Está en la página 1de 142

PRESUPUESTO GENERAL

Item Descripcion Unid.

PRELIMINARES
1.01 Corte de Piso con Pulidora ml
1.02 Demolicion de Muro e=0,15 y/o Tableta m²
1.03 Demolicion de Placa Maciza e=0,15 m²
1.04 Demolicion de tableta 0,30*0,30 y/o Ladrillo Pieza
1.05 Demolicion de media caña en granito ml
1.06 Cerramiento con geotextil blanco m²
1.07 Demolicion de Piso epoxico de 3 o 5mm m²
1.08 Demolicion de Viga aerea 0,30*0,30 ml
1.09 Sellado o Perforacion de pase placa de 6" unid.
1.10 Cerramiento con plastico transparente m²
1.11 Cinta de señalizacion ml
1.12 Cerramiento con geotextil blanco y palo rollizo m²
1.13
1.14
1.15
1.16
1.17
1.18
1.19
1.20

MOVIMIENTO DE TIERRAS
2.01 Excavacion y retiro de material manual m³
2.02 Recebo Cemento Compactado m³
2.03 Excavacion y retiro de material con maquinaria m³
2.04 Recebo B400 m³
2.05 Relleno de excavacion con material de excavacion m³
2.06
2.07
2.08
2.09
2.10
2.11
2.12
2.13
2.14
2.15
2.16
2.17
2.18
2.19
2.20
CIMIENTOS
3.01 Viga de Cimentacion en Tee Invertida 0,60*0,50 ml
3.02 Zapata 1.00*1.00 m³
3.03 Viga de Cimentacion 3000PSI m³
3.04 Ciclopeo de Cimentacion m³
3.05 Base en Piedra media zonga m³
3.06 Concreto pobre 0,05*0,20 m
3.07 Dado en concreto 0,35*0,20*0,20 unid.
3.08 Sobrecimiento en bloque estructural de perforacion vertical ml
3.09
3.10
3.11
3.12
3.13
3.14
3.15
3.16
3.17
3.18
3.19
3.20

ESTRUCTURAS
4.01 Placa de Contrapiso e=0,15 m²
4.02 Refuerzo en Acero de 3/8" para Dovela ml
4.03 Grouting para Dovela ml
4.04 Pedestal de 0,40*0,40 h=1,05 unid.
4.05 Muro Pantalla e=0,20 m³
4.06 Columna 0.30*0.30 m³
4.07 Placa de Contrapiso e=0,25 R=4000PSI m²
4.08 Viga 0,15*0,20 ml
4.09 Columneta 0,25*0,25 de Proteccion para Bajante de 6" ml
4.10 Placa de subpresion e=0,20 m²
4.11 Anclaje de Acero con sikaPower Fix unid.
4.12 Placa en concreto endurecida de 4000PSI acel a 3 dias e=0,20 m²
4.13 Bordillo en concreto 0,25*0,10 ml
4.14 Placa de Entre piso e=0,10 m²
4.15 Prefabricado en concreto de 0,07*0,17*1,77 unid.
4.16 Placa de contrapiso e=0,30 m²
4.17 Muro Pantalla e=0,25 m³
4.18 Viga de 0,25*0,25 ml
4.19 Placa de Entre piso e=0,15 m²
4.20 Escalera Maciza en concreto m³

MAMPOSTERIA
5.01 Muro en ladrillo portante prensado estructural m²
5.02 Muro en ladrillo portante prensado estructural Pieza
5.03 Muro en Bloque estructural de perforacion Vertical m²
5.04 Muro en ladrillo tolete prensado Aligerado m²
5.05 Machon en Bloque de Perforacion Vertical 0,30*0,30 ml
5.06 Muro en Vidriblock m²
5.07 Machon en ladrillo portante prensado ml
5.08 Muro en bloque abuzardado m²
5.09
5.10
5.11
5.12
5.13
5.14
5.15
5.16
5.17
5.18
5.19
5.20

IMPERMEABILIZACION
6.01 Impermeabilizacion con Sikafill 5 años m²
6.02 Impermeabilizacion con sikalatex m²
6.03 Impermeabilizacion con sikaguard 720 m²
6.04 Imperm. con manto asfaltico y foil en aluminio m²
6.05 Impermeabilizacion con Sikafill 10 años m²
6.06 Impermeabilizacion de muro con sika Transparente m²
6.07 Impermeabilizacion con sika mortero 101 m²
6.08 Impermeabilizacion con sikafloor 400N Estándar Medio m²
6.09 Impermeabilizacion con Sonoguard Peatonal m²
6.10 Impermeabilizacion con Tegraproff m²
6.11 Cinta PVC para tanques ml
6.12
6.13
6.14
6.15
6.16
6.17
6.18
6.19
6.20

CUBIERTA
7.01 Desmonte e instalacion de Teja m²
7.02 Suministro e instalacion de Flanche cal 18 d=0,30 ml
7.03 Teja cindurit de 0,78 m²
7.04 Teja cindurit punto Diamante de 0,78 m²
7.05 Teja en fibto cemento m²
7.06 Teja plastica m²
7.07 Teja en Zinc m²
7.08
7.09
7.10
7.11
7.12
7.13
7.14
7.15
7.16
7.17
7.18
7.19
7.20

PISOS Y GUARDAESCOBAS
8.01 Tableta Sahara 0,30*0,30 Junta Acida Sika m²
8.02 Tableta Sahara 0,30*0,30 Junta Acida Sika Pieza
8.03 Tableta P5 0,33*0,33 m²
8.04 Tableta P5 0,33*0,33 Pieza
8.05 Piso Epoxico Sikafloor 162CO 3mm m²
8.06 Afinado de Piso e=0,04 m²
8.07 Sellado de junta con Sikaflex 1CSL ml
8.08 Adoquin sobre recebo m²
8.09 Guardaescoba Alfa Negro ml
8.10 Trantamiento de junta con Sikarefuerzo ml
8.11 Piso Epoxico Sikafloor 162CO 5mm m²
8.12 Anclaje de Pernos en piso de 3/8" unid.
8.13 Mortero Epoxico con Sikafloor 162CO e=0,02 m²
8.14 Alistamiento de superficie con sikadur 32 Primer m²
8.15 Media Caña en mortero epoxico ml
8.16 Media caña en Granito Pulido ml
8.17 Guardaescoba en Caucho ml
8.18 Poyo en concreto 0,10*0,10 ml
8.19 Tratamiento de junta con Sikadur 51SL a=15mm Prof=30mm ml
8.20 Piso en Vinilo 0,30*0,30 m²

PAÑETES Y CIELO RASOS


9.01 Pañete en muro con mortero de Planta m²
9.02 Pase Placa de 6" con tapon de inspeccion unid.
9.03 Pase Placa de 6" sin tapon de inspeccion unid.
9.04 Pañete en muro tradicional m²
9.05 Pañete impermeabilizado en muro m²
9.06
9.07
9.08
9.09
9.10
9.11
9.12
9.13
9.14
9.15
9.16
9.17
9.18
9.19
9.20

INSTALACIONES HIDRAULICAS Y SANITARIAS


10.01 Punto Sanitario de 3" y 4" unid.
10.02 Punto Hidraulico de 1/2 unid.
10.03 Red de desague de Aguas Negras de 4" ml
10.04 Red de Suministro de 1" ml
10.05 Red de Suministro de 3/4" ml
10.06 Reventilacion de 2" ml
10.07 Montaje y desmonte de Aparato sanitario unid.
10.08 Fundido de Muerto en concreto de 0,35*0,35 unid.
10.09 Red de Suministro de PVC-P 11/2" ml
10.10 Red de Suministro de PVC-P 11/4" ml
10.11 Caja de Inspeccion en concreto 0,40*0,40 h=0,80 unid.
10.12 Suministro e instalacion de Registro de Bola de 1/2" unid.
10.13 Suministro e instalacion de rejilla de 5*4 unid.
10.14 Bajante de Aguas Negras de 6" ml
10.15 Punto sanitario en HG de 3" o 4" unid.
10.16 Tuberia Sanitaria en HG de 3" o 4" ml
10.17 Red de Suministro de PVC-P 2" ml
10.18 Salida Sanitaria de 2" unid.
10.19 Red de desague de 2" ml
10.20 Salida hidraulica en HG unid.

INSTALACIONES ELECTRICAS
11.01 Salida Lampara muro Punto
11.02 Acometida electrica de 1" No 10+12 ml
11.03 Lampara Fluorescente 2*32 unid
11.04
11.05
11.06
11.07
11.08
11.09
11.10
11.11
11.12
11.13
11.14
11.15
11.16
11.17
11.18
11.19
11.20

ENCHAPES Y ACCESORIOS
12.01 Ceramica para pared m²
12.02 Ceramica para pared Pieza
12.03 Tableta Sahara 0,09 x 0,18 m²
12.04 Win en aluminio esquinero ml
12.05 Media caña sahara 0,30ml ml
12.06
12.07
12.08
12.09
12.10
12.11
12.12
12.13
12.14
12.15
12.16
12.17
12.18
12.19
12.20

CARPINTERIA METALICA
13.01
13.02
13.03
13.04
13.05
13.06
13.07
13.08
13.09
13.10
13.11
13.12
13.13
13.14
13.15
13.16
13.17
13.18
13.19
13.20

CARPINTERIA EN MADERA
14.01
14.02
14.03
14.04
14.05
14.06
14.07
14.08
14.09
14.10
14.11
14.12
14.13
14.14
14.15
14.16
14.17
14.18
14.19
14.20

PINTURA
15.01 Pintura en vinilo I sobre Estuco m²
15.02 Pintura Barniz para muebles o cielo raso m²
15.03 Graniplast m²
15.04 Pintura en esmalte m²
15.05 Estuco acrilico m²
15.06 Pintura en Epoxifenolico m²
15.07 Pintura de Señalizacion con sikafloor 2430CO e=0,08 ml
15.08 Esquinero en Aluminio de 1"*1/8" ml
15.09 Pintura en cemento sobre concreto m²
15.10 Pintura epoxica con sikafloor 2430 CO m²
15.11 Esquinero Plastico ml
15.12 Pintura epoxica con sikafloor 2430 CO en media caña ml
15.13 Pintura en esmalte en puerta unid.
15.14 Pintura Koraza m²
15.15 Pintura en laca en puerta de 0,80*2,00 unid.
15.16 Pintura anticorrosiva en superficie m²
15.17 Estuco veneciano m²
15.18 Pintura en vinilo III en techo m²
15.19 Pintura de Señalizacion con Esmalte e=0,10 ml
15.20 Pintura con Vinilo Tipo IV m²

ASEO
16.01 Limpieza con Desengrasante Alfa m²
16.02 Limpieza con Thinner m²
16.03 Limpieza con acido Muriatico m²
16.04 Limpieza de Viga Canal ml
16.05 Limpieza de Superficie con removedor m²
16.06 Limpieza de Superficie con Timsen m²
16.07 Limpieza de Planta Piso
16.08 Desmonte y Limpieza de cielo Raso m²
16.09 Borrado de Cintas ml
16.10
16.11
16.12
16.13
16.14
16.15
16.16
16.17
16.18
16.19
16.20

PISOS
17.01 Piso en Vinilo Pieza
17.02 Poyo en concreto de 0,05*0,05 ml
17.03 Media caña en mortero ml
17.04 Tableta P5 0,33*0,33 o 0,30*0,30 Beige m²
17.05 Tableta P5 0,33*0,33 o 0,30*0,30 Beige Pieza
17.06 Guardaescoba Alfa negro Pieza
17.07 Poyo en ladrillo ml
17.08 Mortero de Nivelacion e=0,08 Impermeabilizado m²
17.09 Piso Epoxico Sikafloor 162CO 4mm m²
17.10 Tratamiento de Junta Con SikaRood y SikaFlex 1csl ml
17.11 Sardinel Prefabricado 0,8*0,50*0,20 ml
17.12 Piso con sikagrout 200 e=0,05 m²
17.13 Anclaje de "U" en acero de 1/2 unid.
17.14 Media caña en PVC ml
17.15 Piso en porcelanato m²
17.16 Guardaescoba en porcelanato ml
17.17 Tratamiento de Junta con sikadur Panel 3*8mm ml
17.18 Instalacion de protectores ml
17.19 Pirlan de diltacion en Bronce ml
17.20 Piso epoxico con sikafloor 261 e=2mm m²

INSTALACIONES HIDRAULICAS Y SANITARIAS


18.01 Red de Suministro HG de 1/2" ml
18.02 Instalacion de sifon en acero inoxidable unid.
18.03 Destape de Sifon unid.
18.04 Sum e inst de Registro de Bola de 2" unid.
18.05 Instalacion de Lavamanos unid.
18.06 Bajante de A.LL de 4" ml
18.07 Canal en PVC ml
18.08 Filtro en Grava de 1" 0,40*0,20 ml
18.09
18.10
18.11
18.12
18.13
18.14
18.15
18.16
18.17
18.18
18.19
18.20

PINTURA
19.01 Pintura de señalizacion antideslizante a=0,10 ml
19.02 Sello de junta con sikaboom ml
19.03 Pintura con sikafloor 363CO m²
19.04 Aplicacion de Wash primer m²
19.05
19.06
19.07
19.08
19.09
19.10
19.11
19.12
19.13
19.14
19.15
19.16
19.17
19.18
19.19
19.20

PISOS
20.01 Barrera de Vapor m²
20.02 Junta Blindada ml
20.03 Pintura en piso con sikafloor 261CO m²
20.04 Piso en latex Cement e=2mm m²
20.05 Media Caña prefabricada Alfa (incluye corte, demolicion e inst.) ml
20.06 Poyo en concreto de 0.08*0.10 con media caña en mortero 4cms y pintura epoxica ml
20.07 Poyo en concreto de 0.08*0.10 con media caña en mortero 4cms y pintura en esmalte ml
20.08 Media caña en PVC (incluye corte, demolicion e inst.) ml
20.09 Praderizacion m²
20.10 Piso en Gravilla lavada m²
20.11
20.12
20.13
20.14
20.15
20.16
20.17
20.18
20.19
20.20

ESTRUCTURAS
21.01 Viga de remate 0,15*0,15 ml
21.02 Viga Cinta 0,20*0,05 ml
21.03 Columneta de 0,20*0,10*0,40 unid.
21.04 Placa Facil Santafe m²
RESUPUESTO GENERAL
Vr. Unit.

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

#N/A
#N/A
#N/A
#N/A

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

#N/A
#N/A
#N/A
#N/A
#N/A

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
$ 37,500
#N/A
#N/A
#N/A
#N/A

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

#N/A
#N/A
#N/A
#N/A
#N/A

#N/A
#N/A
$ 8,500
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

#N/A
#N/A

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

$ 7,831
#N/A
#N/A
#N/A
#N/A
#N/A

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

#N/A
#N/A
#N/A
#N/A
ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Corte de Piso con Pulidora
HOJA No 1 DE
ITEM: 1.01
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8001 Pulidora dia 0.0050 $ 15,312 $ 77
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

1
MATERIALES
9012 Disco Diamantado de 9" unid. 0.0050 $ 249,700 $ 1,249
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.0350 $ 11,975 $ 419
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV: Demolicion de Muro e=0,15 y/o Tableta
HOJA No 2 DE
ITEM: 1.02
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8002 Volqueta * 6mts³ con cargue m³ 0.2100 $ 31,350 $ 6,584
8023 Herramienta Menor % 0.0500 #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

2
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.5000 $ 11,975 $ 5,988
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Demolicion de Placa Maciza e=0,15
HOJA No 3 DE
ITEM: 1.03
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8002 Volqueta * 6mts³ con cargue m³ 0.2100 $ 31,350 $ 6,584
8023 Herramienta Menor % 0.0500 #N/A #N/A
#N/A #N/A $ -
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

3
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.0000 $ 11,975 $ 11,975
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Demolicion de tableta 0,30*0,30 y/o Ladrillo
HOJA No 4 DE
ITEM: 1.04
UNIDAD: Pieza

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8002 Volqueta * 6mts³ con cargue m³ 0.0038 $ 31,350 $ 119
8023 Herramienta Menor % 0.0500 #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

4
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.3500 $ 11,975 $ 4,191
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Demolicion de media caña en granito
HOJA No 5 DE
ITEM: 1.05
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8002 Volqueta * 6mts³ con cargue m³ 0.0140 $ 31,350 $ 439
8023 Herramienta Menor % 0.0500 #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

5
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.2500 $ 11,975 $ 2,994
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV: Cerramiento con geotextil blanco
HOJA No 6 DE
ITEM: 1.06
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8023 Herramienta Menor % 0.0500 #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

6
MATERIALES
9048 Geotextil Blanco para cerramiento ml 0.5000 $ 1,646 $ 823
9017 Anclaje de 3/8" rosca interna unid. 0.5000 $ 990 $ 495
9020 Varilla de 3/8 Roscada ml 0.1250 $ 7,700 $ 963
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.0830 $ 11,975 $ 994
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Demolicion de Piso epoxico de 3 o 5mm
HOJA No 7 DE
ITEM: 1.07
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

7
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Demolicion de Viga aerea 0,30*0,30
HOJA No 8 DE
ITEM: 1.08
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8012 Andamio Seccion Sem. 1.4500 $ 4,466 $ 6,476
8023 Herramienta Menor % 0.0500 #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

8
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 2.0000 $ 11,975 $ 23,950
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV: Sellado o Perforacion de pase placa de 6"
HOJA No 9 DE
ITEM: 1.09
UNIDAD: unid.

