OBRA Ejecución de la Obra “Adecuación, Mejoramiento y Sustitución de la Infraestructura Educativa de la I.E. N° 64721 Hildebrando Fuentes, Raymondi – Atalaya – Ucayali”.

laya – Ucayali”.SATIPO - JUNIN


CONTRATISTA CONSORCIO TERRASUR (Integrado por TERRAK SAC y TABLEROS Y PUENTES S.A SUCURSAL DEL PERU)
ENTIDAD PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA-PRONEID
PLAZO DE EJECUCION 390 DIAS CALENDARIOS
MONTO CONTRATADO S/. 24,490,288.53 (INC. IGV)

PRESUPUESTO
Item Descripción Und. Metrado Precio S/. Parcial S/.
01 ESTRUCTURAS 12,289,716.00
01.01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, DEMOLICION 669,486.34
01.01.01 Construcciones Provisionales 260,095.98
01.01.01.01 ALMACEN, COMEDOR Y VESTUARIOS DE OBRA GLB 1.00 32,000.00 32,000.00
01.01.01.02 CARTEL DE OBRA 3.60x7.20 PZA 1.00 1,301.94 1,301.94
01.01.01.03 CERCO PROVISONAL DE TRIPLAY DE 6MM M 917.00 52.12 47,794.04
01.01.01.04 BAÑOS PORTATILES PARA OBRA GLB 1.00 5,000.00 5,000.00
01.01.01.05 TRANSPORTE, INSTALACION Y DESINSTALACION DE AULAS PREFABRICADAS Und. 20.00 8,700.00 174,000.00

01.01.02 Instalaciones Provisionales 8,400.00


01.01.02.01 CONSUMO DE ENERGIA ELECTRICA Y AGUA PARA LA CONSTRUCCION GLB 1.00 8,400.00 8,400.00
01.01.03 Trabajos Preliminares 10,800.00
01.01.03.01 LIMPIEZA PERMANENTE DE LA OBRA GLB 1.00 10,800.00 10,800.00
01.01.04 Eliminacion de Obstrucciones 88,771.72
01.01.04.01 ELIMINACION DE MALEZA Y ARBUSTOS DE FACIL EXTRACCION M2 36,665.34 2.13 78,097.17
01.01.04.02 ELIMINACION DE ARBOL Und. 185.00 49.64 9,183.40
01.01.04.03 ELIMINACION DE POSTE DE LUZ Und. 15.00 99.41 1,491.15
01.01.05 Remociones 20,837.97
01.01.05.01 DESMONTAJE DE APARATOS SANITARIOS UND 28.00 23.39 654.92
01.01.05.02 DESMONTAJE DE BARANDA M 146.94 5.56 816.99
01.01.05.03 DESMONTAJE TECHO DE ETERNIT/CALAMINA M2 3,657.54 1.63 5,961.79
01.01.05.04 DESMONTAJE DE PUERTAS M2 204.60 4.69 959.57
01.01.05.05 DESMONTAJE DE VENTANAS M2 912.20 2.80 2,554.16
01.01.05.06 DESMONTAJE DE ESTRUCTURA METALICA M2 942.20 10.40 9,798.88
01.01.05.07 DESMONTAJE DE TABLERO ELECTRICO Und. 2.00 39.76 79.52
01.01.05.08 DESMONTAJE DE LUMINARIAS Und. 1.00 12.14 12.14
01.01.06 Demoliciones 174,491.59
01.01.06.01 DEMOLICION DE PISO DE CONCRETO INC. F. P. M2 2,950.51 5.48 16,168.79
01.01.06.02 DEMOLICION DE LOSA DE CONCRETO e=15 cm. M2 3,854.52 4.42 17,036.98
01.01.06.03 DEMOLICION MASIVA M3 12.89 45.15 581.98
01.01.06.04 DEMOLICION COLUMNAS, VIGAS DE CONCRETO Y ZAPATAS M3 234.15 62.17 14,557.11
01.01.06.05 DEMOLICION MUROS DE LADRILLO KK C/MAQUINA M3 393.35 17.84 7,017.36
01.01.06.06 DEMOLICION DE LOSA ALIGERADA H=0.20m M2 1,025.99 15.16 15,554.01
01.01.06.07 DEMOLICION DE BANCAS DE CONCRETO M3 6.80 61.33 417.04
01.01.06.08 DEMOLICION DE GRAAS DE CONCRETO M3 18.38 23.98 440.75
01.01.06.09 DEMOLICION DE CUNETA CONCRETO e=10cm M3 125.73 23.35 2,935.80
01.01.06.10 ACARREO INTERNO, MAT. PROCEDENTE DE DEMOLICION M3 2,617.57 16.25 42,535.51
01.01.06.11 ELIMINACION DE DEMOLICIONES M3 2,617.57 21.87 57,246.26
01.01.07 Movilizacion de Maquinarias y Herramientas 12,000.00
01.01.07.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS GLB 1.00 12,000.00 12,000.00
01.01.08 Trazo, Niveles y Replanteo 94,089.08
OBRA Ejecución de la Obra “Adecuación, Mejoramiento y Sustitución de la Infraestructura Educativa de la I.E. N° 64721 Hildebrando Fuentes, Raymondi – Atalaya – Ucayali”.SATIPO - JUNIN
CONTRATISTA CONSORCIO TERRASUR (Integrado por TERRAK SAC y TABLEROS Y PUENTES S.A SUCURSAL DEL PERU)
ENTIDAD PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA-PRONEID
PLAZO DE EJECUCION 390 DIAS CALENDARIOS
MONTO CONTRATADO S/. 24,490,288.53 (INC. IGV)

PRESUPUESTO
Item Descripción Und. Metrado Precio S/. Parcial S/.
01.01.08.01 TRAZO Y REPLANTEO PRELIMINAR M2 29,683.25 1.52 45,118.54
01.01.08.02 REPLANTEO DURANTE EL PROCESO M2 29,683.25 1.52 45,118.54
01.01.08.03 TRANSPORTE VERTICAL CON WINCHE ELECTRICO GLB 1.00 3,852.00 3,852.00
01.02 SEGURIDAD Y SALUD 139,781.44
01.02.01 ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD EN EL GLB 1.00 23,000.00 23,000.00
TRABAJO
01.02.02 EQUIPOS DE PROTECCION INDIVIDUAL Und. 120.00 536.94 64,432.80
01.02.03 EQUIPO DE PROTECCION COLECTIVA GLB 1.00 9,282.29 9,282.29
01.02.04 SEÑALIZACION TEMPORAL DE SEGURIDAD GLB 1.00 8,769.71 8,769.71
01.02.05 CAPACITACION EN SEGURIDAD Y SALUD GLB 1.00 28,392.00 28,392.00
01.02.06 RECURSOS PARA RESPUESTA ANTE EMERGENCIAS EN SEGURIDAD Y SALUD EN EL TRABAJO GLB 1.00 5,904.64 5,904.64

01.03 Movimiento de Tierras 2,643,888.10


01.03.01 Excavaciones 191,925.15
01.03.01.01 EXCAV. ZANJAS Y ZAPATA Rt<2kg/cm2 h=1.5m M3 3,247.62 37.14 120,616.61
01.03.01.02 EXCAV. ZANJAS Y ZAPATA Rt<2kg/cm2 h=2.0m M3 388.79 43.34 16,850.16
01.03.01.03 EXCAVACION C/EQUIPO A NIVEL DE SUBRASANTE M3 4,364.34 9.84 42,945.11
01.03.01.04 EXCAVACION CIMIENTOS Y VIGAS DE CIMENTACION M3 265.65 43.34 11,513.27
01.03.02 Cortes 405,421.15
01.03.02.01 CORTE MASIVO DE TERRENO A MAQUINA M3 38,762.02 9.84 381,418.28
01.03.02.02 CORTE DE TERRENO PARA MEJORAMIENTO DE SUELO DE CIMENTACION M3 3,049.92 7.87 24,002.87

01.03.03 Rellenos 560,734.89


01.03.03.01 RELLENO CON MATERIAL GRANULAR C/EQUIPO NO MENOR A 3% DE FINOS M3 1,019.75 42.52 43,359.77

01.03.03.02 RELLENO CON MATERIAL GRANULAR C/EQUIPO NO MENOR A 12% DE FINOS M3 5,930.41 42.52 252,161.03

01.03.03.03 RELLENO C/AFIRMADO PARA PLATEA Y MUROS M3 2,734.24 42.52 116,259.88


01.03.03.04 AFIRMADO DE 8'' PARA PISOS, PATIOS Y VEREDAS, COMPACTADO M2 50.15 15.05 754.76
01.03.03.05 RELLENO C/MATERIAL GRANULAR SELECCIONADO CON EQUIPO LIVIANO M3 1,448.77 49.29 71,409.87

01.03.03.06 RELLENO CON MATERIAL PROPIO M3 4,802.35 15.99 76,789.58


01.03.04 Nivelacion Interior y Apisonado 192,981.66
01.03.04.01 NIVELACION INTERIOR Y APISONADO PARA F. PISO, PATIO Y VEREDAS M2 5,304.03 3.32 17,609.38
01.03.04.02 MEJORAMIENTO DE SUELO CON GEOMEMBRANAS M2 1,600.28 17.65 28,244.94
01.03.04.03 MEJORAMIENTO DE SUELO CON GEO MALLAS M2 5,052.45 21.09 106,556.17
01.03.04.04 MEJORAMIENTO DE SUELO CON GEOTEXTIL M2 5,052.45 8.03 40,571.17
01.03.05 Eliminacion de Material Excedente 1,292,825.25
01.03.05.01 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES M3 6,099.83 16.25 99,122.24
01.03.05.02 ELIMINACION MATERIAL EXCEDENTE C/EQUIPO, CARGUIO A MANO M3 5,969.65 14.59 87,097.19
01.03.05.03 ELIMINACION MATERIAL EXCEDENTE C/MAQUINA M3 50,599.26 21.87 1,106,605.82
OBRA Ejecución de la Obra “Adecuación, Mejoramiento y Sustitución de la Infraestructura Educativa de la I.E. N° 64721 Hildebrando Fuentes, Raymondi – Atalaya – Ucayali”.SATIPO - JUNIN
CONTRATISTA CONSORCIO TERRASUR (Integrado por TERRAK SAC y TABLEROS Y PUENTES S.A SUCURSAL DEL PERU)
ENTIDAD PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA-PRONEID
PLAZO DE EJECUCION 390 DIAS CALENDARIOS
MONTO CONTRATADO S/. 24,490,288.53 (INC. IGV)

PRESUPUESTO
Item Descripción Und. Metrado Precio S/. Parcial S/.
01.04 OBRAS DE CONCRETO SIMPLE 469,012.94
01.04.01 Solados 5,654.79
01.04.01.01 SOLADO PARA ZAPATAS Y VIGAS DE CIMENTACION e=2'', 1:12 CEM/HORM. M2 255.18 22.16 5,654.79

01.04.02 Sobrecimientos 463,358.15


01.04.02.01 SUBZAPATA MEZCLA 1:12 + 30% P.G. M3 201.58 170.03 34,274.65
01.04.02.02 CIMIENTO CONCRETO f'c=140 kg/cm2 + 30% P.G. M3 707.20 186.99 132,239.33
01.04.02.03 CIMIENTO CORRIDO, ENCOF. Y DESENCOF. M2 1,986.87 42.03 83,508.15
01.04.02.04 SOBRECIMIENTO, CONCRETO 1:8 + 25% P.M. f'c=> 100 kg/cm2 M3 99.49 266.00 26,464.34
01.04.02.05 SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO M2 906.96 34.31 31,117.80
01.04.02.06 FALSO PISO MEZCLA 1:8 e=4'' M2 4,960.88 30.78 152,695.89
01.04.02.07 GRADAS EN PISO CONCRETO CICLOPEO M2 2.88 36.85 106.13
01.04.02.08 GRADAS, ENCOFRADO Y DESENCOFRADO M2 24.00 31.53 756.72
01.04.02.09 CURADO DE CONCRETO M2 1,614.07 1.36 2,195.14
01.05 OBRAS DE CONCRETO ARMADO 7,768,859.65
01.05.01 Zapatas 205,050.84
01.05.01.01 ZAPATAS - CONCRETO 210 kg/cm2 M3 409.45 318.79 130,528.57
01.05.01.02 ZAPATAS - ENCOFRADO Y DESENCOFRADO M2 632.75 28.29 17,900.50
01.05.01.03 ZAPATAS - ACERO fy=4200 kg/cm2 KG 11,665.53 4.78 55,761.23
01.05.01.04 CURADO DE CONCRETO M2 632.75 1.36 860.54
01.05.02 Vigas de Cimentacion 594,362.83
01.05.02.01 VIGAS DE CIMENT. - CONCRETO 210 kg/cm2 M3 558.92 334.93 187,199.08
01.05.02.02 VIGAS DE CIMENT. - ENCOFRADO Y DESENCOFRADO M2 3,297.22 52.99 174,719.69
01.05.02.03 VIGAS DE CIMENT. - ACERO fy=4200 kg/cm2 KG 47,690.34 4.78 227,959.83
01.05.02.04 CURADO DE CONCRETO M2 3,297.23 1.36 4,484.23
01.05.03 Losas de Cimentacion 578,730.36
01.05.03.01 LOSAS DE CIMENT. - CONCRETO 210 kg/cm2 M3 759.99 327.60 248,972.72
01.05.03.02 LOSAS DE CIMENT. - ENCOFRADO Y DESENCOFRADO M2 392.91 45.51 17,881.33
01.05.03.03 LOSAS DE CIMENT. - ACERO fy=4200 kg/cm2 KG 65,134.30 4.78 311,341.95
01.05.03.04 CURADO DE CONCRETO M2 392.91 1.36 534.36
01.05.04 Muros Reforzados 485,517.50
01.05.04.01 MUROS DE CONTENC. - CONCRETO 210 kg/cm2 M3 390.79 431.15 168,489.11
01.05.04.02 MUROS DE CONTENC. - ENCOF. Y DESENCOFRADO (DOS CARAS) M2 2,572.03 52.81 135,828.90
01.05.04.03 MUROS DE CONTENC. - ACERO fy=4200 kg/cm2 KG 37,176.05 4.78 177,701.52
01.05.04.04 CURADO DE CONCRETO M2 2,572.04 1.36 3,497.97
01.05.05 Columnas 2,107,979.43
01.05.05.01 COLUMNAS. - CONCRETO 210 kg/cm2 C/ADIT/PLASTIFICANTE - CARAVI M3 1,096.92 458.76 503,223.02
01.05.05.02 COLUMNAS. - ENCOFRADO Y DESENCOFRADO M2 12,848.63 55.17 708,858.92
01.05.05.03 COLUMNAS. - ACERO fy=4200 kg/cm2 KG 183,770.58 4.78 878,423.37
01.05.05.04 CURADO DE CONCRETO M2 12,848.62 1.36 17,474.12
01.05.06 Placas 58,934.54
OBRA Ejecución de la Obra “Adecuación, Mejoramiento y Sustitución de la Infraestructura Educativa de la I.E. N° 64721 Hildebrando Fuentes, Raymondi – Atalaya – Ucayali”.SATIPO - JUNIN
CONTRATISTA CONSORCIO TERRASUR (Integrado por TERRAK SAC y TABLEROS Y PUENTES S.A SUCURSAL DEL PERU)
ENTIDAD PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA-PRONEID
PLAZO DE EJECUCION 390 DIAS CALENDARIOS
MONTO CONTRATADO S/. 24,490,288.53 (INC. IGV)

PRESUPUESTO
Item Descripción Und. Metrado Precio S/. Parcial S/.
01.05.06.01 PLACAS - CONCRETO f'c=210 kg/cm2 M3 31.74 438.36 13,913.55
01.05.06.02 PLACAS - ENCOFRADO Y DESENCOFRADO M2 515.47 54.34 28,010.64
01.05.06.03 PLACAS - ACERO fy=4200 kg/cm2 KG 3,411.99 4.78 16,309.31
01.05.06.04 CURADO DE CONCRETO M2 515.47 1.36 701.04
01.05.07 Vigas 1,501,040.55
01.05.07.01 VIGAS - CONCRETO 210 kg/cm2 - 1 PISO M3 1,223.26 346.28 423,590.47
01.05.07.02 VIGAS - ENCOFRADO Y DESENCOFRADO M2 7,465.33 63.92 477,183.89
01.05.07.03 VIGAS - ACERO fy= 4200 kg/cm2 KG 123,458.71 4.78 590,132.63
01.05.07.04 CURADO DE CONCRETO M2 7,451.15 1.36 10,133.56
01.05.08 Escaleras 74,936.61
01.05.08.01 ESCALERAS - CONCRETO 210 kg/cm2 M3 49.31 447.06 22,044.53
01.05.08.02 ESCALERAS - ENCOFRADO Y DESENCOFRADO M2 370.66 83.74 31,039.07
01.05.08.03 ESCALERAS - ACERO fy=4200 kg/cm2 KG 4,466.30 4.78 21,348.91
01.05.08.04 CURADO DE CONCRETO M2 370.66 1.36 504.10
01.05.09 Losas Macizas 115,929.59
01.05.09.01 LOSAS MACIZAS - CONC. 210 kg/cm2 - 1 PISO M3 108.57 351.96 38,212.30
01.05.09.02 LOSAS MACIZAS - ENCOFRADO Y DESENCOFRADO M2 640.69 55.64 35,647.99
01.05.09.03 LOSAS MACIZAS - ACERO fy=4200 kg/cm2 KG 8,618.82 4.78 41,197.96
01.05.09.04 CURADO DE CONCRETO M2 640.69 1.36 871.34
01.05.10 Losas Aligeradas 1,248,489.54
01.05.10.01 LOSA ALIGERADA - CONCRETO 210 kg/cm2 M3 888.28 349.33 310,302.85
01.05.10.02 LOSA ALIGERADA - ENCOFRADO Y DESENCOFRADO M2 9,807.45 39.48 387,198.13
01.05.10.03 LOSA ALIGERADA - ACERO fy=4200 kg/cm2 KG 51,535.20 4.78 246,338.26
01.05.10.04 LOSA ALIGERADA - LADR. HUECO 15x30x30 Und. 78,485.63 3.55 278,623.99
01.05.10.05 CURADO DE CONCRETO M2 9,807.41 1.36 13,338.08
01.05.10.06 LOSA DE PISO - CONCRETO 210 kg/cm2 M3 11.42 349.33 3,989.35
01.05.10.07 LOSA PISO ACERO fy=4200 kg/cm2 - GRADO 60 KG 1,819.85 4.78 8,698.88
01.05.11 Rampa 5,640.42
01.05.11.01 RAMPA DE CONCRETO 210 kg/cm2 M3 8.44 437.00 3,688.28
01.05.11.02 RAMPAS - ENCOFRADO Y DESENCOFRADO M2 6.13 55.64 341.07
01.05.11.03 RAMPAS - ACERO DE REFUERZO fy=4200kg/cm2 KG 335.30 4.78 1,602.73
01.05.11.04 CURADO DE CONCRETO M2 6.13 1.36 8.34
01.05.12 Cimentacion Armada 22,754.91
01.05.12.01 CIMIENTOS REFORZADOS CONCRETO f'c=210 kg/cm2 M3 34.78 318.80 11,087.86
01.05.12.02 CIMIENTOS REFORZADOS ENCOFRADO Y DESENCOFRADO M2 88.82 42.03 3,733.10
01.05.12.03 CIMIENTO REFORZADO - ACERO fy=4200 kg/cm2 KG 1,634.55 4.78 7,813.15
01.05.12.04 CURADO DE CONCRETO M2 88.82 1.36 120.80
01.05.13 Graderias 145,078.05
01.05.13.01 GRADERIAS - CONCRETO 210 kg/cm2 M3 132.81 323.83 43,007.86
01.05.13.02 GRADERIAS - ENCOFRADO Y DESENCOFRADO M2 1,530.54 31.53 48,257.93
01.05.13.03 GRADERIAS - ACERO DE REFUERZO fy=4200 kg/cm2 KG 10,822.33 4.78 51,730.74
OBRA Ejecución de la Obra “Adecuación, Mejoramiento y Sustitución de la Infraestructura Educativa de la I.E. N° 64721 Hildebrando Fuentes, Raymondi – Atalaya – Ucayali”.SATIPO - JUNIN
CONTRATISTA CONSORCIO TERRASUR (Integrado por TERRAK SAC y TABLEROS Y PUENTES S.A SUCURSAL DEL PERU)
ENTIDAD PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA-PRONEID
PLAZO DE EJECUCION 390 DIAS CALENDARIOS
MONTO CONTRATADO S/. 24,490,288.53 (INC. IGV)

PRESUPUESTO
Item Descripción Und. Metrado Precio S/. Parcial S/.
01.05.13.04 CURADO DE CONCRETO M2 1,530.53 1.36 2,081.52
01.05.14 Soleras 448,215.57
01.05.14.01 SOLERA - CONCRETO 140 kg/cm2 M3 362.23 289.12 104,727.94
01.05.14.02 SOLERA - ENCOFRADO Y DESENCOFRADO M2 4,400.42 46.91 206,423.70
01.05.14.03 SOLERA - ACERO fy=4200 kg/cm2 KG 27,422.46 4.78 131,079.36
01.05.14.04 CURADO DE CONCRETO M2 4,400.42 1.36 5,984.57
01.05.15 Sobrecimientos Reforzados 174,980.04
01.05.15.01 SOBREC. REF. CONCRETO f'c=210 kg/cm2 M3 211.67 415.67 87,984.87
01.05.15.02 SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO M2 1,700.45 34.31 58,342.44
01.05.15.03 SOBRECIMIENTO REFORZADO ACERO fy=4200 kg/cm2 - GRADO 60 KG 5,503.00 4.78 26,304.34
01.05.15.04 CURADO DE CONCRETO M2 1,726.76 1.36 2,348.39
01.05.16 Otros 1,218.87
01.05.16.01 DADOS DE CONCRETO EN JUNTA DILATACION PISO C:H 1:10 M3 0.80 239.68 191.74
01.05.16.02 DADOS DE CONCRETO, ENCOF. Y DESENCOF. M2 12.80 42.03 537.98
01.05.16.03 DADOS, ACERO DE REFUERZO fy=4200 kg/cm2 KG 98.69 4.78 471.74
01.05.16.04 CURADO DE CONCRETO M2 12.80 1.36 17.41
01.06 ESTRUCTURAS METALICAS 168,741.93
01.06.01 Estructura Metalica en Piscina 52,499.02
01.06.01.01 VIGA PRINCIPAL DE ACERO VP Und. 8.00 2,949.44 23,595.52
01.06.01.02 VIGUETA DE ACERO V1 Und. 127.50 181.49 23,139.98
01.06.01.03 TEMPLADORES METALICOS Y ACCESORIOS kg 667.97 3.85 2,571.68
01.06.01.04 ANCLAJES PARA ARMADURA METALICA SEGÚN DISEÑO Und. 16.00 199.49 3,191.84
01.06.02 Estructuras Metalicas Cancha 15,532.88
01.06.02.01 TIJERALES TIPO A-1 Und. 10.00 714.92 7,149.20
01.06.02.02 VIGUETAS TIPO VG-2 Und. 9.00 781.86 7,036.74
01.06.02.03 TEMPLADORES METALICOS Y ACCESORIOS kg 197.57 3.85 760.64
01.06.02.04 ANCLAJES SEGÚN DISEÑO Und. 10.00 58.63 586.30
01.06.03 Estructuras Metalicas Polideportivo 67,401.99
01.06.03.01 ARCO PARABOLICO Und. 10.00 2,841.91 28,419.10
01.06.03.02 VIGUETA DE ACERO V1 Und. 153.00 181.49 27,767.97
01.06.03.03 TEMPLADORES METALICOS Y ACCESORIOS kg 751.46 3.85 2,893.12
01.06.03.04 TIJERALES TIPO A-1 Und. 10.00 714.92 7,149.20
01.06.03.05 ANCLAJES SEGÚN DISEÑO Und. 20.00 58.63 1,172.60
01.06.04 Estructuras Metalicas Taller Automotriz 21,867.14
01.06.04.01 VIGA PRINCIPAL DE ACERO VP Und. 5.00 2,949.44 14,747.20
01.06.04.02 VIGUETA DE ACERO V1 Und. 36.00 181.49 6,533.64
01.06.04.03 ANCLAJES SEGÚN DISEÑO Und. 10.00 58.63 586.30
01.06.05 Estructuras Metalicas Entrada Nivel Secundaria 11,440.90
01.06.05.01 VIGA PRINCIPAL DE ACERO VP Und. 3.00 2,949.44 8,848.32
01.06.05.02 VIGUETA DE ACERO V1 Und. 12.00 181.49 2,177.88
01.06.05.03 ANCLAJES SEGÚN DISEÑO Und. 6.00 58.63 351.78
OBRA Ejecución de la Obra “Adecuación, Mejoramiento y Sustitución de la Infraestructura Educativa de la I.E. N° 64721 Hildebrando Fuentes, Raymondi – Atalaya – Ucayali”.SATIPO - JUNIN
CONTRATISTA CONSORCIO TERRASUR (Integrado por TERRAK SAC y TABLEROS Y PUENTES S.A SUCURSAL DEL PERU)
ENTIDAD PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA-PRONEID
PLAZO DE EJECUCION 390 DIAS CALENDARIOS
MONTO CONTRATADO S/. 24,490,288.53 (INC. IGV)

PRESUPUESTO
Item Descripción Und. Metrado Precio S/. Parcial S/.
01.06.05.04 TEMPLADORES, ACERO fy=4200 kg/cm2 - GRADO 60 kg 26.00 2.42 62.92
01.07 COBERTURA 429,945.60
01.07.01 Cobertura Patio Techado 429,945.60
01.07.01.01 COBERTURA DE ACERO AUTOSOPORTADO E=0.60 mm M2 1,212.33 320.00 387,945.60
01.07.01.02 CERRAMIENTO DE TIMPANOS CON PLANCHA DE ACERO ACANALADA AUTO SOPORTADA e=0.80mm M2 240.00 175.00 42,000.00

02 ARQUITECTURA 9,228,209.14
02.01 MUROS Y TABIQUES DE ALBAÑILERIA 1,253,977.36
02.01.01 MURO DE LADRILLO KK TIPO IV CABEZA M: 1:1:4 E=1.5 cm (*) M2 4,508.34 128.65 579,997.94
02.01.02 MURO DE LADRILLO KK TIPO IV SOGA M: 1:1:4 E=1.5 cm (*) M2 8,569.05 76.98 659,645.47
02.01.03 MURO DE LADRILLO KK TIPO IV CANTO M: 1:1:4 E=1.5 cm (*) M2 85.75 65.38 5,606.34
02.01.04 ALAMBRE # 8 REFUERZO HORIZONTAL EN MUROS KG 1,372.67 4.64 6,369.19
02.01.05 TABIQUERIA DRYWALL ESTÁNDAR ST 1/2 A DOS CARAS CON PARANTES DE 69 X 38 X 3 @ 45 MM M2 13.80 170.90 2,358.42

02.02 REVOQUES Y REVESTIMIENTOS 1,420,043.82


02.02.01 TARRAJEO PRIMARIO, MORTERO C:A 1:5 M2 2,528.21 20.28 51,272.10
02.02.02 TARRAJEO EN MURO: INTERIOR Y EXTERIOR M2 18,301.07 21.42 392,008.92
02.02.03 TARRAJEO EN MUROS EXT. A PARTIR 2do PISO M2 3,926.40 27.28 107,112.19
02.02.04 TARRAJEO DE COLUMNAS M2 8,807.10 33.19 292,307.65
02.02.05 TARRAJEO DE VIGAS M2 5,651.97 45.52 257,277.67
02.02.06 TARRAJEO EN PLACAS DE CONCRETO (ASCENSOR) M2 273.11 25.15 6,868.72
02.02.07 TARRAJEO C/CEMENTO FROTACHADO PASO Y CONTRAPASO (ESCALERAS) M2 967.30 26.81 25,933.31

