEO SANITARIO 16.00
SC REPLANTEO SANITARIO 16.00 1.00
CAJAS DE PASO 384.00
MARCO y TAPA DE FIERRO FUNDIDO 0.60 m CIERRE HERMETICO 384.00 8.00
TUBERIAS GALVANIZADAS DE 3/4'' 422.38
OPERARIO 84.48 0.96
PEON 253.43 2.88
TUBERIA DE FIERRO GALVANIZADO 3/4" 0.00 29.38
RETROEXCAVADORA CASE 590 SK 84.47 0.96
CONECTORES Y ACCESORIOS DE INSTALACION SANITARIA 32.00
SC CONECTORES Y ACCESORIOS SANITARIOS 32.00 1.00
SUMIDEROS Y TUBERIAS DE DESAGÜE 159.13
OPERARIO 79.57 0.99
PEON 79.57 0.99
TUBERIA PVC-SAL 6" X 5 m. 0.00 142.22
CODO PVC-SAL 6" X 45° 0.00 2.84
CODO PVC-SAL 6" X 90° 0.00 2.84
TEE SANITARIA PVC-SAL DE 6" 0.00 0.43
YEE PVC SAL SIMPLE DE 6" 0.00 5.69
PEGAMENTO PARA PVC DE 1/4 GLN 0.00 3.56
FACTOR DEL CATEGORIA DE MANO DE OBRA Y EQUIPOS
RECURSO

OPERARIO
OFICIAL
1.00 PEON
TOPOGRAFO
390.40 ESTACION TOTAL
390.40 RODILLO LISO VIBRATORIO AUTOPROPULSADO 7- 9 ton
390.40 RODILLO LISO VIBR AUTOP 101-135 HP 10-12 TON
106.13 CORTADORA DE CONCRETO 14"
EQUIPO DE PINTURA
1.00 MARTILLO NEUMATICO DE 29 kg
MARTILLO PERFORADOR (para compresora)
46.77 COMPRESORA NEUMATICA 250 - 330 PCM - 87 HP
468.12 CARGADOR SOBRE LLANTAS DE 125 HP 2.5 YD3
RETROEXCAVADORA CASE 590 SK
MOTONIVELADORA DE 125 HP
4.00
CAMION CISTERNA 4x2 (AGUA) 2,000 GAL.
CAMION VOLQUETE 4x2 210-280 HP 8 M3
1.00 VIBRADOR DE CONCRETO 4 HP 1.35"
MEZCLADORA DE CONCRETO DE 9 - 11 P3
102.42 CIZALLA ELECTRICA
716.93 PUNTA ACERO HEXAGONAL ROMPE PAVIMENTO
0.98 0.98
102.42 102.42
102.42 102.42

2.18 2.18
21.90 21.90
43.80 43.80
21.90 21.90

704.47 704.47
352.35 352.35
352.35 352.35

460.27 460.27

873.13 873.13
0.97 0.97
217.25 217.25
0.97 0.97

450.00 450.00
224.42 224.42
492.13 492.13
0.94 0.94
224.42 224.42
0.94 0.94

157.52 157.52
157.52 157.52
353.05 353.05
11763.63 11763.63
0.98 0.98

24.52 24.52
489.93 489.93
979.88 979.88
533.40 533.40
284.46 284.46
244.98 244.98

100.07 100.07
200.15 200.15
53.00 53.00
22.60 22.60
527.53 527.53

6.33 6.33
63.25 63.25
356.27 356.27

156.12 156.12
312.23 312.23
1248.93 1248.93
7.32 7.32
6.51 6.51
28.98 28.98
156.12 156.12

12.48 12.48
148.20 148.20
1.57 1.57

1245.00 1245.00
41.28 41.28
123.83 123.83
5.26 5.26
5.29 5.29
61.92 61.92

38.00 38.00

1.00 1.00

825.00 825.00

2.00 2.00

36.00 36.00
36.00 36.00
189.00 189.00

1.00 1.00

1.00 1.00

8.00 8.00

54.60 54.60
54.60 54.60
109.51 109.51

27.32 27.32
27.32 27.32
220.80 220.80
36.60 36.60
62.40 62.40
40.70 40.70
7.68 7.68