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8023 Herramienta Menor % 0.0500 #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

9
MATERIALES
2018 Concreto 3000PSI de Planta Gravilla Comun m³ 0.0120 $ 231,003 $ 2,772
15003 Tabla Burra Ordinaria Cepillada y Canteada 0,30*0,03 unid. 0.3000 $ 3,615 $ 1,084
1002 Alambre Negro kg 0.1000 $ 2,999 $ 300
17001 Vinilo Tipo I Viniltex gl 0.0880 $ 50,820 $ 4,472
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 2.5000 $ 11,975 $ 29,938
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

10
MEMORIA GRAFICA
FECHA:
ACTIV: Cerramiento con plastico transparente
HOJA No 10 DE
ITEM: 1.10
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8023 Herramienta Menor % 0.0500 #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

10
MATERIALES
9051 Plastico Transparente*200m² ml 1.0000 $ 5,474 $ 5,474
9017 Anclaje de 3/8" rosca interna unid. 0.5000 $ 990 $ 495
9020 Varilla de 3/8 Roscada ml 0.1250 $ 7,700 $ 963
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.0830 $ 11,975 $ 994
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Cinta de señalizacion
HOJA No 11 DE
ITEM: 1.11
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

11
MATERIALES
9053 Cinta de señalizacion *500m Rollo 0.0020 $ 29,700 $ 59
15001 Repisa Ordinario * 3mts unid. 0.5000 $ 5,613 $ 2,807
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.0625 $ 11,975 $ 748
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Cerramiento con geotextil blanco y palo rollizo
HOJA No 12 DE
ITEM: 1.12
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

12
MATERIALES
9048 Geotextil Blanco para cerramiento ml 0.4700 $ 1,646 $ 773
15006 Palo Rollizo de 3m unid. 0.1666 $ 1,120 $ 187
9001 Puntilla de 11/2", 2", 21/2" y 3" Lib. 0.0500 $ 2,530 $ 127
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.0830 $ 11,975 $ 994
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 13 DE
ITEM: 1.13
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

13
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 14 DE
ITEM: 1.14
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

14
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 15 DE
ITEM: 1.15
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

15
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 16 DE
ITEM: 1.16
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

16
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 17 DE
ITEM: 1.17
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

17
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 18 DE
ITEM: 1.18
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

18
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

19
MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 19 DE
ITEM: 1.19
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

19
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 20 DE
ITEM: 1.20
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

20
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV: Excavacion y retiro de material manual
HOJA No 21 DE
ITEM: 2.01
UNIDAD: m³

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8002 Volqueta * 6mts³ con cargue m³ 1.4000 $ 36,666 $ 51,332
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

21
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.9300 $ 11,975 $ 11,137
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Recebo Cemento Compactado
HOJA No 22 DE
ITEM: 2.02
UNIDAD: m³

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8006 Canguro dia 0.1000 $ 63,800 $ 6,380
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

22
MATERIALES
2023 Recebo B200 m³ 1.4000 $ 41,388 $ 57,943
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.8500 $ 11,975 $ 10,179
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Excavacion y retiro de material con maquinaria
HOJA No 23 DE
ITEM: 2.03
UNIDAD: m³

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8008 Retroexcavadora (Stan Bye de 6 Horas) hora 0.0416 $ 57,420 $ 2,389
8002 Volqueta * 6mts³ con cargue m³ 1.4000 $ 31,350 $ 43,890
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

23
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Recebo B400
HOJA No 24 DE
ITEM: 2.04
UNIDAD: m³

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8006 Canguro dia 0.2000 $ 63,800 $ 12,760
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

24
MATERIALES
2030 Recebo B400 m³ 1.3000 $ 44,935 $ 58,416
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.7000 $ 11,975 $ 8,383
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Relleno de excavacion con material de excavacion
HOJA No 25 DE
ITEM: 2.05
UNIDAD: m³

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8006 Canguro dia 0.2000 $ 63,800 $ 12,760
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

25
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.7000 $ 11,975 $ 8,383
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 26 DE
ITEM: 2.06
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

26
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 27 DE
ITEM: 2.07
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

27
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA

28
FECHA:
ACTIV:
HOJA No 28 DE
ITEM: 2.08
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

28
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 29 DE
ITEM: 2.09
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

29
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 30 DE
ITEM: 2.10
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

30
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 31 DE
ITEM: 2.11
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

31
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 32 DE
ITEM: 2.12
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

32
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 33 DE
ITEM: 2.13
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

33
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 34 DE
ITEM: 2.14
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

34
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 35 DE
ITEM: 2.15
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

35
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 36 DE
ITEM: 2.16
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

36
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:

37
ACTIV:
HOJA No 37 DE
ITEM: 2.17
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

37
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 38 DE
ITEM: 2.18
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

38
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 39 DE
ITEM: 2.19
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

39
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 40 DE
ITEM: 2.20
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

40
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Viga de Cimentacion en Tee Invertida 0,60*0,50
HOJA No 41 DE
ITEM: 3.01
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8004 Vibrador a Gasolina dia 0.1000 $ 34,452 $ 3,445
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

41
MATERIALES
2022 Concreto 3000PSI de Planta Acelerado a 7 dias m³ 0.2310 $ 383,310 $ 88,545
15001 Repisa Ordinario * 3mts unid. 1.0000 $ 5,613 $ 5,613
15004 Lamina de Madecor 2,15*2,44 - 6mm unid. 0.1250 $ 33,785 $ 4,223
9001 Puntilla de 11/2", 2", 21/2" y 3" Lib. 1.0000 $ 2,530 $ 2,530
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 3.0820 $ 11,975 $ 36,907
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Zapata 1.00*1.00
HOJA No 42 DE
ITEM: 3.02
UNIDAD: m³

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8004 Vibrador a Gasolina dia 0.1000 $ 34,452 $ 3,445
8023 Herramienta Menor % 0.0500 $ 275,426 $ 13,771
8026 Pluma con polea dia 1.0000 $ 40,000 $ 40,000
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

42
MATERIALES

#N/A #N/A #N/A #N/A


#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 23.0000 $ 11,975 $ 275,426
2037 Excavacion y retiro de material manual m³ $ 55,000 $ -
SUB-TOTAL $ 275,426

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Viga de Cimentacion 3000PSI
HOJA No 43 DE
ITEM: 3.03
UNIDAD: m³

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8004 Vibrador a Gasolina dia 0.0400 $ 34,452 $ 1,378
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

43
MATERIALES
2011 Concreto 3000PSI mezclado en Obra m³ 1.1000 #N/A #N/A
9001 Puntilla de 11/2", 2", 21/2" y 3" Lib. 0.6000 $ 2,530 $ 1,518
15003 Tabla Burra Ordinaria Cepillada y Canteada 0,30*0,03 unid. 0.7833 $ 3,615 $ 2,831
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 6.8900 $ 11,975 $ 82,508
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Ciclopeo de Cimentacion
HOJA No 44 DE
ITEM: 3.04
UNIDAD: m³

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

44
MATERIALES
2031 Piedra media Zonga m³ 0.6000 $ 44,935 $ 26,961
2011 Concreto 3000PSI mezclado en Obra m³ 0.4000 #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.0000 $ 11,975 $ 11,975
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Base en Piedra media zonga
HOJA No 45 DE
ITEM: 3.05
UNIDAD: m³

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

45
MATERIALES
2031 Piedra media Zonga m³ 1.1000 $ 44,935 $ 49,429
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.5000 $ 11,975 $ 5,988
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Concreto pobre 0,05*0,20

46
HOJA No 46 DE
ITEM: 3.06
UNIDAD: m

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8023 Herramienta Menor % 0.0500 #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

46
MATERIALES
2014 Concreto 1500PSI mezclado en Obra m³ 0.0100 #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.2500 $ 11,975 $ 2,994
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Dado en concreto 0,35*0,20*0,20
HOJA No 47 DE
ITEM: 3.07
UNIDAD: unid.

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8023 Herramienta Menor % 0.0500 #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

47
MATERIALES
2011 Concreto 3000PSI mezclado en Obra m³ 0.0144 #N/A #N/A
1004 Acero Corrugado de 3/8"*60000PSI*6mts Varilla 0.5000 $ 8,575 $ 4,287
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.5000 $ 11,975 $ 17,963
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV: Sobrecimiento en bloque estructural de perforacion vertical
HOJA No 48 DE
ITEM: 3.08
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8023 Herramienta Menor % 0.0500 #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

48
MATERIALES
3004 Bloque estructural de perforacion Vertical unid. 4.0000 $ 1,593 $ 6,371
2006 Mortero para Pega Dosif 1:4 m³ 0.0024 #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.5000 $ 11,975 $ 5,988
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 49 DE
ITEM: 3.09
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

49
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 50 DE
ITEM: 3.10
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

50
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 51 DE
ITEM: 3.11
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

51
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 52 DE
ITEM: 3.12
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

52
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 53 DE
ITEM: 3.13
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

53
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 54 DE
ITEM: 3.14
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

54
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 55 DE

55
ITEM: 3.15
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

55
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 56 DE
ITEM: 3.16
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

56
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 57 DE
ITEM: 3.17
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

57
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 58 DE
ITEM: 3.18
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

58
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 59 DE
ITEM: 3.19
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

59
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 60 DE
ITEM: 3.20
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

60
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Placa de Contrapiso e=0,15
HOJA No 61 DE
ITEM: 4.01
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8004 Vibrador a Gasolina dia 0.0125 $ 34,452 $ 431
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

61
MATERIALES
2018 Concreto 3000PSI de Planta Gravilla Comun m³ 0.1575 $ 231,003 $ 36,383
1017 Malla Electrosoldada 0,15*0,15 Q2 * 12mts² 18,90 Kg unid. 0.0833 $ 69,003 $ 5,748
1002 Alambre Negro kg 0.0787 $ 2,999 $ 236
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 2.5000 $ 11,975 $ 29,938
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

El Acero estimado por m³ de concreto es de 130kg

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Refuerzo en Acero de 3/8" para Dovela
HOJA No 62 DE
ITEM: 4.02
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8005 Taladro dia 0.0200 $ 30,250 $ 605
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

62
MATERIALES
1011 Acero Figurado de 3/8"*60000PSI*6mts kg 0.6160 #N/A #N/A
12007 Sikadur 42 Anclaje Kg 0.0200 $ 22,202 $ 444
9016 Broca Ranurada de 3/8" * 10" unid. 0.0200 $ 25,265 $ 505
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.1600 $ 11,975 $ 1,916
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Grouting para Dovela
HOJA No 63 DE
ITEM: 4.03
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

63
MATERIALES
2021 Grouting m³ 0.0138 $ 408,230 $ 5,623
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16001 Ayudante de Albañileria hh 0.2500 $ 4,955 $ 1,239
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Pedestal de 0,40*0,40 h=1,05
HOJA No 64 DE
ITEM: 4.04

64
UNIDAD: unid.

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

64
MATERIALES
2022 Concreto 3000PSI de Planta Acelerado a 7 dias m³ 0.1848 $ 383,310 $ 70,836
15002 Liston Ordinario Cepillado y canteado 0,05*3mts unid. 10.0000 $ 4,423 $ 44,231
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.0000 $ 11,975 $ 11,975
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Muro Pantalla e=0,20
HOJA No 65 DE
ITEM: 4.05
UNIDAD: m³

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8004 Vibrador a Gasolina dia 0.0400 $ 34,452 $ 1,378
8007 Paral Telescopico Largo mes 8.0000 $ 7,273 $ 58,186
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

65
MATERIALES
2024 Concreto 3000PSI de Planta Gravilla Fina m³ 1.0500 $ 357,025 $ 374,876
15002 Liston Ordinario Cepillado y canteado 0,05*3mts unid. 66.6600 $ 4,423 $ 294,844
9001 Puntilla de 11/2", 2", 21/2" y 3" Lib. 2.1200 $ 2,530 $ 5,364
15001 Repisa Ordinario * 3mts unid. 16.6600 $ 5,613 $ 93,518
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 15.9500 $ 11,975 $ 191,002
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Columna 0.30*0.30
HOJA No 66 DE
ITEM: 4.06
UNIDAD: m³

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8004 Vibrador a Gasolina dia 0.0400 $ 34,452 $ 1,378
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

66
MATERIALES
15002 Liston Ordinario Cepillado y canteado 0,05*3mts unid. 88.9000 $ 4,423 $ 393,214
15001 Repisa Ordinario * 3mts unid. 18.0000 $ 5,613 $ 101,039
9001 Puntilla de 11/2", 2", 21/2" y 3" Lib. 8.0000 $ 2,530 $ 20,240
2024 Concreto 3000PSI de Planta Gravilla Fina m³ 1.0500 $ 357,025 $ 374,876
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 16.4600 $ 11,975 $ 197,109
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV: Placa de Contrapiso e=0,25 R=4000PSI
HOJA No 67 DE
ITEM: 4.07
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

67
MATERIALES
2032 Concreto 4000PSI de Planta Gravilla Comun m³ 0.2575 $ 297,330 $ 76,562
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 4.1600 $ 11,975 $ 49,816
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Viga 0,15*0,20
HOJA No 68 DE
ITEM: 4.08
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8023 Herramienta Menor % 0.0500 #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

68
MATERIALES
2011 Concreto 3000PSI mezclado en Obra m³ 0.0450 #N/A #N/A
15002 Liston Ordinario Cepillado y canteado 0,05*3mts unid. 3.0000 $ 4,423 $ 13,269
15001 Repisa Ordinario * 3mts unid. 0.3300 $ 5,613 $ 1,852
15005 Bocel*3mts unid. 1.3300 $ 2,591 $ 3,445
1012 Acero Figurado de 1/2"*60000PSI*6mts kg 2.0100 #N/A #N/A
1011 Acero Figurado de 3/8"*60000PSI*6mts kg 0.7000 #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.0000 $ 11,975 $ 11,975
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Columneta 0,25*0,25 de Proteccion para Bajante de 6"
HOJA No 69 DE
ITEM: 4.09
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8005 Taladro dia 0.0400 $ 30,250 $ 1,210
8023 Herramienta Menor % 0.0500 #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

69
MATERIALES
2018 Concreto 3000PSI de Planta Gravilla Comun m³ 0.0465 $ 231,003 $ 10,731
15002 Liston Ordinario Cepillado y canteado 0,05*3mts unid. 5.1500 $ 4,423 $ 22,779
15001 Repisa Ordinario * 3mts unid. 1.0300 $ 5,613 $ 5,782
15005 Bocel*3mts unid. 0.7900 $ 2,591 $ 2,046
1011 Acero Figurado de 3/8"*60000PSI*6mts kg 3.0240 #N/A #N/A
12007 Sikadur 42 Anclaje Kg 0.0500 $ 22,202 $ 1,110
9016 Broca Ranurada de 3/8" * 10" unid. 0.0500 $ 25,265 $ 1,263
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 2.0000 $ 11,975 $ 23,950
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV: Placa de subpresion e=0,20
HOJA No 70 DE
ITEM: 4.10
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8004 Vibrador a Gasolina dia 0.0167 $ 34,452 $ 574
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

70
MATERIALES
2018 Concreto 3000PSI de Planta Gravilla Comun m³ 0.2500 $ 231,003 $ 57,751
1017 Malla Electrosoldada 0,15*0,15 Q2 * 12mts² 18,90 Kg unid. 0.0833 $ 69,003 $ 5,748
1002 Alambre Negro kg 0.0787 $ 2,999 $ 236
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 2.9000 $ 11,975 $ 34,728
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Anclaje de Acero con sikaPower Fix
HOJA No 71 DE
ITEM: 4.11
UNIDAD: unid.

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
11001 Pistola Anchor Fix unid. 0.0010 $ 301,600 $ 302
8005 Taladro dia 0.0100 $ 30,250 $ 303
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

71
MATERIALES
12026 Sika Power Fix 4*300cc Tubo 0.0416 $ 74,646 $ 3,105
9049 Broca Ranurada de 1/2" * 10" unid. 0.0100 $ - $ -
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.0830 $ 11,975 $ 994
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:Placa en concreto endurecida de 4000PSI acel a 3 dias e=0,20
HOJA No 72 DE
ITEM: 4.12
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8004 Vibrador a Gasolina dia 0.0167 $ 34,452 $ 574
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

72
MATERIALES
2034 Concreto de 4000PSI acelerada a 3 dias m³ 0.2500 $ 440,858 $ 110,215
12027 Mastercron Neutro kg 7.0000 $ 985 $ 6,896
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 2.9000 $ 11,975 $ 34,728
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Bordillo en concreto 0,25*0,10
HOJA No 73 DE
ITEM: 4.13
UNIDAD: ml

73
MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8004 Vibrador a Gasolina dia 0.0500 $ 34,452 $ 1,723
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

73
MATERIALES
2018 Concreto 3000PSI de Planta Gravilla Comun m³ 0.0263 $ 231,003 $ 6,064
15003 Tabla Burra Ordinaria Cepillada y Canteada 0,30*0,03 unid. 0.6600 $ 3,615 $ 2,386
1011 Acero Figurado de 3/8"*60000PSI*6mts kg 0.4480 #N/A #N/A
1012 Acero Figurado de 1/2"*60000PSI*6mts kg 2.0000 #N/A #N/A
1002 Alambre Negro kg 0.1200 $ 2,999 $ 360
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.7500 $ 11,975 $ 8,981
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV: Placa de Entre piso e=0,10
HOJA No 74 DE
ITEM: 4.14
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

74
MATERIALES
2018 Concreto 3000PSI de Planta Gravilla Comun m³ 0.1050 $ 231,003 $ 24,255
1017 Malla Electrosoldada 0,15*0,15 Q2 * 12mts² 18,90 Kg unid. 0.0833 $ 69,003 $ 5,748
1002 Alambre Negro kg 0.0787 $ 2,999 $ 236
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 2.5000 $ 11,975 $ 29,938
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Prefabricado en concreto de 0,07*0,17*1,77
HOJA No 75 DE
ITEM: 4.15
UNIDAD: unid.

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

75
MATERIALES
2011 Concreto 3000PSI mezclado en Obra m³ 0.0211 #N/A #N/A
1005 Acero Corrugado de 1/2"*60000PSI*6mts Varilla 0.6900 $ 15,312 $ 10,565
15002 Liston Ordinario Cepillado y canteado 0,05*3mts unid. 0.8800 $ 4,423 $ 3,892
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.0000 $ 11,975 $ 11,975
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Placa de contrapiso e=0,30
HOJA No 76 DE
ITEM: 4.16
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8004 Vibrador a Gasolina dia 0.0500 $ 34,452 $ 1,723
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

76
MATERIALES
2032 Concreto 4000PSI de Planta Gravilla Comun m³ 0.3000 $ 297,330 $ 89,199
8022 Bombeo de concreto m³ 0.3000 $ 38,500 $ 11,550
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.7000 $ 11,975 $ 20,358
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Muro Pantalla e=0,25
HOJA No 77 DE
ITEM: 4.17
UNIDAD: m³

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8004 Vibrador a Gasolina dia 0.0400 $ 34,452 $ 1,378
8007 Paral Telescopico Largo mes 8.0000 $ 7,273 $ 58,186
8022 Bombeo de concreto m³ 1.0000 $ 38,500 $ 38,500
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

77
MATERIALES
2036 Concreto de 4000PSI Grava fina m³ 1.0500 $ 306,953 $ 322,301
15002 Liston Ordinario Cepillado y canteado 0,05*3mts unid. 66.6600 $ 4,423 $ 294,844
9001 Puntilla de 11/2", 2", 21/2" y 3" Lib. 2.1200 $ 2,530 $ 5,364
15001 Repisa Ordinario * 3mts unid. 16.6600 $ 5,613 $ 93,518
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 10.6800 $ 11,975 $ 127,893
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV: Viga de 0,25*0,25
HOJA No 78 DE
ITEM: 4.18
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

78
MATERIALES
2032 Concreto 4000PSI de Planta Gravilla Comun m³ 0.0625 $ 297,330 $ 18,583
15002 Liston Ordinario Cepillado y canteado 0,05*3mts unid. 5.0000 $ 4,423 $ 22,116
15001 Repisa Ordinario * 3mts unid. 0.3300 $ 5,613 $ 1,852
15005 Bocel*3mts unid. 1.3300 $ 2,591 $ 3,445
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.0000 $ 11,975 $ 11,975
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Placa de Entre piso e=0,15
HOJA No 79 DE
ITEM: 4.19
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8022 Bombeo de concreto m³ 0.1500 $ 38,500 $ 5,775
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

79
MATERIALES
2032 Concreto 4000PSI de Planta Gravilla Comun m³ 0.1500 $ 297,330 $ 44,599
8013 Formaleta para placa mes 1.0000 $ 5,309 $ 5,309
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 2.5000 $ 11,975 $ 29,938
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Escalera Maciza en concreto
HOJA No 80 DE
ITEM: 4.20
UNIDAD: m³

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8023 Herramienta Menor % 0.0500 #N/A #N/A
8004 Vibrador a Gasolina dia 0.0400 $ 34,452 $ 1,378
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

80
MATERIALES
9061 ACPM gl 0.2200 $ 7,700 $ 1,694
2011 Concreto 3000PSI mezclado en Obra m³ 1.1000 #N/A #N/A
8013 Formaleta para placa mes 8.6900 $ 5,309 $ 46,132
8016 Paral Telescopico Estándar Sem. 1.0000 $ 7,273 $ 7,273
9001 Puntilla de 11/2", 2", 21/2" y 3" Lib. 1.4900 $ 2,530 $ 3,770
15001 Repisa Ordinario * 3mts unid. 2.7400 $ 5,613 $ 15,380
15003 Tabla Burra Ordinaria Cepillada y Canteada 0,30*0,03 unid. 3.0000 $ 3,615 $ 10,844
15007 Tabla Burra Ordinaria Cepillada y Canteada 0,25*0,03 unid. 4.0000 $ 3,020 $ 12,078
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 17.7000 $ 11,975 $ 211,958
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Muro en ladrillo portante prensado estructural
HOJA No 81 DE
ITEM: 5.01
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

81
MATERIALES
3003 Ladrillo portante prensado estructural Santafe unid. 34.3300 $ 1,036 $ 35,573
2025 Mortero Seco para pega Resist 125Kg m³ 0.0109 $ 319,749 $ 3,485
1018 Malla Ram ml 2.0000 $ 811 $ 1,623
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.0600 $ 11,975 $ 12,694
#N/A #N/A $ -
SUB-TOTAL $ 12,694

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Muro en ladrillo portante prensado estructural
HOJA No 82 DE
ITEM: 5.02
UNIDAD: Pieza

82
MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

82
MATERIALES
2005 Mortero para Pega Dosif 1:3 m³ 0.0161 #N/A #N/A
3002 Ladrillo Recocido unid. 53.9600 $ 330 $ 17,807
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.8600 $ 11,975 $ 10,299
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Muro en Bloque estructural de perforacion Vertical
HOJA No 83 DE
ITEM: 5.03
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8023 Herramienta Menor % 0.0500 #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

83
MATERIALES
3004 Bloque estructural de perforacion Vertical unid. 12.2500 $ 1,593 $ 19,512
2006 Mortero para Pega Dosif 1:4 m³ 0.0126 #N/A #N/A
1018 Malla Ram ml 1.0000 $ 811 $ 811
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.1200 $ 11,975 $ 13,412
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Muro en ladrillo tolete prensado Aligerado
HOJA No 84 DE
ITEM: 5.04
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