02.02.08 TARRAJEO CON IMPERMEABILIZANTE CISTERNA M2 146.07 29.33 4,284.23


02.02.09 TARRAJEO PRIMARIO CON IMPERMEABILIZANTE PISCINA M2 436.25 30.79 13,432.14
02.02.10 TARRAJEO PULIDO DE BANCAS DE CONCRETO (1:5) M2 150.89 22.92 3,458.40
02.02.11 TARRAJEO PULIDO DE SARDINELES DE CONCRETO (1:5) M2 1,085.48 22.92 24,879.20
02.02.12 TARRAJEO PULIDO DE MUROS DE CONCRETO (1:5) (MUROS DE CONTENCION) M2 1,673.20 33.29 55,700.83

02.02.13 BRUÑAS SEGÚN DETALLE (1x1 cm) M 16,198.27 6.72 108,852.37


02.02.14 TARRAJEO C/CEMENTO FROTACHADO (TRIBUNAS) PASO=80cm y CONTRAPASO=40 cm M2 70.50 29.32 2,067.06

02.02.15 VESTIDURA DE DERRAMES (1:5) M 5,602.92 12.94 72,501.78


02.02.16 VESTIDURA DE DERRAMES CON BORDES BOLEADOS M:1:2 M 110.32 18.92 2,087.25
02.03 CIELO RASOS 358,039.30
02.03.01 CIELO RASO CON MEZCLA C:A 1:5 M2 9,650.55 35.35 341,146.94
02.03.02 VESTIDURA EN FONDO DE ESCALERAS Y PUENTE M2 461.54 36.60 16,892.36
02.04 PISOS Y PAVIMENTOS 2,931,181.07
02.04.01 CONTRAPISOS 222,793.08
02.04.01.01 CONTRAPISO DE 40 mm M2 8,642.09 25.78 222,793.08
02.04.02 PISOS 1,887,700.74
OBRA Ejecución de la Obra “Adecuación, Mejoramiento y Sustitución de la Infraestructura Educativa de la I.E. N° 64721 Hildebrando Fuentes, Raymondi – Atalaya – Ucayali”.SATIPO - JUNIN
CONTRATISTA CONSORCIO TERRASUR (Integrado por TERRAK SAC y TABLEROS Y PUENTES S.A SUCURSAL DEL PERU)
ENTIDAD PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA-PRONEID
PLAZO DE EJECUCION 390 DIAS CALENDARIOS
MONTO CONTRATADO S/. 24,490,288.53 (INC. IGV)

PRESUPUESTO
Item Descripción Und. Metrado Precio S/. Parcial S/.
02.04.02.01 PISO PORCELANATO 40X40 TIPO IV COLOR GRIS PLATA M2 4,872.12 57.22 278,782.71
02.04.02.02 PISO CERAMICO DE 40X40 COLOR BLANCO M2 1,178.92 62.47 73,647.13
02.04.02.03 PISO DE CEMENTO FROT. Y BRUÑ. E=2'' M2 5,634.76 26.77 150,842.53
02.04.02.04 PISO DE CEMENTO SEMIPULIDO CON ACABADO SPRAY DECK M2 237.18 120.87 28,667.95
02.04.02.05 PISO DE CEMENTO SEMIPULIDO Y BRUÑADO E=2'' S/COLOREAR M2 805.76 29.98 24,156.68
02.04.02.06 PISO TERRAZO LAVADO M2 880.18 66.41 58,452.75
02.04.02.07 PISO DEPORTIVO SINTETICO VINILICO PVC E=9MM M2 522.00 264.93 138,293.46
02.04.02.08 PISO CERAMICO DE 20X20 PARA PISCINA CELESTE PLUS M2 312.50 68.62 21,443.75
02.04.02.09 PISOS DE CAUCHO VULCANIZADO, E=13MM M2 2,917.50 237.80 693,781.50
02.04.02.10 SEMBRADO DE GRASS NATURAL M2 11,470.80 16.71 191,677.07
02.04.02.11 SUMINISTRO Y COLOCACION DE TIERRA DE CHACRA M2 11,470.80 6.40 73,413.12
02.04.02.12 PISO DE MADERA PUMAQUIRO MACHIHEMBRADO DE 5''x7'', ESPESOR 3/4'' ACABADO BARNIZ MARINO M2 108.40 194.34 21,066.46

02.04.02.13 PISO DE ASFALTO E=2'' EN CALIENTE M2 2,917.50 45.75 133,475.63


02.04.03 PISOS DE CONCRETO 820,687.25
02.04.03.01 LOSA DEPORTIVA DE CONCRETO 210 kg/cm2 ACABADO FROTACHADO E=0.15M INCLUIDO CON M2 1,054.88 70.55 74,421.78
CURADO ADITIVO
02.04.03.02 ESTACIONAMIENTO - PATIO CONCRETO 210 kg/cm2 ACABADO FROTACHADO Y BRUÑADO e=0.15M M2 413.93 70.55 29,202.76
INCLUIDO CON CURADO ADITIVO
02.04.03.03 PATIO TECHADO Y PRINCIPAL DE CONCRETO 210 kg/cm2 ACABADO FROTACHADO Y BRUÑADO M2 2,615.81 70.55 184,545.40
e=0.15M INCLUIDO CON CURADO ADITIVO
02.04.03.04 ALAMEDA DE CONCRETO 175 kg/cm2 ACABADO FROTACHADO Y BRUÑADO e=0.10M INCLUIDO CON M2 355.56 55.74 19,818.91
CURADO ADITIVO
02.04.03.05 VEREDA DE CONCRETO 175 kg/cm2 ACABADO FROTACHADO Y BRUÑADO e=0.10M INCLUIDO CON M2 5,930.46 55.74 330,563.84
CURADO ADITIVO
02.04.03.06 RAMPA DE CONCRETO 175 kg/cm2 ACABADO FROTACHADO Y BRUÑADO e=0.15M INCLUIDO CON M2 1,080.31 75.99 82,092.76
CURADO ADITIVO
02.04.03.07 SARDINEL DE CONCRETO 175 kg/cm2 h=0.50m, ACABADO 1:2 INC. CURADO C/ADITIVO M 871.52 56.94 49,624.35

02.04.03.08 SARDINEL CONCRETO f'c=175 kg/cm2 h=0.15m, INCLUIDO CON CURADO ADITIVO M 14.55 26.78 389.65

02.04.03.09 SARDINEL DE CONCRETO 175 kg/cm2 h ext=0.15m, INCLUIDO CURADO CON ADITIVO M 1,007.36 26.78 26,977.10

02.04.03.10 SARDINEL DE CONCRETO 175 kg/cm2 h ext=0.35m, INCLUIDO CURADO CON ADITIVO M 9.80 40.04 392.39

02.04.03.11 ENCOFRADO Y DESENCOFRADO NORMAL EN SARDINELES DE PATIOS, VEREDAS M2 929.00 24.39 22,658.31

02.05 ZOCALOS Y CONTRAZOCALOS 332,714.17


02.05.01 ZOCALOS 180,821.28
02.05.01.01 ZOCALO CERAMICO 45x45 COLOR BLANCO M2 2,038.59 63.63 129,715.48
02.05.01.02 ZOCALO CERAMICO 40x40 COLOR BLANCO M2 685.57 63.63 43,622.82
OBRA Ejecución de la Obra “Adecuación, Mejoramiento y Sustitución de la Infraestructura Educativa de la I.E. N° 64721 Hildebrando Fuentes, Raymondi – Atalaya – Ucayali”.SATIPO - JUNIN
CONTRATISTA CONSORCIO TERRASUR (Integrado por TERRAK SAC y TABLEROS Y PUENTES S.A SUCURSAL DEL PERU)
ENTIDAD PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA-PRONEID
PLAZO DE EJECUCION 390 DIAS CALENDARIOS
MONTO CONTRATADO S/. 24,490,288.53 (INC. IGV)

PRESUPUESTO
Item Descripción Und. Metrado Precio S/. Parcial S/.
02.05.01.03 ZOCALO CON CERAMICA 20x20 ESPECIAL PARA PISCINA M2 127.50 58.69 7,482.98
02.05.02 CONTRAZOCALOS 151,892.89
02.05.02.01 CONTRA. PORCELANATO DE 0.40x0.40 H=0.10M, MT TIPO IV COLOR PLATA O SIMILAR M 2,871.50 20.96 60,186.64

02.05.02.02 CONTR.S/COLOREAR H=10 cm MZ 1:2 e=1.5 cm M 58.62 8.96 525.24


02.05.02.03 CONTR.S/COLOREAR H=30 cm MZ 1:2 e=1.5 cm M 2,175.84 13.65 29,700.22
02.05.02.04 CONTR.S/COLOREAR H=45 cm MZ 1:2 e=1.5 cm M 39.66 13.86 549.69
02.05.02.05 CONTR.S/COLOREAR H=60 cm MZ 1:2 e=1.5 cm M 354.78 17.04 6,045.45
02.05.02.06 CONTR.S/COLOREAR H=75 cm MZ 1:2 e=1.5 cm M 56.66 23.69 1,342.28
02.05.02.07 CONTR.S/COLOREAR H=85 cm (CERCO) MZ 1:2 e=1.5 cm M 1,655.11 25.67 42,486.67
02.05.02.08 CONTRAZOCALO MAD. PUMAQUIRO 3/4''X4'' + RODON 3/4'' M 43.20 15.32 661.82
02.05.02.09 CONTR. DE CEMENTO PULIDO BRUÑADO INTERIOR H=40cm MZ 1:2 e=1.5cm M 216.60 13.96 3,023.74

02.05.02.10 CONTRAZOCALO DE TERRAZO, h=0.10m M 61.90 15.65 968.74


02.05.02.11 CONTRAZOCALO RECTO DE ESCALERAS (H=0.30M) M 344.40 18.59 6,402.40
02.06 COBERTURA (CUBIERTA) 902,551.28
02.06.01 COBERTURA DE PLANCHA DE ALUZINCADA DE ESPESOR DE 0.5MM PREPINTADO DE COLOR AZUL M2 9,772.45 47.79 467,025.39
02.06.02 CUMBRERA DE ALUMINIO ZINCADO PREPINTADO RECUB. C/ALEAC-AL-ZINC-SIL E=0.50 ML 442.45 40.68 17,998.87

02.06.03 COBERTURA DE PLANCHA POLICARBONATO REFLECTIVO DE 10mm M2 1,757.35 145.57 255,817.44


02.06.04 LISTONES DE MADERA SECA Y CEPILLADA P/FIJAR COB ALUZINC EN ALIGERADO P2 7,404.96 11.68 86,489.93

02.06.05 CORREAS DE MADERA TORNILLO 2''x6'' P2 3,011.22 9.85 29,660.52


02.06.06 IMPERMEAB. DE TECHOS CON PINTURA ASFALTICA M2 8,812.21 5.17 45,559.13
02.07 KIOSCO Y FOTOCOPIADORA 10,933.11
02.07.01 VIGAS Y LISTONERIA DE MADERA TORNILLO P2 1,109.96 9.85 10,933.11
02.08 CARPINTERIA DE MADERA 231,342.91
02.08.01 PUERTAS 231,342.91
02.08.01.01 PUERTA MACHIHEMBRADA DE MADERA CEDRO C/MIRILLA M2 206.98 421.85 87,314.51
02.08.01.02 PUERTA MACHIHEMBRADA MADERA CEDRO M2 207.75 389.11 80,837.60
02.08.01.03 PUERTA DOBLE HOJA MACHIHEMBRADA DE MADERA CEDRO M2 36.12 453.72 16,388.37
02.08.01.04 CELOSIAS DE MADERA EN PARASOLES (ADMINIST) M2 83.28 402.40 33,511.87
02.08.01.05 PUERTA MACHIHEMBRADA DE MADERA CEDRO, DOBLE HOJA VAIVEN M2 23.40 487.59 11,409.61
02.08.01.06 PUERTA EN MUEBLE BAJO (COCINA) M2 8.82 213.26 1,880.95
02.09 CARPINTERIA METALICA Y HERRERIA 800,826.74
02.09.01 PUERTAS DE FIERRO 24,071.90
02.09.01.01 PUERTA DE FIERRO PARA CASETA DE GAS M2 3.15 147.39 464.28
02.09.01.02 PUERTA METALICA PARA CASETA DE BOMBAS M2 12.18 169.40 2,063.29
02.09.01.03 PUERTA METALICA, INCLUYE MIRILLA M2 20.16 275.92 5,562.55
02.09.01.04 PUERTA METALICA DOBLE HOJA M2 34.20 275.92 9,436.46
02.09.01.05 PUERTA METALICA ENROLLABLE M2 30.16 217.02 6,545.32
OBRA Ejecución de la Obra “Adecuación, Mejoramiento y Sustitución de la Infraestructura Educativa de la I.E. N° 64721 Hildebrando Fuentes, Raymondi – Atalaya – Ucayali”.SATIPO - JUNIN
CONTRATISTA CONSORCIO TERRASUR (Integrado por TERRAK SAC y TABLEROS Y PUENTES S.A SUCURSAL DEL PERU)
ENTIDAD PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA-PRONEID
PLAZO DE EJECUCION 390 DIAS CALENDARIOS
MONTO CONTRATADO S/. 24,490,288.53 (INC. IGV)

PRESUPUESTO
Item Descripción Und. Metrado Precio S/. Parcial S/.
02.09.02 VENTANAS DE ALUMINIO 436,872.62
02.09.02.01 VENTANA DE ALUMINIO FIJA CON PLATINA HORIZONTAL M2 493.80 210.83 104,107.85
02.09.02.02 VENTANA DE ALUMINIO SISTEMA CORREDIZA Y PLATINA SUPERIOR EN LA PARTE SUPERIOR M2 1,156.58 189.70 219,403.23

02.09.02.03 VENTANA DE ALUMINIO FIJA C/CRISTAL TEMPLADO TRANSPARENTE M2 50.94 189.70 9,663.32
02.09.02.04 VENTANA DE ALUMINIO FIJA SISTEMA CORREDIZA CON CRISTAL TEMPLADO 6MM M2 53.03 189.70 10,059.79

02.09.02.05 VENTANA CIRCULAR CON ACCESORIOS DE ACERO INOXIDABLE (R=1.39m) M2 146.55 332.31 48,700.03

02.09.02.06 VENTANA CON MARCO DE ALUMINIO Y CRISTAL 10MM (BOLETERIA) M2 4.61 434.15 2,001.43
02.09.02.07 MAMPARA CON MARCO DE ALUMINIO CON CRISTAL TEMPLADO 10mm INCLUYE ACCESORIOS M2 33.12 429.25 14,216.76

02.09.02.08 VENTANA CELOSIA CON MARCO TUBO ALUMINIO 2''x4'' Y PLATINAS 2''x1/4'' HORIZONTAL M2 94.83 302.86 28,720.21

02.09.03 DIVISION DE ALUMINIO 65,802.65


02.09.03.01 GABINETES DE ESTRUCTURAS DE ALUMINIO Y PANELES DE MELAMINE (S.S.H.H.) ML 130.58 209.65 27,376.10

02.09.03.02 GABINETE DE ESTRUCTURA DE ALUMINIO Y PANELES DE MELAMINE (URINARIO) H=1.20 ML 35.20 209.65 7,379.68

02.09.03.03 PUERTA DE CUBICULOS SSHH CON MELAMINE HIDROFUGO 18MM CON MARCO DE ALUMINIO M2 104.64 253.24 26,499.03

02.09.03.04 PUERTA DE POLICARBONATO CON MARCO DE ALUMINIO M2 27.20 167.20 4,547.84


02.09.04 BARANDAS METALICAS 83,136.85
02.09.04.01 BARANDA EN CORREDORES AC INOX S/DETALLE M 653.90 127.14 83,136.85
02.09.05 PASAMANOS 29,365.13
02.09.05.01 PASAMANO DE TUBO DE Ø 2'' AC. INOX BRILLANTE EN PISCINA M 19.20 102.03 1,958.98
02.09.05.02 PASAMANO DE TUBO F° N° DE 2'' EN ESCALERA M 326.40 73.48 23,983.87
02.09.05.03 PASAMANOS DE 1.1/2'' ACERO INOX EN SSHH DISCP M 38.60 88.66 3,422.28
02.09.06 ESCALERAS 7,995.82
02.09.06.01 ESCALERA GATO EMPOTRADA DE ACERO INOXIDABLE Und. 1.00 292.75 292.75
02.09.06.02 CANTONERA DE FIERRO EN ESCALERA M 259.45 29.69 7,703.07
02.09.07 CERCO Y REJA 152,973.77
02.09.07.01 CERCO EXTERIOR TIPO REJA S/DISEÑO M2 201.06 300.93 60,504.99
02.09.07.02 CERCO TIPO MALLA COCADA 2''X2'' CON ALAMBRE N° 10 M2 478.59 130.69 62,546.93
02.09.07.03 PUERTA DE INGRESOS DOBLE HOJA TIPO REJA METALICA CON TUBO CUADRADO (CERCO) M2 93.19 210.45 19,611.84

02.09.07.04 PUERTA DE INGRESO TIPO REJA METALICA CON TUBO CUADRADO (CERCO) M2 41.79 246.71 10,310.01

02.09.08 ELEMENTOS METALICOS ESPECIALES 608.00


02.09.08.01 MARCO Y TAPA DE FIERRO D=0.60m Und. 2.00 147.69 295.38
02.09.08.02 MARCO Y TAPA DE FIERRO 0.80x0.80M P/TQUE CISTERNA Und. 2.00 156.31 312.62
OBRA Ejecución de la Obra “Adecuación, Mejoramiento y Sustitución de la Infraestructura Educativa de la I.E. N° 64721 Hildebrando Fuentes, Raymondi – Atalaya – Ucayali”.SATIPO - JUNIN
CONTRATISTA CONSORCIO TERRASUR (Integrado por TERRAK SAC y TABLEROS Y PUENTES S.A SUCURSAL DEL PERU)
ENTIDAD PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA-PRONEID
PLAZO DE EJECUCION 390 DIAS CALENDARIOS
MONTO CONTRATADO S/. 24,490,288.53 (INC. IGV)

PRESUPUESTO
Item Descripción Und. Metrado Precio S/. Parcial S/.
02.10 CERRAJERIA 39,965.62
02.10.01 BISAGRAS 6,306.60
02.10.01.01 BISAGRA DE ACERO ALUMINIZADO DE 4'' PESADA EN PUERTA PZA 24.00 4.80 115.20
02.10.01.02 BISAGRAS CAPUCHINAS ACERO ALUMINIZADO 3 1/2'' PZA 817.00 5.00 4,085.00
02.10.01.03 BARRA ANTIPANICO PARA PUERTA DE INGRESO A POLIDEPORTIVO PZA 4.00 526.60 2,106.40
02.10.02 CERRADURA 23,989.58
02.10.02.01 CERRADURA DOS GOLPES EN PUERTA PZA 406.00 56.83 23,072.98
02.10.02.02 CERRADURA PARA PUERTA EXTERIOR TRES GOLPES PZA 2.00 63.83 127.66
02.10.02.03 CERRADURA PARA PUERTA INTERIOR DOBLE PERILLA PZA 18.00 43.83 788.94
02.10.03 ACCESORIOS CIERRE 9,669.44
02.10.03.01 CERROJO DE 3'' ALUMINIZADO PARA PUERTA PZA 225.00 7.31 1,644.75
02.10.03.02 MANIJA DE BRONCE 4'' PARA PARA PUERTAS PZA 134.00 7.36 986.24
02.10.03.03 PICAPORTE DE 6'', DE FIERRO PZA 243.00 11.43 2,777.49
02.10.03.04 FRENO HIDRAULICO PARA PUERTA DE CRISTAL Und. 6.00 710.16 4,260.96
02.11 VIDRIOS, CRISTALES Y SIMILARES 188,184.93
02.11.01 VIDRIOS Y CRISTALES 188,184.93
02.11.01.01 CRISTAL TEMPLADO 6MM M2 1,391.08 113.53 157,929.31
02.11.01.02 CRISTAL TEMPLADO 10MM M2 46.35 185.57 8,601.17
02.11.01.03 CRISTAL REFLECTIVO DE SEGURIDAD M2 4.61 211.97 977.18
02.11.01.04 BARANDA DE CRISTAL TEMPLADO 10MM CON ACCESORIOS DE ACERO INOX DE 2'' M2 80.40 257.18 20,677.27

02.12 PINTURA 412,637.59


02.12.01 PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES 389,137.80
02.12.01.01 PINTURA LATEX 2 MANOS EN CIELO RASO Y VIGAS M2 16,601.73 8.02 133,145.87
02.12.01.02 PINTURA LATEX 2 MANOS EN MUROS Y COLUMNA M2 26,198.24 6.39 167,406.75
02.12.01.03 PINTURA OLEOMATE 2 MANOS EN MUROS Y COLUMNAS EXTERIORES (PRIMER PISO) M2 1,252.30 11.97 14,990.03

02.12.01.04 PINTURA OLEOMATE 2 MANOS EN MUROS Y COLUMNAS EXT. A PARTIR 2DO. PISO M2 6,148.30 11.97 73,595.15

02.12.02 PINTURA DE CARPNTERIA DE MADERA 8,010.52


02.12.02.01 PRESERVANTE PARA MADERA M2 270.90 9.15 2,478.74
02.12.02.02 PINTURA BARNIZ EN CARP. DE MADERA M2 270.90 20.42 5,531.78
02.12.03 PINTURA DE ELEMENTOS METALICOS 15,489.27
02.12.03.01 PINTURA ANTICORROSIVA Y ESM. EN BARANDAS Y PASAMANOS 2 MANOS M 244.80 6.22 1,522.66

02.12.03.02 PINTURA DEMARCACION DE LOSA DEPORTIVA M2 1,054.88 13.24 13,966.61


02.13 VARIOS, LIMPIEZA Y JARDINERIA 13,500.00
02.13.01 LIMIPEZA PERMANENTE DE LA OBRA GLB. 1.00 10,800.00 10,800.00
02.13.02 LIMPIEZA FINAL DE LA OBRA GLB. 1.00 2,700.00 2,700.00
02.14 OTROS 332,311.24
02.14.01 VARIOS 63,015.62
OBRA Ejecución de la Obra “Adecuación, Mejoramiento y Sustitución de la Infraestructura Educativa de la I.E. N° 64721 Hildebrando Fuentes, Raymondi – Atalaya – Ucayali”.SATIPO - JUNIN
CONTRATISTA CONSORCIO TERRASUR (Integrado por TERRAK SAC y TABLEROS Y PUENTES S.A SUCURSAL DEL PERU)
ENTIDAD PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA-PRONEID
PLAZO DE EJECUCION 390 DIAS CALENDARIOS
MONTO CONTRATADO S/. 24,490,288.53 (INC. IGV)

PRESUPUESTO
Item Descripción Und. Metrado Precio S/. Parcial S/.
02.14.01 GARGOLA DE CONCRETO SEGÚN DISEÑO Und. 60.00 81.09 4,865.40
02.14.02 CANALETA f'c=140 P/EVAC. PLUVIAL, MEDIA CAÑA 4'' EN PASADIZO M 566.74 14.75 8,359.42
02.14.03 ASTA DE BANERA TIPICO PZA 2.00 1,014.81 2,029.62
02.14.04 MESA C.A. REVST. C/CERAMICO M2 66.94 340.71 22,807.13
02.14.05 MESA DE CONCRETO, ACABADO CON POLVO DE MARMOL ML 82.74 248.19 20,535.24
02.14.06 MESA REVESTIDA CON PLANCHA DE ACERO INOXIDABLE PZA 8.00 408.59 3,268.72
02.14.07 ENCHAPE EN PLANCHA DE GRANITO ROJO M2 17.14 67.10 1,150.09
02.14.02 EQUIPAMIENTO DEPORTIVO Y DE RECREACION 14,898.63
02.14.02.01 ARCO Y TABLERO FULBITO - BASKET (MET-MAD) Und. 4.00 2,272.72 9,090.88
02.14.02.02 ARCO PARA FUTBALL Und. 2.00 2,272.72 4,545.44
02.14.02.03 TUBOS C. VOLEY, INC. RED Y DADOS CONCRETO JGO 3.00 420.77 1,262.31
02.14.03 EQUPAMIENTO DE PISCINA 183,617.51
02.14.03.01 PARTIDORES CON ACCESORIOS DE ACERO INOXIDABLE PARA COMPETENCIA Und. 12.00 12,757.06 153,084.72

02.14.03.02 ESCALERA DE ACERO INOX Und. 4.00 1,475.58 5,902.32


02.14.03.03 ANDARIBELES PARA PISCINA ML 5.00 1,908.71 9,543.55
02.14.03.04 COBERTOR PARA PISCINA M2 1.00 9,667.84 9,667.84
02.14.03.05 CARRO TRANSPORTADOR DE COBERTOR EN PISCINA Und. 1.00 5,419.08 5,419.08
02.14.04 JUNTAS 35,024.74
02.14.04.01 JUNTA DE DILATACION CON ESPUMA PLASTICA+JEBE MICROPOROSO M 575.69 16.06 9,245.58
02.14.04.02 TAPA JUNTA CON PLANCHA LISA 3/16 VERTICAL (ENTRE MODULOS) M 279.28 21.18 5,915.15
02.14.04.03 TAPA JUNTA HORIZONTAL CON PLANCHA DE ACERO LISO 3/16 M 260.89 26.15 6,822.27
02.14.04.04 JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1'' M 1,351.45 6.22 8,406.02
02.14.04.05 JUNTA DE CONSTRUCCION TIPO J1 M 228.00 13.94 3,178.32
02.14.04.06 JUNTA DE CONSTRUCCION TIPO J2 M 84.00 17.35 1,457.40
02.14.05 PIZARRA 35,754.74
02.14.05.01 PIZARRA MURAL 5.0x1.0 SIN TISERO Und. 64.00 234.40 15,001.60
02.14.05.02 PIZARRA ACRILICA CON MARCO DE ALUMINIO 5.00X1.40 MT Und. 6.00 431.82 2,590.92
02.14.05.03 PIZARRA ACRILICA CON MARCO DE ALUMINIO 4.20X1.40 MT Und. 9.00 414.22 3,727.98
02.14.05.04 TICERO DE MADERA CEDRO (L=4.20 m) BARNIZADO Und. 3.00 194.86 584.58
02.14.05.05 TICERO DE MADERA CEDRO (L=5.00 m) BARNIZADO Und. 59.00 234.74 13,849.66
03 INSTALACIONES SANITARIAS 978,766.47
03.01 APARATOS SANITARIOS Y ACCESORIOS 173,350.10
03.01.01 INIDORO FLUXOMETRICO BLANCO Und. 126.00 588.06 74,095.56
03.01.02 URINARIO FLUXOMETRICO Und. 51.00 365.21 18,625.71
03.01.03 LAVATORIO DE LOZA TIPO MANANTIAL Und. 3.00 151.92 455.76
03.01.04 LAVATORIO TIPO OVALIN SONNET DE LOSA BLANCO Und. 127.00 107.14 13,606.78
03.01.05 LAVADERO DE ACERO INOX. 1 POZA S/ESCURRIDEA Und. 9.00 50.00 450.00
03.01.06 LAVADERO DE ACERO INOX. 2 POZAS S/ESCURRIDERA Und. 5.00 250.00 1,250.00
03.01.07 LAVADERO DE GRANITO 1 POZA Und. 11.00 148.61 1,634.71
03.01.08 DUCHA CROMADA SIMPLE Und. 44.00 195.67 8,609.48
OBRA Ejecución de la Obra “Adecuación, Mejoramiento y Sustitución de la Infraestructura Educativa de la I.E. N° 64721 Hildebrando Fuentes, Raymondi – Atalaya – Ucayali”.SATIPO - JUNIN
CONTRATISTA CONSORCIO TERRASUR (Integrado por TERRAK SAC y TABLEROS Y PUENTES S.A SUCURSAL DEL PERU)
ENTIDAD PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA-PRONEID
PLAZO DE EJECUCION 390 DIAS CALENDARIOS
MONTO CONTRATADO S/. 24,490,288.53 (INC. IGV)