1242.00 1242.00

1.00 1.00

1.00 1.00

8.00 8.00
84.48 84.48
253.43 253.43
29.38 29.38
84.47 84.47

1.00 1.00

79.57 79.57
79.57 79.57
142.22 142.22
2.84 2.84
2.84 2.84
0.43 0.43
5.69 5.69
3.56 3.56
OBRAS PROVISIONALES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS
MOVILIZACION Y DESMOVILIZACION
TRAZO Y REPLANTEO AL INICIO Y DURANTE LA EJECUCION DE OBRA
OFICIAL
PEON
TOPOGRAFO
ESTACION TOTAL
MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL
MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL
LIMPIEZA DEL TERRENO MANUAL
OPERARIO
PEON
SERVICIOS HIGIENICOS PORTÁTILES
SC ALQUILER DE SERVICIOS HIGIÉNICOS PORTÁTILES (BAÑOS QUÍMICOS) PARA EL PERSONAL DE OBRA
OBRAS PRELIMINARES
DESMONTAJE DE SISTEMA DE DRENAJE DE LAVADO
SC DESMONTAJE DE SISTEMA DE DRENAJE DE LAVADO
DEMOLICION DE LOSA DE CONCRETO
OFICIAL
PEON
MARTILLO NEUMATICO DE 29 kg
COMPRESORA NEUMATICA 250 - 330 PCM - 87 HP
PUNTA ACERO HEXAGONAL ROMPE PAVIMENTO
DEMOLICION DE ESTRUCTURAS EXISTENTE
OPERARIO
OFICIAL
PEON
MARTILLO PERFORADOR (para compresora)
ELIMINACION DE MATERIAL EXCEDENTE
PEON
CARGADOR SOBRE LLANTAS DE 125 HP 2.5 YD3
CAMION VOLQUETE 4x2 210-280 HP 8 M3
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN TERRENO NORMAL
PEON
CONFORMACION Y COMPACTACION DE LA SUBRASANTE
PEON
RODILLO LISO VIBRATORIO AUTOPROPULSADO 7- 9 ton
MOTONIVELADORA DE 125 HP
CAMION CISTERNA 4x2 (AGUA) 2 000 GAL.
BASE DE AFIRMADO H=0.30 m
OPERARIO
PEON
MATERIAL GRANULAR DE RIO (SELECCIONADO)
RODILLO LISO VIBR AUTOP 101-135 HP 10-12 TON
MOTONIVELADORA DE 125 HP
CAMION CISTERNA 4x2 (AGUA) 2 000 GAL.
CONCRETO
ACERO CORRUGADO fy= 4200 kg/cm2
OPERARIO
OFICIAL
ALAMBRE NEGRO N° 16
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60
CIZALLA ELECTRICA
CONCRETO PREMEZCLADO f'c=315 kg/cm2
OPERARIO
OFICIAL
PEON
CONCRETO PREMEZCLADO f'c= 315 kg/cm2
SERVICIO DE BOMBA PARA CONCRETO PREMEZCLADO
VIBRADOR DE CONCRETO 4 HP 1.35"
ENCOFRADO Y DESENCOFRADO NORMAL
OFICIAL
PEON
ALAMBRE NEGRO N° 16
CLAVOS PARA MADERA CON CABEZA DE 3"
MADERA TORNILLO
ACERO LISO DOWEL 6M X 5/8''
OFICIAL
PEON
ACERO LISO EN VARILLAS DE 5/8" X 6 m
SOLADO DE CONCRETO de 2''
OPERARIO
OFICIAL
PEON
GASOLINA 84 OCTANOS
HORMIGON
CEMENTO PORTLAND TIPO I (42.5 kg)
MEZCLADORA DE CONCRETO DE 9 - 11 P3
VARIOS
CORTE CON DISCO EN JUNTAS
OPERARIO
DISCO DE CORTE
CORTADORA DE CONCRETO 14"
SELLADO DE JUNTAS DE DILATACION Y CORTE, Y AISLAMIENTO CON MASILLA DE POLIURETANO
SC M. DE O. PARA SELLADO DE JUNTAS Y ASISLAMIENTO CON POLIURETANO
PINTURA DE PAVIMENTOS O SARDINELES
OPERARIO
PEON
PINTURA PARA TRAFICO
THINNER CORRIENTE
EQUIPO DE PINTURA
REPARACION DE CANALETA DE DRENAJE EXISTENTE CON REJILLA
SC DE O. PARA REPARACION DE CANALETA DE DRENAJE EXISTENTE CON REJILLA