84
MATERIALES
3006 Ladrillo tolete prensado liviano unid. 56.5900 $ 655 $ 37,038
2025 Mortero Seco para pega Resist 125Kg m³ 0.0218 $ 319,749 $ 6,971
1018 Malla Ram ml 2.0000 $ 811 $ 1,623
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.5000 $ 11,975 $ 17,963
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Machon en Bloque de Perforacion Vertical 0,30*0,30
HOJA No 85 DE
ITEM: 5.05
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8005 Taladro dia 0.0200 $ 30,250 $ 605
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

85
MATERIALES
3004 Bloque estructural de perforacion Vertical unid. 8.6802 $ 1,593 $ 13,826
2025 Mortero Seco para pega Resist 125Kg m³ 0.0375 $ 319,749 $ 11,975
1018 Malla Ram ml 0.6300 $ 811 $ 511
1011 Acero Figurado de 3/8"*60000PSI*6mts kg 0.6160 #N/A #N/A
12007 Sikadur 42 Anclaje Kg 0.0200 $ 22,202 $ 444
9016 Broca Ranurada de 3/8" * 10" unid. 0.0200 $ 25,265 $ 505
2021 Grouting m³ 0.0086 $ 408,230 $ 3,511
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.8000 $ 11,975 $ 21,555
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV: Muro en Vidriblock
HOJA No 86 DE
ITEM: 5.06
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

86
MATERIALES
9050 Vidri block 0,20*0,20 unid. 21.7400 $ 11,484 $ 249,662
2020 Cemento Blanco kg 30.0000 $ 1,308 $ 39,237
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 2.0000 $ 11,975 $ 23,950
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Machon en ladrillo portante prensado
HOJA No 87 DE
ITEM: 5.07
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

87
MATERIALES
3003 Ladrillo portante prensado estructural Santafe unid. 20.0000 $ 1,036 $ 20,724
2025 Mortero Seco para pega Resist 125Kg m³ 0.0064 $ 319,749 $ 2,046
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.0000 $ 11,975 $ 11,975
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Muro en bloque abuzardado
HOJA No 88 DE
ITEM: 5.08
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8023 Herramienta Menor % 0.0500 #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

88
MATERIALES
3008 Bloque abuzardado en concreto unid. 12.5000 $ 3,300 $ 41,250
2006 Mortero para Pega Dosif 1:4 m³ 0.0220 #N/A #N/A
1018 Malla Ram ml 1.0000 $ 811 $ 811
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.5000 $ 11,975 $ 17,963
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 89 DE
ITEM: 5.09
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

89
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 90 DE
ITEM: 5.10
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

90
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 91 DE
ITEM: 5.11
UNIDAD:

91
MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

91
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 92 DE
ITEM: 5.12
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

92
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 93 DE
ITEM: 5.13
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

93
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 94 DE
ITEM: 5.14
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

94
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 95 DE
ITEM: 5.15
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

95
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 96 DE
ITEM: 5.16
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

96
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 97 DE
ITEM: 5.17
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

97
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 98 DE
ITEM: 5.18
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

98
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 99 DE
ITEM: 5.19
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

99
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 100 DE
ITEM: 5.20
UNIDAD:

100
MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

100
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV: Impermeabilizacion con Sikafill 5 años
HOJA No 101 DE
ITEM: 6.01
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

101
MATERIALES
12001 Sikafill 5 Kg 1.6800 $ 12,760 $ 21,437
12002 SikaFelt m² 1.1000 $ 2,361 $ 2,597
9006 Escoba unid. 0.0100 $ 3,850 $ 39
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.0000 $ 11,975 $ 11,975
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Impermeabilizacion con sikalatex
HOJA No 102 DE
ITEM: 6.02
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

102
MATERIALES
12020 Sikalatex Kg 0.7000 $ 7,003 $ 4,902
2026 Mortero Seco para pañete Resist 25Kg m³ 0.0165 $ 264,831 $ 4,370
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.0000 $ 11,975 $ 11,975
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Impermeabilizacion con sikaguard 720
HOJA No 103 DE
ITEM: 6.03
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

103
MATERIALES
12021 Sikafloor Epocem Modul Kg 0.3000 $ 37,004 $ 11,101
12022 Sikagard 720 Kg 6.0000 $ 6,606 $ 39,635
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.2000 $ 11,975 $ 14,370
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Imperm. con manto asfaltico y foil en aluminio
HOJA No 104 DE
ITEM: 6.04
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

104
MATERIALES
12023 Manto Asfaltico con Foil en Aluminio Rollo 0.1100 $ 117,063 $ 12,877
12024 Emulsion Asfaltica Kg 1.0000 $ 3,254 $ 3,254
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.0000 $ 11,975 $ 11,975
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV: Impermeabilizacion con Sikafill 10 años
HOJA No 105 DE
ITEM: 6.05
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

105
MATERIALES
12028 Sikafill 10 Kg 1.6800 $ 14,036 $ 23,580
12002 SikaFelt m² 1.1000 $ 2,361 $ 2,597
9006 Escoba unid. 0.0100 $ 3,850 $ 39
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.0000 $ 11,975 $ 11,975
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Impermeabilizacion de muro con sika Transparente
HOJA No 106 DE
ITEM: 6.06
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

106
MATERIALES
12030 Sika transparente 5 kg 0.3000 $ 12,632 $ 3,790
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.3000 $ 11,975 $ 3,593
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Impermeabilizacion con sika mortero 101
HOJA No 107 DE
ITEM: 6.07
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

107
MATERIALES
12032 Sika 101 Mortero Kg 2.0000 $ 4,019 $ 8,039
12020 Sikalatex Kg 0.0600 $ 7,003 $ 420
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.5000 $ 11,975 $ 5,988
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV: Impermeabilizacion con sikafloor 400N Estándar Medio
HOJA No 108 DE
ITEM: 6.08
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

108
MATERIALES
12033 Sikafloor 400N kg 1.1000 $ 43,384 $ 47,722
12034 Sikafloor 156CO Kg 0.3000 $ 45,553 $ 13,666
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.5000 $ 11,975 $ 5,988
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Impermeabilizacion con Sonoguard Peatonal
HOJA No 109 DE
ITEM: 6.09
UNIDAD: m²

MAQUINARIAY EQUIPO

109
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

109
MATERIALES
12040 Sonoguard Base Coat (Unid*5gls) unid. 0.1800 $ 561,440 $ 101,059
12042 Filler 1-2-3 y 5 (Unid * 25kgs) unid. 0.0600 $ 32,857 $ 1,971
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.5000 $ 11,975 $ 5,988
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Impermeabilizacion con Tegraprof
HOJA No 110 DE
ITEM: 6.10
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8023 Herramienta Menor % 0.0500 $ 5,988 $ 299
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

110
MATERIALES
12043 Tregraproof kg 0.8300 $ 15,057 $ 12,497
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.5000 $ 11,975 $ 5,988
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Cinta PVC para tanques
HOJA No 111 DE
ITEM: 6.11
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8023 Herramienta Menor % 0.0500 $ 5,988 $ 299
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

111
MATERIALES
8024 Cinta PVC ml 1.0100 $ 35,090 $ 35,441
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.5000 $ 11,975 $ 5,988
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 112 DE
ITEM: 6.12
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

112
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 113 DE
ITEM: 6.13
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

113
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 114 DE
ITEM: 6.14
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

114
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 115 DE
ITEM: 6.15
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

115
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 116 DE
ITEM: 6.16
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

116
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 117 DE
ITEM: 6.17
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

117
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 118 DE
ITEM: 6.18
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL

118
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

118
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 119 DE
ITEM: 6.19
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

119
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 120 DE
ITEM: 6.20
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

120
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Desmonte e instalacion de Teja
HOJA No 121 DE
ITEM: 7.01
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

121
MATERIALES
12008 Sikaflex 1A, 11FC y 1CSL * 300c.c Tubo 0.0200 $ 25,520 $ 510
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.6500 $ 11,975 $ 7,784
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Suministro e instalacion de Flanche cal 18 d=0,30
HOJA No 122 DE
ITEM: 7.02
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8005 Taladro dia 0.0200 $ 30,250 $ 605
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

122
MATERIALES
6002 Flanche Cal 18 d=0,30 ml 1.0500 $ 24,750 $ 25,988
9016 Broca Ranurada de 3/8" * 10" unid. 0.0200 $ 25,265 $ 505
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.5000 $ 11,975 $ 5,988
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Teja cindurit de 0,78
HOJA No 123 DE
ITEM: 7.03
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
9035 Arnes con Slinga unid. 0.0030 $ 696,696 $ 2,090
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

123
MATERIALES
6003 Teja cindurit a=0,78 m² 1.3500 $ 26,286 $ 35,486
9034 Tornillo autoperforante unid. 4.0000 $ 331 $ 1,324
12008 Sikaflex 1A, 11FC y 1CSL * 300c.c Tubo 0.1000 $ 25,520 $ 2,552
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.6500 $ 11,975 $ 7,784
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Teja cindurit punto Diamante de 0,78
HOJA No 124 DE
ITEM: 7.04
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

124
MATERIALES
6004 Teja Punto Diamante m² 1.3500 $ 76,184 $ 102,848
9034 Tornillo autoperforante unid. 4.0000 $ 331 $ 1,324
12008 Sikaflex 1A, 11FC y 1CSL * 300c.c Tubo 0.1000 $ 25,520 $ 2,552
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.6500 $ 11,975 $ 7,784
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Teja en fibto cemento
HOJA No 125 DE
ITEM: 7.05
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8023 Herramienta Menor % 0.0500 #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

125
MATERIALES
6005 Teja en Fibro cemento No 4 unid. 1.0000 $ 14,721 $ 14,721
6006 Gancho para teja fibro cemento unid. 4.0000 $ 608 $ 2,433
12008 Sikaflex 1A, 11FC y 1CSL * 300c.c Tubo 0.1500 $ 25,520 $ 3,828
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.7000 $ 11,975 $ 8,383
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Teja plastica
HOJA No 126 DE
ITEM: 7.06
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

126
MATERIALES
6001 Amarre para Teja plastica unid. 4.0000 $ 66 $ 264
6007 Teja Plastica No 4 m² 1.0200 $ 43,256 $ 44,122
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.7000 $ 11,975 $ 8,383
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Teja en Zinc
HOJA No 127 DE
ITEM: 7.07
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A

127
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

127
MATERIALES
6008 Teja en Zinc 3m m² 1.0200 $ 11,956 $ 12,195
6001 Amarre para Teja plastica unid. 4.0000 $ 66 $ 264
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.7000 $ 11,975 $ 8,383
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 128 DE
ITEM: 7.08
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

128
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 129 DE
ITEM: 7.09
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

129
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 130 DE
ITEM: 7.10
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

130
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 131 DE
ITEM: 7.11
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

131
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 132 DE
ITEM: 7.12
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

132
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 133 DE
ITEM: 7.13
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

133
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 134 DE
ITEM: 7.14
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

134
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 135 DE
ITEM: 7.15
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

135
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 136 DE
ITEM: 7.16
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A

136
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

136
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 137 DE
ITEM: 7.17
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

137
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 138 DE
ITEM: 7.18
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

138
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 139 DE
ITEM: 7.19
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

139
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 140 DE
ITEM: 7.20
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

140
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Tableta Sahara 0,30*0,30 Junta Acida Sika
HOJA No 141 DE
ITEM: 8.01
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

141
MATERIALES
7001 Tableta Alfa Sahara 0,30*0,30 m² 1.0500 $ 24,882 $ 26,126
9013 Alfalisto Pluss Kg 6.5000 $ 2,361 $ 15,344
12003 Sikafloor 261 Kg 1.1400 $ 40,194 $ 45,821
12004 Sikadur 506 Kg 1.1400 $ 1,148 $ 1,309
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.5000 $ 11,975 $ 17,963
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Tableta Sahara 0,30*0,30 Junta Acida Sika
HOJA No 142 DE
ITEM: 8.02
UNIDAD: Pieza

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

142
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Tableta P5 0,33*0,33
HOJA No 143 DE
ITEM: 8.03
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

143
MATERIALES
7002 Tableta Alfa P5 0,33*0,33 Blanca m² 1.0500 $ 37,890 $ 39,784
2005 Mortero para Pega Dosif 1:3 m³ 0.0330 #N/A #N/A
2020 Cemento Blanco kg 2.0000 $ 1,308 $ 2,616
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.5000 $ 11,975 $ 17,963
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Tableta P5 0,33*0,33
HOJA No 144 DE
ITEM: 8.04
UNIDAD: Pieza

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

144
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Piso Epoxico Sikafloor 162CO 3mm
HOJA No 145 DE
ITEM: 8.05
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8005 Taladro dia 0.0500 $ 30,250 $ 1,513
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A

145
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

145
MATERIALES
12005 Sikafloor 162CO Kg 2.0000 $ 45,553 $ 91,106
12006 Sikadur 510 o 520 Kg 6.0000 $ 2,437 $ 14,623
9015 Rodillo de Puas 9" unid. 0.0100 $ 66,352 $ 664
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.0000 $ 11,975 $ 11,975
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Afinado de Piso e=0,04
HOJA No 146 DE
ITEM: 8.06
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

146
MATERIALES
2001 Agua Lt 10.0000 $ 11 $ 110
2003 Arena de Peña m³ 0.0500 $ 42,570 $ 2,129
2002 Cemento Porhand Gris kg 19.0000 $ 574 $ 10,910
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.4000 $ 11,975 $ 4,790
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV: Sellado de junta con Sikaflex 1CSL
HOJA No 147 DE
ITEM: 8.07
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

147
MATERIALES
12008 Sikaflex 1A, 11FC y 1CSL * 300c.c Tubo 0.3548 $ 25,520 $ 9,054
9038 Pistola de Calafateo unid. 0.0100 $ 6,600 $ 66
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.1000 $ 11,975 $ 1,198
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Adoquin sobre recebo
HOJA No 148 DE
ITEM: 8.08
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

148
MATERIALES
2003 Arena de Peña m³ 0.0650 $ 42,570 $ 2,767
7003 Adoquin en corbatin Royal Santafe unid. 42.0000 $ 1,100 $ 46,200
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.0500 $ 11,975 $ 12,574
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Guardaescoba Alfa Negro
HOJA No 149 DE
ITEM: 8.09
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8001 Pulidora dia 0.0200 $ 15,312 $ 306
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

149
MATERIALES
7004 Guardaescoba Alfa Negro ml 1.1000 $ 9,801 $ 10,781
9023 Pegacor Blanco kg 2.0000 $ 1,319 $ 2,639
9024 Disco para pulidora de 4" Corte en humedo unid. 0.0200 $ 119,434 $ 2,389
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.5000 $ 11,975 $ 5,988
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV: Trantamiento de junta con Sikarefuerzo
HOJA No 150 DE
ITEM: 8.10
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

150
MATERIALES
12009 Sika Rod de 3/8" ml 1.0100 $ 530 $ 536
12008 Sikaflex 1A, 11FC y 1CSL * 300c.c Tubo 0.0806 $ 25,520 $ 2,057
12010 Sikadur 32 Primer Kg 0.2500 $ 56,527 $ 14,132
12011 Sika Refuerzo Tejido ml 0.2500 $ 16,588 $ 4,147
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.5000 $ 11,975 $ 5,988
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Piso Epoxico Sikafloor 162CO 5mm
HOJA No 151 DE
ITEM: 8.11
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

151
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Anclaje de Pernos en piso de 3/8"
HOJA No 152 DE
ITEM: 8.12
UNIDAD: unid.

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8005 Taladro dia 0.0200 $ 30,250 $ 605
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

152
MATERIALES
12007 Sikadur 42 Anclaje Kg 0.0200 $ 22,202 $ 444
9016 Broca Ranurada de 3/8" * 10" unid. 0.0200 $ 25,265 $ 505
9017 Anclaje de 3/8" rosca interna unid. 1.0000 $ 990 $ 990
9020 Varilla de 3/8 Roscada ml 0.2500 $ 7,700 $ 1,925
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.1600 $ 11,975 $ 1,916
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Mortero Epoxico con Sikafloor 162CO e=0,02
HOJA No 153 DE
ITEM: 8.13
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8005 Taladro dia 0.1000 $ 30,250 $ 3,025
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

153
MATERIALES
12005 Sikafloor 162CO Kg 4.2000 $ 45,553 $ 191,323
12016 Sikadur 501, 504 o 506 Kg 33.6000 $ 1,148 $ 38,586
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.5000 $ 11,975 $ 17,963
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Alistamiento de superficie con sikadur 32 Primer
HOJA No 154 DE
ITEM: 8.14
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A

154
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

154
MATERIALES
12010 Sikadur 32 Primer Kg 0.4200 $ 56,527 $ 23,741
9007 Rodillo Master 9" unid. 0.0500 $ 8,683 $ 434
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.2500 $ 11,975 $ 2,994
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Media Caña en mortero epoxico
HOJA No 155 DE
ITEM: 8.15
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

155
MATERIALES
12005 Sikafloor 162CO Kg 0.6600 $ 45,553 $ 30,065
12006 Sikadur 510 o 520 Kg 4.6600 $ 2,437 $ 11,357
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.0000 $ 11,975 $ 11,975
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Media caña en Granito Pulido
HOJA No 156 DE
ITEM: 8.16
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

156
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Guardaescoba en Caucho
HOJA No 157 DE
ITEM: 8.17
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

157
MATERIALES
7006 Guardaescoba en Caucho ml 1.0500 $ 2,200 $ 2,310
9031 Boxer Bot. 0.1000 $ 13,750 $ 1,375
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.5000 $ 11,975 $ 5,988
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV: Poyo en concreto 0,10*0,10
HOJA No 158 DE
ITEM: 8.18
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

158
MATERIALES
1004 Acero Corrugado de 3/8"*60000PSI*6mts Varilla 0.0250 $ 8,575 $ 214
12007 Sikadur 42 Anclaje Kg 0.0400 $ 22,202 $ 888
2018 Concreto 3000PSI de Planta Gravilla Comun m³ 0.0110 $ 231,003 $ 2,541
15002 Liston Ordinario Cepillado y canteado 0,05*3mts unid. 2.0000 $ 4,423 $ 8,846
15001 Repisa Ordinario * 3mts unid. 0.3300 $ 5,613 $ 1,852
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.5000 $ 11,975 $ 17,963
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Tratamiento de junta con Sikadur 51SL a=15mm Prof=30mm
HOJA No 159 DE
ITEM: 8.19
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

159
MATERIALES
12019 Sikadur 51 SL Kg 0.5500 $ 49,830 $ 27,407
9038 Pistola de Calafateo unid. 0.0100 $ 6,600 $ 66
9025 Cinta de Enmascarar de 11/2" Rollo 0.0500 $ 3,277 $ 164
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.1000 $ 11,975 $ 1,198
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Piso en Vinilo 0,30*0,30
HOJA No 160 DE
ITEM: 8.20
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

160
MATERIALES
#N/A #N/A 1.0500 #N/A #N/A
9031 Boxer Bot. 1.0000 $ 13,750 $ 13,750
7011 Piso Flex cuadros de 0,50*0,50 m² 1.0500 $ 69,670 $ 73,153
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16001 Ayudante de Albañileria hh 1.0000 $ 4,955 $ 4,955
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Pañete en muro con mortero de Planta
HOJA No 161 DE
ITEM: 9.01
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

161
MATERIALES
2026 Mortero Seco para pañete Resist 25Kg m³ 0.0158 $ 264,831 $ 4,171
12020 Sikalatex Kg 0.0600 $ 7,003 $ 420
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.0000 $ 11,975 $ 11,975
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Pase Placa de 6" con tapon de inspeccion
HOJA No 162 DE
ITEM: 9.02
UNIDAD: unid.

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

162
MATERIALES
14024 Tubo PVC Sanitario de 6" ml 0.6000 $ 48,320 $ 28,992
14025 Union PVC Sanitaria de 6" unid. 1.0000 $ 21,150 $ 21,150
14026 Tapon de Inspeccion de 6" unid. 1.0000 $ 36,103 $ 36,103
14003 Soldadura PVC Liquida *1/4 Gl unid. 0.0500 $ 56,090 $ 2,805
14004 Limpiador PVC Liquida *1/4 Gl unid. 0.0250 $ 27,044 $ 676
12005 Sikafloor 162CO Kg 0.2500 $ 45,553 $ 11,388
12006 Sikadur 510 o 520 Kg 0.5000 $ 2,437 $ 1,219
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 6.0000 $ 11,975 $ 71,850
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Pase Placa de 6" sin tapon de inspeccion
HOJA No 163 DE
ITEM: 9.03
UNIDAD: unid.