PRESUPUESTO
Item Descripción Und. Metrado Precio S/. Parcial S/.
03.01.09 COLOCACION DE APARATOS SANITARIOS Und. 342.00 97.79 33,444.18
03.01.10 DISPENSADOR DE PAPEL TOALLA Und. 113.00 39.06 4,413.78
03.01.11 DISPENSADOR DE JABON LIQUIDO Und. 113.00 39.95 4,514.35
03.01.12 DISPENSADOR DE PAPEL HIGIENICO Und. 117.00 39.06 4,570.02
03.01.13 COLOCACION DE ACCESORIOS SANITARIOS Und. 343.00 22.39 7,679.77
03.02 SISTEMA DE AGUA FRIA 181,248.92
03.02.01 TRABAJOS PRELIMINARES REDES DE AGUA 1,564.63
03.02.01.01 TRAZO NIVELES Y REPLANTEO DURANTE EL PROCESO ML 1,029.36 1.52 1,564.63
03.02.02 MOVIMIENTO DE TIERRAS 22,174.24
03.02.02.01 EXCAVACION DE ZANJAS PARA REDES DE AGUA ML 1,029.36 7.22 7,431.98
03.02.02.02 REFINE Y NIVELACION DE ZANJAS ML 1,029.36 1.40 1,441.10
03.02.02.03 CAMA DE ARENA CON MATERIAL PRESTAMO H=0.10 M ML 1,029.36 6.44 6,629.08
03.02.02.04 RELLENO COMPACTADO C/MAT. PROPIO C/PL VIB m3 308.81 15.03 4,641.41
03.02.02.05 ELIMINACION DE MAT. EXCEDENTE CARGUIO MANUAL Y VOLQUETE 6M3 m3 92.64 21.92 2,030.67
03.02.03 SALIDAS DE AGUA FRIA 33,594.96
03.02.03.01 SALIDA DE AGUA FRIA PVC C-10 DE 1/2" pto 190.00 85.94 16,328.60
03.02.03.02 SALIDA DE AGUA FRIA PVC C-10 DE 3/4" pto 55.00 80.98 4,453.90
03.02.03.03 SALIDA DE AGUA FRIA -PVC C-10 1" pto 51.00 71.96 3,669.96
03.02.03.04 SALIDA DE AGUA FRIA PVC C-10 DE 1 1/4 pto 115.00 79.50 9,142.50
03.02.04 RED DE DISTRIBUCION DE AGUA FRIA 17,107.66
03.02.04.01 TUBERIA DE AGUA PVC C-10 DE 4" m 15.32 40.20 615.86
03.02.04.02 TUBERIA DE AGUA PVC C-10 DE 3" m 69.48 27.87 1,936.41
03.02.04.03 TUBERIA DE AGUA PVC C-10 DE 2" m 89.90 17.56 1,578.64
03.02.04.04 TUBERIA DE AGUA PVC C-10 DE 1 1/2" m 145.46 14.34 2,085.90
03.02.04.05 TUBERIA DE AGUA PVC C-10 DE 1 1/4" m 277.09 13.39 3,710.24
03.02.04.06 TUBERIA DE AGUA PVC C-10 DE 1" m 46.52 11.72 545.21
03.02.04.07 TUBERIA DE AGUA PVC C-10 DE 3/4" m 206.35 11.10 2,290.49
03.02.04.08 TUBERIA DE AGUA PVC C-10 DE 1/2" m 411.45 10.56 4,344.91
03.02.05 RED DE ALIMENTACION AGUA FRIA 17,973.00
03.02.05.01 TUBERIA DE AGUA PVC C-10 DE 2 1/2" m 410.75 21.83 8,966.67
03.02.05.02 TUBERIA DE AGUA PVC C-10 DE 2 " m 156.31 17.56 2,744.80
03.02.05.03 TUBERIA DE AGUA PVC C-10 DE 1 1/2 " m 339.94 14.34 4,874.74
03.02.05.04 TUBERIA DE AGUA PVC C-10 DE 1 1/4 " m 3.16 13.39 42.31
03.02.05.05 TUBERIA DE AGUA PVC C-10 DE 1 " m 37.20 11.72 435.98
03.02.05.06 TUBERIA DE AGUA PVC C-10 DE 3/4 " m 76.50 11.10 849.15
03.02.05.07 TUBERIA DE AGUA PVC C-10 DE 1/2 " m 5.50 10.79 59.35
03.02.06 VALVULAS DE AGUA FRIA 14,964.36
03.02.06.01 VALVULA COMPUERTA DE BRONCE DE 1/2" und 3.00 86.77 260.31
03.02.06.02 VALVULA COMPUERTA DE BRONCE DE 3/4" und 18.00 94.63 1,703.34
03.02.06.03 VALVULA COMPUERTA DE BRONCE DE 1" und 10.00 113.86 1,138.60
03.02.06.04 VALVULA COMPUERTA DE BRONCE DE 1 1/4" und 33.00 138.44 4,568.52
OBRA Ejecución de la Obra “Adecuación, Mejoramiento y Sustitución de la Infraestructura Educativa de la I.E. N° 64721 Hildebrando Fuentes, Raymondi – Atalaya – Ucayali”.SATIPO - JUNIN
CONTRATISTA CONSORCIO TERRASUR (Integrado por TERRAK SAC y TABLEROS Y PUENTES S.A SUCURSAL DEL PERU)
ENTIDAD PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA-PRONEID
PLAZO DE EJECUCION 390 DIAS CALENDARIOS
MONTO CONTRATADO S/. 24,490,288.53 (INC. IGV)

PRESUPUESTO
Item Descripción Und. Metrado Precio S/. Parcial S/.
03.02.06.05 VALVULA COMPUERTA DE BRONCE DE 1 1/2" und 25.00 172.29 4,307.25
03.02.06.06 VALVULA CHECK DE BRONCE 1" und 1.00 126.86 126.86
03.02.06.07 CAJA DE VALVULA EN PARED, INCLUYE TAPA und 78.00 36.66 2,859.48
03.02.07 EQUIPO DE BOMBEO -RED AGUA CAMPUS EDUC. 31,679.68
03.02.07.01 BOMBA DE PRESION CTE. Y VEL. VARIABLE 3HP und 4.00 1,996.95 7,987.80
03.02.07.02 BOMBA SUMERGIBLE PARA POZO SUMIDERO DE 1 HP und 4.00 2,867.44 11,469.76
03.02.07.03 REBOSE DE CISTERNA D=6" und 2.00 150.96 301.92
03.02.07.04 TUBERIA DE FoGo de 2 1/2" und 13.24 41.63 551.18
03.02.07.05 TUBERIA DE AGUA c-10 de 3" und 13.28 27.87 370.11
03.02.07.06 ACCESORIOS DE PVC SAP C10 CISTERNA CAMPUS E. und 1.00 1,695.77 1,695.77
03.02.07.07 ACCESORIOS DE F°G° CISTERNA CAMPUS E. und 1.00 1,527.83 1,527.83
03.02.07.08 VALVULA COMPUERTA DE BRONCE DE 3" und 4.00 528.03 2,112.12
03.02.07.09 VALVULA COMPUERTA DE BRONCE DE 2 1/2" und 4.00 358.39 1,433.56
03.02.07.10 VALVULA FLOTADORA DE 2 1/2" und 2.00 373.63 747.26
03.02.07.11 VALVULA CHECK DE BRONCE 2 1/2" und 4.00 377.22 1,508.88
03.02.07.12 VALVULA DE PIE BRONCE D=3" und 4.00 350.90 1,403.60
03.02.07.13 BRIDA ROMPE AGUA und 4.00 119.34 477.36
03.02.07.14 POYO DE CONCRETO FC=210 kg/cm2 m3 0.27 342.69 92.53
03.02.08 EQUIPO DE BOMBEO -BOMBA PARA PISCINA 7,939.86
03.02.08.01 BOMBA DE PRESION CTE. Y VEL. VARIABLE 2HP und 1.00 5,643.05 5,643.05
03.02.08.02 TUBERIA DE F°G° DE 2" m 5.41 35.65 192.87
03.02.08.03 TUBERIA DE AGUA PVC C-10 DE 2 1/2" m 3.32 21.83 72.48
03.02.08.04 ACCESORIOS DE PVC SAP C10 BOMBA und 1.00 433.56 433.56
03.02.08.05 ACCESORIOS DE F°G° BOMBA und 1.00 454.76 454.76
03.02.08.06 VALVULA COMPUERTA DE BRONCE DE 2 1/2" und 1.00 358.39 358.39
03.02.08.07 VALVULA COMPUERTA DE BRONCE DE 2" und 1.00 227.81 227.81
03.02.08.08 VALVULA CHECK DE BRONCE 2" und 1.00 201.93 201.93
03.02.08.09 VALVULA CHECK DE BRONCE D=2 1/2" und 1.00 191.12 191.12
03.02.08.10 BRIDA ROMPE AGUA und 1.00 119.34 119.34
03.02.08.11 POYO DE CONCRETO FC=210 KG/CM2 m3 0.13 342.69 44.55
03.02.09 EQUIPO DE BOMBEO RECIRCULACION PISCINA 34,250.53
03.02.09.01 BOMBA DE 4 HP RECIRCULACION und 3.00 5,090.73 15,272.19
03.02.09.02 ACCESORIOS DE PVC SAP C-10 PISCINA und 12.00 469.06 5,628.72
03.02.09.03 BOQUILLAS DE ASPIRACION 2" und 2.00 94.22 188.44
03.02.09.04 BOQUILLAS DE RETORNO 2" und 16.00 20.09 321.44
03.02.09.05 FILTRO DE ARENA D=1.40m, h=1.8m und 3.00 4,224.94 12,674.82
03.02.09.06 POYO DE CONCRETO FC=210 kg/cm2 m3 0.33 342.69 113.09
03.02.09.07 VALVULA FLOTADORA DE BRONCE DE 3/4" und 1.00 51.83 51.83
03.03 SISTEMA DE REGADIO 66,637.32
03.03.01 TRABAJOS PRELIMINARES REDES DE REGADIO 2,010.66
03.03.01.01 TRAZO NIVELES Y REPLANTEO DURANTE EL PROCESO ml 1,322.80 1.52 2,010.66
OBRA Ejecución de la Obra “Adecuación, Mejoramiento y Sustitución de la Infraestructura Educativa de la I.E. N° 64721 Hildebrando Fuentes, Raymondi – Atalaya – Ucayali”.SATIPO - JUNIN
CONTRATISTA CONSORCIO TERRASUR (Integrado por TERRAK SAC y TABLEROS Y PUENTES S.A SUCURSAL DEL PERU)
ENTIDAD PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA-PRONEID
PLAZO DE EJECUCION 390 DIAS CALENDARIOS
MONTO CONTRATADO S/. 24,490,288.53 (INC. IGV)

PRESUPUESTO
Item Descripción Und. Metrado Precio S/. Parcial S/.
03.03.02 MOVIMIENTO DE TIERRAS 25,602.49
03.03.02.01 EXCAVACION DE ZANJAS PARA REDES SANITARIAS (HASTA 1M) m 1,322.80 7.22 9,550.62
03.03.02.02 REFINE Y NIVELACION DE ZANJAS (P/TUB DE 1/2"-1 1/2") m 1,322.80 1.40 1,851.92
03.03.02.03 CAMA DE ARENA CON MATERIAL PRESTAMO H=0.10 M ml 1,322.80 6.44 8,518.83
03.03.02.04 RELLENO COMPACTADO C/EQUIPO, MATERIAL PROPIO m3 396.84 7.74 3,071.54
03.03.02.05 ELIMINACION DE MAT. EXCEDENTE CARGUIO MANUAL Y VOLQUETE 6M3 (D=10 KM) m3 119.05 21.92 2,609.58

03.03.03 RED DE ALIMENTACION 19,419.18


03.03.03.01 TUBERIA DE AGUA PVC C-10 DE 2" m 547.50 17.56 9,614.10
03.03.03.02 TUBERIA DE AGUA PVC C-10 DE 1 1/2" m 202.30 14.34 2,900.98
03.03.03.03 TUBERIA DE AGUA PVC C-10 DE 1 1/4" m 112.90 13.39 1,511.73
03.03.03.04 TUBERIA DE AGUA PVC C-10 DE 1" m 460.10 11.72 5,392.37
03.03.04 ACCESORIOS 8,284.37
03.03.04.01 GRIFO DE RIEGO DE 1/2" und 8.00 81.77 654.16
03.03.04.02 GRIFO DE RIEGO DE POR ASPERSION und 71.00 93.61 6,646.31
03.03.04.03 VALVULA SOLENOIDE DE 2" und 5.00 160.12 800.60
03.03.04.04 CAJA DE VALVULA EN PARED, INCLUYE TAPA und 5.00 36.66 183.30
03.03.05 EQUIPOS 11,320.62
03.03.05.01 ELECTROBOMBA DE 2 HP und 2.00 2,722.80 5,445.60
03.03.05.02 REBOSE DE CISTERNA D=6" und 1.00 150.96 150.96
03.03.05.03 TUBERIA DE AGUA PVC C-10 DE 3" m 6.64 27.87 185.06
03.03.05.04 TUBERIA DE FoGo de 2 1/2" m 6.62 41.63 275.59
03.03.05.05 ACCESORIOS DE PVC SAP C10 CIST. REGADIO und 1.00 733.10 733.10
03.03.05.06 ACCESORIOS DE F°G° CIST. REGADIO und 1.00 801.59 801.59
03.03.05.07 VALVULA COMPUERTA DE BRONCE DE 3" und 2.00 528.03 1,056.06
03.03.05.08 VALVULA COMPUERTA DE BRONCE DE 2 1/2" und 2.00 358.39 716.78
03.03.05.09 VALVULA FLOTADORA DE 2 1/2" und 1.00 373.63 373.63
03.03.05.10 VALVULA CHECK DE 2 1/2" und 2.00 393.96 787.92
03.03.05.11 VALVULA DE PIE BRONCE D=3" und 2.00 350.90 701.80
03.03.05.12 POYO DE CONCRETO FC=210 kg/cm2 m3 0.27 342.69 92.53
03.04 SISTEMA DE DRENAJE PLUVIAL 366,756.23
03.04.01 TRABAJOS PRELIMINARES REDES DE DRENAJE 2,465.55
03.04.01.01 TRAZO Y REPLANTEO DURANTE EL PROCESO m 2,515.87 0.98 2,465.55
03.04.02 MOVIMIENTO DE TIERRAS 117,741.77
03.04.02.01 EXCAVACION DE ZANJAS PARA REDES DE DRENAJE m 2,649.49 3.94 10,438.99
03.04.02.02 EXCAVACION DE PLATAFORMA m2 2,549.90 7.35 18,741.77
03.04.02.03 REFINEY NIVELACION DE ZANJAS ml 1,954.68 1.40 2,736.55
03.04.02.04 RELLENO Y COMPACTADO MANUAL MAT. DE PRESTAMO GRAVA DE 1/2" m3 244.22 72.33 17,664.43
03.04.02.05 RELLENO Y COMPACTADO MANUAL MAT. DE PRESTAMO GRAVA DE 3/8" m3 175.92 72.33 12,724.29
03.04.02.06 RELLENO COMPACTADO C/EQUIPO, MATERIAL PROPIO m3 3,824.85 7.74 29,604.34
OBRA Ejecución de la Obra “Adecuación, Mejoramiento y Sustitución de la Infraestructura Educativa de la I.E. N° 64721 Hildebrando Fuentes, Raymondi – Atalaya – Ucayali”.SATIPO - JUNIN
CONTRATISTA CONSORCIO TERRASUR (Integrado por TERRAK SAC y TABLEROS Y PUENTES S.A SUCURSAL DEL PERU)
ENTIDAD PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA-PRONEID
PLAZO DE EJECUCION 390 DIAS CALENDARIOS
MONTO CONTRATADO S/. 24,490,288.53 (INC. IGV)

PRESUPUESTO
Item Descripción Und. Metrado Precio S/. Parcial S/.
03.04.02.07 ELIMINACION DE MAT. EXCEDENTE CARGUIO MANUAL Y VOLQUETE 6M3 (D=10 KM) m3 1,178.44 21.92 25,831.40

03.04.03 RED COLECTORA 198,804.08


03.04.03.01 CANALETA DE CONCRETO EN TECHOS A=0.25m m 293.93 72.80 21,398.10
03.04.03.02 CANALETAS DE MEDIA CAÑA D=3" m 592.00 14.75 8,732.00
03.04.03.03 CUNETAS DE CONCRETO FC=175 KG/CM2 CON REJILLA A=0.40m m 565.56 159.67 90,302.97
03.04.03.04 CUNETA DE CONCRETO TIPO 2 m 129.05 74.81 9,654.23
03.04.03.05 MONTANTE DE DRENAJE PVC DE 3" m 213.93 33.15 7,091.78
03.04.03.06 TUBERIA DE DESAGUE PVC U.F ISO 4435 315mm (12") S-20 m 294.86 89.83 26,487.27
03.04.03.07 TUBERIA DE DESAGUE PVC SAL DE 4" CRIBADA m 1,526.40 23.02 35,137.73
03.04.04 ACCESORIOS 36,344.78
03.04.04.01 ABRAZADERAS P/TUBERIAS A CADA 2" und 427.86 33.07 14,149.33
03.04.04.02 TEE DE PVC DE 3" und 24.00 40.02 960.48
03.04.04.03 CODO PVC 3" und 6.00 13.35 80.10
03.04.04.04 MANGUITO BAJANTE PVC 3" und 24.00 23.38 561.12
03.04.04.05 CODO PVC 4" und 48.00 15.92 764.16
03.04.04.06 TEE DE PVC DE 12" X 4" und 48.00 84.55 4,058.40
03.04.04.07 TAMPON PVC 4" und 48.00 13.12 629.76
03.04.04.08 GEOTEXTIL m2 1,244.16 12.17 15,141.43
03.04.05 CAMARAS DE INSPECCION 11,400.05
03.04.05.01 BUZON und 7.00 1,431.11 10,017.77
03.04.05.02 TRAMPA DE SOLIDOS und 1.00 1,382.28 1,382.28
03.05 DESAGUE Y VENTILACION 174,759.96
03.05.01 TRABAJOS PRELIMINARES REDES DE DESAGUE 1,060.03
03.05.01.01 TRAZO,NIVELES Y REPLANTEO DURANTE EL PROCESO ml 1,606.11 0.66 1,060.03
03.05.02 MOVIMIENTO DE TIERRAS 39,100.44
03.05.02.01 EXCAVACION DE ZANJAS PARA REDES SANITARIAS (HASTA 1M) m 2,409.17 8.14 19,610.64
03.05.02.02 REFINE Y NIVELACION DE ZANJAS ml 1,606.11 1.40 2,248.55
03.05.02.03 CAMA DE ARENA CON MATERIAL PRESTAMO H=0.10M ml 1,606.11 6.44 10,343.35
03.05.02.04 RELLENO COMPACTADO C/EQUIPO, MATERIAL PROPIO m3 481.83 7.74 3,729.36
03.05.02.05 ELIMINACION DE MAT. EXCEDENTE CARGUIO MANUAL Y VOLQUETE 6M3 m3 144.55 21.92 3,168.54
03.05.03 SALIDAS DE DESAGUE 40,321.11
03.05.03.01 SALIDA DE DESAGUE PVC DE 4" pto 117.00 111.59 13,056.03
03.05.03.02 SALIDA DE DESAGUE PVC DE 4" pto 96.00 88.08 8,455.68
03.05.03.03 SALIDA DE DESAGUE PVC DE 2" pto 230.00 81.78 18,809.40
03.05.04 REDES DE DERIVACION Y MONTANTES, VENT. EMPOTRADAS Y ENTERRADA 23,985.57

03.05.04.01 TUBERIA DE DESAGUE PVC 4" m 308.41 19.32 5,958.48


03.05.04.02 TUBERIA DE DESAGUE PVC 3" m 249.70 16.05 4,007.69
03.05.04.03 TUBERIA DE DESAGUE PVC 2" m 909.76 15.41 14,019.40
03.05.05 RED COLECTORA 19,260.20
OBRA Ejecución de la Obra “Adecuación, Mejoramiento y Sustitución de la Infraestructura Educativa de la I.E. N° 64721 Hildebrando Fuentes, Raymondi – Atalaya – Ucayali”.SATIPO - JUNIN
CONTRATISTA CONSORCIO TERRASUR (Integrado por TERRAK SAC y TABLEROS Y PUENTES S.A SUCURSAL DEL PERU)
ENTIDAD PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA-PRONEID
PLAZO DE EJECUCION 390 DIAS CALENDARIOS
MONTO CONTRATADO S/. 24,490,288.53 (INC. IGV)

PRESUPUESTO
Item Descripción Und. Metrado Precio S/. Parcial S/.
03.05.05.01 TUBERIA DE DESAGUE PVC 4" m 220.03 19.32 4,250.98
03.05.05.02 TUBERIA DE DESAGUE PVC 6" m 390.56 38.43 15,009.22
03.05.06 ACCESORIOS DE REDES INTERIORES Y COLECTORAS 25,377.02
03.05.06.01 REGISTRO DE BRONCE 2" pza 57.00 19.04 1,085.28
03.05.06.02 REGISTRO DE BRONCE 4" pza 11.00 41.61 457.71
03.05.06.03 SUMIDERO DE BRONCE 3" pza 82.00 28.54 2,340.28
03.05.06.04 REJILLA DE FIERRO 0.10X0.60 und 29.00 52.53 1,523.37
03.05.06.05 REJILLA DE FIERRO 0.10X0.90 und 4.00 58.54 234.16
03.05.06.06 REJILLA DE FIERRO 0.15X0.60 und 12.00 58.54 702.48
03.05.06.07 REJILLA DE FIERRO 0.15X0.90 und 2.00 69.96 139.92
03.05.06.08 REJILLA DE FIERRO 0.15X0.15 und 2.00 70.82 141.64
03.05.06.09 REJILLA DE FIERRO 0.20X0.15 und 2.91 82.49 240.05
03.05.06.10 SOMBRERO DE VENTILACION 2" pza 39.00 8.84 344.76
03.05.06.11 SOMBRERO DE VENTILACION 3" pza 5.00 12.42 62.10
03.05.06.12 SOMBRERO DE VENTILACION 4" und 12.00 16.56 198.72
03.05.06.13 REJILLA DE POLIPROPILENO DE REBOSADERO A=0.20M PISCINA m 174.00 97.85 17,025.90
03.05.06.14 REJILL DE POLIPROPILENO DE REBOSADERO A=0.15M m 9.00 97.85 880.65
03.05.07 CAMARAS DE INSPECCION 25,655.59
03.05.07.01 CAMARA DE INSPECCION 0.25X0.50 und 3.00 261.85 785.55
03.05.07.02 CAMARA DE INSPECCION 0.30X0.60 und 78.00 265.13 20,680.14
03.05.07.03 CAMARA DE INSPECCION 0.45X0.50 und 9.00 284.38 2,559.42
03.05.07.04 CAMARA DE INSPECCION 0.60X0.60 und 5.00 309.82 1,549.10
03.05.07.05 CAJA DE 0.60X0.60 P/REBOSE und 2.00 40.69 81.38
03.06 VARIOS 3,432.90
03.06.01 TRAMPA DE GRASA (SEGÚN DETALLES Y ACCESORIOS) und 1.00 1,052.18 1,052.18
03.06.02 TRAMPA DE ARENA (SEGÚN DETALLES Y ACCESORIOS) und 1.00 1,057.64 1,057.64
03.06.03 TRAMPA DE LODOS und 1.00 1,323.08 1,323.08
03.07 DESINFECCION Y PRUEBA HIDRAULICA 11,950.04
03.07.01 PRUEBA HIDRAULICA DE TUBERIA DE PVC DESAGUE m 1,606.11 1.91 3,067.67
03.07.02 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA D AGUA m 2,331.33 3.81 8,882.37
03.08 EMPALMES A REDES EXISTENTES 631.00
03.08.01 EMPALME A RED DE AGUA POTABLE und 2.00 63.15 126.30
03.08.02 EMPALME A RED EXISTENTE DE ALCANTARILLADO und 2.00 252.35 504.70
04 INSTALACIONES ELECTRICAS 2,079,363.05
04.01 INSTALACIONES ELECTRICAS REDES INTERIORES 839,626.02
04.01.01 SALIDA PARA ALUMBRADO, TOMACORREINTES , FUERZA Y SEÑALES DEBILES 167,228.58
04.01.01.01 SALIDA DE TECHO (CENTRO DE LUZ) Pto 914.00 59.37 54,264.18
04.01.01.02 SALIDA PARA BRAQUETE (PARED) Pto 38.00 82.22 3,124.36
04.01.01.03 SALIDA PARA CONTROL DE LUZ EN TIJERAL Pto 96.00 84.47 8,109.12
04.01.01.04 SALIDA PARA CENTRO PARA VENTILADOR Pto 168.00 84.47 14,190.96
04-01.01.05 SALIDA DE TOMACORRIENTES PARA ARTEFACTOS DE EMERGENCIA Pto 208.00 67.44 14,027.52
OBRA Ejecución de la Obra “Adecuación, Mejoramiento y Sustitución de la Infraestructura Educativa de la I.E. N° 64721 Hildebrando Fuentes, Raymondi – Atalaya – Ucayali”.SATIPO - JUNIN
CONTRATISTA CONSORCIO TERRASUR (Integrado por TERRAK SAC y TABLEROS Y PUENTES S.A SUCURSAL DEL PERU)
ENTIDAD PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA-PRONEID
PLAZO DE EJECUCION 390 DIAS CALENDARIOS
MONTO CONTRATADO S/. 24,490,288.53 (INC. IGV)