REPARACION DE CAJAS DE SEDIMENTACION DE SOLIDOS
SC REPARACION DE CAJAS DE SEDIMENTACION DE SOLIDOS
GEOMEMBRANA IMPERMEABILIZANTE
SC GEOMEMBRANA DE POLIETILENO DE 40 MIL(1.00 mm) SELLADA CON FUSION
REPARACION Y REACONDICIONAMIENTO DE CISTERNA
SC REPARACION Y REACONDICIONAMIENTO DE CISTERNA
REJILLA METALICA ANCHO 0.34 m
OPERARIO
OFICIAL
SC REJILLA METALICA PARA CANALETAS R-1
INSTALACIONES ELECTRICAS
REPLANTEO ELÉCTRICO
SC REPLANTEO ELECTRICO
PUESTA A TIERRA
SC POZO A TIERRA
CAJA DE PASO
SC CAJA DE PASO TIPO CE-1
ACOMETIDA ELECTRICA TUB PVC 2''
OPERARIO
PEON
TUBERIA PVC-SAL 2" X 3 m
TUBERIA PVC 1 1/2''
OPERARIO
PEON
TUBERIA PVC-SAP ELECTRICA DE 1½" X 3 m (40 mm)
CURVAS PVC-SAP ELECTRICAS 1½" (40 mm)
UNIONES PVC-SAP 1½" ELECTRICAS (40 mm)
CONEXIONES PVC-SAP 1½" ELECTRICAS (40 mm)
PEGAMENTO PARA PVC
CABLEADO ELECTRICO
SC CABLEADO ELECTRICO
CONECTORES Y ACCESORIOS DE INSTALACION
SC CONECTORES Y ACCESORIOS
INSTALACIONES SANITARIAS
REPLANTEO SANITARIO
SC REPLANTEO SANITARIO
CAJAS DE PASO
MARCO y TAPA DE FIERRO FUNDIDO 0.60 m CIERRE HERMETICO
TUBERIAS GALVANIZADAS DE 3/4''
OPERARIO
PEON
TUBERIA DE FIERRO GALVANIZADO 3/4"
RETROEXCAVADORA CASE 590 SK
CONECTORES Y ACCESORIOS DE INSTALACION SANITARIA
SC CONECTORES Y ACCESORIOS SANITARIOS
SUMIDEROS Y TUBERIAS DE DESAGÜE
OPERARIO
PEON
TUBERIA PVC-SAL 6" X 5 m.
CODO PVC-SAL 6" X 45°
CODO PVC-SAL 6" X 90°
TEE SANITARIA PVC-SAL DE 6"
YEE PVC SAL SIMPLE DE 6"
PEGAMENTO PARA PVC DE 1/4 GLN
2,264.23
40
40 100%
1,277.33
390.4 98%
390.4 98%
390.4 98%
106.13 27%
400
400 100%
514.88
46.77 10%
468.12 99%
32
32 400%
2,649.57
24
24 100%
1,126.62
102.42 98%
716.93 689%
102.42 98%
102.42 98%
102.42 98%
89.78
2.18 5%
21.9 55%
43.8 110%
21.9 55%
1,409.17
704.47 196%
352.35 98%
352.35 98%
3,332.80
460.27
460.27 198%
1,524.90
873.13 390%
217.25 97%
217.25 97%
217.25 97%
1,347.63
450 187%
224.42 94%
0 49213%
224.42 94%
224.42 94%
224.42 94%
4,455.07
472.55
157.52 98%
157.52 98%
0 35305%
0 1176363%
157.52 98%
1,739.30
24.52 10%
489.93 198%
979.88 395%
0 53340%
0 28446%
244.98 99%
300.23
100.07 96%
200.15 192%
0 5300%
0 2260%
0 52753%
69.58
6.33 8%
63.25 79%
0 35627%
1,873.40
156.12 98%
312.23 195%
1,248.93 781%
0 732%
0 651%
0 2898%
156.12 98%
117,809.08
14.03
12.48 52%
0 14820%
1.57 7%
49,800
49,800 124500%
227.03
41.28 86%
123.83 258%
0 526%
0 529%
61.92 129%
1,520
1,520 3800%
16
16 100%
66,000
66,000 82500%
160
160 200%
72.02
36 90%
36 90%
0 18900%
70,035.82
8
8 100%
24
24 100%
256
256 800%
109.2
54.6 98%
54.6 98%
0 10951%
54.62
27.32 85%
27.32 85%
0 22080%
0 3660%
0 6240%
0 4070%
0 768%
69,552
69,552 124200%
32
32 100%
1,013.52
16
16 100%
384
384 800%
422.38
84.48 96%
253.43 288%
0 2938%
84.47 96%
32
32 100%
159.13
79.57 99%
79.57 99%
0 14222%
0 284%
0 284%
0 43%
0 569%
0 356%