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A

163
SUB-TOTAL #N/A

163
MATERIALES
14024 Tubo PVC Sanitario de 6" ml 0.8000 $ 48,320 $ 38,656
14003 Soldadura PVC Liquida *1/4 Gl unid. 0.0500 $ 56,090 $ 2,805
14003 Soldadura PVC Liquida *1/4 Gl unid. 0.0250 $ 56,090 $ 1,402
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 5.0000 $ 11,975 $ 59,875
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Pañete en muro tradicional
HOJA No 164 DE
ITEM: 9.04
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8023 Herramienta Menor % 0.0500 #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

164
MATERIALES
2005 Mortero para Pega Dosif 1:3 m³ 0.0158 #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.5000 $ 11,975 $ 5,988
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Pañete impermeabilizado en muro
HOJA No 165 DE
ITEM: 9.05
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8023 Herramienta Menor % 0.0500 $ - $ -
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

165
MATERIALES
2005 Mortero para Pega Dosif 1:3 m³ 0.0158 #N/A #N/A
12025 Sika 1 Kg 0.5000 $ 10,230 $ 5,115
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.5000 $ 11,975 $ 5,988
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 166 DE
ITEM: 9.06
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

166
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 167 DE
ITEM: 9.07
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

167
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 168 DE
ITEM: 9.08
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

168
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 169 DE
ITEM: 9.09
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

169
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 170 DE
ITEM: 9.10
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

170
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 171 DE
ITEM: 9.11
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

171
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 172 DE
ITEM: 9.12
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

172
172
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 173 DE
ITEM: 9.13
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

173
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 174 DE
ITEM: 9.14
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

174
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 175 DE
ITEM: 9.15
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

175
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 176 DE
ITEM: 9.16
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

176
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 177 DE
ITEM: 9.17
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

177
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 178 DE
ITEM: 9.18
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

178
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 179 DE
ITEM: 9.19
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

179
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 180 DE
ITEM: 9.20
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

180
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Punto Sanitario de 3" y 4"
HOJA No 181 DE
ITEM: 10.01
UNIDAD: unid.

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

181
181
MATERIALES
14001 Codo 90° CxC PVC Sanitario de 3" unid. 2.7700 $ 4,808 $ 13,318
14002 Codo 90° CxC PVC Sanitario de 4" unid. 1.3700 $ 8,284 $ 11,349
14003 Soldadura PVC Liquida *1/4 Gl unid. 0.1000 $ 56,090 $ 5,609
14005 Tubo PVC Sanitario de 3" ml 0.9300 $ 12,894 $ 11,991
14006 Tubo PVC Sanitario de 4" ml 0.2700 $ 17,969 $ 4,852
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16004 Cuadrilla de Instalaciones BB hc 1.6000 $ 13,173 $ 21,076
16008 Sub Contrato % 38% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Punto Hidraulico de 1/2
HOJA No 182 DE
ITEM: 10.02
UNIDAD: unid.

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

182
MATERIALES
14007 Codo 90° PVC Presion de 11/2" unid. 0.7400 $ 4,235 $ 3,134
14008 Codo 90° PVC Presion de 1" unid. 0.7700 $ 1,124 $ 866
14009 Codo 90° PVC Presion de 3/4" unid. 1.0700 $ 647 $ 692
14010 Codo 90° PVC Presion de 1/2" unid. 2.3500 $ 358 $ 840
14011 Registro de Bola 3/4" Red White unid. 0.5000 $ 54,868 $ 27,434
14012 Tubo PVC Presion 3/4" RDE 11 ml 0.5800 $ 3,499 $ 2,029
14013 Tubo PVC Presion 1" RDE 13.5 ml 0.4900 $ 3,971 $ 1,946
14014 Tubo PVC Presion 11/2" RDE 21 ml 0.4300 $ 7,227 $ 3,108
14015 Tubo PVC Presion 1/2" RDE 9 ml 2.6200 $ 2,108 $ 5,522
14003 Soldadura PVC Liquida *1/4 Gl unid. 0.0400 $ 56,090 $ 2,244
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16004 Cuadrilla de Instalaciones BB hc 1.6800 $ 13,173 $ 22,130
16008 Sub Contrato % 38% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Red de desague de Aguas Negras de 4"
HOJA No 183 DE
ITEM: 10.03
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

183
MATERIALES
14002 Codo 90° CxC PVC Sanitario de 4" unid. 0.0600 $ 8,284 $ 497
14006 Tubo PVC Sanitario de 4" ml 1.0500 $ 17,969 $ 18,867
9026 Soporte para tuberia de 4" unid. 1.0000 $ 5,500 $ 5,500
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16004 Cuadrilla de Instalaciones BB hc 0.5500 $ 13,173 $ 7,245
16008 Sub Contrato % 38% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Red de Suministro de 1"
HOJA No 184 DE
ITEM: 10.04
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

184
MATERIALES
14008 Codo 90° PVC Presion de 1" unid. 0.5000 $ 1,124 $ 562
14003 Soldadura PVC Liquida *1/4 Gl unid. 0.0100 $ 56,090 $ 561
14013 Tubo PVC Presion 1" RDE 13.5 ml 1.0500 $ 3,971 $ 4,170
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16004 Cuadrilla de Instalaciones BB hc 0.3500 $ 13,173 $ 4,610
16008 Sub Contrato % 38% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV: Red de Suministro de 3/4"
HOJA No 185 DE
ITEM: 10.05
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

185
MATERIALES
14009 Codo 90° PVC Presion de 3/4" unid. 0.5000 $ 647 $ 323
14003 Soldadura PVC Liquida *1/4 Gl unid. 0.0100 $ 56,090 $ 561
14012 Tubo PVC Presion 3/4" RDE 11 ml 1.0500 $ 3,499 $ 3,674
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16004 Cuadrilla de Instalaciones BB hc 0.3500 $ 13,173 $ 4,610
16008 Sub Contrato % 38% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Reventilacion de 2"
HOJA No 186 DE
ITEM: 10.06
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

186
MATERIALES
14016 Codo 90° CxC PVC Sanitario de 2" unid. 0.1400 $ 2,077 $ 291
14017 Tubo PVC A.LL. de 2" ml 1.0500 $ 5,551 $ 5,828
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16004 Cuadrilla de Instalaciones BB hc 0.5000 $ 13,173 $ 6,586
16008 Sub Contrato % 38% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Montaje y desmonte de Aparato sanitario
HOJA No 187 DE
ITEM: 10.07
UNIDAD: unid.

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

187
MATERIALES
2020 Cemento Blanco kg 0.5000 $ 1,308 $ 654
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16004 Cuadrilla de Instalaciones BB hc 1.6000 $ 13,173 $ 21,076
16008 Sub Contrato % 38% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV: Fundido de Muerto en concreto de 0,35*0,35
HOJA No 188 DE
ITEM: 10.08
UNIDAD: unid.

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

188
MATERIALES
2018 Concreto 3000PSI de Planta Gravilla Comun m³ 0.0670 $ 231,003 $ 15,477
15002 Liston Ordinario Cepillado y canteado 0,05*3mts unid. 4.6600 $ 4,423 $ 20,612
15001 Repisa Ordinario * 3mts unid. 0.5000 $ 5,613 $ 2,807
9001 Puntilla de 11/2", 2", 21/2" y 3" Lib. 0.2500 $ 2,530 $ 633
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 2.0000 $ 11,975 $ 23,950
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Red de Suministro de PVC-P 11/2"
HOJA No 189 DE
ITEM: 10.09
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

189
MATERIALES
14007 Codo 90° PVC Presion de 11/2" unid. 0.5000 $ 4,235 $ 2,118
14003 Soldadura PVC Liquida *1/4 Gl unid. 0.0100 $ 56,090 $ 561
14014 Tubo PVC Presion 11/2" RDE 21 ml 1.0500 $ 7,227 $ 7,589
17005 Esmalte Domestico gl 0.0400 $ 49,500 $ 1,980
9028 Soporte para tuberia de 2" unid. 1.0000 $ 5,500 $ 5,500
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16004 Cuadrilla de Instalaciones BB hc 0.3500 $ 13,173 $ 4,610
16008 Sub Contrato % 38% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Red de Suministro de PVC-P 11/4"
HOJA No 190 DE
ITEM: 10.10
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

190
MATERIALES
190
14022 Codo 90° PVC Presion de 11/4" unid. 0.5000 $ 4,041 $ 2,021
14003 Soldadura PVC Liquida *1/4 Gl unid. 0.0100 $ 56,090 $ 561
14023 Tubo PVC Presion 11/4" RDE 21 ml 1.0500 $ 5,537 $ 5,813
17005 Esmalte Domestico gl 0.0400 $ 49,500 $ 1,980
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16004 Cuadrilla de Instalaciones BB hc 0.3500 $ 13,173 $ 4,610
16008 Sub Contrato % 38% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Caja de Inspeccion en concreto 0,40*0,40 h=0,80
HOJA No 191 DE
ITEM: 10.11
UNIDAD: unid.

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

191
MATERIALES
1017 Malla Electrosoldada 0,15*0,15 Q2 * 12mts² 18,90 Kg unid. 0.1716 $ 69,003 $ 11,841
2024 Concreto 3000PSI de Planta Gravilla Fina m³ 0.2163 $ 357,025 $ 77,224
15002 Liston Ordinario Cepillado y canteado 0,05*3mts unid. 8.7000 $ 4,423 $ 38,481
15001 Repisa Ordinario * 3mts unid. 1.3300 $ 5,613 $ 7,466
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 4.0000 $ 11,975 $ 47,900
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV: Suministro e instalacion de Registro de Bola de 1/2"
HOJA No 192 DE
ITEM: 10.12
UNIDAD: unid.

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

192
MATERIALES
14027 Registro de Bola de 1/2" Red White unid. 1.0000 $ 43,129 $ 43,129
14020 Cinta de Teflon Rollo 0.5000 $ 3,190 $ 1,595
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16004 Cuadrilla de Instalaciones BB hc 0.3000 $ 13,173 $ 3,952
16008 Sub Contrato % 38% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Suministro e instalacion de rejilla de 5*4
HOJA No 193 DE
ITEM: 10.13
UNIDAD: unid.

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

193
MATERIALES
9046 Rejilla de 5*4 unid. 1.0000 $ 11,000 $ 11,000
12008 Sikaflex 1A, 11FC y 1CSL * 300c.c Tubo 0.1000 $ 25,520 $ 2,552
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16004 Cuadrilla de Instalaciones BB hc 0.5000 $ 13,173 $ 6,586
16008 Sub Contrato % 38% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Bajante de Aguas Negras de 6"
HOJA No 194 DE
ITEM: 10.14
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

194
MATERIALES
14028 Codo 90° CxC PVC Sanitario de 6" unid. 0.0600 $ 70,730 $ 4,244
14024 Tubo PVC Sanitario de 6" ml 1.0500 $ 48,320 $ 50,736
9047 Soporte para tuberia de 6" unid. 1.0000 $ 8,800 $ 8,800
17005 Esmalte Domestico gl 0.0500 $ 49,500 $ 2,475
14003 Soldadura PVC Liquida *1/4 Gl unid. 0.0500 $ 56,090 $ 2,805
14004 Limpiador PVC Liquida *1/4 Gl unid. 0.0500 $ 27,044 $ 1,352 0.05
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16004 Cuadrilla de Instalaciones BB hc 0.5500 $ 13,173 $ 7,245
16008 Sub Contrato % 38% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Punto sanitario en HG de 3" o 4"
HOJA No 195 DE
ITEM: 10.15
UNIDAD: unid.

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

195
MATERIALES
14029 Codo HG Agua de 3" unid. 2.7700 $ 16,716 $ 46,302
14030 Codo HG Agua de 4" unid. 1.3700 $ 35,218 $ 48,248
14031 Tubo HG Agua de 3" ml 0.9300 $ 46,786 $ 43,511
14032 Tubo HG Agua de 4" ml 0.2700 $ 66,564 $ 17,972
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16004 Cuadrilla de Instalaciones BB hc 3.2000 $ 13,173 $ 42,152
16008 Sub Contrato % 38% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV: Tuberia Sanitaria en HG de 3" o 4"
HOJA No 196 DE
ITEM: 10.16
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

196
MATERIALES
14032 Tubo HG Agua de 4" ml 1.0500 $ 66,564 $ 69,893
14030 Codo HG Agua de 4" unid. 0.0600 $ 35,218 $ 2,113
9026 Soporte para tuberia de 4" unid. 1.0000 $ 5,500 $ 5,500
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16004 Cuadrilla de Instalaciones BB hc 3.2000 $ 13,173 $ 42,152
16008 Sub Contrato % 38% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Red de Suministro de PVC-P 2"
HOJA No 197 DE
ITEM: 10.17
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

197
MATERIALES
14035 Codo 90° PVC Presion de 2" unid. 0.5000 $ 7,420 $ 3,710
14003 Soldadura PVC Liquida *1/4 Gl unid. 0.0400 $ 56,090 $ 2,244
14034 Tubo PVC-P de 2" ml 1.0500 $ 29,634 $ 31,116
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16004 Cuadrilla de Instalaciones BB hc 0.7000 $ 13,173 $ 9,221
16008 Sub Contrato % 38% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Salida Sanitaria de 2"
HOJA No 198 DE
ITEM: 10.18
UNIDAD: unid.

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

198
MATERIALES
14036 Codo 90° CxC PVC Sanitario de 2" unid. 2.7700 $ 2,077 $ 5,754
14037 Tubo PVC Sanitario de 2" ml 0.9300 $ 8,635 $ 8,030
14003 Soldadura PVC Liquida *1/4 Gl unid. 0.1000 $ 56,090 $ 5,609
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16004 Cuadrilla de Instalaciones BB hc 1.6000 $ 13,173 $ 21,076
16008 Sub Contrato % 38% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Red de desague de 2"
HOJA No 199 DE
ITEM: 10.19
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

199
MATERIALES
14016 Codo 90° CxC PVC Sanitario de 2" unid. 0.0600 $ 2,077 $ 125
14037
9026
Tubo PVC Sanitario de 2"
Soporte para tuberia de 4"
#N/A
#N/A
#N/A
#N/A
ml
unid.
#N/A
#N/A
#N/A
#N/A
1.0500 $
1.0000 $
8,635
5,500
#N/A
#N/A
#N/A
#N/A
$
$
9,066
5,500
#N/A
#N/A
#N/A
#N/A
199
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16004 Cuadrilla de Instalaciones BB hc 0.5500 $ 13,173 $ 7,245
16008 Sub Contrato % 38% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Salida hidraulica en HG
HOJA No 200 DE
ITEM: 10.20
UNIDAD: unid.

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

200
MATERIALES
14038 Codo HG de 1" unid. 1.5100 $ 1,837 $ 2,774
14039 Codo HG de 3/4" unid. 1.0700 $ 1,187 $ 1,270
14040 Codo HG de 1/2" unid. 2.4600 $ 752 $ 1,851
14041 Tubo HG de 11/2" ml 0.4300 $ 20,469 $ 8,802
14042 Tubo HG de 1" ml 0.4900 $ 12,866 $ 6,305
14043 Tubo HG de 3/4" ml 0.5800 $ 8,241 $ 4,780
14044 Tubo HG de 1/2" ml 2.6200 $ 6,327 $ 16,576
14011 Registro de Bola 3/4" Red White unid. 0.5000 $ 54,868 $ 27,434
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16004 Cuadrilla de Instalaciones BB hc 1.8500 $ 13,173 $ 24,369
16008 Sub Contrato % 38% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Salida Lampara muro
HOJA No 201 DE
ITEM: 11.01
UNIDAD: Punto

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8023 Herramienta Menor % 0.0500 $ 18,178 $ 909
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

201
MATERIALES
13001 Adaptador terminal conduit 1/2" unid. 2.0000 $ 255 $ 510
13002 Alambre Cobre THW 12 AWG ml 9.0000 $ 1,340 $ 12,058
13003 Alambre Cobre THW 14 AWG ml 4.5000 $ 938 $ 4,222
13004 Caja octogonal Conduit unid. 1.0000 $ 1,209 $ 1,209
14004 Limpiador PVC Liquida *1/4 Gl unid. 0.0100 $ 27,044 $ 270
14003 Soldadura PVC Liquida *1/4 Gl unid. 0.0100 $ 56,090 $ 561
13007 Tubo Conduit PVC 1/2" ml 4.5000 $ 1,383 $ 6,222
13010 Conector de resorte Rojo unid. 2.8000 $ 17,765 $ 49,742
9034 Tornillo autoperforante unid. 1.0000 $ 331 $ 331
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16004 Cuadrilla de Instalaciones BB hc 1.0000 $ 13,173 $ 13,173
16008 Sub Contrato % 38% $ 13,173 $ 5,006
SUB-TOTAL $ 18,178

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Acometida electrica de 1" No 10+12
HOJA No 202 DE
ITEM: 11.02
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8023 Herramienta Menor % 0.0500 $ 54,534 $ 2,727
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

202
MATERIALES
13008 Alambre Cobre THW 10 AWG ml 3.0000 $ 2,181 $ 6,544
13002 Alambre Cobre THW 12 AWG ml 1.0000 $ 1,340 $ 1,340
13009 Tubo Conduit PVC 1" ml 1.0000 $ 2,510 $ 2,510
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16004 Cuadrilla de Instalaciones BB hc 3.0000 $ 13,173 $ 39,518
16008 Sub Contrato % 0.3800 $ 39,518 $ 15,017
SUB-TOTAL $ 54,534

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Lampara Fluorescente 2*32
HOJA No 203 DE
ITEM: 11.03
UNIDAD: unid

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8023 Herramienta Menor % 0.0500 $ 18,178 $ 909
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

203
MATERIALES
13011 Lampara fluoresente 2*32 unid. 1.0000 $ 132,000 $ 132,000
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16004 Cuadrilla de Instalaciones BB hc 1.0000 $ 13,173 $ 13,173
16008 Sub Contrato % 0.3800 $ 13,173 $ 5,006
SUB-TOTAL $ 18,178

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 204 DE
ITEM: 11.04
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

204
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 205 DE
ITEM: 11.05
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

205
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 206 DE
ITEM: 11.06
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

206
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 207 DE
ITEM: 11.07
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

207
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 208 DE
ITEM: 11.08
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

208
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
208
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 209 DE
ITEM: 11.09
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

209
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 210 DE
ITEM: 11.10
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

210
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 211 DE
ITEM: 11.11
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

211
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 212 DE
ITEM: 11.12
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

212
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 213 DE
ITEM: 11.13
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

213
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 214 DE
ITEM: 11.14
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

214
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 215 DE
ITEM: 11.15
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

215
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 216 DE
ITEM: 11.16
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

216
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 217 DE
ITEM: 11.17
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

217
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
217
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 218 DE
ITEM: 11.18
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

218
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 219 DE
ITEM: 11.19
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

219
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 220 DE
ITEM: 11.20
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

220
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Ceramica para pared
HOJA No 221 DE
ITEM: 12.01
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

221
MATERIALES
7014 Ceramica valencia Blanca 0,20*0,30 m² 1.0300 $ 19,800 $ 20,394
9023 Pegacor Blanco kg 6.3000 $ 1,319 $ 8,312
9014 Alfacolor kg 0.3500 $ 4,092 $ 1,432
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.8500 $ 11,975 $ 10,179
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Ceramica para pared
HOJA No 222 DE
ITEM: 12.02
UNIDAD: Pieza

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

222
MATERIALES
10001 1.0000 $ -
9003 Pegacor Gris kg 1.0000 $ 1,100 $ 1,100
10002 1.0000 $ -
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16004 Cuadrilla de Instalaciones BB hc 3.2000 $ 13,173 $ 42,152
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV: Tableta Sahara 0,09 x 0,18
HOJA No 223 DE
ITEM: 12.03
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8019 Cortadora de Enchape dia 0.0333 $ 16,500 $ 550
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

223
MATERIALES
7012 Tableta Alfa Sahara 0,09 x 0,18 m² 1.0000 $ 12,870 $ 12,870
9023 Pegacor Blanco kg 4.50 $ 1,319 $ 5,937
7008 Junta Epoxica Alfa 200 kg 4.0000 $ 10,403 $ 41,611
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.8000 $ 11,975 $ 21,555
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Win en aluminio esquinero
HOJA No 224 DE
ITEM: 12.04
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