PRESUPUESTO
Item Descripción Und. Metrado Precio S/. Parcial S/.
04.01.01.06 SALIDA PARA INTERRUPTORES DE CONMUTACIÓN SIMPLES Pto 146.00 74.24 10,839.04
04.01.01.07 SALIDA PARA INTERRUPTORES DE CONMUTACIÓN DOBLES Pto 142.00 77.14 10,953.88
04.01.01.08 SALIDA PARA INTERRUPTORES DE CONMUTACIÓN TRIPLES Pto 10.00 79.60 796.00
04.01.01.09 SALIDA PARA CONTROL DE VENTILADOR Pto 156.00 99.53 15,526.68
04.01.01.10 SALIDA PARA TOMACORRIENTE DOBLE C/LINEA DE TIERRA Pto 474.00 73.76 34,962.24
04.01.01.11 SALIDAD PARA CAMPANA EXTRACTORA Pto 2.00 75.76 151.52
04.01.01.12 INTERRUPTOR TIPO CUCHILLA 2x20A Und 3.00 40.44 121.32
04.01.01.13 INTERRUPTOR TIPO CUCHILLA 3x20A Und 4.00 40.44 161.76
04.01.02 SALIDAD PARA COMUNICACIONES Y SEÑALES 20,734.15
04.01.02.01 SALIDAD PARA TV CABLE Pto 61.00 82.36 5,023.96
04.01.02.02 SALIDA PARA INTERCOMUNICADOR Pto 12.00 108.67 1,304.04
04.01.02.03 SALIDA PARA RED DATA Pto 114.00 95.77 10,917.78
04.01.02.04 SALIDA PARA CENTRAL DE ALARMAS Pto 1.00 65.27 65.27
04.01.02.05 SALIDA PARA ESTACIÓN MANUAL Pto 8.00 69.34 554.72
04.01.02.06 SALIDA PARA DETERTOR DE HUMO Y/O TEMPERATURA Pto 22.00 59.37 1,306.14
04.01.02.07 SALIDA PARA CAMARA DE VIGILANCIA Pto 8.00 59.37 474.96
04.01.02.08 SALIDA PARA SISTEMA WIFI Pto 3.00 69.34 208.02
04.01.02.09 SALIDA PARA PROTECTOR Pto 3.00 69.34 208.02
04.01.02.10 SALIDA PARA CONTROL DE ELECTROBOMBAS Pto 3.00 99.53 298.59
04.01.02.11 SALIDA PARA ELECTROBOMBAS DE AGUA Pto 5.00 74.53 372.65
04.01.03 CAJAS 11,479.53
04.01.03.01 CAJA DE PASE OCTOGONAL 4"x2" P Und 90.00 46.85 4,216.50
04.01.03.02 CAJA DE PASE F"G" 6x&x3" Und 38.00 45.48 1,728.24
04.01.03.03 CAJA DE PASE F"G" 8x8x6" Und 56.00 72.54 4,062.24
04.01.03.04 CAJA DE PASE F"G" 12x12x6" Und 15.00 98.17 1,472.55
04.01.04 CONDUCTO PVC-P.- PARA COMUNICACIONES ,ALARMAS Y VIGILANCIA 32,273.71
04.01.04.01 TUBERIA PVC-P 20mm M 2,479.60 11.61 28,788.16
04.01.04.02 TUBERIA DE PVC -P 25mm M 285.00 12.23 3,485.55
04.01.05 CONDCUTO PVC -P PARA REDES INTERIORES 94,080.24
04.01.05.01 TUBERIA PVC -P 20mm M 7,119.80 11.61 82,660.88
04.01.05.02 TUBERIA PVC -P 25mm M 702.70 12.23 8,594.02
04.01.05.03 TUBERIA PVC -P 35mm M 146.70 13.36 1,959.91
04.01.05.04 TUBERIA PVC -P 50mm M 49.20 17.59 865.43
04.01.06 CONDUCTORES PARA REDES INTERIORES 115,628.38
04.01.06.01 ALIMENTADOR NH80[2-1x2.5 +1x2.5(t)] mm2 M 4,168.88 10.17 42,397.51
04.01.06.02 ALIMENTADOR NH80[2-1x4 +1x4(t)] mm2 M 5,712.40 11.56 66,035.34
04.01.06.03 ALIMENTADOR NH80[2-1x6 +1x6(t)] mm 2 M 201.30 17.86 3,595.22
04.01.06.04 ALIMENTADOR NH80[2-1x10 +1x10(t)] mm2 M 1.20 20.76 24.91
04.01.06.05 ALIMENTADOR NH80[2-1x16 +1x16(t)] mm2 M 45.60 28.28 1,289.57
04.01.06.06 ALIMENTADOR NH80[2-1x35 +1x35(t)] mm 2 M 49.20 46.46 2,285.83
OBRA Ejecución de la Obra “Adecuación, Mejoramiento y Sustitución de la Infraestructura Educativa de la I.E. N° 64721 Hildebrando Fuentes, Raymondi – Atalaya – Ucayali”.SATIPO - JUNIN
CONTRATISTA CONSORCIO TERRASUR (Integrado por TERRAK SAC y TABLEROS Y PUENTES S.A SUCURSAL DEL PERU)
ENTIDAD PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA-PRONEID
PLAZO DE EJECUCION 390 DIAS CALENDARIOS
MONTO CONTRATADO S/. 24,490,288.53 (INC. IGV)

PRESUPUESTO
Item Descripción Und. Metrado Precio S/. Parcial S/.
04.01.07 TABLEROS Y CUCHILLAS (LLAVES) 69,004.06
04.01.07.01 TABLEROS GABINETE METALICO PARA 12 POLOS Und 1.00 256.62 256.62
04.01.07.02 TABLEROS GABINETE METALICO PARA 18 POLOS Und 1.00 299.62 299.62
04.01.07.03 TABLEROS GABINETE METALICO PARA 24POLOS Und 12.00 343.62 4,123.44
04.01.07.04 TABLEROS GABINETE METALICO PARA 30 POLOS Und 3.00 392.62 1,177.86
04.01.07.05 TABLEROS GABINETE METALICO PARA 36 POLOS Und 8.00 436.62 3,492.96
04.01.07.06 TABLEROS GABINETE METALICO PARA 42 POLOS Und 8.00 382.62 3,060.96
04.01.07.07 TABLEROS GABINETE METALICO PARA 48 POLOS Und 1.00 529.62 529.62
04.01.07.08 TABLEROS GABINETE METALICO PARA 54 POLOS Und 1.00 572.62 572.62
04.01.07.09 TABLEROS GABINETE METALICO PARA 60 POLOS Und 6.00 629.62 3,777.72
04.01.07.10 TABLEROS GABINETE METALICO PARA 72 POLOS Und 3.00 629.62 1,888.86
04.01.07.11 INTERRUPTOR TERMOMAGNETICO 2x15A Und 111.00 39.12 4,342.32
04.01.07.12 INTERRUPTOR TERMOMAGNETICO 2x20A Und 152.00 39.12 5,946.24
04.01.07.13 INTERRUPTOR TERMOMAGNETICO 2x40A Und 2.00 45.72 91.44
04.01.07.14 INTERRUPTOR TERMOMAGNETICO 3x20A Und 3.00 135.92 407.76
04.01.07.15 INTERRUPTOR TERMOMAGNETICO 3x30A Und 25.00 135.92 3,398.00
04.01.07.16 INTERRUPTOR TERMOMAGNETICO 3x40A Und 2.00 138.04 276.08
04.01.07.17 INTERRUPTOR TERMOMAGNETICO 3x50A Und 15.00 135.92 2,038.80
04.01.07.18 INTERRUPTOR TERMOMAGNETICO 3x60A Und 7.00 140.50 983.50
04.01.07.19 INTERRUPTOR TERMOMAGNETICO 3x70A Und 4.00 173.62 694.48
04.01.07.20 INTERRUPTOR TERMOMAGNETICO 3x125A Und 2.00 232.47 464.94
04.01.07.21 INTERRUPTOR TERMOMAGNETICO 3x150A Und 2.00 280.65 561.30
04.01.07.22 INTERRUPTOR DIFERENCIA 2x25A Und 278.00 110.14 30,618.92
04.01.08 ARTEFACTOR PARA ALUMBRADO EN INTERIORES 278,599.44
04.01.08.01 ARTEFACTO FLUORECENTE 3/36W (SIM.BE JOSFEL) Und 445.00 224.06 99,706.70
04.01.08.02 ARTEFACTO FLUORECENTE 2/36W (SIM.BE JOSFEL) Und 134.00 147.26 19,732.84
04.01.08.03 ART. FLUO 2/18WEMPOTRADO MARCO ALUM (DIF. PLAS) MS-122 Und 217.00 187.84 40,761.28
04.01.08.04 ART.FLUOR.CIRCULAR 32W (TPR PRIMA -122 JOSFEL) Und 74.00 125.64 9,297.36
04.01.08.05 ART. BRAQ.C/SOCKET DE PORCELANA Y LAP .20 W Und 6.00 60.75 364.50
04.01.08.06 ARTEFACTO REFLECTOR CON LAMP., TIPO ARAM Und 8.00 1,341.37 10,730.96
04.01.08.07 ARTEFACTOR REFLECTOR CON MAP. 150 W., TIPO ARAM Und 170.00 361.23 61,409.10
04.01.08.08 LUMINARIA JOSFEL MER-H 250 W-HM Und 88.00 373.00 32,824.00
04.01.08.09 ARTEFACTO DE EMERGENCIA CON LAMP. AHORRADORA DE 20 w, 2 HORAS DE AUTON Und 21.00 85.34 1,792.14

04.01.08.10 ARTEF TIPO BRAQ CON SOCKET DE PORCELANA Y LAM 1X18 Und 4.00 495.14 1,980.56
04.01.09 ARTEFACTOS ELECTRICOS 47,130.32
04.01.09.01 VENTILADOR ADOSADO A TECHO Und 164.00 287.38 47,130.32
04.01.10 LINEA DE GAS 3,467.61
04.01.10.01 RED DE GAS CON TUBERIA DE COBRE 1/2" m 29.00 22.99 666.71
04.01.10.02 VALVUAL DE BRONCE DE 1/2" DE BOLA Und 11.00 40.54 445.94
04.01.10.03 SALIDAD DE GAS DE 1/2" Pto 8.00 81.83 654.64
OBRA Ejecución de la Obra “Adecuación, Mejoramiento y Sustitución de la Infraestructura Educativa de la I.E. N° 64721 Hildebrando Fuentes, Raymondi – Atalaya – Ucayali”.SATIPO - JUNIN
CONTRATISTA CONSORCIO TERRASUR (Integrado por TERRAK SAC y TABLEROS Y PUENTES S.A SUCURSAL DEL PERU)
ENTIDAD PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA-PRONEID
PLAZO DE EJECUCION 390 DIAS CALENDARIOS
MONTO CONTRATADO S/. 24,490,288.53 (INC. IGV)

PRESUPUESTO
Item Descripción Und. Metrado Precio S/. Parcial S/.
04.01.10.04 SUMINISTRO E INSTALACIÓN SO-GAS 100 (2BAL) Und 2.00 850.16 1,700.32
04.02 INSTALACIONES ELECTRICAS REDES EXTERIORES 1,239,737.03
04.02.01 INSTALACIONES ELECTRICAS 100.50
04.02.01.01 MURETE PORTAMEDIDOR TRIFASICO Und 1.00 100.50 100.50
04.02.02 REDES EXTERIORES DE ELECTRICIDAD 26,570.05
04.02.02.01 EXCAVACION DE ZANJAS PARA CABLE SUBTERRANEO m3 1,025.65 21.67 22,225.84
04.02.02.02 BUZO DE CONCRETO PARA RED ELECTRICA Und 39.00 111.39 4,344.21
04.02.03 CONDCUTO PVC - PARA REDES EXTERIORES DE ELECTRICIDAD 73,359.91
04.02.03.01 TUBERIA DE PVC -P 35 mm m 802.30 13.36 10,718.73
04.02.03.02 TUBERIA DE PVC -P 50 mm m 1,146.35 17.59 20,164.30
04.02.03.03 TUBERIA DE PVC -P 100 mm m 1,220.60 34.80 42,476.88
04.02.04 CONEXIONES A RED EXTERNA Y MEDIDORES 287,588.33
04.02.04.01 ALIMENTADOR N2XH[3-1x6 +1x6(N)+1x6(T)] mm2 ml 863.90 21.52 18,591.13
04.02.04.02 ALIMENTADOR N2XH[3-1x16 +1x16(N)+1x10(T)] mm2 ml 199.30 37.44 7,461.79
04.02.04.03 ALIMENTADOR N2XH[3-1x25 +1x26(N)+1x25(T)] mm2 ml 146.20 54.91 8,027.84
04.02.04.04 ALIMENTADOR N2XH[3-1x35 +1x35(N)+1x25(T)] mm2 ml 534.00 66.71 35,623.14
04.02.04.05 ALIMENTADOR N2XH[3-1x50 +1x50(N)+1x10(T)] mm2 ml 355.85 83.73 29,795.32
04.02.04.06 ALIMENTADOR N2XH[3-1x70 +1x70(N)+1x16(T)] mm2 ml 463.90 112.63 52,249.06
04.02.04.07 ALIMENTADOR N2XH[3-1x240 +1x240(N)+1x25(T)] mm2 ml 400.85 338.88 135,840.05
04.02.05 TABLEROS Y CUCHILLAS (LLAVES) 24,576.84
04.02.05.01 TABLEROSN GABINETE METALICO PARA 24 POLOS Und 3.00 343.62 1,030.86
04.02.05.02 TABLERO ELECTRICOS AUTOPORTADO Und 1.00 3,793.34 3,793.34
04.02.05.03 TAB. AUTOMATICO PARA CONSTROL DE BOMBA DE PISCINA Und 3.00 1,846.67 5,540.01
04.02.05.04 INTERRUPTOR TERMOMAGNETICO 2X15A Und 4.00 39.12 156.48
04.02.05.05 INTERRUPTOR TERMOMAGNETICO 2X20A Und 5.00 39.12 195.60
04.02.05.06 INTERRUPTOR TERMOMAGNETICO 3X20A Und 1.00 135.92 135.92
04.02.05.07 INTERRUPTOR TERMOMAGNETICO 3X30A Und 4.00 135.92 543.68
04.02.05.08 INTERRUPTOR TERMOMAGNETICO 3X70A Und 3.00 206.42 619.26
04.02.05.09 INTERRUPTOR TERMOMAGNETICO 3X100A Und 2.00 219.52 439.04
04.02.05.10 INTERRUPTOR TERMOMAGNETICO 3X125A Und 5.00 265.27 1,326.35
04.02.05.11 INTERRUPTOR TERMOMAGNETICO 3X175A Und 1.00 219.90 219.90
04.02.05.12 INTERRUPTOR TERMOMAGNETICO3X700A Und 1.00 9,286.06 9,286.06
04.02.05.13 INTERRUPTOR DIFERENCIAL 2X25A Und 10.00 110.14 1,101.40
04.02.05.14 INTERRUPTOR HORARIO Und 1.00 188.94 188.94
04.02.06 INSTALACION DE PARARRAYOS 16,740.34
04.02.06.01 PARARRAYOC/DISPOSITIVO D/CEBADO C/03 P/TIERRA, ADOSADO Und 2.00 7,120.34 14,240.68
04.02.06.02 POSTE DE CONCRETO CENTRIFUGADO 12m Und 2.00 1,249.83 2,499.66
04.02.07 INSTALACION DE SISTEMA PUESTA A TIERRA 5,932.36
04.02.07.01 POZO PUESTA A TIERRA -2004 -P-1 (R<15ohms) Und 8.00 571.35 4,570.80
04.02.07.02 TUBERIA PVC -P 25mm m 40.00 12.23 489.20
04.02.07.03 CABLE COBRE DESANUSO 1x25 mm2 m 4.00 16.49 65.96
OBRA Ejecución de la Obra “Adecuación, Mejoramiento y Sustitución de la Infraestructura Educativa de la I.E. N° 64721 Hildebrando Fuentes, Raymondi – Atalaya – Ucayali”.SATIPO - JUNIN
CONTRATISTA CONSORCIO TERRASUR (Integrado por TERRAK SAC y TABLEROS Y PUENTES S.A SUCURSAL DEL PERU)
ENTIDAD PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA-PRONEID
PLAZO DE EJECUCION 390 DIAS CALENDARIOS
MONTO CONTRATADO S/. 24,490,288.53 (INC. IGV)

PRESUPUESTO
Item Descripción Und. Metrado Precio S/. Parcial S/.
04.02.07.04 CABLE COBRE DESANUSO 1x50 mm2 m 36.00 22.40 806.40
04.02.08 POSTE Y ARTEFACTO DE ALUMBRADO 106,741.64
04.02.08.01 POSTE DE CONCRETO CENTRIFUGADO 12m Und 6.00 1,317.24 7,903.44
04.02.08.02 POSTE DE CONCRETO CENTRIFUGADO 9m Und 4.00 971.74 3,886.96
04.02.08.03 POSTE DE CONCRETO CENTRIFUGADO 8m Und 7.00 851.86 5,963.02
04.02.08.04 REFLEXTORES SNF 111 CON 2Xson 400W Und 54.00 1,341.37 72,433.98
04.02.08.05 LUMINARIA DE VAPOR DE SODIO DE 70 w Und 12.00 416.24 4,994.88
04.02.08.06 REFLECTOR RL 40 JOSFEL Und 32.00 361.23 11,559.36
04.02.09 REDES ESTERIOES PARA COMUNICACIONES 22,120.68
04.02.09.01 EXCAVACION DE ZANJA PARA REDES DE COMUNICACIÓN m3 346.00 21.67 7,497.82
04.02.09.02 BUZON DE CONCRETO PARA RED DE COMUNICACIONES Und 22.00 111.39 2,450.58
04.02.09.03 TUBERIA PVC -P 50mm m3 692.00 17.59 12,172.28
04.02.10 ASCENSOR 424,423.70
04.02.10.01 ASCESOR DE 1000kg PARA TRES PISOS Und 2.00 212,211.85 424,423.70
04.02.11 SUB ESTACIÓN 251,582.68
04.02.11.01 SUBESTACIÓN 225W Und 1.00 251,582.68 251,582.68

COSTO DIRECTO S/. 24,490,288.53


GASTOS GENERALES 10.42% 2,551,205.77
UTILIDAD 9.97% 2,442,739.57
SUB TOTAL 29,484,233.87
IGV (SIN IGV - LEY DE EXONERACION DE LA AMAZONIA) 0.00
TOTAL 29,484,233.87

PORCENTAJE VALORIZADO DE OBRA


PORCENTAJE VALORIZADO ACUMULADO DE OBRA
PLAZO DE EJECUCION DE OBRA
MES 1 MES 2 MES 3 MES 14 MES 15 MES 16 MES 17 MES 18 MES 12
30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C.

32,000.00
1,301.94
47,794.04
416.67 416.67 416.67 416.67 416.67 416.67 416.67 416.67 416.67
###
58,000.00 58,000.00 58,000.00

700.00 700.00 700.00 700.00 700.00 700.00 700.00 700.00 700.00


###

900.00 900.00 900.00 900.00 900.00 900.00 900.00 900.00 900.00


###

39,048.59 39,048.58
9,183.40
1,491.15

654.92
816.99
5,961.79
959.57
2,554.16
9,798.88
79.52
12.14

16,168.79
17,036.98
581.98
14,557.11
7,017.36
15,554.01
417.04
440.75
2,935.80
42,535.51
57,246.26

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00


PLAZO DE EJECUCION DE OBRA
MES 1 MES 2 MES 3 MES 14 MES 15 MES 16 MES 17 MES 18 MES 12
30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C.
45,118.54
3,759.88 3,759.88 3,759.88 3,759.88 3,759.88 3,759.88 3,759.88 3,759.88 3,759.88
###
3,852.00

7,666.67 15,333.33

42,955.20 21,477.60
6,188.19 3,094.10
730.81 730.81 730.81 730.81 730.81 730.81 730.81 730.81 730.81
###
2,366.00 2,366.00 2,366.00 2,366.00 2,366.00 2,366.00 2,366.00 2,366.00 2,366.00
###
492.05 492.05 492.05 492.05 492.05 492.05 492.05 492.05 492.05
###

120,616.61
16,850.16
42,945.11
11,513.27

190,709.14 190,709.14
24,002.87

43,359.77

252,161.03

116,259.88
754.76
71,409.87

76,789.58

17,609.38
28,244.94
106,556.17
40,571.17

49,561.12 49,561.12
43,548.60 43,548.59
368,868.61 368,868.61 368,868.60
PLAZO DE EJECUCION DE OBRA
MES 1 MES 2 MES 3 MES 14 MES 15 MES 16 MES 17 MES 18 MES 12
30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C.

5,654.79

17,137.33 17,137.32
66,119.67 66,119.66
83,508.15
26,464.34
15,558.90 15,558.90
152,695.89
106.13
756.72
2,195.14

130,528.57
17,900.50
55,761.23
860.54

187,199.08
174,719.69
113,979.92 113,979.91
4,484.23

248,972.72
17,881.33
311,341.95
534.36

42,122.28 84,244.56
67,914.45 67,914.45
35,540.30 71,080.61 71,080.61

167,741.01 167,741.00
118,143.15 236,286.31 118,143.15
292,807.79 292,807.79
4,992.61 4,992.61 2,496.29
PLAZO DE EJECUCION DE OBRA
MES 1 MES 2 MES 3 MES 14 MES 15 MES 16 MES 17 MES 18 MES 12
30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C.
4,637.85 4,637.85
4,668.44 9,336.88 9,336.88
5,436.44 5,436.44 5,436.43
200.30 200.30 100.14

141,196.82 141,196.82
###
79,530.65 159,061.30 79,530.64
196,710.88 196,710.87
2,895.30 2,895.30
###

7,348.18 7,348.18 7,348.17


10,346.36 10,346.36 10,346.35
3,558.15 7,116.30 7,116.30 3,558.16
144.03 144.03 144.03

19,106.15 9,553.07
8,912.00 8,911.99
20,598.98
348.54 348.53

155,151.43 77,575.71
96,799.53 96,799.53
123,169.13
139,311.99
5,335.23 5,335.23
3,989.35
8,698.88

3,688.28
341.07
1,602.73
8.34

11,087.86
3,733.10
7,813.15
120.80

28,671.91 14,335.95
48,257.93
17,243.58 34,487.16
PLAZO DE EJECUCION DE OBRA
MES 1 MES 2 MES 3 MES 14 MES 15 MES 16 MES 17 MES 18 MES 12
30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C.
1,040.76 1,040.76

206,423.70
65,539.68
1,994.86

43,992.44 43,992.43
58,342.44
13,152.17 13,152.17
782.80 1,565.59

191.74
537.98
471.74
17.41

23,595.52
23,139.98
2,571.68
3,191.84

760.64
586.30

28,419.10
27,767.97
###
7,149.20
1,172.60

6,533.64

351.78
PLAZO DE EJECUCION DE OBRA
MES 1 MES 2 MES 3 MES 14 MES 15 MES 16 MES 17 MES 18 MES 12
30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C.
62.92

###

115,999.59 115,999.59 115,999.59 115,999.58


131,929.09 131,929.09 131,929.09 131,929.11
5,606.34
1,273.84 1,273.84 1,273.84 1,273.83
###

5,696.90 11,393.80 11,393.80 11,393.80


87,113.09 87,113.09 87,113.09
###
23,802.71 23,802.71 23,802.71
###
64,957.26 64,957.26 64,957.26
###
57,172.82 57,172.82 57,172.82
###
3,434.36 3,434.36
###

4,284.23
13,432.14
3,458.40
24,879.20
55,700.83

13,606.55 27,213.09 27,213.09


###
2,067.06

9,062.72 18,125.45 18,125.45


###
260.91 521.81 521.81
###

68,229.39 136,458.78
###
8,446.18

111,396.54 111,396.54
PLAZO DE EJECUCION DE OBRA
MES 1 MES 2 MES 3 MES 14 MES 15 MES 16 MES 17 MES 18 MES 12
30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C.
69,695.68 139,391.36
18,411.78 36,823.57
37,710.63 75,421.27
7,166.99 14,333.98
6,039.17 12,078.34
14,613.19 29,226.38
138,293.46
21,443.75
346,890.75 346,890.75
95,838.53
73,413.12
###

133,475.63

74,421.78

29,202.76

92,272.70

19,818.91

110,187.95 110,187.95 110,187.94

41,046.38 41,046.38

49,624.35

389.65

26,977.10

392.39

22,658.31

64,857.74
21,811.41
PLAZO DE EJECUCION DE OBRA
MES 1 MES 2 MES 3 MES 14 MES 15 MES 16 MES 17 MES 18 MES 12
30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C.
7,482.98

30,093.32

262.62
14,850.11
274.84
3,022.72
671.14
21,243.33
###
1,511.87

484.37

###
###

###

21,828.63 21,828.63
###
20,209.40 20,209.40
###
4,097.09 4,097.09
###
8,377.97 8,377.97
###
2,852.40 2,852.40
###
470.24 470.24
###
PLAZO DE EJECUCION DE OBRA
MES 1 MES 2 MES 3 MES 14 MES 15 MES 16 MES 17 MES 18 MES 12
30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C.

13,013.48 13,013.48 13,013.48 13,013.48 13,013.48 13,013.48


###
27,425.40 27,425.40 27,425.40 27,425.40 27,425.40 27,425.40
###

1,207.92 1,207.92 1,207.92 1,207.92 1,207.92 1,207.92


###
1,257.47 1,257.47 1,257.47 1,257.47 1,257.47 1,257.47
###

6,087.50 6,087.50 6,087.50 6,087.50 6,087.50 6,087.50


###

250.18 250.18 250.18 250.18 250.18 250.18


###
1,777.10 1,777.10 1,777.10 1,777.10 1,777.10 1,777.10
###

3,590.03 3,590.03 3,590.03 3,590.03 3,590.03 3,590.03


###

15,126.25 15,126.25 15,126.25 15,126.24


15,636.73 15,636.73 15,636.73 15,636.74
4,902.96 4,902.96 4,902.96 4,902.96

2,577.50 2,577.50 2,577.50 2,577.51


PLAZO DE EJECUCION DE OBRA
MES 1 MES 2 MES 3 MES 14 MES 15 MES 16 MES 17 MES 18 MES 12
30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C.

157,929.31
8,601.17
977.18
20,677.27

24,208.34 24,208.34 24,208.34


###
30,437.59 30,437.59 30,437.59
###
2,725.46 2,725.46 2,725.46
###

13,380.94 13,380.94 13,380.94


###

900.00 900.00 900.00 900.00 900.00 900.00 900.00 900.00 900.00


###
PLAZO DE EJECUCION DE OBRA
MES 1 MES 2 MES 3 MES 14 MES 15 MES 16 MES 17 MES 18 MES 12
30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C.

###

###
###
###
###

###
###
###
###
###
###

10,585.08 10,585.08 10,585.08 10,585.08 10,585.08


###
2,660.82 2,660.82 2,660.82 2,660.82 2,660.82
###
65.11 65.11 65.11 65.11 65.11
###
1,943.83 1,943.83 1,943.83 1,943.83 1,943.83
###
64.29 64.29 64.29 64.29 64.29
###
178.57 178.57 178.57 178.57 178.57
###
233.53 233.53 233.53 233.53 233.53
###
1,229.93 1,229.93 1,229.93 1,229.93 1,229.93
###
PLAZO DE EJECUCION DE OBRA
MES 1 MES 2 MES 3 MES 14 MES 15 MES 16 MES 17 MES 18 MES 12
30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C.
4,777.74 4,777.74 4,777.74 4,777.74 4,777.74
###
630.54 630.54 630.54 630.54 630.54
###
644.91 644.91 644.91 644.91 644.91
###
652.86 652.86 652.86 652.86 652.86
###
1,097.11 1,097.11 1,097.11 1,097.11 1,097.11
###

1,564.63

7,431.98
1,441.10
6,629.08
4,641.41
2,030.67

2,721.43 2,721.43 2,721.43 2,721.43


###
742.32 742.32 742.32 742.32
###
611.66 611.66 611.66 611.66
###
1,523.75 1,523.75 1,523.75 1,523.75
###

87.98 87.98 87.98 87.98 87.98


###
276.63 276.63 276.63 276.63 276.63
###
225.52 225.52 225.52 225.52 225.52
###
297.99 297.99 297.99 297.99 297.99
###
530.03 530.03 530.03 530.03 530.03
###
77.89 77.89 77.89 77.89 77.89
###
327.21 327.21 327.21 327.21 327.21
###
620.70 620.70 620.70 620.70 620.70
###

1,280.95 1,280.95 1,280.95 1,280.95 1,280.95


###
392.11 392.11 392.11 392.11 392.11
###
696.39 696.39 696.39 696.39 696.39
###
6.04 6.04 6.04 6.04 6.04
###
62.28 62.28 62.28 62.28 62.28
###
121.31 121.31 121.31 121.31 121.31
###
8.48 8.48 8.48 8.48 8.48
###

37.19 37.19 37.19 37.19 37.19


###
243.33 243.33 243.33 243.33 243.33
###
162.66 162.66 162.66 162.66 162.66
###
652.65 652.65 652.65 652.65 652.65
###
PLAZO DE EJECUCION DE OBRA
MES 1 MES 2 MES 3 MES 14 MES 15 MES 16 MES 17 MES 18 MES 12
30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C.
615.32 615.32 615.32 615.32 615.32
###
18.12 18.12 18.12 18.12 18.12
###
408.50 408.50 408.50 408.50 408.50
###

1,141.11 1,141.11 1,141.11 1,141.11 1,141.11


###
1,638.54 1,638.54 1,638.54 1,638.54 1,638.54
###
43.13 43.13 43.13 43.13 43.13
###
78.74 78.74 78.74 78.74 78.74
###
52.87 52.87 52.87 52.87 52.87
###
242.25 242.25 242.25 242.25 242.25
###
218.26 218.26 218.26 218.26 218.26
###
301.73 301.73 301.73 301.73 301.73
###
204.79 204.79 204.79 204.79 204.79
###
106.75 106.75 106.75 106.75 106.75
###
215.55 215.55 215.55 215.55 215.55
###
200.51 200.51 200.51 200.51 200.51
###
68.19 68.19 68.19 68.19 68.19
###
13.22 13.22 13.22 13.22 13.22
###

806.15 806.15 806.15 806.15 806.15


###
27.55 27.55 27.55 27.55 27.55
###
10.35 10.35 10.35 10.35 10.35
###
61.94 61.94 61.94 61.94 61.94
###
64.97 64.97 64.97 64.97 64.97
###
51.20 51.20 51.20 51.20 51.20
###
32.54 32.54 32.54 32.54 32.54
###
28.85 28.85 28.85 28.85 28.85
###
27.30 27.30 27.30 27.30 27.30
###
17.05 17.05 17.05 17.05 17.05
###
6.36 6.36 6.36 6.36 6.36
###

2,181.74 2,181.74 2,181.74 2,181.74 2,181.74


###
804.10 804.10 804.10 804.10 804.10
###
26.92 26.92 26.92 26.92 26.92
###
45.92 45.92 45.92 45.92 45.92
###
1,810.69 1,810.69 1,810.69 1,810.69 1,810.69
###
16.16 16.16 16.16 16.16 16.16
###
7.40 7.40 7.40 7.40 7.40
###

2,010.66
PLAZO DE EJECUCION DE OBRA
MES 1 MES 2 MES 3 MES 14 MES 15 MES 16 MES 17 MES 18 MES 12
30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C.

9,550.62
1,851.92
8,518.83
3,071.54
2,609.58

1,373.44 1,373.44 1,373.44 1,373.44 1,373.44


###
414.43 414.43 414.43 414.43 414.43
###
215.96 215.96 215.96 215.96 215.96
###
770.34 770.34 770.34 770.34 770.34
###

93.45 93.45 93.45 93.45 93.45


###
949.47 949.47 949.47 949.47 949.47
###
114.37 114.37 114.37 114.37 114.37
###
26.19 26.19 26.19 26.19 26.19
###

777.94 777.94 777.94 777.94 777.94


###
21.57 21.57 21.57 21.57 21.57
###
26.44 26.44 26.44 26.44 26.44
###
39.37 39.37 39.37 39.37 39.37
###
104.73 104.73 104.73 104.73 104.73
###
114.51 114.51 114.51 114.51 114.51
###
150.87 150.87 150.87 150.87 150.87
###
102.40 102.40 102.40 102.40 102.40
###
53.38 53.38 53.38 53.38 53.38
###
112.56 112.56 112.56 112.56 112.56
###
100.26 100.26 100.26 100.26 100.26
###
13.22 13.22 13.22 13.22 13.22
###

2,465.55

10,438.99
18,741.77
2,736.55
17,664.43
12,724.29
29,604.34
PLAZO DE EJECUCION DE OBRA
MES 1 MES 2 MES 3 MES 14 MES 15 MES 16 MES 17 MES 18 MES 12
30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C.
25,831.40

4,279.62 4,279.62 4,279.62


###
1,746.40 1,746.40 1,746.40
###
18,060.59 18,060.59 18,060.59
###
1,930.85 1,930.85 1,930.85
###
1,418.36 1,418.36 1,418.36
###
5,297.45 5,297.45 5,297.45
###
7,027.55 7,027.55 7,027.55
###

2,829.87 2,829.87 2,829.87


###
192.10 192.10 192.10
###
16.02 16.02 16.02
###
112.22 112.22 112.22
###
152.83 152.83 152.83
###
811.68 811.68 811.68
###
125.95 125.95 125.95
###
3,028.29 3,028.29 3,028.29
###

2,003.55 2,003.55 2,003.55


###
276.46 276.46 276.46
###

1,060.03

19,610.64
2,248.55
10,343.35
3,729.36
3,168.54

1,865.15 1,865.15 1,865.15 1,865.15 1,865.15


###
1,207.95 1,207.95 1,207.95 1,207.95 1,207.95
###
2,687.06 2,687.06 2,687.06 2,687.06 2,687.06
###

851.21 851.21 851.21 851.21 851.21


###
572.53 572.53 572.53 572.53 572.53
###
2,002.77 2,002.77 2,002.77 2,002.77 2,002.77
###
PLAZO DE EJECUCION DE OBRA
MES 1 MES 2 MES 3 MES 14 MES 15 MES 16 MES 17 MES 18 MES 12
30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C.
607.28 607.28 607.28 607.28 607.28
###
2,144.17 2,144.17 2,144.17 2,144.17 2,144.17
###

155.04 155.04 155.04 155.04 155.04


###
65.39 65.39 65.39 65.39 65.39
###
334.33 334.33 334.33 334.33 334.33
###
217.62 217.62 217.62 217.62 217.62
###
33.45 33.45 33.45 33.45 33.45
###
100.35 100.35 100.35 100.35 100.35
###
19.99 19.99 19.99 19.99 19.99
###
20.23 20.23 20.23 20.23 20.23
###
34.29 34.29 34.29 34.29 34.29
###
49.25 49.25 49.25 49.25 49.25
###
8.87 8.87 8.87 8.87 8.87
###
28.39 28.39 28.39 28.39 28.39
###
2,432.27 2,432.27 2,432.27 2,432.27 2,432.27
###
125.81 125.81 125.81 125.81 125.81
###

112.22 112.22 112.22 112.22 112.22


###
2,954.31 2,954.31 2,954.31 2,954.31 2,954.31
###
365.63 365.63 365.63 365.63 365.63
###
221.30 221.30 221.30 221.30 221.30
###
11.63 11.63 11.63 11.63 11.63
###

27,132.09 27,132.09
1,562.18 1,562.18
4,054.56 4,054.56
7,095.48 7,095.48
7,013.76 7,013.76
PLAZO DE EJECUCION DE OBRA
MES 1 MES 2 MES 3 MES 14 MES 15 MES 16 MES 17 MES 18 MES 12
30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C.
5,419.52 5,419.52
5,476.94 5,476.94
398.00 398.00
7,763.34 7,763.34
17,481.12 17,481.12
75.76 75.76
60.66 60.66
80.88 80.88

2,511.98 2,511.98
652.02 652.02
5,458.89 5,458.89
32.64 32.63
277.36 277.36
653.07 653.07
237.48 237.48
104.01 104.01
104.01 104.01
149.30 149.29
186.33 186.32

2,108.25 2,108.25
864.12 864.12
2,031.12 2,031.12
736.28 736.27

28,788.16
3,485.55

20,665.22 20,665.22 20,665.22 20,665.22


2,148.51 2,148.51 2,148.51 2,148.49
489.98 489.98 489.98 489.97
216.36 216.36 216.36 216.35

42,397.51
66,035.34
3,595.22
24.91
1,289.57
2,285.83
PLAZO DE EJECUCION DE OBRA
MES 1 MES 2 MES 3 MES 14 MES 15 MES 16 MES 17 MES 18 MES 12
30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C.

256.62
299.62
4,123.44
1,177.86
3,492.96
3,060.96
529.62
572.62
3,777.72
1,888.86
4,342.32
5,946.24
91.44
407.76
3,398.00
276.08
2,038.80
983.50
694.48
464.94
561.30
30,618.92

49,853.35 49,853.35
9,866.42 9,866.42
20,380.64 20,380.64
4,648.68 4,648.68
182.25 182.25
5,365.48 5,365.48
30,704.55 30,704.55
16,412.00 16,412.00
896.07 896.07

990.28 990.28

23,565.16 23,565.16

666.71
445.94
654.64
PLAZO DE EJECUCION DE OBRA
MES 1 MES 2 MES 3 MES 14 MES 15 MES 16 MES 17 MES 18 MES 12
30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C.
1,700.32

100.50

22,225.84
4,344.21

5,359.37 5,359.36
10,082.15 10,082.15
21,238.44 21,238.44

9,295.57 9,295.56
3,730.90 3,730.89
4,013.92 4,013.92
17,811.57 17,811.57
14,897.66 14,897.66
26,124.53 26,124.53
67,920.03 67,920.02

515.43 515.43
1,896.67 1,896.67
2,770.01 2,770.00
78.24 78.24
97.80 97.80
67.96 67.96
271.84 271.84
309.63 309.63
219.52 219.52
663.18 663.17
109.95 109.95
4,643.03 4,643.03
550.70 550.70
94.47 94.47

14,240.68
2,499.66

4,570.80
489.20
65.96
PLAZO DE EJECUCION DE OBRA
MES 1 MES 2 MES 3 MES 14 MES 15 MES 16 MES 17 MES 18 MES 12
30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C. 30 D.C.
806.40

7,903.44
3,886.96
5,963.02
72,433.98
4,994.88
11,559.36

7,497.82
2,450.58
12,172.28

53,052.96 53,052.96 53,052.96 53,052.96 53,052.96


###

251,582.68

336,087.11 1,026,123.52 1,611,070.32 1,952,572.99 2,066,431.22 2,234,169.68 3,426,368.32 3,359,789.28 2,097,815.99


###
0.00 35,010.91 106,893.48 167,828.64 203,403.71 215,264.56 232,738.24 356,932.12 349,996.44 218,533.98
###
0.00 33,522.40 102,348.84 160,693.30 194,755.86 206,112.45 222,843.22 341,756.92 335,116.11 209,242.86
###
0.00 404,620.42 1,235,365.84 1,939,592.26 2,350,732.56 2,487,808.23 2,689,751.14 4,125,057.36 4,044,901.83 2,525,592.83
###

MES 1 MES 2 MES 3 MES 4 MES 15 MES 16 MES 17 MES 18 MES 19 MES 11 MES 12
0.00% 1.37% 4.19% 6.58% 12.00% 13.00% 18.00% 24.00% 8.57%
###
0.00% 1.37% 5.56% 12.14% 24.14% 37.14% 55.14% 79.14% 8.57%
###
MES 13 TOTAL
30 D.C. 390 D.C.

32,000.00
1,301.94
47,794.04
416.63 5,000.00
174,000.00

700.00 8,400.00

900.00 10,800.00

78,097.17
9,183.40
1,491.15

654.92
816.99
5,961.79
959.57
2,554.16
9,798.88
79.52
12.14

16,168.79
17,036.98
581.98
14,557.11
7,017.36
15,554.01
417.04
440.75
2,935.80
42,535.51
57,246.26

12,000.00
MES 13 TOTAL
30 D.C. 390 D.C.
45,118.54
3,759.86 45,118.54
3,852.00

23,000.00

64,432.80
9,282.29
730.80 8,769.71
2,366.00 28,392.00
492.09 5,904.64

120,616.61
16,850.16
42,945.11
11,513.27

381,418.28

24,002.87

43,359.77

252,161.03
116,259.88
754.76

71,409.87
76,789.58

17,609.38
28,244.94
106,556.17
40,571.17

99,122.24
87,097.19
1,106,605.82
MES 13 TOTAL
30 D.C. 390 D.C.

5,654.79

34,274.65
132,239.33
83,508.15
26,464.34
31,117.80
152,695.89
106.13
756.72
2,195.14

130,528.57
17,900.50
55,761.23
860.54

187,199.08
174,719.69
227,959.83
4,484.23

248,972.72
17,881.33
311,341.95
534.36

168,489.11
135,828.90
177,701.52
3,497.97

503,223.02
708,858.92
878,423.37
17,474.12
MES 13 TOTAL
30 D.C. 390 D.C.
13,913.55
28,010.64
16,309.31
701.04

423,590.47
477,183.89
590,132.63
10,133.56

22,044.53
31,039.07
21,348.91
504.10

38,212.30
35,647.99
41,197.96
871.34

310,302.85
387,198.13
246,338.26
278,623.99
13,338.08
3,989.35
8,698.88

3,688.28
341.07
1,602.73
8.34

11,087.86
3,733.10
7,813.15
120.80

43,007.86
48,257.93
51,730.74
MES 13 TOTAL
30 D.C. 390 D.C.
2,081.52

104,727.94
206,423.70
131,079.36
5,984.57

87,984.87
58,342.44
26,304.34
2,348.39

191.74
537.98
471.74
17.41

23,595.52
23,139.98
2,571.68
3,191.84

7,149.20
7,036.74
760.64
586.30

28,419.10
27,767.97
2,893.12
7,149.20
1,172.60

14,747.20
6,533.64
586.30

8,848.32
2,177.88
351.78
MES 13 TOTAL
30 D.C. 390 D.C.
62.92

193,972.80 387,945.60
42,000.00 42,000.00

579,997.94
659,645.47
5,606.34
6,369.19
2,358.42

51,272.10
392,008.92
107,112.19
292,307.65
257,277.67
6,868.72

25,933.31
4,284.23
13,432.14
3,458.40
24,879.20
55,700.83

108,852.37
2,067.06

72,501.78
2,087.25

341,146.94
16,892.36

222,793.08
MES 13 TOTAL
30 D.C. 390 D.C.
278,782.71
73,647.13
150,842.53
28,667.95
24,156.68
58,452.75
138,293.46
21,443.75
693,781.50
191,677.07
73,413.12
21,066.46

133,475.63

74,421.78

29,202.76

184,545.40

19,818.91

330,563.84

82,092.76

49,624.35

389.65

26,977.10

392.39

22,658.31

129,715.48
43,622.82
MES 13 TOTAL
30 D.C. 390 D.C.
7,482.98

60,186.64

525.24
29,700.22
549.69
6,045.45
1,342.28
42,486.67
661.82
3,023.74

968.74
6,402.40 6,402.40

467,025.39 467,025.39
17,998.87 17,998.87

127,908.72 255,817.44
86,489.93

29,660.52
45,559.13 45,559.13

10,933.11

87,314.51
80,837.60
16,388.37
33,511.87
11,409.61
1,880.95

464.28
2,063.29
5,562.55
9,436.46
6,545.32
MES 13 TOTAL
30 D.C. 390 D.C.

104,107.85
219,403.23

9,663.32
10,059.79

48,700.03

2,001.43
14,216.76

28,720.21

27,376.10 27,376.10

7,379.68 7,379.68

26,499.03 26,499.03

4,547.84 4,547.84

83,136.85 83,136.85

1,958.98 1,958.98
23,983.87 23,983.87
3,422.28 3,422.28

292.75 292.75
7,703.07 7,703.07

60,504.99
62,546.93
19,611.84

10,310.01

295.38 295.38
312.62 312.62
MES 13 TOTAL
30 D.C. 390 D.C.

115.20 115.20
4,085.00 4,085.00
2,106.40 2,106.40

23,072.98 23,072.98
127.66 127.66
788.94 788.94

1,644.75 1,644.75
986.24 986.24
2,777.49 2,777.49
4,260.96 4,260.96

157,929.31
8,601.17
977.18
20,677.27

12,104.17 133,145.87
15,218.80 167,406.75
1,362.73 14,990.03

6,690.45 73,595.15

2,478.74 2,478.74
5,531.78 5,531.78

1,522.66 1,522.66

13,966.61 13,966.61

900.00 10,800.00
2,700.00 2,700.00
MES 13 TOTAL
30 D.C. 390 D.C.
4,865.40 4,865.40
8,359.42 8,359.42
2,029.62 2,029.62
22,807.13 22,807.13
20,535.24 20,535.24
3,268.72 3,268.72
1,150.09 1,150.09

9,090.88 9,090.88
4,545.44 4,545.44
1,262.31 1,262.31

153,084.72

5,902.32
9,543.55
9,667.84
5,419.08

9,245.58
5,915.15
6,822.27
8,406.02
3,178.32
1,457.40

15,001.60 15,001.60
2,590.92 2,590.92
3,727.98 3,727.98
584.58 584.58
13,849.66 13,849.66

74,095.56
18,625.71
455.76
13,606.78
450.00
1,250.00
1,634.71
8,609.48
MES 13 TOTAL
30 D.C. 390 D.C.
33,444.18
4,413.78
4,514.35
4,570.02
7,679.77

1,564.63

7,431.98
1,441.10
6,629.08
4,641.41
2,030.67

16,328.60
4,453.90
3,669.96
9,142.50

615.86
1,936.41
1,578.64
2,085.90
3,710.24
545.21
2,290.49
4,344.91

8,966.67
2,744.80
4,874.74
42.31
435.98
849.15
59.35

260.31
1,703.34
1,138.60
4,568.52
MES 13 TOTAL
30 D.C. 390 D.C.
4,307.25
126.86
2,859.48

7,987.80
11,469.76
301.92
551.18
370.11
1,695.77
1,527.83
2,112.12
1,433.56
747.26
1,508.88
1,403.60
477.36
92.53

5,643.05
192.87
72.48
433.56
454.76
358.39
227.81
201.93
191.12
119.34
44.55

15,272.19
5,628.72
188.44
321.44
12,674.82
113.09
51.83

2,010.66
MES 13 TOTAL
30 D.C. 390 D.C.

9,550.62
1,851.92
8,518.83
3,071.54
2,609.58

9,614.10
2,900.98
1,511.73
5,392.37

654.16
6,646.31
800.60
183.30

5,445.60
150.96
185.06
275.59
733.10
801.59
1,056.06
716.78
373.63
787.92
701.80
92.53

2,465.55

10,438.99
18,741.77
2,736.55
17,664.43
12,724.29
29,604.34
MES 13 TOTAL
30 D.C. 390 D.C.
25,831.40

21,398.10
8,732.00
90,302.97
9,654.23
7,091.78
26,487.27
35,137.73

14,149.33
960.48
80.10
561.12
764.16
4,058.40
629.76
15,141.43

10,017.77
1,382.28

1,060.03

19,610.64
2,248.55
10,343.35
3,729.36
3,168.54

13,056.03
8,455.68
18,809.40

5,958.48
4,007.69
14,019.40
MES 13 TOTAL
30 D.C. 390 D.C.
4,250.98
15,009.22

1,085.28
457.71
2,340.28
1,523.37
234.16
702.48
139.92
141.64
240.05
344.76
62.10
198.72
17,025.90
880.65

785.55
20,680.14
2,559.42
1,549.10
81.38

1,052.18 1,052.18
1,057.64 1,057.64
1,323.08 1,323.08

3,067.67 3,067.67
8,882.37 8,882.37

126.30 126.30
504.70 504.70

54,264.18
3,124.36
8,109.12
14,190.96
14,027.52
MES 13 TOTAL
30 D.C. 390 D.C.
10,839.04
10,953.88
796.00
15,526.68
34,962.24
151.52
121.32
161.76

5,023.96
1,304.04
10,917.78
65.27
554.72
1,306.14
474.96
208.02
208.02
298.59
372.65

4,216.50
1,728.24
4,062.24
1,472.55

28,788.16
3,485.55

82,660.88
8,594.02
1,959.91
865.43

42,397.51
66,035.34
3,595.22
24.91
1,289.57
2,285.83
MES 13 TOTAL
30 D.C. 390 D.C.

256.62
299.62
4,123.44
1,177.86
3,492.96
3,060.96
529.62
572.62
3,777.72
1,888.86
4,342.32
5,946.24
91.44
407.76
3,398.00
276.08
2,038.80
983.50
694.48
464.94
561.30
30,618.92

99,706.70
19,732.84
40,761.28
9,297.36
364.50
10,730.96
61,409.10
32,824.00
1,792.14

1,980.56

47,130.32
0.00
666.71
445.94
654.64
MES 13 TOTAL
30 D.C. 390 D.C.
1,700.32
0.00
0.00
100.50

22,225.84
4,344.21

10,718.73
20,164.30
42,476.88

18,591.13
7,461.79
8,027.84
35,623.14
29,795.32
52,249.06
135,840.05

1,030.86
3,793.34
5,540.01
156.48
195.60
135.92
543.68
619.26
439.04
1,326.35
219.90
9,286.06
1,101.40
188.94

14,240.68
2,499.66

4,570.80
489.20
65.96
MES 13 TOTAL
30 D.C. 390 D.C.
806.40

7,903.44
3,886.96
5,963.02
72,433.98
4,994.88
11,559.36

7,497.82
2,450.58
12,172.28

53,052.98 424,423.70

251,582.68

1,382,318.61 24,576,054.66
143,999.09 2,560,140.21
137,876.87 2,451,294.16
1,664,194.57 29,587,489.03

MES 13
5.64%
20.04%
PRESUPUESTO

OBRA ADECUACION, MEJORAMIENTO Y SUSTITUCION DE LA INFRAESTRUCTURA EDUCATIVA DE


SATIPO - JUNIN
CONTRATISTA CONSORCIO TERRASUR (Integrado por TERRAK SAC y TABLEROS Y PUENTES S.A SUCURS
ENTIDAD PROGRAMA NACIONAL DE INFRAESTRUCTURA EDUCATIVA-PRONEID
PLAZO DE
390 DIAS CALENDARIOS
EJECUCION
PRESUPUESTO S/. 34,212,121.79 (INC. IGV)
MONTO
S/. 29,570,000.00 (SIN IGV - LEY DE EXONERACION DE LA AMAZONIA)
CONTRATADO

Item Descripción
01 ESTRUCTURAS
01.01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, DEMOLICION
01.01.01 Construcciones Provisionales
01.01.01.01 ALMACEN, COMEDOR Y VESTUARIOS DE OBRA
01.01.01.02 CARTEL DE OBRA 3.60x7.20
01.01.01.03 CERCO PROVISONAL DE TRIPLAY DE 6MM
01.01.01.04 BAÑOS PORTATILES PARA OBRA
01.01.01.05 TRANSPORTE, INSTALACION Y DESINSTALACION DE AULAS
PREFABRICADAS
01.01.02 Instalaciones Provisionales
01.01.02.01 CONSUMO DE ENERGIA ELECTRICA Y AGUA PARA LA CONSTRUCCION
01.01.03 Trabajos Preliminares
01.01.03.01 LIMPIEZA PERMANENTE DE LA OBRA
01.01.04 Eliminacion de Obstrucciones
01.01.04.01 ELIMINACION DE MALEZA Y ARBUSTOS DE FACIL EXTRACCION
01.01.04.02 ELIMINACION DE ARBOL
01.01.04.03 ELIMINACION DE POSTE DE LUZ
01.01.05 Remociones
01.01.05.01 DESMONTAJE DE APARATOS SANITARIOS
01.01.05.02 DESMONTAJE DE BARANDA
01.01.05.03 DESMONTAJE TECHO DE ETERNIT/CALAMINA
01.01.05.04 DESMONTAJE DE PUERTAS
01.01.05.05 DESMONTAJE DE VENTANAS
01.01.05.06 DESMONTAJE DE ESTRUCTURA METALICA
01.01.05.07 DESMONTAJE DE TABLERO ELECTRICO
01.01.05.08 DESMONTAJE DE LUMINARIAS
01.01.06 Demoliciones
01.01.06.01 DEMOLICION DE PISO DE CONCRETO INC. F. P.
01.01.06.02 DEMOLICION DE LOSA DE CONCRETO e=15 cm.
01.01.06.03 DEMOLICION MASIVA
01.01.06.04 DEMOLICION COLUMNAS, VIGAS DE CONCRETO Y ZAPATAS
01.01.06.05 DEMOLICION MUROS DE LADRILLO KK C/MAQUINA
01.01.06.06 DEMOLICION DE LOSA ALIGERADA H=0.20m
01.01.06.07 DEMOLICION DE BANCAS DE CONCRETO
01.01.06.08 DEMOLICION DE GRAAS DE CONCRETO
01.01.06.09 DEMOLICION DE CUNETA CONCRETO e=10cm
01.01.06.10 ACARREO INTERNO, MAT. PROCEDENTE DE DEMOLICION
01.01.06.11 ELIMINACION DE DEMOLICIONES
01.01.07 Movilizacion de Maquinarias y Herramientas
01.01.07.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
01.01.08 Trazo, Niveles y Replanteo
01.01.08.01 TRAZO Y REPLANTEO PRELIMINAR
01.01.08.02 REPLANTEO DURANTE EL PROCESO
01.01.08.03 TRANSPORTE VERTICAL CON WINCHE ELECTRICO
01.02 SEGURIDAD Y SALUD
01.02.01 ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE
SEGURIDAD Y SALUD EN EL TRABAJO
01.02.02 EQUIPOS DE PROTECCION INDIVIDUAL
01.02.03 EQUIPO DE PROTECCION COLECTIVA
01.02.04 SEÑALIZACION TEMPORAL DE SEGURIDAD
01.02.05 CAPACITACION EN SEGURIDAD Y SALUD
01.02.06 RECURSOS PARA RESPUESTA ANTE EMERGENCIAS EN SEGURIDAD Y
SALUD EN EL TRABAJO
01.03 Movimiento de Tierras
01.03.01 Excavaciones
01.03.01.01 EXCAV. ZANJAS Y ZAPATA Rt<2kg/cm2 h=1.5m
01.03.01.02 EXCAV. ZANJAS Y ZAPATA Rt<2kg/cm2 h=2.0m
01.03.01.03 EXCAVACION C/EQUIPO A NIVEL DE SUBRASANTE
01.03.01.04 EXCAVACION CIMIENTOS Y VIGAS DE CIMENTACION
01.03.02 Cortes
01.03.02.01 CORTE MASIVO DE TERRENO A MAQUINA
01.03.02.02 CORTE DE TERRENO PARA MEJORAMIENTO DE SUELO DE CIMENTACION

01.03.03 Rellenos
01.03.03.01 RELLENO CON MATERIAL GRANULAR C/EQUIPO NO MENOR A 3% DE FINOS

01.03.03.02 RELLENO CON MATERIAL GRANULAR C/EQUIPO NO MENOR A 12% DE


FINOS
01.03.03.03 RELLENO C/AFIRMADO PARA PLATEA Y MUROS
01.03.03.04 AFIRMADO DE 8'' PARA PISOS, PATIOS Y VEREDAS, COMPACTADO
01.03.03.05 RELLENO C/MATERIAL GRANULAR SELECCIONADO CON EQUIPO LIVIANO

01.03.03.06 RELLENO CON MATERIAL PROPIO


01.03.04 Nivelacion Interior y Apisonado
01.03.04.01 NIVELACION INTERIOR Y APISONADO PARA F. PISO, PATIO Y VEREDAS
01.03.04.02 MEJORAMIENTO DE SUELO CON GEOMEMBRANAS
01.03.04.03 MEJORAMIENTO DE SUELO CON GEO MALLAS
01.03.04.04 MEJORAMIENTO DE SUELO CON GEOTEXTIL
01.03.05 Eliminacion de Material Excedente
01.03.05.01 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES
01.03.05.02 ELIMINACION MATERIAL EXCEDENTE C/EQUIPO, CARGUIO A MANO
01.03.05.03 ELIMINACION MATERIAL EXCEDENTE C/MAQUINA
01.04 OBRAS DE CONCRETO SIMPLE
01.04.01 Solados
01.04.01.01 SOLADO PARA ZAPATAS Y VIGAS DE CIMENTACION e=2'', 1:12 CEM/HORM.