224
MATERIALES
9043 Win en Aluminio esquinero ml 1.0000 $ 6,050 $ 6,050
9023 Pegacor Blanco kg 0.2000 $ 1,319 $ 264
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.1500 $ 11,975 $ 1,796
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Media caña sahara 0,30ml
HOJA No 225 DE
ITEM: 12.05
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

225
MATERIALES
7015 Media caña Sahara 0,300,245 unid. 4.1200 $ 4,038 $ 16,637
9023 Pegacor Blanco kg 1.0000 $ 1,319 $ 1,319
7013 Junta Epoxica Alfa 100 kg 1.0000 $ 10,776 $ 10,776
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.5000 $ 11,975 $ 5,988
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 226 DE
ITEM: 12.06
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

226
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
226
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 227 DE
ITEM: 12.07
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

227
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 228 DE
ITEM: 12.08
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

228
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 229 DE
ITEM: 12.09
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

229
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 230 DE
ITEM: 12.10
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

230
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 231 DE
ITEM: 12.11
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

231
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 232 DE
ITEM: 12.12
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

232
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 233 DE
ITEM: 12.13
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

233
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 234 DE
ITEM: 12.14
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

234
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 235 DE
ITEM: 12.15
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

235
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
235
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 236 DE
ITEM: 12.16
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

236
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 237 DE
ITEM: 12.17
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

237
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 238 DE
ITEM: 12.18
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

238
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 239 DE
ITEM: 12.19
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

239
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 240 DE
ITEM: 12.20
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

240
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 241 DE
ITEM: 13.01
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

241
MATERIALES
4001 1.0000 $ -
18002 1.2500 $ -
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 242 DE
ITEM: 13.02
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

242
MATERIALES
4002 1.0000 $ -
18001 2.5200 $ -
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 243 DE
ITEM: 13.03
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

243
MATERIALES
4003 1.0000 $ -
18001 3.6000 $ -
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 244 DE
ITEM: 13.04
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

244
MATERIALES
4004 1.0000 $ -
18002 0.5000 $ -
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
244
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 245 DE
ITEM: 13.05
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

245
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 246 DE
ITEM: 13.06
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

246
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 247 DE
ITEM: 13.07
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

247
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 248 DE
ITEM: 13.08
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

248
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 249 DE
ITEM: 13.09
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

249
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 250 DE
ITEM: 13.10
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

250
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 251 DE
ITEM: 13.11
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

251
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 252 DE
ITEM: 13.12
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

252
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 253 DE
ITEM: 13.13
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

253
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
253
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 254 DE
ITEM: 13.14
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

254
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 255 DE
ITEM: 13.15
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

255
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 256 DE
ITEM: 13.16
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

256
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 257 DE
ITEM: 13.17
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

257
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 258 DE
ITEM: 13.18
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

258
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 259 DE
ITEM: 13.19
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

259
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 260 DE
ITEM: 13.20
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

260
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 261 DE
ITEM: 14.01
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

261
MATERIALES
4005 1.0000 $ -
17002 Barniz Transparente Algreco gl 0.1500 $ - $ -
4006 $ -
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.0000 $ 11,975 $ 11,975
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 262 DE
ITEM: 14.02
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

262
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
262
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 263 DE
ITEM: 14.03
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

263
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 264 DE
ITEM: 14.04
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

264
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 265 DE
ITEM: 14.05
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

265
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 266 DE
ITEM: 14.06
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

266
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 267 DE
ITEM: 14.07
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

267
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 268 DE
ITEM: 14.08
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

268
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 269 DE
ITEM: 14.09
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

269
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 270 DE
ITEM: 14.10
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

270
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 271 DE
ITEM: 14.11
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

271
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
271
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 272 DE
ITEM: 14.12
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

272
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 273 DE
ITEM: 14.13
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

273
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 274 DE
ITEM: 14.14
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

274
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 275 DE
ITEM: 14.15
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

275
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 276 DE
ITEM: 14.16
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

276
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 277 DE
ITEM: 14.17
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

277
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 278 DE
ITEM: 14.18
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

278
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 279 DE
ITEM: 14.19
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

279
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 280 DE
ITEM: 14.20
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

280
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
280
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Pintura en vinilo I sobre Estuco
HOJA No 281 DE
ITEM: 15.01
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

281
MATERIALES
17001 Vinilo Tipo I Viniltex gl 0.0840 $ 50,820 $ 4,269
9007 Rodillo Master 9" unid. 0.0100 $ 8,683 $ 87
9008 Lija No 80, 100, 120, 150 y 200 Pliego 0.0500 $ 1,276 $ 64
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16005 Cuadrilla de Pintura CC hc 0.1300 $ 13,771 $ 1,790
16008 Sub Contrato % 45% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Pintura Barniz para muebles o cielo raso
HOJA No 282 DE
ITEM: 15.02
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

282
MATERIALES
17002 Barniz Transparente Algreco gl 0.2800 $ - $ -
9008 Lija No 80, 100, 120, 150 y 200 Pliego 0.2500 $ 1,276 $ 319
9009 Tapa Poros para Madera gl 0.1100 $ 30,675 $ 3,374
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16005 Cuadrilla de Pintura CC hc 1.2300 $ 13,771 $ 16,939
16008 Sub Contrato % 45% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Graniplast
HOJA No 283 DE
ITEM: 15.03
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

283
MATERIALES
17004 Graniplast m² 1.0000 $ - $ -
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Pintura en esmalte
HOJA No 284 DE
ITEM: 15.04
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

284
MATERIALES
17005 Esmalte Domestico gl 0.1050 $ 49,500 $ 5,198
9007 Rodillo Master 9" unid. 0.0100 $ 8,683 $ 87
9008 Lija No 80, 100, 120, 150 y 200 Pliego 0.0500 $ 1,276 $ 64
9018 Thinner gl 0.0300 $ 14,036 $ 421
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16005 Cuadrilla de Pintura CC hc 0.1300 $ 13,771 $ 1,790
16008 Sub Contrato % 45% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Estuco acrilico
HOJA No 285 DE
ITEM: 15.05
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

285
MATERIALES
12018 Estuka Acrilico Kg 2.0000 $ 3,796 $ 7,592
9008 Lija No 80, 100, 120, 150 y 200 Pliego 0.0200 $ 1,276 $ 26
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16005 Cuadrilla de Pintura CC hc 0.1600 $ 13,771 $ 2,203 #N/A
16008 Sub Contrato % 45% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Pintura en Epoxifenolico
HOJA No 286 DE
ITEM: 15.06
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

286
MATERIALES
12013 Epoxifenolico Blanco gl 0.1250 $ 116,435 $ 14,554
9007 Rodillo Master 9" unid. 0.0100 $ 8,683 $ 87
9008 Lija No 80, 100, 120, 150 y 200 Pliego 0.0500 $ 1,276 $ 64
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16005 Cuadrilla de Pintura CC hc 0.1500 $ 13,771 $ 2,066
16008 Sub Contrato % 45% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV: Pintura de Señalizacion con sikafloor 2430CO e=0,08
HOJA No 287 DE
ITEM: 15.07
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

287
MATERIALES
9025 Cinta de Enmascarar de 11/2" Rollo 0.0525 $ 3,277 $ 172
12015 SikaFloor 2430CO Kg 0.0487 $ 24,116 $ 1,174
9007 Rodillo Master 9" unid. 0.0050 $ 8,683 $ 43
9008 Lija No 80, 100, 120, 150 y 200 Pliego 0.1000 $ 1,276 $ 128
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16005 Cuadrilla de Pintura CC hc 0.1300 $ 13,771 $ 1,790
16008 Sub Contrato % 45% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Esquinero en Aluminio de 1"*1/8"
HOJA No 288 DE
ITEM: 15.08
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

288
MATERIALES
9033 Angulo en Aluminio de 1"*1/8" ml 1.0500 $ 6,545 $ 6,872
12008 Sikaflex 1A, 11FC y 1CSL * 300c.c Tubo 0.3225 $ 25,520 $ 8,230
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.3300 $ 11,975 $ 3,952
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Pintura en cemento sobre concreto
HOJA No 289 DE
ITEM: 15.09
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

289
MATERIALES
2002 Cemento Porhand Gris kg 1.0000 $ 574 $ 574
9036 PVA gl 0.0400 $ 29,700 $ 1,188
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
289
SUB-TOTAL #N/A

MANO DE OBRA
16005 Cuadrilla de Pintura CC hc 0.1500 $ 13,771 $ 2,066
16008 Sub Contrato % 45% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Pintura epoxica con sikafloor 2430 CO
HOJA No 290 DE
ITEM: 15.10
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

290
MATERIALES
12015 SikaFloor 2430CO Kg 0.3347 $ 24,116 $ 8,072
9007 Rodillo Master 9" unid. 0.0100 $ 8,683 $ 87
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16005 Cuadrilla de Pintura CC hc 0.5000 $ 13,771 $ 6,886
16008 Sub Contrato % 38% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Esquinero Plastico
HOJA No 291 DE
ITEM: 15.11
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

291
MATERIALES
9042 Esquinero Plastico L=2,30 ml 1.0500 $ 479 $ 502
12008 Sikaflex 1A, 11FC y 1CSL * 300c.c Tubo 0.0400 $ 25,520 $ 1,021
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.2500 $ 11,975 $ 2,994
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Pintura epoxica con sikafloor 2430 CO en media caña
HOJA No 292 DE
ITEM: 15.12
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

292
MATERIALES
9025 Cinta de Enmascarar de 11/2" Rollo 0.0500 $ 3,277 $ 164
12005 Sikafloor 162CO Kg 0.0670 $ 45,553 $ 3,052
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16005 Cuadrilla de Pintura CC hc 0.2500 $ 13,771 $ 3,443
16008 Sub Contrato % 38% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Pintura en esmalte en puerta
HOJA No 293 DE
ITEM: 15.13
UNIDAD: unid.

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

293
MATERIALES
17005 Esmalte Domestico gl 0.5170 $ 49,500 $ 25,592
9008 Lija No 80, 100, 120, 150 y 200 Pliego 1.0000 $ 1,276 $ 1,276
9018 Thinner gl 0.2500 $ 14,036 $ 3,509
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16005 Cuadrilla de Pintura CC hc 4.0000 $ 13,771 $ 55,085
16008 Sub Contrato % 38% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Pintura Koraza
HOJA No 294 DE
ITEM: 15.14
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8012 Andamio Seccion Sem. 0.5000 $ 4,466 $ 2,233
8023 Herramienta Menor % 0.0500 #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

294
MATERIALES
17008 Koraza gl 0.1320 $ 60,984 $ 8,050
9007 Rodillo Master 9" unid. 0.0100 $ 8,683 $ 87
9008 Lija No 80, 100, 120, 150 y 200 Pliego 0.0500 $ 1,276 $ 64
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16005 Cuadrilla de Pintura CC hc 0.1300 $ 13,771 $ 1,790
16008 Sub Contrato % 45% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Pintura en laca en puerta de 0,80*2,00
HOJA No 295 DE
ITEM: 15.15
UNIDAD: unid.

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8011 Compresor para pintura dia 0.1000 $ 25,520 $ 2,552
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

295
MATERIALES
17003 Laca gl 0.2000 $ 39,699 $ 7,940
9008 Lija No 80, 100, 120, 150 y 200 Pliego 0.5000 $ 1,276 $ 638
9018 Thinner gl 0.2500 $ 14,036 $ 3,509
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16005 Cuadrilla de Pintura CC hc 4.0000 $ 13,771 $ 55,085
16008 Sub Contrato % 38% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Pintura anticorrosiva en superficie
HOJA No 296 DE
ITEM: 15.16
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8011 Compresor para pintura dia 0.0200 $ 25,520 $ 510
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

296
MATERIALES
17009 Anticorrosivo Gris gl 0.1100 $ 35,001 $ 3,850
9018 Thinner gl 0.0300 $ 14,036 $ 421
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16005 Cuadrilla de Pintura CC hc 0.1300 $ 13,771 $ 1,790
16008 Sub Contrato % 45% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Estuco veneciano
HOJA No 297 DE
ITEM: 15.17
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

297
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16005 Cuadrilla de Pintura CC hc 1.3000 $ 13,771 $ 17,903
16008 Sub Contrato % 45% $ 17,903 $ 8,056
SUB-TOTAL $ 25,959

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Pintura en vinilo III en techo
HOJA No 298 DE
ITEM: 15.18
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8012 Andamio Seccion Sem. 0.0200 $ 4,466 $ 89
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

298
MATERIALES
17010 Vinilo Tipo III Tito Pabon gl 0.0840 $ 13,772 $ 1,157
9007 Rodillo Master 9" unid. 0.0100 $ 8,683 $ 87
9008 Lija No 80, 100, 120, 150 y 200 Pliego 0.0500 $ 1,276 $ 64
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A
298
MANO DE OBRA
16005 Cuadrilla de Pintura CC hc 0.1300 $ 13,771 $ 1,790
16008 Sub Contrato % 45% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV: Pintura de Señalizacion con Esmalte e=0,10
HOJA No 299 DE
ITEM: 15.19
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

299
MATERIALES
17007 Pintura amarilla de señalizacion gl 0.0055 $ 93,500 $ 514
9025 Cinta de Enmascarar de 11/2" Rollo 0.0525 $ 3,277 $ 172
9007 Rodillo Master 9" unid. 0.0050 $ 8,683 $ 43
9008 Lija No 80, 100, 120, 150 y 200 Pliego 0.1000 $ 1,276 $ 128
9018 Thinner gl 0.0100 $ 14,036 $ 140
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16005 Cuadrilla de Pintura CC hc 0.1300 $ 13,771 $ 1,790
16008 Sub Contrato % 45% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Pintura con Vinilo Tipo IV
HOJA No 300 DE
ITEM: 15.20
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

300
MATERIALES
17011 Vinilo Tipo IV gl 0.0840 $ 5,500 $ 462
9007 Rodillo Master 9" unid. 0.0100 $ 8,683 $ 87
9008 Lija No 80, 100, 120, 150 y 200 Pliego 0.0500 $ 1,276 $ 64
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16005 Cuadrilla de Pintura CC hc 0.1300 $ 13,771 $ 1,790
16008 Sub Contrato % 45% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Limpieza con Desengrasante Alfa
HOJA No 301 DE
ITEM: 16.01
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

301
MATERIALES
9010 Desengrasante Alfa Lt 0.0500 $ 26,400 $ 1,320
2001 Agua Lt 0.5000 $ 11 $ 6
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.2500 $ 11,975 $ 2,994
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Limpieza con Thinner
HOJA No 302 DE
ITEM: 16.02
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

302
MATERIALES
9018 Thinner gl 0.1000 $ 14,036 $ 1,404
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.2500 $ 11,975 $ 2,994
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV: Limpieza con acido Muriatico
HOJA No 303 DE
ITEM: 16.03
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

303
MATERIALES
9027 Acido Muriatico gl 0.1000 $ 8,677 $ 868
2001 Agua Lt 1.0000 $ 11 $ 11
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.2500 $ 11,975 $ 2,994
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Limpieza de Viga Canal
HOJA No 304 DE
ITEM: 16.04
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

304
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.2500 $ 11,975 $ 2,994
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Limpieza de Superficie con removedor
HOJA No 305 DE
ITEM: 16.05
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

305
MATERIALES
17006 Removedor gl 0.1000 $ 52,800 $ 5,280
9018 Thinner gl 0.1000 $ 14,036 $ 1,404
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.5000 $ 11,975 $ 5,988
16008 Sub Contrato % 45% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV: Limpieza de Superficie con Timsen
HOJA No 306 DE
ITEM: 16.06
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

306
MATERIALES
12017 Timsen Bolsa 1.0000 $ 7,700 $ 7,700
2001 Agua Lt 10.0000 $ 11 $ 110
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.2500 $ 11,975 $ 2,994
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Limpieza de Planta
HOJA No 307 DE
ITEM: 16.07
UNIDAD: Piso

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8012 Andamio Seccion Sem. 3.0000 $ 4,466 $ 13,398
8017 Rueda para andamio Mes 1.0000 $ 13,398 $ 13,398
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

307
MATERIALES
9041 Arnes con Slinga (Alquiler) dia 8.0000 $ 16,500 $ 132,000
9039 Papel Industrial Rollo 8.0000 $ 14,798 $ 118,386
9040 Impermeables unid. 12.0000 $ 35,728 $ 428,736
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A
307
MANO DE OBRA
16002 Oficial de Albañileria hh 96.0000 $ 7,020 $ 673,929
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Desmonte y Limpieza de cielo Raso
HOJA No 308 DE
ITEM: 16.08
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

308
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.7500 $ 11,975 $ 8,981
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Borrado de Cintas
HOJA No 309 DE
ITEM: 16.09
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

309
MATERIALES
17006 Removedor gl 0.0200 $ 52,800 $ 1,056
9018 Thinner gl 0.0200 $ 14,036 $ 281
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16005 Cuadrilla de Pintura CC hc 0.1000 $ 13,771 $ 1,377
16008 Sub Contrato % 45% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 310 DE
ITEM: 16.10
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

310
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 311 DE
ITEM: 16.11
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

311
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 312 DE
ITEM: 16.12
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

312
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 313 DE
ITEM: 16.13
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

313
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 314 DE
ITEM: 16.14
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

314
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 315 DE
ITEM: 16.15
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

315
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 316 DE
ITEM: 16.16
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

316
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
316
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 317 DE
ITEM: 16.17
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

317
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 318 DE
ITEM: 16.18
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

318
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 319 DE
ITEM: 16.19
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

319
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 320 DE
ITEM: 16.20
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

320
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Piso en Vinilo
HOJA No 321 DE
ITEM: 17.01
UNIDAD: Pieza

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

321
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV: Poyo en concreto de 0,05*0,05
HOJA No 322 DE
ITEM: 17.02
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

322
MATERIALES
2018 Concreto 3000PSI de Planta Gravilla Comun m³ 0.0028 $ 231,003 $ 635
15002 Liston Ordinario Cepillado y canteado 0,05*3mts unid. 1.0000 $ 4,423 $ 4,423
9001 Puntilla de 11/2", 2", 21/2" y 3" Lib. 0.1000 $ 2,530 $ 253
1011 Acero Figurado de 3/8"*60000PSI*6mts kg 0.2800 #N/A #N/A
1010 Acero Figurado de 1/4"*60000PSI*6mts kg 0.2500 #N/A #N/A
12007 Sikadur 42 Anclaje Kg 0.1000 $ 22,202 $ 2,220
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.5300 $ 11,975 $ 18,322
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Media caña en mortero
HOJA No 323 DE
ITEM: 17.03
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

323
MATERIALES
2025 Mortero Seco para pega Resist 125Kg m³ 0.0055 $ 319,749 $ 1,759
15002 Liston Ordinario Cepillado y canteado 0,05*3mts unid. 0.3300 $ 4,423 $ 1,460
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.0000 $ 11,975 $ 11,975
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Tableta P5 0,33*0,33 o 0,30*0,30 Beige
HOJA No 324 DE
ITEM: 17.04
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

324
MATERIALES
7010 Tableta Alfa P5 0,33*0,33 o 0,30*0,30 Beige m² 1.0500 $ 43,129 $ 45,285
2005 Mortero para Pega Dosif 1:3 m³ 0.0330 #N/A #N/A
2020 Cemento Blanco kg 2.0000 $ 1,308 $ 2,616
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.5000 $ 11,975 $ 17,963
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Tableta P5 0,33*0,33 o 0,30*0,30 Beige
HOJA No 325 DE
ITEM: 17.05
UNIDAD: Pieza

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

325
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
325

#N/A #N/A #N/A #N/A


SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV: Guardaescoba Alfa negro
HOJA No 326 DE
ITEM: 17.06
UNIDAD: Pieza

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

326
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Poyo en ladrillo
HOJA No 327 DE
ITEM: 17.07
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8005 Taladro dia 0.0200 $ 30,250 $ 605
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

327
MATERIALES
3003 Ladrillo portante prensado estructural Santafe unid. 6.6000 $ 1,036 $ 6,839
2025 Mortero Seco para pega Resist 125Kg m³ 0.0034 $ 319,749 $ 1,087
1011 Acero Figurado de 3/8"*60000PSI*6mts kg 0.1680 #N/A #N/A
12007 Sikadur 42 Anclaje Kg 0.0200 $ 22,202 $ 444
9016 Broca Ranurada de 3/8" * 10" unid. 0.0200 $ 25,265 $ 505
2021 Grouting m³ 0.0028 $ 408,230 $ 1,143
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.5000 $ 11,975 $ 17,963
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Mortero de Nivelacion e=0,08 Impermeabilizado
HOJA No 328 DE
ITEM: 17.08
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

328
MATERIALES
2033 Mortero 3000PSI de Planta m³ 0.0840 $ 354,090 $ 29,744
1017 Malla Electrosoldada 0,15*0,15 Q2 * 12mts² 18,90 Kg unid. 0.0875 $ 69,003 $ 6,038
1002 Alambre Negro kg 0.0043 $ 2,999 $ 13
12025 Sika 1 Kg 1.0000 $ 10,230 $ 10,230
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16001 Ayudante de Albañileria hh 1.5000 $ 4,955 $ 7,432
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV: Piso Epoxico Sikafloor 162CO 4mm
HOJA No 329 DE
ITEM: 17.09
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

329
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Tratamiento de Junta Con SikaRood y SikaFlex 1csl
HOJA No 330 DE
ITEM: 17.10
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

330
MATERIALES
9025 Cinta de Enmascarar de 11/2" Rollo 0.0525 $ 3,277 $ 172
12009 Sika Rod de 3/8" ml 1.0100 $ 530 $ 536
12008 Sikaflex 1A, 11FC y 1CSL * 300c.c Tubo 0.3322 $ 25,520 $ 8,477
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.3300 $ 11,975 $ 3,952
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Sardinel Prefabricado 0,8*0,50*0,20
HOJA No 331 DE
ITEM: 17.11
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

331
MATERIALES
3007 Sardinel Prefabricado 0,8*0,50*0,20 unid. 1.2500 $ 37,897 $ 47,372
2005 Mortero para Pega Dosif 1:3 m³ 0.0210 #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.5000 $ 11,975 $ 5,988
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Piso con sikagrout 200 e=0,05
HOJA No 332 DE
ITEM: 17.12
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

332
MATERIALES
12012 Sika Grout 200 y 212 Kg 111.0000 $ 21,695 $ 2,408,178
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.5000 $ 11,975 $ 5,988
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV: Anclaje de "U" en acero de 1/2
HOJA No 333 DE
ITEM: 17.13
UNIDAD: unid.