01.04.02 Sobrecimientos
01.04.02.01 SUBZAPATA MEZCLA 1:12 + 30% P.G.
01.04.02.02 CIMIENTO CONCRETO f'c=140 kg/cm2 + 30% P.G.
01.04.02.03 CIMIENTO CORRIDO, ENCOF. Y DESENCOF.
01.04.02.04 SOBRECIMIENTO, CONCRETO 1:8 + 25% P.M. f'c=> 100 kg/cm2
01.04.02.05 SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO
01.04.02.06 FALSO PISO MEZCLA 1:8 e=4''
01.04.02.07 GRADAS EN PISO CONCRETO CICLOPEO
01.04.02.08 GRADAS, ENCOFRADO Y DESENCOFRADO
01.04.02.09 CURADO DE CONCRETO
01.05 OBRAS DE CONCRETO ARMADO
01.05.01 Zapatas
01.05.01.01 ZAPATAS - CONCRETO 210 kg/cm2
01.05.01.02 ZAPATAS - ENCOFRADO Y DESENCOFRADO
01.05.01.03 ZAPATAS - ACERO fy=4200 kg/cm2
01.05.01.04 CURADO DE CONCRETO
01.05.02 Vigas de Cimentacion
01.05.02.01 VIGAS DE CIMENT. - CONCRETO 210 kg/cm2
01.05.02.02 VIGAS DE CIMENT. - ENCOFRADO Y DESENCOFRADO
01.05.02.03 VIGAS DE CIMENT. - ACERO fy=4200 kg/cm2
01.05.02.04 CURADO DE CONCRETO
01.05.03 Losas de Cimentacion
01.05.03.01 LOSAS DE CIMENT. - CONCRETO 210 kg/cm2
01.05.03.02 LOSAS DE CIMENT. - ENCOFRADO Y DESENCOFRADO
01.05.03.03 LOSAS DE CIMENT. - ACERO fy=4200 kg/cm2
01.05.03.04 CURADO DE CONCRETO
01.05.04 Muros Reforzados
01.05.04.01 MUROS DE CONTENC. - CONCRETO 210 kg/cm2
01.05.04.02 MUROS DE CONTENC. - ENCOF. Y DESENCOFRADO (DOS CARAS)
01.05.04.03 MUROS DE CONTENC. - ACERO fy=4200 kg/cm2
01.05.04.04 CURADO DE CONCRETO
01.05.05 Columnas
01.05.05.01 COLUMNAS. - CONCRETO 210 kg/cm2 C/ADIT/PLASTIFICANTE - CARAVI
01.05.05.02 COLUMNAS. - ENCOFRADO Y DESENCOFRADO
01.05.05.03 COLUMNAS. - ACERO fy=4200 kg/cm2
01.05.05.04 CURADO DE CONCRETO
01.05.06 Placas
01.05.06.01 PLACAS - CONCRETO f'c=210 kg/cm2
01.05.06.02 PLACAS - ENCOFRADO Y DESENCOFRADO
01.05.06.03 PLACAS - ACERO fy=4200 kg/cm2
01.05.06.04 CURADO DE CONCRETO
01.05.07 Vigas
01.05.07.01 VIGAS - CONCRETO 210 kg/cm2 - 1 PISO
01.05.07.02 VIGAS - ENCOFRADO Y DESENCOFRADO
01.05.07.03 VIGAS - ACERO fy= 4200 kg/cm2
01.05.07.04 CURADO DE CONCRETO
01.05.08 Escaleras
01.05.08.01 ESCALERAS - CONCRETO 210 kg/cm2
01.05.08.02 ESCALERAS - ENCOFRADO Y DESENCOFRADO
01.05.08.03 ESCALERAS - ACERO fy=4200 kg/cm2
01.05.08.04 CURADO DE CONCRETO
01.05.09 Losas Macizas
01.05.09.01 LOSAS MACIZAS - CONC. 210 kg/cm2 - 1 PISO
01.05.09.02 LOSAS MACIZAS - ENCOFRADO Y DESENCOFRADO
01.05.09.03 LOSAS MACIZAS - ACERO fy=4200 kg/cm2
01.05.09.04 CURADO DE CONCRETO
01.05.10 Losas Aligeradas
01.05.10.01 LOSA ALIGERADA - CONCRETO 210 kg/cm2
01.05.10.02 LOSA ALIGERADA - ENCOFRADO Y DESENCOFRADO
01.05.10.03 LOSA ALIGERADA - ACERO fy=4200 kg/cm2
01.05.10.04 LOSA ALIGERADA - LADR. HUECO 15x30x30
01.05.10.05 CURADO DE CONCRETO
01.05.10.06 LOSA DE PISO - CONCRETO 210 kg/cm2
01.05.10.07 LOSA PISO ACERO fy=4200 kg/cm2 - GRADO 60
01.05.11 Rampa
01.05.11.01 RAMPA DE CONCRETO 210 kg/cm2
01.05.11.02 RAMPAS - ENCOFRADO Y DESENCOFRADO
01.05.11.03 RAMPAS - ACERO DE REFUERZO fy=4200kg/cm2
01.05.11.04 CURADO DE CONCRETO
01.05.12 Cimentacion Armada
01.05.12.01 CIMIENTOS REFORZADOS CONCRETO f'c=210 kg/cm2
01.05.12.02 CIMIENTOS REFORZADOS ENCOFRADO Y DESENCOFRADO
01.05.12.03 CIMIENTO REFORZADO - ACERO fy=4200 kg/cm2
01.05.12.04 CURADO DE CONCRETO
01.05.13 Graderias
01.05.13.01 GRADERIAS - CONCRETO 210 kg/cm2
01.05.13.02 GRADERIAS - ENCOFRADO Y DESENCOFRADO
01.05.13.03 GRADERIAS - ACERO DE REFUERZO fy=4200 kg/cm2
01.05.13.04 CURADO DE CONCRETO
01.05.14 Soleras
01.05.14.01 SOLERA - CONCRETO 140 kg/cm2
01.05.14.02 SOLERA - ENCOFRADO Y DESENCOFRADO
01.05.14.03 SOLERA - ACERO fy=4200 kg/cm2
01.05.14.04 CURADO DE CONCRETO
01.05.15 Sobrecimientos Reforzados
01.05.15.01 SOBREC. REF. CONCRETO f'c=210 kg/cm2
01.05.15.02 SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO
01.05.15.03 SOBRECIMIENTO REFORZADO ACERO fy=4200 kg/cm2 - GRADO 60
01.05.15.04 CURADO DE CONCRETO
01.05.16 Otros
01.05.16.01 DADOS DE CONCRETO EN JUNTA DILATACION PISO C:H 1:10
01.05.16.02 DADOS DE CONCRETO, ENCOF. Y DESENCOF.
01.05.16.03 DADOS, ACERO DE REFUERZO fy=4200 kg/cm2
01.05.16.04 CURADO DE CONCRETO
01.06 ESTRUCTURAS METALICAS
01.06.01 Estructura Metalica en Piscina
01.06.01.01 VIGA PRINCIPAL DE ACERO VP
01.06.01.02 VIGUETA DE ACERO V1
01.06.01.03 TEMPLADORES METALICOS Y ACCESORIOS
01.06.01.04 ANCLAJES PARA ARMADURA METALICA SEGÚN DISEÑO
01.06.02 Estructuras Metalicas Cancha
01.06.02.01 TIJERALES TIPO A-1
01.06.02.02 VIGUETAS TIPO VG-2
01.06.02.03 TEMPLADORES METALICOS Y ACCESORIOS
01.06.02.04 ANCLAJES SEGÚN DISEÑO
01.06.03 Estructuras Metalicas Polideportivo
01.06.03.01 ARCO PARABOLICO
01.06.03.02 VIGUETA DE ACERO V1
01.06.03.03 TEMPLADORES METALICOS Y ACCESORIOS
01.06.03.04 TIJERALES TIPO A-1
01.06.03.05 ANCLAJES SEGÚN DISEÑO
01.06.04 Estructuras Metalicas Taller Automotriz
01.06.04.01 VIGA PRINCIPAL DE ACERO VP
01.06.04.02 VIGUETA DE ACERO V1
01.06.04.03 ANCLAJES SEGÚN DISEÑO
01.06.05 Estructuras Metalicas Entrada Nivel Secundaria
01.06.05.01 VIGA PRINCIPAL DE ACERO VP
01.06.05.02 VIGUETA DE ACERO V1
01.06.05.03 ANCLAJES SEGÚN DISEÑO
01.06.05.04 TEMPLADORES, ACERO fy=4200 kg/cm2 - GRADO 60
01.07 COBERTURA
01.07.01 Cobertura Patio Techado
01.07.01.01 COBERTURA DE ACERO AUTOSOPORTADO E=0.60 mm
01.07.01.02 CERRAMIENTO DE TIMPANOS CON PLANCHA DE ACERO ACANALADA AUTO
SOPORTADA e=0.80mm
02 ARQUITECTURA
02.01 MUROS Y TABIQUES DE ALBAÑILERIA
02.01.01 MURO DE LADRILLO KK TIPO IV CABEZA M: 1:1:4 E=1.5 cm (*)
02.01.02 MURO DE LADRILLO KK TIPO IV SOGA M: 1:1:4 E=1.5 cm (*)
02.01.03 MURO DE LADRILLO KK TIPO IV CANTO M: 1:1:4 E=1.5 cm (*)
02.01.04 ALAMBRE # 8 REFUERZO HORIZONTAL EN MUROS
02.01.05 TABIQUERIA DRYWALL ESTÁNDAR ST 1/2 A DOS CARAS CON PARANTES DE
69 X 38 X 3 @ 45 MM
02.02 REVOQUES Y REVESTIMIENTOS
02.02.01 TARRAJEO PRIMARIO, MORTERO C:A 1:5
02.02.02 TARRAJEO EN MURO: INTERIOR Y EXTERIOR
02.02.03 TARRAJEO EN MUROS EXT. A PARTIR 2do PISO
02.02.04 TARRAJEO DE COLUMNAS
02.02.05 TARRAJEO DE VIGAS
02.02.06 TARRAJEO EN PLACAS DE CONCRETO (ASCENSOR)
02.02.07 TARRAJEO C/CEMENTO FROTACHADO PASO Y CONTRAPASO (ESCALERAS)

02.02.08 TARRAJEO CON IMPERMEABILIZANTE CISTERNA


02.02.09 TARRAJEO PRIMARIO CON IMPERMEABILIZANTE PISCINA
02.02.10 TARRAJEO PULIDO DE BANCAS DE CONCRETO (1:5)
02.02.11 TARRAJEO PULIDO DE SARDINELES DE CONCRETO (1:5)
02.02.12 TARRAJEO PULIDO DE MUROS DE CONCRETO (1:5) (MUROS DE
CONTENCION)
02.02.13 BRUÑAS SEGÚN DETALLE (1x1 cm)
02.02.14 TARRAJEO C/CEMENTO FROTACHADO (TRIBUNAS) PASO=80cm y
CONTRAPASO=40 cm
02.02.15 VESTIDURA DE DERRAMES (1:5)
02.02.16 VESTIDURA DE DERRAMES CON BORDES BOLEADOS M:1:2
02.03 CIELO RASOS
02.03.01 CIELO RASO CON MEZCLA C:A 1:5
02.03.02 VESTIDURA EN FONDO DE ESCALERAS Y PUENTE
02.04 PISOS Y PAVIMENTOS
02.04.01 CONTRAPISOS
02.04.01.01 CONTRAPISO DE 40 mm
02.04.02 PISOS
02.04.02.01 PISO PORCELANATO 40X40 TIPO IV COLOR GRIS PLATA
02.04.02.02 PISO CERAMICO DE 40X40 COLOR BLANCO
02.04.02.03 PISO DE CEMENTO FROT. Y BRUÑ. E=2''
02.04.02.04 PISO DE CEMENTO SEMIPULIDO CON ACABADO SPRAY DECK
02.04.02.05 PISO DE CEMENTO SEMIPULIDO Y BRUÑADO E=2'' S/COLOREAR
02.04.02.06 PISO TERRAZO LAVADO
02.04.02.07 PISO DEPORTIVO SINTETICO VINILICO PVC E=9MM
02.04.02.08 PISO CERAMICO DE 20X20 PARA PISCINA CELESTE PLUS
02.04.02.09 PISOS DE CAUCHO VULCANIZADO, E=13MM
02.04.02.10 SEMBRADO DE GRASS NATURAL
02.04.02.11 SUMINISTRO Y COLOCACION DE TIERRA DE CHACRA
02.04.02.12 PISO DE MADERA PUMAQUIRO MACHIHEMBRADO DE 5''x7'', ESPESOR 3/4''
ACABADO BARNIZ MARINO
02.04.02.13 PISO DE ASFALTO E=2'' EN CALIENTE
02.04.03 PISOS DE CONCRETO
02.04.03.01 LOSA DEPORTIVA DE CONCRETO 210 kg/cm2 ACABADO FROTACHADO
E=0.15M INCLUIDO CON CURADO ADITIVO
02.04.03.02 ESTACIONAMIENTO - PATIO CONCRETO 210 kg/cm2 ACABADO
FROTACHADO Y BRUÑADO e=0.15M INCLUIDO CON CURADO ADITIVO
02.04.03.03 PATIO TECHADO Y PRINCIPAL DE CONCRETO 210 kg/cm2 ACABADO
FROTACHADO Y BRUÑADO e=0.15M INCLUIDO CON CURADO ADITIVO
02.04.03.04 ALAMEDA DE CONCRETO 175 kg/cm2 ACABADO FROTACHADO Y BRUÑADO
e=0.10M INCLUIDO CON CURADO ADITIVO
02.04.03.05 VEREDA DE CONCRETO 175 kg/cm2 ACABADO FROTACHADO Y BRUÑADO
e=0.10M INCLUIDO CON CURADO ADITIVO
02.04.03.06 RAMPA DE CONCRETO 175 kg/cm2 ACABADO FROTACHADO Y BRUÑADO
e=0.15M INCLUIDO CON CURADO ADITIVO
02.04.03.07 SARDINEL DE CONCRETO 175 kg/cm2 h=0.50m, ACABADO 1:2 INC. CURADO
C/ADITIVO
02.04.03.08 SARDINEL CONCRETO f'c=175 kg/cm2 h=0.15m, INCLUIDO CON CURADO
ADITIVO
02.04.03.09 SARDINEL DE CONCRETO 175 kg/cm2 h ext=0.15m, INCLUIDO CURADO CON
ADITIVO
02.04.03.10 SARDINEL DE CONCRETO 175 kg/cm2 h ext=0.35m, INCLUIDO CURADO CON
ADITIVO
02.04.03.11 ENCOFRADO Y DESENCOFRADO NORMAL EN SARDINELES DE PATIOS,
VEREDAS
02.05 ZOCALOS Y CONTRAZOCALOS
02.05.01 ZOCALOS
02.05.01.01 ZOCALO CERAMICO 45x45 COLOR BLANCO
02.05.01.02 ZOCALO CERAMICO 40x40 COLOR BLANCO
02.05.01.03 ZOCALO CON CERAMICA 20x20 ESPECIAL PARA PISCINA
02.05.02 CONTRAZOCALOS
02.05.02.01 CONTRA. PORCELANATO DE 0.40x0.40 H=0.10M, MT TIPO IV COLOR PLATA O
SIMILAR
02.05.02.02 CONTR.S/COLOREAR H=10 cm MZ 1:2 e=1.5 cm
02.05.02.03 CONTR.S/COLOREAR H=30 cm MZ 1:2 e=1.5 cm
02.05.02.04 CONTR.S/COLOREAR H=45 cm MZ 1:2 e=1.5 cm
02.05.02.05 CONTR.S/COLOREAR H=60 cm MZ 1:2 e=1.5 cm
02.05.02.06 CONTR.S/COLOREAR H=75 cm MZ 1:2 e=1.5 cm
02.05.02.07 CONTR.S/COLOREAR H=85 cm (CERCO) MZ 1:2 e=1.5 cm
02.05.02.08 CONTRAZOCALO MAD. PUMAQUIRO 3/4''X4'' + RODON 3/4''
02.05.02.09 CONTR. DE CEMENTO PULIDO BRUÑADO INTERIOR H=40cm MZ 1:2 e=1.5cm

02.05.02.10 CONTRAZOCALO DE TERRAZO, h=0.10m


02.05.02.11 CONTRAZOCALO RECTO DE ESCALERAS (H=0.30M)
02.06 COBERTURADE
COBERTURA (CUBIERTA)
PLANCHA DE ALUZINCADA DE ESPESOR DE 0.5MM
02.06.01 PREPINTADO DE COLOR AZUL
02.06.02 CUMBRERA DE ALUMINIO ZINCADO PREPINTADO RECUB. C/ALEAC-AL-
ZINC-SIL E=0.50
02.06.03 COBERTURA DE PLANCHA POLICARBONATO REFLECTIVO DE 10mm
02.06.04 LISTONES DE MADERA SECA Y CEPILLADA P/FIJAR COB ALUZINC EN
ALIGERADO
02.06.05 CORREAS DE MADERA TORNILLO 2''x6''
02.06.06 IMPERMEAB. DE TECHOS CON PINTURA ASFALTICA
02.07 KIOSCO Y FOTOCOPIADORA
02.07.01 VIGAS Y LISTONERIA DE MADERA TORNILLO
02.08 CARPINTERIA DE MADERA
02.08.01 PUERTAS
02.08.01.01 PUERTA MACHIHEMBRADA DE MADERA CEDRO C/MIRILLA
02.08.01.02 PUERTA MACHIHEMBRADA MADERA CEDRO
02.08.01.03 PUERTA DOBLE HOJA MACHIHEMBRADA DE MADERA CEDRO
02.08.01.04 CELOSIAS DE MADERA EN PARASOLES (ADMINIST)
02.08.01.05 PUERTA MACHIHEMBRADA DE MADERA CEDRO, DOBLE HOJA VAIVEN
02.08.01.06 PUERTA EN MUEBLE BAJO (COCINA)
02.09 CARPINTERIA METALICA Y HERRERIA
02.09.01 PUERTAS DE FIERRO
02.09.01.01 PUERTA DE FIERRO PARA CASETA DE GAS
02.09.01.02 PUERTA METALICA PARA CASETA DE BOMBAS
02.09.01.03 PUERTA METALICA, INCLUYE MIRILLA
02.09.01.04 PUERTA METALICA DOBLE HOJA
02.09.01.05 PUERTA METALICA ENROLLABLE
02.09.02 VENTANAS DE ALUMINIO
02.09.02.01 VENTANA DE ALUMINIO FIJA CON PLATINA HORIZONTAL
02.09.02.02 VENTANA DE ALUMINIO SISTEMA CORREDIZA Y PLATINA SUPERIOR EN LA
PARTE SUPERIOR
02.09.02.03 VENTANA DE ALUMINIO FIJA C/CRISTAL TEMPLADO TRANSPARENTE
02.09.02.04 VENTANA DE ALUMINIO FIJA SISTEMA CORREDIZA CON CRISTAL
TEMPLADO 6MM
02.09.02.05 VENTANA CIRCULAR CON ACCESORIOS DE ACERO INOXIDABLE (R=1.39m)

02.09.02.06 VENTANA CON MARCO DE ALUMINIO Y CRISTAL 10MM (BOLETERIA)


02.09.02.07 MAMPARA CON MARCO DE ALUMINIO CON CRISTAL TEMPLADO 10mm
INCLUYE ACCESORIOS
02.09.02.08 VENTANA CELOSIA CON MARCO TUBO ALUMINIO 2''x4'' Y PLATINAS 2''x1/4''
HORIZONTAL
02.09.03 DIVISION DE ALUMINIO
02.09.03.01 GABINETES DE ESTRUCTURAS DE ALUMINIO Y PANELES DE MELAMINE
(S.S.H.H.)
02.09.03.02 GABINETE DE ESTRUCTURA DE ALUMINIO Y PANELES DE MELAMINE
(URINARIO) H=1.20
02.09.03.03 PUERTA DE CUBICULOS SSHH CON MELAMINE HIDROFUGO 18MM CON
MARCO DE ALUMINIO
02.09.03.04 PUERTA DE POLICARBONATO CON MARCO DE ALUMINIO
02.09.04 BARANDAS METALICAS
02.09.04.01 BARANDA EN CORREDORES AC INOX S/DETALLE
02.09.05 PASAMANOS
02.09.05.01 PASAMANO DE TUBO DE Ø 2'' AC. INOX BRILLANTE EN PISCINA
02.09.05.02 PASAMANO DE TUBO F° N° DE 2'' EN ESCALERA
02.09.05.03 PASAMANOS DE 1.1/2'' ACERO INOX EN SSHH DISCP
02.09.06 ESCALERAS
02.09.06.01 ESCALERA GATO EMPOTRADA DE ACERO INOXIDABLE
02.09.06.02 CANTONERA DE FIERRO EN ESCALERA
02.09.07 CERCO Y REJA
02.09.07.01 CERCO EXTERIOR TIPO REJA S/DISEÑO
02.09.07.02 CERCO TIPO MALLA COCADA 2''X2'' CON ALAMBRE N° 10
02.09.07.03 PUERTA DE INGRESOS DOBLE HOJA TIPO REJA METALICA CON TUBO
CUADRADO (CERCO)
02.09.07.04 PUERTA DE INGRESO TIPO REJA METALICA CON TUBO CUADRADO
(CERCO)
02.09.08 ELEMENTOS METALICOS ESPECIALES
02.09.08.01 MARCO Y TAPA DE FIERRO D=0.60m
02.09.08.02 MARCO Y TAPA DE FIERRO 0.80x0.80M P/TQUE CISTERNA
02.10 CERRAJERIA
02.10.01 BISAGRAS
02.10.01.01 BISAGRA DE ACERO ALUMINIZADO DE 4'' PESADA EN PUERTA
02.10.01.02 BISAGRAS CAPUCHINAS ACERO ALUMINIZADO 3 1/2''
02.10.01.03 BARRA ANTIPANICO PARA PUERTA DE INGRESO A POLIDEPORTIVO
02.10.02 CERRADURA
02.10.02.01 CERRADURA DOS GOLPES EN PUERTA
02.10.02.02 CERRADURA PARA PUERTA EXTERIOR TRES GOLPES
02.10.02.03 CERRADURA PARA PUERTA INTERIOR DOBLE PERILLA
02.10.03 ACCESORIOS CIERRE
02.10.03.01 CERROJO DE 3'' ALUMINIZADO PARA PUERTA
02.10.03.02 MANIJA DE BRONCE 4'' PARA PARA PUERTAS
02.10.03.03 PICAPORTE DE 6'', DE FIERRO
02.10.03.04 FRENO HIDRAULICO PARA PUERTA DE CRISTAL
02.11 VIDRIOS, CRISTALES Y SIMILARES
02.11.01 VIDRIOS Y CRISTALES
02.11.01.01 CRISTAL TEMPLADO 6MM
02.11.01.02 CRISTAL TEMPLADO 10MM
02.11.01.03 CRISTAL REFLECTIVO DE SEGURIDAD
02.11.01.04 BARANDA DE CRISTAL TEMPLADO 10MM CON ACCESORIOS DE ACERO
INOX DE 2''
02.12 PINTURA
02.12.01 PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES
02.12.01.01 PINTURA LATEX 2 MANOS EN CIELO RASO Y VIGAS
02.12.01.02 PINTURA LATEX 2 MANOS EN MUROS Y COLUMNA
02.12.01.03 PINTURA OLEOMATE 2 MANOS EN MUROS Y COLUMNAS EXTERIORES
(PRIMER PISO)
02.12.01.04 PINTURA OLEOMATE 2 MANOS EN MUROS Y COLUMNAS EXT. A PARTIR
2DO. PISO
02.12.02 PINTURA DE CARPNTERIA DE MADERA
02.12.02.01 PRESERVANTE PARA MADERA
02.12.02.02 PINTURA BARNIZ EN CARP. DE MADERA
02.12.03 PINTURA DE ELEMENTOS METALICOS
02.12.03.01 PINTURA ANTICORROSIVA Y ESM. EN BARANDAS Y PASAMANOS 2 MANOS