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8005 Taladro dia 0.0200 $ 30,250 $ 605
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

333
MATERIALES
12007 Sikadur 42 Anclaje Kg 0.0200 $ 22,202 $ 444
9016 Broca Ranurada de 3/8" * 10" unid. 0.0200 $ 25,265 $ 505
1012 Acero Figurado de 1/2"*60000PSI*6mts kg 0.3000 #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.1600 $ 11,975 $ 1,916
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Media caña en PVC
HOJA No 334 DE
ITEM: 17.14
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

334
MATERIALES
9052 Media caña en PVC ml 1.0500 $ 4,506 $ 4,731
12008 Sikaflex 1A, 11FC y 1CSL * 300c.c Tubo 0.1774 $ 25,520 $ 4,527
9034 Tornillo autoperforante unid. 2.0000 $ 331 $ 662
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.5000 $ 11,975 $ 5,988
#N/A #N/A #N/A #N/A
334

SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Piso en porcelanato
HOJA No 335 DE
ITEM: 17.15
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

335
MATERIALES
7016 Porcelanato 0,50*0,50 m² 1.0500 $ 38,390 $ 40,310
9055 Pegacor Max Gris kg 6.0000 $ 2,029 $ 12,172
9056 Boquilla Max kg 0.3500 $ 4,158 $ 1,455
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.7000 $ 11,975 $ 20,358
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Guardaescoba en porcelanato
HOJA No 336 DE
ITEM: 17.16
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

336
MATERIALES
7016 Porcelanato 0,50*0,50 m² 0.1050 $ 38,390 $ 4,031
9055 Pegacor Max Gris kg 0.6000 $ 2,029 $ 1,217
9056 Boquilla Max kg 0.0350 $ 4,158 $ 146
9044 Win Plastico de remate ml 1.0100 $ 6,050 $ 6,111
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.9200 $ 11,975 $ 11,017
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV: Tratamiento de Junta con sikadur Panel 3*8mm
HOJA No 337 DE
ITEM: 17.17
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

337
MATERIALES
12031 Sikadur Panel kg 0.0360 $ 31,262 $ 1,125
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.2500 $ 11,975 $ 2,994
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Instalacion de protectores
HOJA No 338 DE
ITEM: 17.18
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8005 Taladro dia 0.0100 $ 30,250 $ 303
9016 Broca Ranurada de 3/8" * 10" unid. 0.0100 $ 25,265 $ 253
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

338
MATERIALES
9020 Varilla de 3/8 Roscada ml 0.2000 $ 7,700 $ 1,540
9017 Anclaje de 3/8" rosca interna unid. 4.0000 $ 990 $ 3,960
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.2500 $ 11,975 $ 2,994
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Pirlan de diltacion en Bronce
HOJA No 339 DE
ITEM: 17.19
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

339
MATERIALES
9058 Pirlan en Bronce ml 1.0500 $ 10,450 $ 10,973
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.2500 $ 11,975 $ 2,994
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Piso epoxico con sikafloor 261 e=2mm
HOJA No 340 DE
ITEM: 17.20
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8005 Taladro dia 0.0500 $ 30,250 $ 1,513
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

340
MATERIALES
12035 Sikafloor 261CO Kg 1.8000 $ 44,277 $ 79,699
12016 Sikadur 501, 504 o 506 Kg 1.8000 $ 1,148 $ 2,067
9015 Rodillo de Puas 9" unid. 0.0100 $ 66,352 $ 664
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.0000 $ 11,975 $ 11,975
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Red de Suministro HG de 1/2"
HOJA No 341 DE
ITEM: 18.01
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

341
MATERIALES
14040 Codo HG de 1/2" unid. 1.0500 $ 752 $ 790
14044 Tubo HG de 1/2" ml 1.0500 $ 6,327 $ 6,643
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16004 Cuadrilla de Instalaciones BB hc 0.5000 $ 13,173 $ 6,586
16008 Sub Contrato % 38% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Instalacion de sifon en acero inoxidable
HOJA No 342 DE
ITEM: 18.02
UNIDAD: unid.

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

342
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 3.0000 $ 11,975 $ 35,925
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Destape de Sifon
HOJA No 343 DE
ITEM: 18.03
UNIDAD: unid.

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

343
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16004 Cuadrilla de Instalaciones BB hc 2.0000 $ 13,173 $ 26,345
16008 Sub Contrato % 38% $ 26,345 $ 10,011
SUB-TOTAL $ 36,356
343

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Sum e inst de Registro de Bola de 2"
HOJA No 344 DE
ITEM: 18.04
UNIDAD: unid.

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

344
MATERIALES
14046 Registro de Bola de 2" unid. 1.0000 $ 121,858 $ 121,858
14020 Cinta de Teflon Rollo 1.0000 $ 3,190 $ 3,190
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16004 Cuadrilla de Instalaciones BB hc 0.5000 $ 13,173 $ 6,586
16008 Sub Contrato % 38% $ - $ -
SUB-TOTAL $ 6,586

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV: Instalacion de Lavamanos
HOJA No 345 DE
ITEM: 18.05
UNIDAD: unid.

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

345
MATERIALES
9057 Mastic Blanco *1/4 de Gl unid. 0.5000 $ 53,350 $ 26,675
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16004 Cuadrilla de Instalaciones BB hc 0.5000 $ 13,173 $ 6,586
16008 Sub Contrato % 38% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Bajante de A.LL de 4"
HOJA No 346 DE
ITEM: 18.06
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

346
MATERIALES
14002 Codo 90° CxC PVC Sanitario de 4" unid. 0.0500 $ 8,284 $ 414
14047 Tubo PVC A.LL. de 4" ml 1.0500 $ 12,658 $ 13,291
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16004 Cuadrilla de Instalaciones BB hc 0.5000 $ 13,173 $ 6,586
16008 Sub Contrato % 38% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Canal en PVC
HOJA No 347 DE
ITEM: 18.07
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

347
MATERIALES
14048 Canal PVC Amazonas ml 1.0300 $ 7,549 $ 7,775
14049 Soporte para Canal unid. 2.7400 $ 2,220 $ 6,083
14050 Tapa Externa para Canal unid. 0.6800 $ 6,079 $ 4,134
14051 Union canal unid. 0.3400 $ 12,491 $ 4,247
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16004 Cuadrilla de Instalaciones BB hc 0.7400 $ 13,173 $ 9,748
16008 Sub Contrato % 38% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV: Filtro en Grava de 1" 0,40*0,20
HOJA No 348 DE
ITEM: 18.08
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8023 Herramienta Menor % 0.0500 #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

348
MATERIALES
2017 Gravilla de Rio m³ 0.0824 $ 92,235 $ 7,600
14052 Geotextil NT 2000 m² 1.0000 $ 4,092 $ 4,092
14053 Tubo PVC A.LL. *3" ml 1.0100 $ 6,180 $ 6,242
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.5000 $ 11,975 $ 17,963
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 349 DE
ITEM: 18.09
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

349
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 350 DE
ITEM: 18.10
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

350
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 351 DE
ITEM: 18.11
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

351
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 352 DE
ITEM: 18.12
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

352
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A
352

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 353 DE
ITEM: 18.13
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

353
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 354 DE
ITEM: 18.14
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

354
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 355 DE
ITEM: 18.15
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

355
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 356 DE
ITEM: 18.16
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

356
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 357 DE
ITEM: 18.17
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

357
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 358 DE
ITEM: 18.18
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

358
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 359 DE
ITEM: 18.19
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

359
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 360 DE
ITEM: 18.20
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

360
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Pintura de señalizacion antideslizante a=0,10
HOJA No 361 DE
ITEM: 19.01
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8011 Compresor para pintura dia 0.0300 $ 25,520 $ 766
#N/A #N/A 1.0000 #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

361
MATERIALES
9018 Thinner gl 0.0100 $ 14,036 $ 140
17012 Carton corrugado x 12m rollo 0.0030 $ 20,845 $ 63
17007 Pintura amarilla de señalizacion gl 0.0050 $ 93,500 $ 468
12006 Sikadur 510 o 520 Kg 0.2500 $ 2,437 $ 609
9039 Papel Industrial Rollo 0.0010 $ 14,798 $ 15
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16005 Cuadrilla de Pintura CC hc 0.4000 $ 13,771 $ 5,509
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
361

Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Sello de junta con sikaboom
HOJA No 362 DE
ITEM: 19.02
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

362
MATERIALES
12018 Estuka Acrilico Kg 0.5000 $ 3,796 $ 1,898
17001 Vinilo Tipo I Viniltex gl 0.0400 $ 50,820 $ 2,033
12029 Sikaboom * 300ml tubo 0.0760 $ 20,288 $ 1,542
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16005 Cuadrilla de Pintura CC hc 0.2500 $ 13,771 $ 3,443
16008 Sub Contrato % 38% $ 3,443 $ 1,308
SUB-TOTAL $ 4,751

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Pintura con sikafloor 363CO
HOJA No 363 DE
ITEM: 19.03
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

363
MATERIALES
9054 Sikafloor 363CO kg 0.2625 $ 51,040 $ 13,398
9007 Rodillo Master 9" unid. 0.0100 $ 8,683 $ 87
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16005 Cuadrilla de Pintura CC hc 0.5000 $ 13,771 $ 6,886
16008 Sub Contrato % 38% $ 6,886 $ 2,617
SUB-TOTAL $ 9,502

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Aplicacion de Wash primer
HOJA No 364 DE
ITEM: 19.04
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8011 Compresor para pintura dia 0.0050 $ 25,520 $ 128
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

364
MATERIALES
17014 Wash Primer gl 0.0644 $ 126,280 $ 8,129
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16005 Cuadrilla de Pintura CC hc 0.1300 $ 13,771 $ 1,790
16008 Sub Contrato % 38% $ 1,790 $ 680
SUB-TOTAL $ 2,471

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 365 DE
ITEM: 19.05
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8011 Compresor para pintura dia 0.0050 $ 25,520 $ 128
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

365
MATERIALES
17015 Imprimante Epoxico 50NT gl 0.0476 $ 96,976 $ 4,618
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16005 Cuadrilla de Pintura CC hc 0.1300 $ 13,771 $ 1,790
16008 Sub Contrato % 38% $ 1,790 $ 680
SUB-TOTAL $ 2,471

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 366 DE
ITEM: 19.06
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8011 Compresor para pintura dia 0.0050 $ 25,520 $ 128
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

366
MATERIALES
17016 Barrera Epoxica Blanca gl 0.0476 $ 127,600 $ 6,076
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16005 Cuadrilla de Pintura CC hc 0.1300 $ 13,771 $ 1,790
16008 Sub Contrato % 38% $ 1,790 $ 680
SUB-TOTAL $ 2,471

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 367 DE
ITEM: 19.07
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

367
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 368 DE
ITEM: 19.08
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

368
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 369 DE
ITEM: 19.09
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

369
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 370 DE
ITEM: 19.10
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

370
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A
370

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 371 DE
ITEM: 19.11
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

371
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 372 DE
ITEM: 19.12
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

372
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 373 DE
ITEM: 19.13
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

373
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 374 DE
ITEM: 19.14
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

374
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 375 DE
ITEM: 19.15
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

375
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 376 DE
ITEM: 19.16
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

376
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 377 DE
ITEM: 19.17
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

377
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 378 DE
ITEM: 19.18
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

378
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 379 DE
ITEM: 19.19
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

379
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A
379

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 380 DE
ITEM: 19.20
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

380
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Barrera de Vapor
HOJA No 381 DE
ITEM: 20.01
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

381
MATERIALES
9015 Rodillo de Puas 9" unid. 0.0100 $ 66,352 $ 664
12036 Sikafloor 81 Epocem kg 1.1000 $ 2,552 $ 2,807
12037 Sikafloor 81 Epocem Modul kg 1.3000 $ 38,471 $ 50,013
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.0000 $ 11,975 $ 11,975
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Junta Blindada
HOJA No 382 DE
ITEM: 20.02
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

382
MATERIALES
12010 Sikadur 32 Primer Kg 0.0600 $ 56,527 $ 3,392
12038 Anvil Tpo 2001 - Junta Blindada kg 4.4000 $ 2,036 $ 8,959
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.5000 $ 11,975 $ 5,988
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV: Pintura en piso con sikafloor 261CO
HOJA No 383 DE
ITEM: 20.03
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

383
MATERIALES
12035 Sikafloor 261CO Kg 0.4500 $ 44,277 $ 19,925
9007 Rodillo Master 9" unid. 0.0100 $ 8,683 $ 87
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16005 Cuadrilla de Pintura CC hc 0.5000 $ 13,771 $ 6,886
16008 Sub Contrato % 38% #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Piso en latex Cement e=2mm
HOJA No 384 DE
ITEM: 20.04
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

384
MATERIALES
12039 Latex cement kg 4.4000 $ 3,751 $ 16,506
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.5000 $ 11,975 $ 5,988
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
Media Caña prefabricada Alfa (incluye corte, demolicion e inst.)
HOJA No 385 DE
ITEM: 20.05
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8001 Pulidora dia 0.0050 $ 15,312 $ 77
8005 Taladro dia 0.0050 $ 30,250 $ 151
8002 Volqueta * 6mts³ con cargue m³ 0.0123 $ 31,350 $ 386
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

385
MATERIALES
9012 Disco Diamantado de 9" unid. 0.0050 $ 249,700 $ 1,249
7017 Media caña en granito prefabricada ml 2.0200 $ 31,900 $ 64,438
9003 Pegacor Gris kg 1.2600 $ 1,100 $ 1,386
1003 Acero Corrugado de 1/4"*60000PSI*6mts Varilla 0.3333 $ 5,335 $ 1,778
9016 Broca Ranurada de 3/8" * 10" unid. 0.0050 $ 25,265 $ 126
12007 Sikadur 42 Anclaje Kg 0.0020 $ 22,202 $ 44
2011 Concreto 3000PSI mezclado en Obra m³ 0.0021 #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 2.0000 $ 11,975 $ 23,950
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
PoyoACTIV:
en concreto de 0.08*0.10 con media caña en mortero 4cms y pintura epoxica
HOJA No 386 DE
ITEM: 20.06
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8001 Pulidora dia 0.0050 $ 15,312 $ 77
8005 Taladro dia 0.0050 $ 30,250 $ 151
8002 Volqueta * 6mts³ con cargue m³ 0.0101 $ 31,350 $ 316
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

386
MATERIALES
9012 Disco Diamantado de 9" unid. 0.0050 $ 249,700 $ 1,249
1004 Acero Corrugado de 3/8"*60000PSI*6mts Varilla 0.1750 $ 8,575 $ 1,501
9016 Broca Ranurada de 3/8" * 10" unid. 0.0050 $ 25,265 $ 126
12007 Sikadur 42 Anclaje Kg 0.0020 $ 22,202 $ 44
15001 Repisa Ordinario * 3mts unid. 0.6600 $ 5,613 $ 3,705
2011 Concreto 3000PSI mezclado en Obra m³ 0.0084 #N/A #N/A
2005 Mortero para Pega Dosif 1:3 m³ 0.0017 #N/A #N/A
9025 Cinta de Enmascarar de 11/2" Rollo 0.0515 $ 3,277 $ 169
9059 Brocha de 3" pelo de Marta unid. 0.0100 $ 13,369 $ 134
12013 Epoxifenolico Blanco gl 0.0392 $ 116,435 $ 4,564
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 2.0000 $ 11,975 $ 23,950
16005 Cuadrilla de Pintura CC hc 0.2500 $ 13,771 $ 3,443
SUB-TOTAL $ 27,393

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
Poyo en
ACTIV:
concreto de 0.08*0.10 con media caña en mortero 4cms y pintura en esmalte
HOJA No 387 DE
ITEM: 20.07
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8001 Pulidora dia 0.0050 $ 15,312 $ 77
8005 Taladro dia 0.0050 $ 30,250 $ 151
8002 Volqueta * 6mts³ con cargue m³ 0.0101 $ 31,350 $ 316
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

387
MATERIALES
9012 Disco Diamantado de 9" unid. 0.0050 $ 249,700 $ 1,249
1004 Acero Corrugado de 3/8"*60000PSI*6mts Varilla 0.1750 $ 8,575 $ 1,501
9016 Broca Ranurada de 3/8" * 10" unid. 0.0050 $ 25,265 $ 126
12007 Sikadur 42 Anclaje Kg 0.0020 $ 22,202 $ 44
15001 Repisa Ordinario * 3mts unid. 0.6600 $ 5,613 $ 3,705
2011 Concreto 3000PSI mezclado en Obra m³ 0.0084 #N/A #N/A
2005 Mortero para Pega Dosif 1:3 m³ 0.0017 #N/A #N/A
9025 Cinta de Enmascarar de 11/2" Rollo 0.0515 $ 3,277 $ 169
9059 Brocha de 3" pelo de Marta unid. 0.0100 $ 13,369 $ 134
17005 Esmalte Domestico gl 0.0294 $ 49,500 $ 1,455
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 2.0000 $ 11,975 $ 23,950
16005 Cuadrilla de Pintura CC hc 0.2500 $ 13,771 $ 3,443
SUB-TOTAL $ 27,393

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Media caña en PVC (incluye corte, demolicion e inst.)
HOJA No 388 DE
ITEM: 20.08
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8005 Taladro dia 0.0050 $ 30,250 $ 151
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

388
MATERIALES
9052 Media caña en PVC ml 1.0500 $ 4,506 $ 4,731
12008 Sikaflex 1A, 11FC y 1CSL * 300c.c Tubo 0.1774 $ 25,520 $ 4,527
9034 Tornillo autoperforante unid. 2.0000 $ 331 $ 662
9016 Broca Ranurada de 3/8" * 10" unid. 0.0050 $ 25,265 $ 126
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.5000 $ 11,975 $ 5,988
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A
388

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Praderizacion
HOJA No 389 DE
ITEM: 20.09
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

389
MATERIALES
7018 Prado m² 1.0200 $ 9,953 $ 10,152
7019 Tierra abonada m³ 0.0100 $ 220,000 $ 2,200
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.2500 $ 11,975 $ 2,994
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV: Piso en Gravilla lavada
HOJA No 390 DE
ITEM: 20.10
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8023 Herramienta Menor % 0.0500 #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

390
MATERIALES
2001 Agua Lt 3.1800 $ 11 $ 35
2003 Arena de Peña m³ 0.0300 $ 42,570 $ 1,277
2002 Cemento Porhand Gris kg 6.9800 $ 574 $ 4,008
9060 Dilatacion en Bronce ml 0.8000 $ 7,700 $ 6,160
2017 Gravilla de Rio m³ 0.0200 $ 92,235 $ 1,845
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 2.5000 $ 11,975 $ 29,938
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 391 DE
ITEM: 20.11
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

391
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 392 DE
ITEM: 20.12
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

392
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 393 DE
ITEM: 20.13
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

393
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 394 DE
ITEM: 20.14
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

394
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 395 DE
ITEM: 20.15
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

395
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 396 DE
ITEM: 20.16
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

396
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 397 DE
ITEM: 20.17
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

397
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A
397

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 398 DE
ITEM: 20.18
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

398
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 399 DE
ITEM: 20.19
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

399
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV:
HOJA No 400 DE
ITEM: 20.20
UNIDAD:

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

400
MATERIALES
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS


MEMORIA GRAFICA
FECHA:
ACTIV: Viga de remate 0,15*0,15
HOJA No 401 DE
ITEM: 21.01
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8023 Herramienta Menor % 0.0500 #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

401
MATERIALES
2018 Concreto 3000PSI de Planta Gravilla Comun m³ 0.0232 $ 231,003 $ 5,354
15002 Liston Ordinario Cepillado y canteado 0,05*3mts unid. 2.0000 $ 4,423 $ 8,846
15001 Repisa Ordinario * 3mts unid. 0.3300 $ 5,613 $ 1,852
15005 Bocel*3mts unid. 1.3300 $ 2,591 $ 3,445
1012 Acero Figurado de 1/2"*60000PSI*6mts kg 4.0100 #N/A #N/A
1011 Acero Figurado de 3/8"*60000PSI*6mts kg 3.3300 #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.0000 $ 11,975 $ 11,975
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Viga Cinta 0,20*0,05
HOJA No 402 DE
ITEM: 21.02
UNIDAD: ml

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8023 Herramienta Menor % 0.0500 #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

402
MATERIALES
2012 Concreto 2500PSI mezclado en Obra m³ 0.0103 #N/A #N/A
1004 Acero Corrugado de 3/8"*60000PSI*6mts Varilla 0.3333 $ 8,575 $ 2,858
15002 Liston Ordinario Cepillado y canteado 0,05*3mts unid. 0.6600 $ 4,423 $ 2,919
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.7500 $ 11,975 $ 8,981
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Columneta de 0,20*0,10*0,40
HOJA No 403 DE
ITEM: 21.03
UNIDAD: unid.