02.12.03.02 PINTURA DEMARCACION DE LOSA DEPORTIVA


02.13 VARIOS, LIMPIEZA Y JARDINERIA
02.13.01 LIMIPEZA PERMANENTE DE LA OBRA
02.13.02 LIMPIEZA FINAL DE LA OBRA
02.14 OTROS
02.14.01 VARIOS
02.14.01 GARGOLA DE CONCRETO SEGÚN DISEÑO
02.14.02 CANALETA f'c=140 P/EVAC. PLUVIAL, MEDIA CAÑA 4'' EN PASADIZO
02.14.03 ASTA DE BANERA TIPICO
02.14.04 MESA C.A. REVST. C/CERAMICO
02.14.05 MESA DE CONCRETO, ACABADO CON POLVO DE MARMOL
02.14.06 MESA REVESTIDA CON PLANCHA DE ACERO INOXIDABLE
02.14.07 ENCHAPE EN PLANCHA DE GRANITO ROJO
02.14.02 EQUIPAMIENTO DEPORTIVO Y DE RECREACION
02.14.02.01 ARCO Y TABLERO FULBITO - BASKET (MET-MAD)
02.14.02.02 ARCO PARA FUTBALL
02.14.02.03 TUBOS C. VOLEY, INC. RED Y DADOS CONCRETO
02.14.03 EQUPAMIENTO DE PISCINA
02.14.03.01 PARTIDORES CON ACCESORIOS DE ACERO INOXIDABLE PARA
COMPETENCIA
02.14.03.02 ESCALERA DE ACERO INOX
02.14.03.03 ANDARIBELES PARA PISCINA
02.14.03.04 COBERTOR PARA PISCINA
02.14.03.05 CARRO TRANSPORTADOR DE COBERTOR EN PISCINA
02.14.04 JUNTAS
02.14.04.01 JUNTA DE DILATACION CON ESPUMA PLASTICA+JEBE MICROPOROSO
02.14.04.02 TAPA JUNTA CON PLANCHA LISA 3/16 VERTICAL (ENTRE MODULOS)
02.14.04.03 TAPA JUNTA HORIZONTAL CON PLANCHA DE ACERO LISO 3/16
02.14.04.04 JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1''
02.14.04.05 JUNTA DE CONSTRUCCION TIPO J1
02.14.04.06 JUNTA DE CONSTRUCCION TIPO J2
02.14.05 PIZARRA
02.14.05.01 PIZARRA MURAL 5.0x1.0 SIN TISERO
02.14.05.02 PIZARRA ACRILICA CON MARCO DE ALUMINIO 5.00X1.40 MT
02.14.05.03 PIZARRA ACRILICA CON MARCO DE ALUMINIO 4.20X1.40 MT
02.14.05.04 TICERO DE MADERA CEDRO (L=4.20 m) BARNIZADO
02.14.05.05 TICERO DE MADERA CEDRO (L=5.00 m) BARNIZADO
03 INSTALACIONES SANITARIAS
03.01 APARATOS SANITARIOS Y ACCESORIOS
03.01.01 INIDORO FLUXOMETRICO BLANCO
03.01.02 URINARIO FLUXOMETRICO
03.01.03 LAVATORIO DE LOZA TIPO MANANTIAL
03.01.04 LAVATORIO TIPO OVALIN SONNET DE LOSA BLANCO
03.01.05 LAVADERO DE ACERO INOX. 1 POZA S/ESCURRIDEA
03.01.06 LAVADERO DE ACERO INOX. 2 POZAS S/ESCURRIDERA
03.01.07 LAVADERO DE GRANITO 1 POZA
03.01.08 DUCHA CROMADA SIMPLE
03.01.09 COLOCACION DE APARATOS SANITARIOS
03.01.10 DISPENSADOR DE PAPEL TOALLA
03.01.11 DISPENSADOR DE JABON LIQUIDO
03.01.12 DISPENSADOR DE PAPEL HIGIENICO
03.01.13 COLOCACION DE ACCESORIOS SANITARIOS
03.02 SISTEMA DE AGUA FRIA
03.02.01 TRABAJOS PRELIMINARES REDES DE AGUA
03.02.01.01 TRAZO NIVELES Y REPLANTEO DURANTE EL PROCESO
03.02.02 MOVIMIENTO DE TIERRAS
03.02.02.01 EXCAVACION DE ZANJAS PARA REDES DE AGUA
03.02.02.02 REFINE Y NIVELACION DE ZANJAS
03.02.02.03 CAMA DE ARENA CON MATERIAL PRESTAMO H=0.10 M
03.02.02.04 RELLENO COMPACTADO C/MAT. PROPIO C/PL VIB
03.02.02.05 ELIMINACION DE MAT. EXCEDENTE CARGUIO MANUAL Y VOLQUETE 6M3
03.02.03 SALIDAS DE AGUA FRIA
03.02.03.01 SALIDA DE AGUA FRIA PVC C-10 DE 1/2"
03.02.03.02 SALIDA DE AGUA FRIA PVC C-10 DE 3/4"
03.02.03.03 SALIDA DE AGUA FRIA -PVC C-10 1"
03.02.03.04 SALIDA DE AGUA FRIA PVC C-10 DE 1 1/4
03.02.04 RED DE DISTRIBUCION DE AGUA FRIA
03.02.04.01 TUBERIA DE AGUA PVC C-10 DE 4"
03.02.04.02 TUBERIA DE AGUA PVC C-10 DE 3"
03.02.04.03 TUBERIA DE AGUA PVC C-10 DE 2"
03.02.04.04 TUBERIA DE AGUA PVC C-10 DE 1 1/2"
03.02.04.05 TUBERIA DE AGUA PVC C-10 DE 1 1/4"
03.02.04.06 TUBERIA DE AGUA PVC C-10 DE 1"
03.02.04.07 TUBERIA DE AGUA PVC C-10 DE 3/4"
03.02.04.08 TUBERIA DE AGUA PVC C-10 DE 1/2"
03.02.05 RED DE ALIMENTACION AGUA FRIA
03.02.05.01 TUBERIA DE AGUA PVC C-10 DE 2 1/2"
03.02.05.02 TUBERIA DE AGUA PVC C-10 DE 2 "
03.02.05.03 TUBERIA DE AGUA PVC C-10 DE 1 1/2 "
03.02.05.04 TUBERIA DE AGUA PVC C-10 DE 1 1/4 "
03.02.05.05 TUBERIA DE AGUA PVC C-10 DE 1 "
03.02.05.06 TUBERIA DE AGUA PVC C-10 DE 3/4 "
03.02.05.07 TUBERIA DE AGUA PVC C-10 DE 1/2 "
03.02.06 VALVULAS DE AGUA FRIA
03.02.06.01 VALVULA COMPUERTA DE BRONCE DE 1/2"
03.02.06.02 VALVULA COMPUERTA DE BRONCE DE 3/4"
03.02.06.03 VALVULA COMPUERTA DE BRONCE DE 1"
03.02.06.04 VALVULA COMPUERTA DE BRONCE DE 1 1/4"
03.02.06.05 VALVULA COMPUERTA DE BRONCE DE 1 1/2"
03.02.06.06 VALVULA CHECK DE BRONCE 1"
03.02.06.07 CAJA DE VALVULA EN PARED, INCLUYE TAPA
03.02.07 EQUIPO DE BOMBEO -RED AGUA CAMPUS EDUC.
03.02.07.01 BOMBA DE PRESION CTE. Y VEL. VARIABLE 3HP
03.02.07.02 BOMBA SUMERGIBLE PARA POZO SUMIDERO DE 1 HP
03.02.07.03 REBOSE DE CISTERNA D=6"
03.02.07.04 TUBERIA DE FoGo de 2 1/2"
03.02.07.05 TUBERIA DE AGUA c-10 de 3"
03.02.07.06 ACCESORIOS DE PVC SAP C10 CISTERNA CAMPUS E.
03.02.07.07 ACCESORIOS DE F°G° CISTERNA CAMPUS E.
03.02.07.08 VALVULA COMPUERTA DE BRONCE DE 3"
03.02.07.09 VALVULA COMPUERTA DE BRONCE DE 2 1/2"
03.02.07.10 VALVULA FLOTADORA DE 2 1/2"
03.02.07.11 VALVULA CHECK DE BRONCE 2 1/2"
03.02.07.12 VALVULA DE PIE BRONCE D=3"
03.02.07.13 BRIDA ROMPE AGUA
03.02.07.14 POYO DE CONCRETO FC=210 kg/cm2
03.02.08 EQUIPO DE BOMBEO -BOMBA PARA PISCINA
03.02.08.01 BOMBA DE PRESION CTE. Y VEL. VARIABLE 2HP
03.02.08.02 TUBERIA DE F°G° DE 2"
03.02.08.03 TUBERIA DE AGUA PVC C-10 DE 2 1/2"
03.02.08.04 ACCESORIOS DE PVC SAP C10 BOMBA
03.02.08.05 ACCESORIOS DE F°G° BOMBA
03.02.08.06 VALVULA COMPUERTA DE BRONCE DE 2 1/2"
03.02.08.07 VALVULA COMPUERTA DE BRONCE DE 2"
03.02.08.08 VALVULA CHECK DE BRONCE 2"
03.02.08.09 VALVULA CHECK DE BRONCE D=2 1/2"
03.02.08.10 BRIDA ROMPE AGUA
03.02.08.11 POYO DE CONCRETO FC=210 KG/CM2
03.02.09 EQUIPO DE BOMBEO RECIRCULACION PISCINA
03.02.09.01 BOMBA DE 4 HP RECIRCULACION
03.02.09.02 ACCESORIOS DE PVC SAP C-10 PISCINA
03.02.09.03 BOQUILLAS DE ASPIRACION 2"
03.02.09.04 BOQUILLAS DE RETORNO 2"
03.02.09.05 FILTRO DE ARENA D=1.40m, h=1.8m
03.02.09.06 POYO DE CONCRETO FC=210 kg/cm2
03.02.09.07 VALVULA FLOTADORA DE BRONCE DE 3/4"
03.03 SISTEMA DE REGADIO
03.03.01 TRABAJOS PRELIMINARES REDES DE REGADIO
03.03.01.01 TRAZO NIVELES Y REPLANTEO DURANTE EL PROCESO
03.03.02 MOVIMIENTO DE TIERRAS
03.03.02.01 EXCAVACION DE ZANJAS PARA REDES SANITARIAS (HASTA 1M)
03.03.02.02 REFINE Y NIVELACION DE ZANJAS (P/TUB DE 1/2"-1 1/2")
03.03.02.03 CAMA DE ARENA CON MATERIAL PRESTAMO H=0.10 M
03.03.02.04 RELLENO COMPACTADO C/EQUIPO, MATERIAL PROPIO
03.03.02.05 ELIMINACION DE MAT. EXCEDENTE CARGUIO MANUAL Y VOLQUETE 6M3
(D=10 KM)
03.03.03 RED DE ALIMENTACION
03.03.03.01 TUBERIA DE AGUA PVC C-10 DE 2"
03.03.03.02 TUBERIA DE AGUA PVC C-10 DE 1 1/2"
03.03.03.03 TUBERIA DE AGUA PVC C-10 DE 1 1/4"
03.03.03.04 TUBERIA DE AGUA PVC C-10 DE 1"
03.03.04 ACCESORIOS
03.03.04.01 GRIFO DE RIEGO DE 1/2"
03.03.04.02 GRIFO DE RIEGO DE POR ASPERSION
03.03.04.03 VALVULA SOLENOIDE DE 2"
03.03.04.04 CAJA DE VALVULA EN PARED, INCLUYE TAPA
03.03.05 EQUIPOS
03.03.05.01 ELECTROBOMBA DE 2 HP
03.03.05.02 REBOSE DE CISTERNA D=6"
03.03.05.03 TUBERIA DE AGUA PVC C-10 DE 3"
03.03.05.04 TUBERIA DE FoGo de 2 1/2"
03.03.05.05 ACCESORIOS DE PVC SAP C10 CIST. REGADIO
03.03.05.06 ACCESORIOS DE F°G° CIST. REGADIO
03.03.05.07 VALVULA COMPUERTA DE BRONCE DE 3"
03.03.05.08 VALVULA COMPUERTA DE BRONCE DE 2 1/2"
03.03.05.09 VALVULA FLOTADORA DE 2 1/2"
03.03.05.10 VALVULA CHECK DE 2 1/2"
03.03.05.11 VALVULA DE PIE BRONCE D=3"
03.03.05.12 POYO DE CONCRETO FC=210 kg/cm2
03.04 SISTEMA DE DRENAJE PLUVIAL
03.04.01 TRABAJOS PRELIMINARES REDES DE DRENAJE
03.04.01.01 TRAZO Y REPLANTEO DURANTE EL PROCESO
03.04.02 MOVIMIENTO DE TIERRAS
03.04.02.01 EXCAVACION DE ZANJAS PARA REDES DE DRENAJE
03.04.02.02 EXCAVACION DE PLATAFORMA
03.04.02.03 REFINEY NIVELACION DE ZANJAS
03.04.02.04 RELLENO Y COMPACTADO MANUAL MAT. DE PRESTAMO GRAVA DE 1/2"
03.04.02.05 RELLENO Y COMPACTADO MANUAL MAT. DE PRESTAMO GRAVA DE 3/8"
03.04.02.06 RELLENO COMPACTADO C/EQUIPO, MATERIAL PROPIO
03.04.02.07 ELIMINACION DE MAT. EXCEDENTE CARGUIO MANUAL Y VOLQUETE 6M3
(D=10 KM)
03.04.03 RED COLECTORA
03.04.03.01 CANALETA DE CONCRETO EN TECHOS A=0.25m
03.04.03.02 CANALETAS DE MEDIA CAÑA D=3"
03.04.03.03 CUNETAS DE CONCRETO FC=175 KG/CM2 CON REJILLA A=0.40m
03.04.03.04 CUNETA DE CONCRETO TIPO 2
03.04.03.05 MONTANTE DE DRENAJE PVC DE 3"
03.04.03.06 TUBERIA DE DESAGUE PVC U.F ISO 4435 315mm (12") S-20
03.04.03.07 TUBERIA DE DESAGUE PVC SAL DE 4" CRIBADA
03.04.04 ACCESORIOS
03.04.04.01 ABRAZADERAS P/TUBERIAS A CADA 2"
03.04.04.02 TEE DE PVC DE 3"
03.04.04.03 CODO PVC 3"
03.04.04.04 MANGUITO BAJANTE PVC 3"
03.04.04.05 CODO PVC 4"
03.04.04.06 TEE DE PVC DE 12" X 4"
03.04.04.07 TAMPON PVC 4"
03.04.04.08 GEOTEXTIL
03.04.05 CAMARAS DE INSPECCION
03.04.05.01 BUZON
03.04.05.02 TRAMPA DE SOLIDOS
03.05 DESAGUE Y VENTILACION
03.05.01 TRABAJOS PRELIMINARES REDES DE DESAGUE
03.05.01.01 TRAZO,NIVELES Y REPLANTEO DURANTE EL PROCESO
03.05.02 MOVIMIENTO DE TIERRAS
03.05.02.01 EXCAVACION DE ZANJAS PARA REDES SANITARIAS (HASTA 1M)
03.05.02.02 REFINE Y NIVELACION DE ZANJAS
03.05.02.03 CAMA DE ARENA CON MATERIAL PRESTAMO H=0.10M
03.05.02.04 RELLENO COMPACTADO C/EQUIPO, MATERIAL PROPIO
03.05.02.05 ELIMINACION DE MAT. EXCEDENTE CARGUIO MANUAL Y VOLQUETE 6M3
03.05.03 SALIDAS DE DESAGUE
03.05.03.01 SALIDA DE DESAGUE PVC DE 4"
03.05.03.02 SALIDA DE DESAGUE PVC DE 4"
03.05.03.03 SALIDA DE DESAGUE PVC DE 2"
03.05.04 REDES DE DERIVACION Y MONTANTES, VENT. EMPOTRADAS Y
ENTERRADA
03.05.04.01 TUBERIA DE DESAGUE PVC 4"
03.05.04.02 TUBERIA DE DESAGUE PVC 3"
03.05.04.03 TUBERIA DE DESAGUE PVC 2"
03.05.05 RED COLECTORA
03.05.05.01 TUBERIA DE DESAGUE PVC 4"
03.05.05.02 TUBERIA DE DESAGUE PVC 6"
03.05.06 ACCESORIOS DE REDES INTERIORES Y COLECTORAS
03.05.06.01 REGISTRO DE BRONCE 2"
03.05.06.02 REGISTRO DE BRONCE 4"
03.05.06.03 SUMIDERO DE BRONCE 3"
03.05.06.04 REJILLA DE FIERRO 0.10X0.60
03.05.06.05 REJILLA DE FIERRO 0.10X0.90
03.05.06.06 REJILLA DE FIERRO 0.15X0.60
03.05.06.07 REJILLA DE FIERRO 0.15X0.90
03.05.06.08 REJILLA DE FIERRO 0.15X0.15
03.05.06.09 REJILLA DE FIERRO 0.20X0.15
03.05.06.10 SOMBRERO DE VENTILACION 2"
03.05.06.11 SOMBRERO DE VENTILACION 3"
03.05.06.12 SOMBRERO DE VENTILACION 4"
03.05.06.13 REJILLA DE POLIPROPILENO DE REBOSADERO A=0.20M PISCINA
03.05.06.14 REJILL DE POLIPROPILENO DE REBOSADERO A=0.15M
03.05.07 CAMARAS DE INSPECCION
03.05.07.01 CAMARA DE INSPECCION 0.25X0.50
03.05.07.02 CAMARA DE INSPECCION 0.30X0.60
03.05.07.03 CAMARA DE INSPECCION 0.45X0.50
03.05.07.04 CAMARA DE INSPECCION 0.60X0.60
03.05.07.05 CAJA DE 0.60X0.60 P/REBOSE
03.06 VARIOS
03.06.01 TRAMPA DE GRASA (SEGÚN DETALLES Y ACCESORIOS)
03.06.02 TRAMPA DE ARENA (SEGÚN DETALLES Y ACCESORIOS)
03.06.03 TRAMPA DE LODOS
03.07 DESINFECCION Y PRUEBA HIDRAULICA
03.07.01 PRUEBA HIDRAULICA DE TUBERIA DE PVC DESAGUE
03.07.02 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA D AGUA
03.08 EMPALMES A REDES EXISTENTES
03.08.01 EMPALME A RED DE AGUA POTABLE
03.08.02 EMPALME A RED EXISTENTE DE ALCANTARILLADO
04 INSTALACIONES ELECTRICAS
04.01 INSTALACIONES ELECTRICAS REDES INTERIORES
04.01.01 SALIDA PARA ALUMBRADO, TOMACORREINTES , FUERZA Y SEÑALES DEBILES
04.01.01.01 SALIDA DE TECHO (CENTRO DE LUZ)
04.01.01.02 SALIDA PARA BRAQUETE (PARED)
04.01.01.03 SALIDA PARA CONTROL DE LUZ EN TIJERAL
04.01.01.04 SALIDA PARA CENTRO PARA VENTILADOR
04-01.01.05 SALIDA DE TOMACORRIENTES PARA ARTEFACTOS DE EMERGENCIA
04.01.01.06 SALIDA PARA INTERRUPTORES DE CONMUTACIÓN SIMPLES
04.01.01.07 SALIDA PARA INTERRUPTORES DE CONMUTACIÓN DOBLES
04.01.01.08 SALIDA PARA INTERRUPTORES DE CONMUTACIÓN TRIPLES
04.01.01.09 SALIDA PARA CONTROL DE VENTILADOR
04.01.01.10 SALIDA PARA TOMACORRIENTE DOBLE C/LINEA DE TIERRA
04.01.01.11 SALIDAD PARA CAMPANA EXTRACTORA
04.01.01.12 INTERRUPTOR TIPO CUCHILLA 2x20A
04.01.01.13 INTERRUPTOR TIPO CUCHILLA 3x20A
04.01.02 SALIDAD PARA COMUNICACIONES Y SEÑALES
04.01.02.01 SALIDAD PARA TV CABLE
04.01.02.02 SALIDA PARA INTERCOMUNICADOR
04.01.02.03 SALIDA PARA RED DATA
04.01.02.04 SALIDA PARA CENTRAL DE ALARMAS
04.01.02.05 SALIDA PARA ESTACIÓN MANUAL
04.01.02.06 SALIDA PARA DETERTOR DE HUMO Y/O TEMPERATURA
04.01.02.07 SALIDA PARA CAMARA DE VIGILANCIA
04.01.02.08 SALIDA PARA SISTEMA WIFI
04.01.02.09 SALIDA PARA PROTECTOR
04.01.02.10 SALIDA PARA CONTROL DE ELECTROBOMBAS
04.01.02.11 SALIDA PARA ELECTROBOMBAS DE AGUA
04.01.03 CAJAS
04.01.03.01 CAJA DE PASE OCTOGONAL 4"x2" P
04.01.03.02 CAJA DE PASE F"G" 6x&x3"
04.01.03.03 CAJA DE PASE F"G" 8x8x6"
04.01.03.04 CAJA DE PASE F"G" 12x12x6"
04.01.04 CONDUCTO PVC-P.- PARA COMUNICACIONES ,ALARMAS Y VIGILANCIA
04.01.04.01 TUBERIA PVC-P 20mm
04.01.04.02 TUBERIA DE PVC -P 25mm
04.01.05 CONDCUTO PVC -P PARA REDES INTERIORES
04.01.05.01 TUBERIA PVC -P 20mm
04.01.05.02 TUBERIA PVC -P 25mm
04.01.05.03 TUBERIA PVC -P 35mm
04.01.05.04 TUBERIA PVC -P 50mm
04.01.06 CONDUCTORES PARA REDES INTERIORES
04.01.06.01 ALIMENTADOR NH80[2-1x2.5 +1x2.5(t)] mm2
04.01.06.02 ALIMENTADOR NH80[2-1x4 +1x4(t)] mm2
04.01.06.03 ALIMENTADOR NH80[2-1x6 +1x6(t)] mm2
04.01.06.04 ALIMENTADOR NH80[2-1x10 +1x10(t)] mm2
04.01.06.05 ALIMENTADOR NH80[2-1x16 +1x16(t)] mm2
04.01.06.06 ALIMENTADOR NH80[2-1x35 +1x35(t)] mm2
04.01.07 TABLEROS Y CUCHILLAS (LLAVES)
04.01.07.01 TABLEROS GABINETE METALICO PARA 12 POLOS
04.01.07.02 TABLEROS GABINETE METALICO PARA 18 POLOS
04.01.07.03 TABLEROS GABINETE METALICO PARA 24POLOS
04.01.07.04 TABLEROS GABINETE METALICO PARA 30 POLOS
04.01.07.05 TABLEROS GABINETE METALICO PARA 36 POLOS
04.01.07.06 TABLEROS GABINETE METALICO PARA 42 POLOS
04.01.07.07 TABLEROS GABINETE METALICO PARA 48 POLOS
04.01.07.08 TABLEROS GABINETE METALICO PARA 54 POLOS
04.01.07.09 TABLEROS GABINETE METALICO PARA 60 POLOS
04.01.07.10 TABLEROS GABINETE METALICO PARA 72 POLOS
04.01.07.11 INTERRUPTOR TERMOMAGNETICO 2x15A
04.01.07.12 INTERRUPTOR TERMOMAGNETICO 2x20A
04.01.07.13 INTERRUPTOR TERMOMAGNETICO 2x40A
04.01.07.14 INTERRUPTOR TERMOMAGNETICO 3x20A
04.01.07.15 INTERRUPTOR TERMOMAGNETICO 3x30A
04.01.07.16 INTERRUPTOR TERMOMAGNETICO 3x40A
04.01.07.17 INTERRUPTOR TERMOMAGNETICO 3x50A
04.01.07.18 INTERRUPTOR TERMOMAGNETICO 3x60A
04.01.07.19 INTERRUPTOR TERMOMAGNETICO 3x70A
04.01.07.20 INTERRUPTOR TERMOMAGNETICO 3x125A
04.01.07.21 INTERRUPTOR TERMOMAGNETICO 3x150A
04.01.07.22 INTERRUPTOR DIFERENCIA 2x25A
04.01.08 ARTEFACTOR PARA ALUMBRADO EN INTERIORES
04.01.08.01 ARTEFACTO FLUORECENTE 3/36W (SIM.BE JOSFEL)
04.01.08.02 ARTEFACTO FLUORECENTE 2/36W (SIM.BE JOSFEL)
04.01.08.03 ART. FLUO 2/18WEMPOTRADO MARCO ALUM (DIF. PLAS) MS-122
04.01.08.04 ART.FLUOR.CIRCULAR 32W (TPR PRIMA -122 JOSFEL)
04.01.08.05 ART. BRAQ.C/SOCKET DE PORCELANA Y LAP .20 W
04.01.08.06 ARTEFACTO REFLECTOR CON LAMP., TIPO ARAM
04.01.08.07 ARTEFACTOR REFLECTOR CON MAP. 150 W., TIPO ARAM
04.01.08.08 LUMINARIA JOSFEL MER-H 250 W-HM
04.01.08.09 ARTEFACTO DE EMERGENCIA CON LAMP. AHORRADORA DE 20 w, 2 HORAS
DE AUTON
04.01.08.10 ARTEF TIPO BRAQ CON SOCKET DE PORCELANA Y LAM 1X18
04.01.09 ARTEFACTOS ELECTRICOS
04.01.09.01 VENTILADOR ADOSADO A TECHO
04.01.10 LINEA DE GAS
04.01.10.01 RED DE GAS CON TUBERIA DE COBRE 1/2"
04.01.10.02 VALVUAL DE BRONCE DE 1/2" DE BOLA
04.01.10.03 SALIDAD DE GAS DE 1/2"
04.01.10.04 SUMINISTRO E INSTALACIÓN SO-GAS 100 (2BAL)
04.02 INSTALACIONES ELECTRICAS REDES EXTERIORES
04.02.01 INSTALACIONES ELECTRICAS
04.02.01.01 MURETE PORTAMEDIDOR TRIFASICO
04.02.02 REDES EXTERIORES DE ELECTRICIDAD
04.02.02.01 EXCAVACION DE ZANJAS PARA CABLE SUBTERRANEO
04.02.02.02 BUZO DE CONCRETO PARA RED ELECTRICA
04.02.03 CONDCUTO PVC - PARA REDES EXTERIORES DE ELECTRICIDAD
04.02.03.01 TUBERIA DE PVC -P 35 mm
04.02.03.02 TUBERIA DE PVC -P 50 mm
04.02.03.03 TUBERIA DE PVC -P 100 mm
04.02.04 CONEXIONES A RED EXTERNA Y MEDIDORES
04.02.04.01 ALIMENTADOR N2XH[3-1x6 +1x6(N)+1x6(T)] mm2
04.02.04.02 ALIMENTADOR N2XH[3-1x16 +1x16(N)+1x10(T)] mm2
04.02.04.03 ALIMENTADOR N2XH[3-1x25 +1x26(N)+1x25(T)] mm2
04.02.04.04 ALIMENTADOR N2XH[3-1x35 +1x35(N)+1x25(T)] mm2
04.02.04.05 ALIMENTADOR N2XH[3-1x50 +1x50(N)+1x10(T)] mm2
04.02.04.06 ALIMENTADOR N2XH[3-1x70 +1x70(N)+1x16(T)] mm2
04.02.04.07 ALIMENTADOR N2XH[3-1x240 +1x240(N)+1x25(T)] mm2
04.02.05 TABLEROS Y CUCHILLAS (LLAVES)
04.02.05.01 TABLEROSN GABINETE METALICO PARA 24 POLOS
04.02.05.02 TABLERO ELECTRICOS AUTOPORTADO
04.02.05.03 TAB. AUTOMATICO PARA CONSTROL DE BOMBA DE PISCINA
04.02.05.04 INTERRUPTOR TERMOMAGNETICO 2X15A
04.02.05.05 INTERRUPTOR TERMOMAGNETICO 2X20A
04.02.05.06 INTERRUPTOR TERMOMAGNETICO 3X20A
04.02.05.07 INTERRUPTOR TERMOMAGNETICO 3X30A
04.02.05.08 INTERRUPTOR TERMOMAGNETICO 3X70A
04.02.05.09 INTERRUPTOR TERMOMAGNETICO 3X100A
04.02.05.10 INTERRUPTOR TERMOMAGNETICO 3X125A
04.02.05.11 INTERRUPTOR TERMOMAGNETICO 3X175A
04.02.05.12 INTERRUPTOR TERMOMAGNETICO3X700A
04.02.05.13 INTERRUPTOR DIFERENCIAL 2X25A
04.02.05.14 INTERRUPTOR HORARIO
04.02.06 INSTALACION DE PARARRAYOS
04.02.06.01 PARARRAYOC/DISPOSITIVO D/CEBADO C/03 P/TIERRA, ADOSADO
04.02.06.02 POSTE DE CONCRETO CENTRIFUGADO 12m
04.02.07 INSTALACION DE SISTEMA PUESTA A TIERRA
04.02.07.01 POZO PUESTA A TIERRA -2004 -P-1 (R<15ohms)
04.02.07.02 TUBERIA PVC -P 25mm
04.02.07.03 CABLE COBRE DESANUSO 1x25 mm2
04.02.07.04 CABLE COBRE DESANUSO 1x50 mm2
04.02.08 POSTE Y ARTEFACTO DE ALUMBRADO
04.02.08.01 POSTE DE CONCRETO CENTRIFUGADO 12m
04.02.08.02 POSTE DE CONCRETO CENTRIFUGADO 9m
04.02.08.03 POSTE DE CONCRETO CENTRIFUGADO 8m
04.02.08.04 REFLEXTORES SNF 111 CON 2Xson 400W
04.02.08.05 LUMINARIA DE VAPOR DE SODIO DE 70 w
04.02.08.06 REFLECTOR RL 40 JOSFEL
04.02.09 REDES ESTERIOES PARA COMUNICACIONES
04.02.09.01 EXCAVACION DE ZANJA PARA REDES DE COMUNICACIÓN
04.02.09.02 BUZON DE CONCRETO PARA RED DE COMUNICACIONES
04.02.09.03 TUBERIA PVC -P 50mm
04.02.10 ASCENSOR
04.02.10.01 ASCESOR DE 1000kg PARA TRES PISOS
04.02.11 SUB ESTACIÓN
04.02.11.01 SUBESTACIÓN 225W

COSTO DIRECTO
GASTOS GENERALES 10.38%
UTILIDAD 9.94%
SUB TOTAL
IGV 0.00% (SIN IGV - LEY DE EXONERACION DE LA AMAZONIA)
TOTAL
O

ESTRUCTURA EDUCATIVA DE LA I.E. FRANCISCO IRAZOLA,

ROS Y PUENTES S.A SUCURSAL DEL PERU)

Und. Metrado Precio S/. Parcial S/.