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8023 Herramienta Menor % 0.0500 #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

403
MATERIALES
2011 Concreto 3000PSI mezclado en Obra m³ 0.0082 #N/A #N/A
1011 Acero Figurado de 3/8"*60000PSI*6mts kg 1.2320 #N/A #N/A
15003 Tabla Burra Ordinaria Cepillada y Canteada 0,30*0,03 unid. 0.3300 $ 3,615 $ 1,193
1002 Alambre Negro kg 0.2500 $ 2,999 $ 750
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 1.5000 $ 11,975 $ 17,963
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Placa Facil Santafe
HOJA No 404 DE
ITEM: 21.04
UNIDAD: m²

MAQUINARIAY EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8023 Herramienta Menor % 0.0500 #N/A #N/A
8014 Mezclador de 1,5 Bultos dia 0.0125 $ 57,420 $ 718
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

404
MATERIALES
3009 Bloquelon Santafe unid. 5.4300 $ 2,904 $ 15,769
1020 Perfil de entrepiso para placa facil*6m unid. 0.1883 $ 123,420 $ 23,240
1017 Malla Electrosoldada 0,15*0,15 Q2 * 12mts² 18,90 Kg unid. 0.0833 $ 69,003 $ 5,748
2011 Concreto 3000PSI mezclado en Obra m³ 0.0709 #N/A #N/A
8016 Paral Telescopico Estándar Sem. 0.2500 $ 7,273 $ 1,818
8025 Cercha Sem. 0.2500 $ 2,680 $ 670
1012 Acero Figurado de 1/2"*60000PSI*6mts kg 1.0000 #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 2.0000 $ 11,975 $ 23,950
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A
ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Excavacion y retiro de material manual
HOJA No 21 DE
ITEM: 2.01
UNIDAD: m³

MAQUINARIA Y EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8002 Volqueta * 6mts³ con cargue m³ 1.4000 $ 36,666 $ 51,332
0 0 $ - $ -
0 0 $ - $ -
0 0 $ - $ -
0 0 $ - $ -
SUB-TOTAL $ 51,332

MATERIALES
0 0 $ - $ -
0 0 $ - $ -
0 0 $ - $ -
0 0 $ - $ -
0 0 $ - $ -
0 0 $ - $ -
0 0 $ - $ -
0 0 $ - $ -
0 0 $ - $ -
0 0 $ - $ -
0 0 $ - $ -
SUB-TOTAL $ -

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.9300 $ 11,975 $ 11,137
0 0 $ - $ -
SUB-TOTAL $ 11,137

OBSERVACIONES:
Vr. TOTAL $ 62,469
ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
8002
ACTIV: Concreto pobre 0,05*0,20
HOJA No 1 DE
ITEM: 3.06
UNIDAD: m

MAQUINARIA Y EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8023 Herramienta Menor % 0.0500 #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MATERIALES
2014 Concreto 1500PSI mezclado en Obra m³ 0.0100 #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.2500 $ 11,975 $ 2,994
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A
ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
8023
ACTIV: Viga de Cimentacion 3000PSI
HOJA No #N/A DE
ITEM: 3.03
UNIDAD: m³

MAQUINARIA Y EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8004 Vibrador a Gasolina dia 0.0400 $ 34,452 $ 1,378
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MATERIALES
2011 Concreto 3000PSI mezclado en Obra m³ 1.1000 #N/A #N/A
9001 Puntilla de 11/2", 2", 21/2" y 3" Lib. 0.6000 $ 2,530 $ 1,518
15003 Tabla Burra Ordinaria Cepillada y Canteada 0,30*0, unid. 0.7833 $ 3,615 $ 2,831
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 6.8900 $ 11,975 $ 82,508
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A
ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
0
ACTIV: Zapata 1.00*1.00
HOJA No ### DE
ITEM: 3.02
UNIDAD: m³

MAQUINARIA Y EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8004 Vibrador a Gasolina dia 0.1000 $ 34,452 $ 3,445
8023 Herramienta Menor % 0.0500 $ 275,426 $ 13,771
8026 Pluma con polea dia 1.0000 $ 40,000 $ 40,000
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MATERIALES

#N/A #N/A #N/A #N/A


#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 23.0000 $ 11,975 $ 275,426
2037 Excavacion y retiro de material manual m³ $ 55,000 $ -
SUB-TOTAL $ 275,426

OBSERVACIONES:
Vr. TOTAL #N/A
ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
0
ACTIV: Placa de subpresion e=0,20
HOJA No #N/A DE
ITEM: 4.10
UNIDAD: m²

MAQUINARIA Y EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8004 Vibrador a Gasolina dia 0.0167 $ 34,452 $ 574
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MATERIALES
2018 Concreto 3000PSI de Planta Gravilla Comun m³ 0.2500 $ 231,003 $ 57,751
1017 Malla Electrosoldada 0,15*0,15 Q2 * 12mts² 18,90 unid. 0.0833 $ 69,003 $ 5,748
1002 Alambre Negro kg 0.0787 $ 2,999 $ 236
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 2.9000 $ 11,975 $ 34,728
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A
ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
2018
ACTIV: Placa de Contrapiso e=0,15
HOJA No 61 DE
ITEM: 4.01
UNIDAD: m²

MAQUINARIA Y EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
8004 Vibrador a Gasolina dia 0.0125 $ 34,452 $ 431
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MATERIALES
2018 Concreto 3000PSI de Planta Gravilla Comun m³ 0.1575 $ 231,003 $ 36,383
1017 Malla Electrosoldada 0,15*0,15 Q2 * 12mts² 18,90 unid. 0.0833 $ 69,003 $ 5,748
1002 Alambre Negro kg 0.0787 $ 2,999 $ 236
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 2.5000 $ 11,975 $ 29,938
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A

El Acero estimado por m³ de concreto es de 130kg


LISTA DE MATERIALES

CODIGO DESCRIPCION UNID. Vr. / UNIT.


0 $ -
1001 Acero de 60000PSI kg
1002 Alambre Negro kg $ 2,999
1003 Acero Corrugado de 1/4"*60000PSI*6mts Varilla $ 5,335
1004 Acero Corrugado de 3/8"*60000PSI*6mts Varilla $ 8,575
1005 Acero Corrugado de 1/2"*60000PSI*6mts Varilla $ 15,312
1006 Acero Corrugado de 5/8"*60000PSI*6mts Varilla $ 23,887
1007 Acero Corrugado de 3/4"*60000PSI*6mts Varilla $ 34,452
1008 Acero Corrugado de 7/8"*60000PSI*6mts Varilla $ 46,702
1009 Acero Corrugado de 1"*60000PSI*6mts Varilla $ 61,248
1010 Acero Figurado de 1/4"*60000PSI*6mts kg #N/A
1011 Acero Figurado de 3/8"*60000PSI*6mts kg #N/A
1012 Acero Figurado de 1/2"*60000PSI*6mts kg #N/A
1013 Acero Figurado de 5/8"*60000PSI*6mts kg #N/A
1014 Acero Figurado de 3/4"*60000PSI*6mts kg #N/A
1015 Acero Figurado de 7/8"*60000PSI*6mts kg #N/A
1016 Acero Figurado de 1"*60000PSI*6mts kg #N/A
1017 Malla Electrosoldada 0,15*0,15 Q2 * 12mts² 18,90 Kgs unid. $ 69,003
1018 Malla Ram ml $ 811
1019 Malla de Vena 0,60*2,00 unid. $ 4,976
1020 Perfil de entrepiso para placa facil*6m unid. $ 123,420
1021
1022
1023
1024
1025
1026
1027
1028
1029
1030
1031
1032
1033
1034
1035
1036
1037
1038
1039
1040
1041
1042
1043
1044
1045
1046
1047
1048
1049
1050
1051
1052
1053
1054
1055
1056
1057
1058
1059
1060
1061
1062
1063
1064
1065
1066
1067
1068
1069
1070
1071
1072
1073
1074
1075
1076
1077
1078
1079
1080
1081
1082
1083
1084
1085
1086
1087
1088
1089
1090
1091
1092
1093
1094
1095
1096
1097
1098
1099

2001 Agua Lt $ 11
2002 Cemento Porhand Gris kg $ 574
2003 Arena de Peña m³ $ 42,570
2004 Mortero para Pega Dosif 1:2 m³ #N/A
2005 Mortero para Pega Dosif 1:3 m³ #N/A
2006 Mortero para Pega Dosif 1:4 m³ #N/A
2007 Mortero para Pega Dosif 1:5 m³ #N/A
2008 Mortero para Pega Dosif 1:6 m³ #N/A
2009 Mortero para Pega Dosif 1:8 m³ #N/A
2010 Mortero para Pega Dosif 1:10 m³ #N/A
2011 Concreto 3000PSI mezclado en Obra m³ #N/A
2012 Concreto 2500PSI mezclado en Obra m³ #N/A
2013 Concreto 2000PSI mezclado en Obra m³ #N/A
2014 Concreto 1500PSI mezclado en Obra m³ #N/A
2015 Concreto 1000PSI mezclado en Obra m³ #N/A
2016 Arena de Rio m³ $ 92,235
2017 Gravilla de Rio m³ $ 92,235
2018 Concreto 3000PSI de Planta Gravilla Comun m³ $ 231,003
2020 Cemento Blanco kg $ 1,308
2021 Grouting m³ $ 408,230
2022 Concreto 3000PSI de Planta Acelerado a 7 dias m³ $ 383,310
2023 Recebo B200 m³ $ 41,388
2024 Concreto 3000PSI de Planta Gravilla Fina m³ $ 357,025
2025 Mortero Seco para pega Resist 125Kg m³ $ 319,749
2026 Mortero Seco para pañete Resist 25Kg m³ $ 264,831
2027 Mixto m³ $ 92,235
2028 Arena de Pozo m³ $ 67,403
2029 Recebo Comun m³ $ 41,388
2030 Recebo B400 m³ $ 44,935
2031 Piedra media Zonga m³ $ 44,935
2032 Concreto 4000PSI de Planta Gravilla Comun m³ $ 297,330
2033 Mortero 3000PSI de Planta m³ $ 354,090
2034 Concreto de 4000PSI acelerada a 3 dias m³ $ 440,858
2035 Fibra Metalica Dramix RL45-50 BN kg $ 7,656
2036 Concreto de 4000PSI Grava fina m³ $ 306,953
2037 Excavacion y retiro de material manual m³ $ 55,000
2038
2039
2040
2041
2042
2043
2044
2045
2046
2047
2048
2049
2050

3001 Bloque No 5 unid. $ 801


3002 Ladrillo Recocido unid. $ 330
3003 Ladrillo portante prensado estructural Santafe unid. $ 1,036
3004 Bloque estructural de perforacion Vertical unid. $ 1,593
3005 Ladrillo prensado liviano unid. $ 655
3006 Ladrillo tolete prensado liviano unid. $ 655
3007 Sardinel Prefabricado 0,8*0,50*0,20 unid. $ 37,897
3008 Bloque abuzardado en concreto unid. $ 3,300
3009 Bloquelon Santafe unid. $ 2,904
3010
3011
3012
3013
3014
3015
3016
3017
3018
3019
3020
3021
3022
3023
3024
3025
3026
3027
3028
3029
3030
3031
3032
3033
3034
3035
3036
3037
3038
3039
3040
3041
3042
3043
3044
3045
3046
3047
3048
3049
3050

4001
4002
4003
4004
4005
4006
4007
4008
4009
4010
4011
4012
4013
4014
4015
4016
4017
4018
4019
4020
4021
4022
4023
4024
4025
4026
4027
4028
4029
4030
4031
4032
4033
4034
4035
4036
4037
4038
4039
4040
4041
4042
4043
4044
4045
4046
4047
4048
4049
4050

5001 Cielo raso en Dry Wall m² $ 35,000


5002 Plafon Boral 1,20 x 0,60 Lisa Blanco unid. $ 15,913
5003
5004
5005
5006
5007
5008
5009
5010
5011
5012
5013
5014
5015
5016
5017
5018
5019
5020
5021
5022
5023
5024
5025
5026
5027
5028
5029
5030
5031
5032
5033
5034
5035
5036
5037
5038
5039
5040
5041
5042
5043
5044
5045
5046
5047
5048
5049
5050

6001 Amarre para Teja plastica unid. $ 66


6002 Flanche Cal 18 d=0,30 ml $ 24,750
6003 Teja cindurit a=0,78 m² $ 26,286
6004 Teja Punto Diamante m² $ 76,184
6005 Teja en Fibro cemento No 4 unid. $ 14,721
6006 Gancho para teja fibro cemento unid. $ 608
6007 Teja Plastica No 4 m² $ 43,256
6008 Teja en Zinc 3m m² $ 11,956
6009 Carpa para cubierta m² $ 15,509
6010
6011
6012
6013
6014
6015
6016
6017
6018
6019
6020
6021
6022
6023
6024
6025
6026
6027
6028
6029
6030
6031
6032
6033
6034
6035
6036
6037
6038
6039
6040
6041
6042
6043
6044
6045
6046
6047
6048
6049
6050

7001 Tableta Alfa Sahara 0,30*0,30 m² $ 24,882


7002 Tableta Alfa P5 0,33*0,33 Blanca m² $ 37,890
7003 Adoquin en corbatin Royal Santafe unid. $ 1,100
7004 Guardaescoba Alfa Negro ml $ 9,801
7005 Ceramica Corona Macedonia Blanca 0,20*0,20 m² $ 18,590
7006 Guardaescoba en Caucho ml $ 2,200
7007 Piso en Vinilo de 2mm m² $ 16,363
7008 Junta Epoxica Alfa 200 kg $ 10,403
7009 Tableta Alfa P5 0,30*0,30 Blanca m² $ 37,627
7010 Tableta Alfa P5 0,33*0,33 o 0,30*0,30 Beige m² $ 43,129
7011 Piso Flex cuadros de 0,50*0,50 m² $ 69,670
7012 Tableta Alfa Sahara 0,09 x 0,18 m² $ 12,870
7013 Junta Epoxica Alfa 100 kg $ 10,776
7014 Ceramica valencia Blanca 0,20*0,30 m² $ 19,800
7015 Media caña Sahara 0,300,245 unid. $ 4,038
7016 Porcelanato 0,50*0,50 m² $ 38,390
7017 Media caña en granito prefabricada ml $ 31,900
7018 Prado m² $ 9,953
7019 Tierra abonada m³ $ 220,000
7020
7021
7022
7023
7024
7025
7026
7027
7028
7029
7030
7031
7032
7033
7034
7035
7036
7037
7038
7039
7040
7041
7042
7043
7044
7045
7046
7047
7048
7049
7050

8001 Pulidora dia $ 15,312


8002 Volqueta * 6mts³ con cargue m³ $ 31,350
8003 Compresor de 2 Martillos hora $ 40,832
8004 Vibrador a Gasolina dia $ 34,452
8005 Taladro dia $ 30,250
8006 Canguro dia $ 63,800
8007 Paral Telescopico Largo mes $ 7,273
8008 Retroexcavadora (Stan Bye de 6 Horas) hora $ 57,420
8009 Volqueta * 6mts³ (Alquiler) hora $ 33,000
8010 Mini Cargador Bobcat hora $ 38,280
8011 Compresor para pintura dia $ 25,520
8012 Andamio Seccion Sem. $ 4,466
8013 Formaleta para placa mes $ 5,309
8014 Mezclador de 1,5 Bultos dia $ 57,420
8015 Planchon de 3mts a=0,30 Sem. $ 2,233
8016 Paral Telescopico Estándar Sem. $ 7,273
8017 Rueda para andamio Mes $ 13,398
8018 Andamio Seccion Pequeña Sem. $ 5,104
8019 Cortadora de Enchape dia $ 16,500
8020 Benitin (1 dia, $180,000 de transporte) hora $ 34,452
8021 Motobomba (Transporte 50000) dia $ 66,000
8022 Bombeo de concreto m³ $ 38,500
8023 Herramienta Menor % 0%
8024 Cinta PVC ml $ 35,090
8025 Cercha Sem. $ 2,680
8026 Pluma con polea dia $ 40,000
8027
8028
8029
8030
8031
8032
8033
8034
8035
8036
8037
8038
8039
8040
8041
8042
8043
8044
8045
8046
8047
8048
8049
8050