###
669,486.34
260,095.98
GLB 1.00 32,000.00 32,000.00
PZA 1.00 1,301.94 1,301.94
M 917.00 52.12 47,794.04
GLB 1.00 5,000.00 5,000.00
Und. 20.00 8,700.00 174,000.00

8,400.00
GLB 1.00 8,400.00 8,400.00
10,800.00
GLB 1.00 10,800.00 10,800.00
88,771.72
M2 36,665.34 2.13 78,097.17
Und. 185.00 49.64 9,183.40
Und. 15.00 99.41 1,491.15
20,837.97
UND 28.00 23.39 654.92
M 146.94 5.56 816.99
M2 3,657.54 1.63 5,961.79
M2 204.60 4.69 959.57
M2 912.20 2.80 2,554.16
M2 942.20 10.40 9,798.88
Und. 2.00 39.76 79.52
Und. 1.00 12.14 12.14
174,491.59
M2 2,950.51 5.48 16,168.79
M2 3,854.52 4.42 17,036.98
M3 12.89 45.15 581.98
M3 234.15 62.17 14,557.11
M3 393.35 17.84 7,017.36
M2 1,025.99 15.16 15,554.01
M3 6.80 61.33 417.04
M3 18.38 23.98 440.75
M3 125.73 23.35 2,935.80
M3 2,617.57 16.25 42,535.51
M3 2,617.57 21.87 57,246.26
12,000.00
GLB 1.00 12,000.00 12,000.00
94,089.08
M2 29,683.25 1.52 45,118.54
M2 29,683.25 1.52 45,118.54
GLB 1.00 3,852.00 3,852.00
139,781.44
GLB 1.00 23,000.00 23,000.00

Und. 120.00 536.94 64,432.80


GLB 1.00 9,282.29 9,282.29
GLB 1.00 8,769.71 8,769.71
GLB 1.00 28,392.00 28,392.00
GLB 1.00 5,904.64 5,904.64

2,643,888.10
191,925.15
M3 3,247.62 37.14 120,616.61
M3 388.79 43.34 16,850.16
M3 4,364.34 9.84 42,945.11
M3 265.65 43.34 11,513.27
405,421.15
M3 38,762.02 9.84 381,418.28
M3 3,049.92 7.87 24,002.87

560,734.89
M3 1,019.75 42.52 43,359.77

M3 5,930.41 42.52 252,161.03

M3 2,734.24 42.52 116,259.88


M2 50.15 15.05 754.76
M3 1,448.77 49.29 71,409.87

M3 4,802.35 15.99 76,789.58


192,981.66
M2 5,304.03 3.32 17,609.38
M2 1,600.28 17.65 28,244.94
M2 5,052.45 21.09 106,556.17
M2 5,052.45 8.03 40,571.17
1,292,825.25
M3 6,099.83 16.25 99,122.24
M3 5,969.65 14.59 87,097.19
M3 50,599.26 21.87 1,106,605.82
469,012.94
5,654.79
M2 255.18 22.16 5,654.79

463,358.15
M3 201.58 170.03 34,274.65
M3 707.20 186.99 132,239.33
M2 1,986.87 42.03 83,508.15
M3 99.49 266.00 26,464.34
M2 906.96 34.31 31,117.80
M2 4,960.88 30.78 152,695.89
M2 2.88 36.85 106.13
M2 24.00 31.53 756.72
M2 1,614.07 1.36 2,195.14
7,768,859.65
205,050.84
M3 409.45 318.79 130,528.57
M2 632.75 28.29 17,900.50
KG 11,665.53 4.78 55,761.23
M2 632.75 1.36 860.54
594,362.83
M3 558.92 334.93 187,199.08
M2 3,297.22 52.99 174,719.69
KG 47,690.34 4.78 227,959.83
M2 3,297.23 1.36 4,484.23
578,730.36
M3 759.99 327.60 248,972.72
M2 392.91 45.51 17,881.33
KG 65,134.30 4.78 311,341.95
M2 392.91 1.36 534.36
485,517.50
M3 390.79 431.15 168,489.11
M2 2,572.03 52.81 135,828.90
KG 37,176.05 4.78 177,701.52
M2 2,572.04 1.36 3,497.97
2,107,979.43
M3 1,096.92 458.76 503,223.02
M2 12,848.63 55.17 708,858.92
KG 183,770.58 4.78 878,423.37
M2 12,848.62 1.36 17,474.12
58,934.54
M3 31.74 438.36 13,913.55
M2 515.47 54.34 28,010.64
KG 3,411.99 4.78 16,309.31
M2 515.47 1.36 701.04
1,501,040.55
M3 1,223.26 346.28 423,590.47
M2 7,465.33 63.92 477,183.89
KG 123,458.71 4.78 590,132.63
M2 7,451.15 1.36 10,133.56
74,936.61
M3 49.31 447.06 22,044.53
M2 370.66 83.74 31,039.07
KG 4,466.30 4.78 21,348.91
M2 370.66 1.36 504.10
115,929.59
M3 108.57 351.96 38,212.30
M2 640.69 55.64 35,647.99
KG 8,618.82 4.78 41,197.96
M2 640.69 1.36 871.34
1,248,489.54
M3 888.28 349.33 310,302.85
M2 9,807.45 39.48 387,198.13
KG 51,535.20 4.78 246,338.26
Und. 78,485.63 3.55 278,623.99
M2 9,807.41 1.36 13,338.08
M3 11.42 349.33 3,989.35
KG 1,819.85 4.78 8,698.88
5,640.42
M3 8.44 437.00 3,688.28
M2 6.13 55.64 341.07
KG 335.30 4.78 1,602.73
M2 6.13 1.36 8.34
22,754.91
M3 34.78 318.80 11,087.86
M2 88.82 42.03 3,733.10
KG 1,634.55 4.78 7,813.15
M2 88.82 1.36 120.80
145,078.05
M3 132.81 323.83 43,007.86
M2 1,530.54 31.53 48,257.93
KG 10,822.33 4.78 51,730.74
M2 1,530.53 1.36 2,081.52
448,215.57
M3 362.23 289.12 104,727.94
M2 4,400.42 46.91 206,423.70
KG 27,422.46 4.78 131,079.36
M2 4,400.42 1.36 5,984.57
174,980.04
M3 211.67 415.67 87,984.87
M2 1,700.45 34.31 58,342.44
KG 5,503.00 4.78 26,304.34
M2 1,726.76 1.36 2,348.39
1,218.87
M3 0.80 239.68 191.74
M2 12.80 42.03 537.98
KG 98.69 4.78 471.74
M2 12.80 1.36 17.41
168,741.93
52,499.02
Und. 8.00 2,949.44 23,595.52
Und. 127.50 181.49 23,139.98
kg 667.97 3.85 2,571.68
Und. 16.00 199.49 3,191.84
15,532.88
Und. 10.00 714.92 7,149.20
Und. 9.00 781.86 7,036.74
kg 197.57 3.85 760.64
Und. 10.00 58.63 586.30
67,401.99
Und. 10.00 2,841.91 28,419.10
Und. 153.00 181.49 27,767.97
kg 751.46 3.85 2,893.12
Und. 10.00 714.92 7,149.20
Und. 20.00 58.63 1,172.60
21,867.14
Und. 5.00 2,949.44 14,747.20
Und. 36.00 181.49 6,533.64
Und. 10.00 58.63 586.30
11,440.90
Und. 3.00 2,949.44 8,848.32
Und. 12.00 181.49 2,177.88
Und. 6.00 58.63 351.78
kg 26.00 2.42 62.92
429,945.60
429,945.60
M2 1,212.33 320.00 387,945.60
M2 240.00 175.00 42,000.00

9,228,209.14
1,253,977.36
M2 4,508.34 128.65 579,997.94
M2 8,569.05 76.98 659,645.47
M2 85.75 65.38 5,606.34
KG 1,372.67 4.64 6,369.19
M2 13.80 170.90 2,358.42

1,420,043.82
M2 2,528.21 20.28 51,272.10
M2 18,301.07 21.42 392,008.92
M2 3,926.40 27.28 107,112.19
M2 8,807.10 33.19 292,307.65
M2 5,651.97 45.52 257,277.67
M2 273.11 25.15 6,868.72
M2 967.30 26.81 25,933.31

M2 146.07 29.33 4,284.23


M2 436.25 30.79 13,432.14
M2 150.89 22.92 3,458.40
M2 1,085.48 22.92 24,879.20
M2 1,673.20 33.29 55,700.83

M 16,198.27 6.72 108,852.37


M2 70.50 29.32 2,067.06

M 5,602.92 12.94 72,501.78


M 110.32 18.92 2,087.25
358,039.30
M2 9,650.55 35.35 341,146.94
M2 461.54 36.60 16,892.36
2,931,181.07
222,793.08
M2 8,642.09 25.78 222,793.08
1,887,700.74
M2 4,872.12 57.22 278,782.71
M2 1,178.92 62.47 73,647.13
M2 5,634.76 26.77 150,842.53
M2 237.18 120.87 28,667.95
M2 805.76 29.98 24,156.68
M2 880.18 66.41 58,452.75
M2 522.00 264.93 138,293.46
M2 312.50 68.62 21,443.75
M2 2,917.50 237.80 693,781.50
M2 11,470.80 16.71 191,677.07
M2 11,470.80 6.40 73,413.12
M2 108.40 194.34 21,066.46

M2 2,917.50 45.75 133,475.63


820,687.25
M2 1,054.88 70.55 74,421.78

M2 413.93 70.55 29,202.76

M2 2,615.81 70.55 184,545.40

M2 355.56 55.74 19,818.91

M2 5,930.46 55.74 330,563.84

M2 1,080.31 75.99 82,092.76

M 871.52 56.94 49,624.35

M 14.55 26.78 389.65

M 1,007.36 26.78 26,977.10

M 9.80 40.04 392.39

M2 929.00 24.39 22,658.31

332,714.17
180,821.28
M2 2,038.59 63.63 129,715.48
M2 685.57 63.63 43,622.82
M2 127.50 58.69 7,482.98
151,892.89
M 2,871.50 20.96 60,186.64

M 58.62 8.96 525.24


M 2,175.84 13.65 29,700.22
M 39.66 13.86 549.69
M 354.78 17.04 6,045.45
M 56.66 23.69 1,342.28
M 1,655.11 25.67 42,486.67
M 43.20 15.32 661.82
M 216.60 13.96 3,023.74

M 61.90 15.65 968.74


M 344.40 18.59 6,402.40
902,551.28
M2 9,772.45 47.79 467,025.39
ML 442.45 40.68 17,998.87

M2 1,757.35 145.57 255,817.44


P2 7,404.96 11.68 86,489.93

P2 3,011.22 9.85 29,660.52


M2 8,812.21 5.17 45,559.13
10,933.11
P2 1,109.96 9.85 10,933.11
231,342.91
231,342.91
M2 206.98 421.85 87,314.51
M2 207.75 389.11 80,837.60
M2 36.12 453.72 16,388.37
M2 83.28 402.40 33,511.87
M2 23.40 487.59 11,409.61
M2 8.82 213.26 1,880.95
800,826.74
24,071.90
M2 3.15 147.39 464.28
M2 12.18 169.40 2,063.29
M2 20.16 275.92 5,562.55
M2 34.20 275.92 9,436.46
M2 30.16 217.02 6,545.32
436,872.62
M2 493.80 210.83 104,107.85
M2 1,156.58 189.70 219,403.23

M2 50.94 189.70 9,663.32


M2 53.03 189.70 10,059.79

M2 146.55 332.31 48,700.03

M2 4.61 434.15 2,001.43


M2 33.12 429.25 14,216.76

M2 94.83 302.86 28,720.21

65,802.65
ML 130.58 209.65 27,376.10

ML 35.20 209.65 7,379.68

M2 104.64 253.24 26,499.03

M2 27.20 167.20 4,547.84


83,136.85
M 653.90 127.14 83,136.85
29,365.13
M 19.20 102.03 1,958.98
M 326.40 73.48 23,983.87
M 38.60 88.66 3,422.28
7,995.82
Und. 1.00 292.75 292.75
M 259.45 29.69 7,703.07
152,973.77
M2 201.06 300.93 60,504.99
M2 478.59 130.69 62,546.93
M2 93.19 210.45 19,611.84

M2 41.79 246.71 10,310.01

608.00
Und. 2.00 147.69 295.38
Und. 2.00 156.31 312.62
39,965.62
6,306.60
PZA 24.00 4.80 115.20
PZA 817.00 5.00 4,085.00
PZA 4.00 526.60 2,106.40
23,989.58
PZA 406.00 56.83 23,072.98
PZA 2.00 63.83 127.66
PZA 18.00 43.83 788.94
9,669.44
PZA 225.00 7.31 1,644.75
PZA 134.00 7.36 986.24
PZA 243.00 11.43 2,777.49
Und. 6.00 710.16 4,260.96
188,184.93
188,184.93
M2 1,391.08 113.53 157,929.31
M2 46.35 185.57 8,601.17
M2 4.61 211.97 977.18
M2 80.40 257.18 20,677.27

412,637.59
389,137.80
M2 16,601.73 8.02 133,145.87
M2 26,198.24 6.39 167,406.75
M2 1,252.30 11.97 14,990.03

M2 6,148.30 11.97 73,595.15

8,010.52
M2 270.90 9.15 2,478.74
M2 270.90 20.42 5,531.78
15,489.27
M 244.80 6.22 1,522.66

M2 1,054.88 13.24 13,966.61


13,500.00
GLB. 1.00 10,800.00 10,800.00
GLB. 1.00 2,700.00 2,700.00
332,311.24
63,015.62
Und. 60.00 81.09 4,865.40
M 566.74 14.75 8,359.42
PZA 2.00 1,014.81 2,029.62
M2 66.94 340.71 22,807.13
ML 82.74 248.19 20,535.24
PZA 8.00 408.59 3,268.72
M2 17.14 67.10 1,150.09
14,898.63
Und. 4.00 2,272.72 9,090.88
Und. 2.00 2,272.72 4,545.44
JGO 3.00 420.77 1,262.31
183,617.51
Und. 12.00 12,757.06 153,084.72

Und. 4.00 1,475.58 5,902.32


ML 5.00 1,908.71 9,543.55
M2 1.00 9,667.84 9,667.84
Und. 1.00 5,419.08 5,419.08
35,024.74
M 575.69 16.06 9,245.58
M 279.28 21.18 5,915.15
M 260.89 26.15 6,822.27
M 1,351.45 6.22 8,406.02
M 228.00 13.94 3,178.32
M 84.00 17.35 1,457.40
35,754.74
Und. 64.00 234.40 15,001.60
Und. 6.00 431.82 2,590.92
Und. 9.00 414.22 3,727.98
Und. 3.00 194.86 584.58
Und. 59.00 234.74 13,849.66
978,766.47
173,350.10
Und. 126.00 588.06 74,095.56
Und. 51.00 365.21 18,625.71
Und. 3.00 151.92 455.76
Und. 127.00 107.14 13,606.78
Und. 9.00 50.00 450.00
Und. 5.00 250.00 1,250.00
Und. 11.00 148.61 1,634.71
Und. 44.00 195.67 8,609.48
Und. 342.00 97.79 33,444.18
Und. 113.00 39.06 4,413.78
Und. 113.00 39.95 4,514.35
Und. 117.00 39.06 4,570.02
Und. 343.00 22.39 7,679.77
181,248.92
1,564.63
ML 1,029.36 1.52 1,564.63
22,174.24
ML 1,029.36 7.22 7,431.98
ML 1,029.36 1.40 1,441.10
ML 1,029.36 6.44 6,629.08
m3 308.81 15.03 4,641.41
m3 92.64 21.92 2,030.67
33,594.96
pto 190.00 85.94 16,328.60
pto 55.00 80.98 4,453.90
pto 51.00 71.96 3,669.96
pto 115.00 79.50 9,142.50
17,107.66
m 15.32 40.20 615.86
m 69.48 27.87 1,936.41
m 89.90 17.56 1,578.64
m 145.46 14.34 2,085.90
m 277.09 13.39 3,710.24
m 46.52 11.72 545.21
m 206.35 11.10 2,290.49
m 411.45 10.56 4,344.91
17,973.00
m 410.75 21.83 8,966.67
m 156.31 17.56 2,744.80
m 339.94 14.34 4,874.74
m 3.16 13.39 42.31
m 37.20 11.72 435.98
m 76.50 11.10 849.15
m 5.50 10.79 59.35
14,964.36
und 3.00 86.77 260.31
und 18.00 94.63 1,703.34
und 10.00 113.86 1,138.60
und 33.00 138.44 4,568.52
und 25.00 172.29 4,307.25
und 1.00 126.86 126.86
und 78.00 36.66 2,859.48
31,679.68
und 4.00 1,996.95 7,987.80
und 4.00 2,867.44 11,469.76
und 2.00 150.96 301.92
und 13.24 41.63 551.18
und 13.28 27.87 370.11
und 1.00 1,695.77 1,695.77
und 1.00 1,527.83 1,527.83
und 4.00 528.03 2,112.12
und 4.00 358.39 1,433.56
und 2.00 373.63 747.26
und 4.00 377.22 1,508.88
und 4.00 350.90 1,403.60
und 4.00 119.34 477.36
m3 0.27 342.69 92.53
7,939.86
und 1.00 5,643.05 5,643.05
m 5.41 35.65 192.87
m 3.32 21.83 72.48
und 1.00 433.56 433.56
und 1.00 454.76 454.76
und 1.00 358.39 358.39
und 1.00 227.81 227.81
und 1.00 201.93 201.93
und 1.00 191.12 191.12
und 1.00 119.34 119.34
m3 0.13 342.69 44.55
34,250.53
und 3.00 5,090.73 15,272.19
und 12.00 469.06 5,628.72
und 2.00 94.22 188.44
und 16.00 20.09 321.44
und 3.00 4,224.94 12,674.82
m3 0.33 342.69 113.09
und 1.00 51.83 51.83
66,637.32
2,010.66
ml 1,322.80 1.52 2,010.66
25,602.49
m 1,322.80 7.22 9,550.62
m 1,322.80 1.40 1,851.92
ml 1,322.80 6.44 8,518.83
m3 396.84 7.74 3,071.54
m3 119.05 21.92 2,609.58

19,419.18
m 547.50 17.56 9,614.10
m 202.30 14.34 2,900.98
m 112.90 13.39 1,511.73
m 460.10 11.72 5,392.37
8,284.37
und 8.00 81.77 654.16
und 71.00 93.61 6,646.31
und 5.00 160.12 800.60
und 5.00 36.66 183.30
11,320.62
und 2.00 2,722.80 5,445.60
und 1.00 150.96 150.96
m 6.64 27.87 185.06
m 6.62 41.63 275.59
und 1.00 733.10 733.10
und 1.00 801.59 801.59
und 2.00 528.03 1,056.06
und 2.00 358.39 716.78
und 1.00 373.63 373.63
und 2.00 393.96 787.92
und 2.00 350.90 701.80
m3 0.27 342.69 92.53
366,756.23
2,465.55
m 2,515.87 0.98 2,465.55
117,741.77
m 2,649.49 3.94 10,438.99
m2 2,549.90 7.35 18,741.77
ml 1,954.68 1.40 2,736.55
m3 244.22 72.33 17,664.43
m3 175.92 72.33 12,724.29
m3 3,824.85 7.74 29,604.34
m3 1,178.44 21.92 25,831.40

198,804.08
m 293.93 72.80 21,398.10
m 592.00 14.75 8,732.00
m 565.56 159.67 90,302.97
m 129.05 74.81 9,654.23
m 213.93 33.15 7,091.78
m 294.86 89.83 26,487.27
m 1,526.40 23.02 35,137.73
36,344.78
und 427.86 33.07 14,149.33
und 24.00 40.02 960.48
und 6.00 13.35 80.10
und 24.00 23.38 561.12
und 48.00 15.92 764.16
und 48.00 84.55 4,058.40
und 48.00 13.12 629.76
m2 1,244.16 12.17 15,141.43
11,400.05
und 7.00 1,431.11 10,017.77
und 1.00 1,382.28 1,382.28
174,759.96
1,060.03
ml 1,606.11 0.66 1,060.03
39,100.44
m 2,409.17 8.14 19,610.64
ml 1,606.11 1.40 2,248.55
ml 1,606.11 6.44 10,343.35
m3 481.83 7.74 3,729.36
m3 144.55 21.92 3,168.54
40,321.11
pto 117.00 111.59 13,056.03
pto 96.00 88.08 8,455.68
pto 230.00 81.78 18,809.40
23,985.57

m 308.41 19.32 5,958.48


m 249.70 16.05 4,007.69
m 909.76 15.41 14,019.40
19,260.20
m 220.03 19.32 4,250.98
m 390.56 38.43 15,009.22
25,377.02
pza 57.00 19.04 1,085.28
pza 11.00 41.61 457.71
pza 82.00 28.54 2,340.28
und 29.00 52.53 1,523.37
und 4.00 58.54 234.16
und 12.00 58.54 702.48
und 2.00 69.96 139.92
und 2.00 70.82 141.64
und 2.91 82.49 240.05
pza 39.00 8.84 344.76
pza 5.00 12.42 62.10
und 12.00 16.56 198.72
m 174.00 97.85 17,025.90
m 9.00 97.85 880.65
25,655.59
und 3.00 261.85 785.55
und 78.00 265.13 20,680.14
und 9.00 284.38 2,559.42
und 5.00 309.82 1,549.10
und 2.00 40.69 81.38
3,432.90
und 1.00 1,052.18 1,052.18
und 1.00 1,057.64 1,057.64
und 1.00 1,323.08 1,323.08
11,950.04
m 1,606.11 1.91 3,067.67
m 2,331.33 3.81 8,882.37
631.00
und 2.00 63.15 126.30
und 2.00 252.35 504.70
2,079,363.05
839,626.02
A Y SEÑALES DEBILES 167,228.58
Pto 914.00 59.37 54,264.18
Pto 38.00 82.22 3,124.36
Pto 96.00 84.47 8,109.12
Pto 168.00 84.47 14,190.96
Pto 208.00 67.44 14,027.52
Pto 146.00 74.24 10,839.04
Pto 142.00 77.14 10,953.88
Pto 10.00 79.60 796.00
Pto 156.00 99.53 15,526.68
Pto 474.00 73.76 34,962.24
Pto 2.00 75.76 151.52
Und 3.00 40.44 121.32
Und 4.00 40.44 161.76
20,734.15
Pto 61.00 82.36 5,023.96
Pto 12.00 108.67 1,304.04
Pto 114.00 95.77 10,917.78
Pto 1.00 65.27 65.27
Pto 8.00 69.34 554.72
Pto 22.00 59.37 1,306.14
Pto 8.00 59.37 474.96
Pto 3.00 69.34 208.02
Pto 3.00 69.34 208.02
Pto 3.00 99.53 298.59
Pto 5.00 74.53 372.65
11,479.53
Und 90.00 46.85 4,216.50
Und 38.00 45.48 1,728.24
Und 56.00 72.54 4,062.24
Und 15.00 98.17 1,472.55
Y VIGILANCIA 32,273.71
M 2,479.60 11.61 28,788.16
M 285.00 12.23 3,485.55
94,080.24
M 7,119.80 11.61 82,660.88
M 702.70 12.23 8,594.02
M 146.70 13.36 1,959.91
M 49.20 17.59 865.43
115,628.38
M 4,168.88 10.17 42,397.51
M 5,712.40 11.56 66,035.34
M 201.30 17.86 3,595.22
M 1.20 20.76 24.91
M 45.60 28.28 1,289.57
M 49.20 46.46 2,285.83
69,004.06
Und 1.00 256.62 256.62
Und 1.00 299.62 299.62
Und 12.00 343.62 4,123.44
Und 3.00 392.62 1,177.86
Und 8.00 436.62 3,492.96
Und 8.00 382.62 3,060.96
Und 1.00 529.62 529.62
Und 1.00 572.62 572.62
Und 6.00 629.62 3,777.72
Und 3.00 629.62 1,888.86
Und 111.00 39.12 4,342.32
Und 152.00 39.12 5,946.24
Und 2.00 45.72 91.44
Und 3.00 135.92 407.76
Und 25.00 135.92 3,398.00
Und 2.00 138.04 276.08
Und 15.00 135.92 2,038.80
Und 7.00 140.50 983.50
Und 4.00 173.62 694.48
Und 2.00 232.47 464.94
Und 2.00 280.65 561.30
Und 278.00 110.14 30,618.92
278,599.44
Und 445.00 224.06 99,706.70
Und 134.00 147.26 19,732.84
Und 217.00 187.84 40,761.28
Und 74.00 125.64 9,297.36
Und 6.00 60.75 364.50
Und 8.00 1,341.37 10,730.96
Und 170.00 361.23 61,409.10
Und 88.00 373.00 32,824.00
Und 21.00 85.34 1,792.14

Und 4.00 495.14 1,980.56


47,130.32
Und 164.00 287.38 47,130.32
3,467.61
m 29.00 22.99 666.71
Und 11.00 40.54 445.94
Pto 8.00 81.83 654.64
Und 2.00 850.16 1,700.32
1,239,737.03
100.50
Und 1.00 100.50 100.50
26,570.05
m3 1,025.65 21.67 22,225.84
Und 39.00 111.39 4,344.21
73,359.91
m 802.30 13.36 10,718.73
m 1,146.35 17.59 20,164.30
m 1,220.60 34.80 42,476.88
287,588.33
ml 863.90 21.52 18,591.13
ml 199.30 37.44 7,461.79
ml 146.20 54.91 8,027.84
ml 534.00 66.71 35,623.14
ml 355.85 83.73 29,795.32
ml 463.90 112.63 52,249.06
ml 400.85 338.88 135,840.05
24,576.84
Und 3.00 343.62 1,030.86
Und 1.00 3,793.34 3,793.34
Und 3.00 1,846.67 5,540.01
Und 4.00 39.12 156.48
Und 5.00 39.12 195.60
Und 1.00 135.92 135.92
Und 4.00 135.92 543.68
Und 3.00 206.42 619.26
Und 2.00 219.52 439.04
Und 5.00 265.27 1,326.35
Und 1.00 219.90 219.90
Und 1.00 9,286.06 9,286.06
Und 10.00 110.14 1,101.40
Und 1.00 188.94 188.94
16,740.34
Und 2.00 7,120.34 14,240.68
Und 2.00 1,249.83 2,499.66
5,932.36
Und 8.00 571.35 4,570.80
m 40.00 12.23 489.20
m 4.00 16.49 65.96
m 36.00 22.40 806.40
106,741.64
Und 6.00 1,317.24 7,903.44
Und 4.00 971.74 3,886.96
Und 7.00 851.86 5,963.02
Und 54.00 1,341.37 72,433.98
Und 12.00 416.24 4,994.88
Und 32.00 361.23 11,559.36
22,120.68
m3 346.00 21.67 7,497.82
Und 22.00 111.39 2,450.58
m3 692.00 17.59 12,172.28
424,423.70
Und 2.00 212,211.85 424,423.70
251,582.68
Und 1.00 251,582.68 251,582.68

###
2,551,205.77
2,442,739.57
###
0.00
###
24,576,054.66

MES 1 MES 2 MES 3 MES 4 MES 5 MES 6


30 30 30 30 30 30
11/1/2015 11/30/2015 12/1/2015 12/30/2015 12/31/2015 1/29/2016 1/30/2016 2/28/2016 2/29/2016 3/29/2016 3/30/2016 4/28/2016

245,760.55 614,401.37 1,228,802.73 1,720,323.83 2,211,844.92 2,703,366.01

1.00% 2.50% 5.00% 7.00% 9.00% 11.00%

11/1/2015 390 11/24/2016

15 11/10/2016

3/15/2015
MES 7 MES 8 MES 9 MES 10 MES 11 MES 12 MES 13
30 30 30 30 30 30 30
4/29/2016 5/28/2016 5/29/2016 6/27/2016 6/28/2016 7/27/2016 7/28/2016 8/26/2016 8/27/2016 9/25/2016 9/26/2016 10/25/2016 10/26/2016 11/24/2016

3,194,887.11 3,440,647.65 2,949,126.56 2,457,605.47 1,843,204.10 1,228,802.73 737,281.64

13.00% 14.00% 12.00% 10.00% 7.50% 5.00% 3.00% 100.00%

15 3/29/2015