9001 Puntilla de 11/2", 2", 21/2" y 3" Lib. $ 2,530


9002 Segueta unid. $ 3,573
9003 Pegacor Gris kg $ 1,100
9004 Boquilla kg $ -
9005 Wind de Remate *6m unid. $ 6,050
9006 Escoba unid. $ 3,850
9007 Rodillo Master 9" unid. $ 8,683
9008 Lija No 80, 100, 120, 150 y 200 Pliego $ 1,276
9009 Tapa Poros para Madera gl $ 30,675
9010 Desengrasante Alfa Lt $ 26,400
9011 Estuka de Sika kg $ 5,111
9012 Disco Diamantado de 9" unid. $ 249,700
9013 Alfalisto Pluss Kg $ 2,361
9014 Alfacolor kg $ 4,092
9015 Rodillo de Puas 9" unid. $ 66,352
9016 Broca Ranurada de 3/8" * 10" unid. $ 25,265
9017 Anclaje de 3/8" rosca interna unid. $ 990
9018 Thinner gl $ 14,036
9019 Tela verde para cerramiento h=2,10 ml $ 2,059
9020 Varilla de 3/8 Roscada ml $ 7,700
9021 Angulo de 2" *3/16" *6mts unid. $ 66,990
9022 Binda Boquilla kg $ -
9023 Pegacor Blanco kg $ 1,319
9024 Disco para pulidora de 4" Corte en humedo unid. $ 119,434
9025 Cinta de Enmascarar de 11/2" Rollo $ 3,277
9026 Soporte para tuberia de 4" unid. $ 5,500
9027 Acido Muriatico gl $ 8,677
9028 Soporte para tuberia de 2" unid. $ 5,500
9029 Guarescoba en PVC ml $ 2,200
9030 Silicona antihongos Tubo $ 8,250
9031 Boxer Bot. $ 13,750
9032 Rejilla en Aluminio 4*3 unid. $ 9,350
9033 Angulo en Aluminio de 1"*1/8" ml $ 6,545
9034 Tornillo autoperforante unid. $ 331
9035 Arnes con Slinga unid. $ 696,696
9036 PVA gl $ 29,700
9037 Polietileno a=1.00 ml $ 4,313
9038 Pistola de Calafateo unid. $ 6,600
9039 Papel Industrial Rollo $ 14,798
9040 Impermeables unid. $ 35,728
9041 Arnes con Slinga (Alquiler) dia $ 16,500
9042 Esquinero Plastico L=2,30 ml $ 479
9043 Win en Aluminio esquinero ml $ 6,050
9044 Win Plastico de remate ml $ 6,050
9045 Rejilla de 4" unid. $ 6,522
9046 Rejilla de 5*4 unid. $ 11,000
9047 Soporte para tuberia de 6" unid. $ 8,800
9048 Geotextil Blanco para cerramiento ml $ 1,646
9049 Broca Ranurada de 1/2" * 10" unid. $ -
9050 Vidri block 0,20*0,20 unid. $ 11,484
9051 Plastico Transparente*200m² ml $ 5,474
9052 Media caña en PVC ml $ 4,506
9053 Cinta de señalizacion *500m Rollo $ 29,700
9054 Sikafloor 363CO kg $ 51,040
9055 Pegacor Max Gris kg $ 2,029
9056 Boquilla Max kg $ 4,158
9057 Mastic Blanco *1/4 de Gl unid. $ 53,350
9058 Pirlan en Bronce ml $ 10,450
9059 Brocha de 3" pelo de Marta unid. $ 13,369
9060 Dilatacion en Bronce ml $ 7,700
9061 ACPM gl $ 7,700
9062
9063
9064
9065
9066
9067
9068
9069
9070
9071
9072
9073
9074
9075
9076
9077
9078
9079
9080
9081
9082
9083
9084
9085
9086
9087
9088
9089
9090
9091
9092
9093
9094
9095
9096
9097
9098
9099
9100

10001
10002
10003
10004
10005
10006
10007
10008
10009
10010
10011
10012
10013
10014
10015
10016
10017
10018
10019
10020
10021
10022
10023
10024
10025
10026
10027
10028
10029
10030
10031
10032
10033
10034
10035
10036
10037
10038
10039
10040
10041
10042
10043
10044
10045
10046
10047
10048
10049
10050

11001 Pistola Anchor Fix unid. $ 301,600


11002
11003
11004
11005
11006
11007
11008
11009
11010
11011
11012
11013
11014
11015
11016
11017
11018
11019
11020
11021
11022
11023
11024
11025
11026
11027
11028
11029
11030
11031
11032
11033
11034
11035
11036
11037
11038
11039
11040
11041
11042
11043
11044
11045
11046
11047
11048
11049
11050

12001 Sikafill 5 Kg $ 12,760


12002 SikaFelt m² $ 2,361
12003 Sikafloor 261 Kg $ 40,194
12004 Sikadur 506 Kg $ 1,148
12005 Sikafloor 162CO Kg $ 45,553
12006 Sikadur 510 o 520 Kg $ 2,437
12007 Sikadur 42 Anclaje Kg $ 22,202
12008 Sikaflex 1A, 11FC y 1CSL * 300c.c Tubo $ 25,520
12009 Sika Rod de 3/8" ml $ 530
12010 Sikadur 32 Primer Kg $ 56,527
12011 Sika Refuerzo Tejido ml $ 16,588
12012 Sika Grout 200 y 212 Kg $ 21,695
12013 Epoxifenolico Blanco gl $ 116,435
12014 SikaFloor 363CO Kg $ 51,040
12015 SikaFloor 2430CO Kg $ 24,116
12016 Sikadur 501, 504 o 506 Kg $ 1,148
12017 Timsen Bolsa $ 7,700
12018 Estuka Acrilico Kg $ 3,796
12019 Sikadur 51 SL Kg $ 49,830
12020 Sikalatex Kg $ 7,003
12021 Sikafloor Epocem Modul Kg $ 37,004
12022 Sikagard 720 Kg $ 6,606
12023 Manto Asfaltico con Foil en Aluminio Rollo $ 117,063
12024 Emulsion Asfaltica Kg $ 3,254
12025 Sika 1 Kg $ 10,230
12026 Sika Power Fix 4*300cc Tubo $ 74,646
12027 Mastercron Neutro kg $ 985
12028 Sikafill 10 Kg $ 14,036
12029 Sikaboom * 300ml tubo $ 20,288
12030 Sika transparente 5 kg $ 12,632
12031 Sikadur Panel kg $ 31,262
12032 Sika 101 Mortero Kg $ 4,019
12033 Sikafloor 400N kg $ 43,384
12034 Sikafloor 156CO Kg $ 45,553
12035 Sikafloor 261CO Kg $ 44,277
12036 Sikafloor 81 Epocem kg $ 2,552
12037 Sikafloor 81 Epocem Modul kg $ 38,471
12038 Anvil Tpo 2001 - Junta Blindada kg $ 2,036
12039 Latex cement kg $ 3,751
12040 Sonoguard Base Coat (Unid*5gls) unid. $ 561,440
12041 Sonoguard Top Coat (Unid*5gls) unid. $ -
12042 Filler 1-2-3 y 5 (Unid * 25kgs) unid. $ 32,857
12043 Tregraproof kg $ 15,057
12044 $ -
12045
12046
12047
12048
12049
12050

13001 Adaptador terminal conduit 1/2" unid. $ 255


13002 Alambre Cobre THW 12 AWG ml $ 1,340
13003 Alambre Cobre THW 14 AWG ml $ 938
13004 Caja octogonal Conduit unid. $ 1,209
13005 Interruptor Doble unid. $ 8,549
13006 Roseta unid. $ 1,926
13007 Tubo Conduit PVC 1/2" ml $ 1,383
13008 Alambre Cobre THW 10 AWG ml $ 2,181
13009 Tubo Conduit PVC 1" ml $ 2,510
13010 Conector de resorte Rojo unid. $ 17,765
13011 Lampara fluoresente 2*32 unid. $ 132,000
13012 $ -
13013 $ -
13014
13015
13016
13017
13018
13019
13020
13021
13022
13023
13024
13025
13026
13027
13028
13029
13030
13031
13032
13033
13034
13035
13036
13037
13038
13039
13040
13041
13042
13043
13044
13045
13046
13047
13048
13049
13050

14001 Codo 90° CxC PVC Sanitario de 3" unid. $ 4,808


14002 Codo 90° CxC PVC Sanitario de 4" unid. $ 8,284
14003 Soldadura PVC Liquida *1/4 Gl unid. $ 56,090
14004 Limpiador PVC Liquida *1/4 Gl unid. $ 27,044
14005 Tubo PVC Sanitario de 3" ml $ 12,894
14006 Tubo PVC Sanitario de 4" ml $ 17,969
14007 Codo 90° PVC Presion de 11/2" unid. $ 4,235
14008 Codo 90° PVC Presion de 1" unid. $ 1,124
14009 Codo 90° PVC Presion de 3/4" unid. $ 647
14010 Codo 90° PVC Presion de 1/2" unid. $ 358
14011 Registro de Bola 3/4" Red White unid. $ 54,868
14012 Tubo PVC Presion 3/4" RDE 11 ml $ 3,499
14013 Tubo PVC Presion 1" RDE 13.5 ml $ 3,971
14014 Tubo PVC Presion 11/2" RDE 21 ml $ 7,227
14015 Tubo PVC Presion 1/2" RDE 9 ml $ 2,108
14016 Codo 90° CxC PVC Sanitario de 2" unid. $ 2,077
14017 Tubo PVC A.LL. de 2" ml $ 5,551
14018 Union PVC Sanitaria de 4" unid. $ 4,305
14019 Tapon de Inspeccion de 4" unid. $ 11,785
14020 Cinta de Teflon Rollo $ 3,190
14021 Registro de Bola 11/2" unid. $ 54,230
14022 Codo 90° PVC Presion de 11/4" unid. $ 4,041
14023 Tubo PVC Presion 11/4" RDE 21 ml $ 5,537
14024 Tubo PVC Sanitario de 6" ml $ 48,320
14025 Union PVC Sanitaria de 6" unid. $ 21,150
14026 Tapon de Inspeccion de 6" unid. $ 36,103
14027 Registro de Bola de 1/2" Red White unid. $ 43,129
14028 Codo 90° CxC PVC Sanitario de 6" unid. $ 70,730
14029 Codo HG Agua de 3" unid. $ 16,716
14030 Codo HG Agua de 4" unid. $ 35,218
14031 Tubo HG Agua de 3" ml $ 46,786
14032 Tubo HG Agua de 4" ml $ 66,564
14033 Union de Reparación de 4" unid. $ 24,272
14034 Tubo PVC-P de 2" ml $ 29,634
14035 Codo 90° PVC Presion de 2" unid. $ 7,420
14036 Codo 90° CxC PVC Sanitario de 2" unid. $ 2,077
14037 Tubo PVC Sanitario de 2" ml $ 8,635
14038 Codo HG de 1" unid. $ 1,837
14039 Codo HG de 3/4" unid. $ 1,187
14040 Codo HG de 1/2" unid. $ 752
14041 Tubo HG de 11/2" ml $ 20,469
14042 Tubo HG de 1" ml $ 12,866
14043 Tubo HG de 3/4" ml $ 8,241
14044 Tubo HG de 1/2" ml $ 6,327
14045 Universal de PVC P 2" unid. $ 23,797
14046 Registro de Bola de 2" unid. $ 121,858
14047 Tubo PVC A.LL. de 4" ml $ 12,658
14048 Canal PVC Amazonas ml $ 7,549
14049 Soporte para Canal unid. $ 2,220
14050 Tapa Externa para Canal unid. $ 6,079
14051 Union canal unid. $ 12,491
14052 Geotextil NT 2000 m² $ 4,092
14053 Tubo PVC A.LL. *3" ml $ 6,180
14054
14055
14056
14057
14058
14059
14060
14061
14062
14063
14064
14065
14066
14067
14068
14069
14070
14071
14072
14073
14074
14075
14076
14077
14078
14079
14080
14081
14082
14083
14084
14085
14086
14087
14088
14089
14090
14091
14092
14093
14094
14095
14096
14097
14098
14099
14100

15001 Repisa Ordinario * 3mts unid. $ 5,613


15002 Liston Ordinario Cepillado y canteado 0,05*3mts unid. $ 4,423
15003 Tabla Burra Ordinaria Cepillada y Canteada 0,30*0,03 unid. $ 3,615
15004 Lamina de Madecor 2,15*2,44 - 6mm unid. $ 33,785
15005 Bocel*3mts unid. $ 2,591
15006 Palo Rollizo de 3m unid. $ 1,120
15007 Tabla Burra Ordinaria Cepillada y Canteada 0,25*0,03 unid. $ 3,020
15008 $ -
15009 $ -
15010 $ -
15011
15012
15013
15014
15015
15016
15017
15018
15019
15020
15021
15022
15023
15024
15025
15026
15027
15028
15029
15030
15031
15032
15033
15034
15035
15036
15037
15038
15039
15040
15041
15042
15043
15044
15045
15046
15047
15048
15049
15050

16001 Ayudante de Albañileria hh $ 4,955


16002 Oficial de Albañileria hh $ 7,020
16003 Cuadrilla de Albañileria AA hc $ 11,975
16004 Cuadrilla de Instalaciones BB hc $ 13,173
16005 Cuadrilla de Pintura CC hc $ 13,771
16006 Cuadrilla de Carpinteria DD hc $ 14,370
16007 Cuadrilla de Cableado Estructurado EE hc $ 15,568
16008 Sub Contrato % 0%
16009 $ -
16010 $ -
16011 $ -
16012 $ -
16013 $ -
16014 $ -
16015
16016
16017
16018
16019
16020

17001 Vinilo Tipo I Viniltex gl $ 50,820


17002 Barniz Transparente Algreco gl $ -
17003 Laca gl $ 39,699
17004 Graniplast m² $ -
17005 Esmalte Domestico gl $ 49,500
17006 Removedor gl $ 52,800
17007 Pintura amarilla de señalizacion gl $ 93,500
17008 Koraza gl $ 60,984
17009 Anticorrosivo Gris gl $ 35,001
17010 Vinilo Tipo III Tito Pabon gl $ 13,772
17011 Vinilo Tipo IV gl $ 5,500
17012 Carton corrugado x 12m rollo $ 20,845
17013 Vinilo Tipo II intervinilo gl $ 33,000
17014 Wash Primer gl $ 126,280
17015 Imprimante Epoxico 50NT gl $ 96,976
17016 Barrera Epoxica Blanca gl $ 127,600
17017 $ -
17018
17019
17020
17021
17022
17023
17024
17025
17026
17027
17028
17029
17030
17031
17032
17033
17034
17035
17036
17037
17038
17039
17040
17041
17042
17043
17044
17045
17046
17047
17048
17049

18001
18002
18003
18004
18005
18006
18007
18008
18009
18010
18011
18012
18013
18014
18015
18016
18017
18018
18019
18020
18021
18022
18023
18024
18025
18026
18027
18028
18029
18030
18031
18032
18033
18034
18035
18036
18037
18038
18039
18040
18041
18042
18043
18044
18045
18046
18047
18048
18049
18050
TERIALES

CAPITULO PROVEEDOR FORMA DE PAGO FECHA


ERROS- MALLAS CERCHAS
ACEROS HIERROS- MALLAS CERCHAS
CONCRETOS
LADRILLOS Y BLOQUES
CARPINTERIA METÁLICA Y EN MADERA
CIELO RASOS
CUBIERTAS Y ACCESORIOS
ENCHAPES PISOS ALFOMBRAS PAPEL
EQUIPO ALQUILER Y MAQUINARIA
FERRETERIA
GRIFERIAS, APARATOS Y ACCESORIOS
HERRAMIENTA MENOR
IMPERMEABILIZANTES, ADITIVOS Y QUIMICOS
INSTALACIONES ELECTRICAS Y COMUNICACIÓN IMPER
GAS INSTALAC
INSTALACIONES HIDRAULICAS, SANITARIAS Y A GAS
MADERAS
MANO DE OBRA
PINTURA
VIDRIOS, ESPEJOS Y CERRADURAS
ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Acero Figurado de 1/4"*60000PSI*6mts
HOJA No 1 DE 8
ITEM: 1.00
UNIDAD: kg

MAQUINARIA Y EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MATERIALES
1003 Acero Corrugado de 1/4"*60000PSI*6mts Varilla 0.7000 $ 5,335 $ 3,735
1002 Alambre Negro kg 0.0500 $ 2,999 $ 150
9002 Segueta unid. 0.0300 $ 3,573 $ 107
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.0270 $ 11,975 $ 323
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A
ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Acero Figurado de 3/8"*60000PSI*6mts
HOJA No 2 DE 8
ITEM: 1.02
UNIDAD: kg

MAQUINARIA Y EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MATERIALES
1004 Acero Corrugado de 3/8"*60000PSI*6mts Varilla 0.3125 $ 8,575 $ 2,680
1002 Alambre Negro kg 0.0500 $ 2,999 $ 150
9002 Segueta unid. 0.0300 $ 3,573 $ 107
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.0270 $ 11,975 $ 323
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A
ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Acero Figurado de 1/2"*60000PSI*6mts
HOJA No 3 DE 8
ITEM: 1.03
UNIDAD: kg

MAQUINARIA Y EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MATERIALES
1005 Acero Corrugado de 1/2"*60000PSI*6mts Varilla 0.1750 $ 15,312 $ 2,680
1002 Alambre Negro kg 0.0500 $ 2,999 $ 150
9002 Segueta unid. 0.0300 $ 3,573 $ 107
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.0270 $ 11,975 $ 323
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A
ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Acero Figurado de 5/8"*60000PSI*6mts
HOJA No 4 DE 8
ITEM: 1.03
UNIDAD: kg

MAQUINARIA Y EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MATERIALES
1006 Acero Corrugado de 5/8"*60000PSI*6mts Varilla 0.1166 $ 23,887 $ 2,785
1002 Alambre Negro kg 0.0500 $ 2,999 $ 150
9002 Segueta unid. 0.0300 $ 3,573 $ 107
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.0270 $ 11,975 $ 323
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A
ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Acero Figurado de 3/4"*60000PSI*6mts
HOJA No 5 DE 8
ITEM: 1.04
UNIDAD: kg

MAQUINARIA Y EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MATERIALES
1007 Acero Corrugado de 3/4"*60000PSI*6mts Varilla 0.0780 $ 34,452 $ 2,687
1002 Alambre Negro kg 0.0500 $ 2,999 $ 150
9002 Segueta unid. 0.0300 $ 3,573 $ 107
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.0270 $ 11,975 $ 323
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A
ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Acero Figurado de 7/8"*60000PSI*6mts
HOJA No 6 DE 8
ITEM: 1.03
UNIDAD: kg

MAQUINARIA Y EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MATERIALES
1008 Acero Corrugado de 7/8"*60000PSI*6mts Varilla 0.0575 $ 46,702 $ 2,685
1002 Alambre Negro kg 0.0500 $ 2,999 $ 150
9002 Segueta unid. 0.0300 $ 3,573 $ 107
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.0270 $ 11,975 $ 323
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A
ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Acero Figurado de 1"*60000PSI*6mts
HOJA No 7 DE 8
ITEM: 1.04
UNIDAD: kg

MAQUINARIA Y EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MATERIALES
1009 Acero Corrugado de 1"*60000PSI*6mts Varilla 0.0440 $ 61,248 $ 2,695
1002 Alambre Negro kg 0.0500 $ 2,999 $ 150
9002 Segueta unid. 0.0300 $ 3,573 $ 107
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16003 Cuadrilla de Albañileria AA hc 0.0270 $ 11,975 $ 323
#N/A #N/A #N/A #N/A
SUB-TOTAL #N/A

OBSERVACIONES:
Vr. TOTAL #N/A
1
2
3
4
5
6
7
ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Mortero para Pega Dosif 1:2
HOJA No 1 DE
ITEM: 1.00
UNIDAD: m³

MAQUINARIA Y EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT.
#N/A
#N/A
#N/A
#N/A
#N/A
SUB-TOTAL

MATERIALES
2001 Agua Lt 268.00 $ 11
2002 Cemento Porhand Gris kg 625.00 $ 574
2003 Arena de Peña m³ 0.97 $ 42,570
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
SUB-TOTAL

MANO DE OBRA
16001 Ayudante de Albañileria hh 4.00 $ 4,955
#N/A
SUB-TOTAL

OBSERVACIONES:
Vr. TOTAL

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Mortero para Pega Dosif 1:3
HOJA No 1 DE
ITEM: 2.00
UNIDAD: m³

MAQUINARIA Y EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT.
#N/A
#N/A
#N/A
#N/A
#N/A
SUB-TOTAL

MATERIALES
2001 Agua Lt 252.00 $ 11
2002 Cemento Porhand Gris kg 450.00 $ 574
2003 Arena de Peña m³ 1.09 $ 42,570
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
SUB-TOTAL

MANO DE OBRA
16001 Ayudante de Albañileria hh 4.00 $ 4,955
#N/A
SUB-TOTAL

OBSERVACIONES:
Vr. TOTAL

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Mortero para Pega Dosif 1:4
HOJA No 3 DE
ITEM: 3.00
UNIDAD: m³
MAQUINARIA Y EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT.
#N/A
#N/A
#N/A
#N/A
#N/A
SUB-TOTAL

MATERIALES
2001 Agua Lt 240.00 $ 11
2002 Cemento Porhand Gris kg 382.00 $ 574
2003 Arena de Peña m³ 1.28 $ 42,570
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
SUB-TOTAL

MANO DE OBRA
16001 Ayudante de Albañileria hh 4.00 $ 4,955
#N/A
SUB-TOTAL

OBSERVACIONES:
Vr. TOTAL

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Mortero para Pega Dosif 1:5
HOJA No 1 DE
ITEM: 4.00
UNIDAD: m³

MAQUINARIA Y EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT.
#N/A
#N/A
#N/A
#N/A
#N/A
SUB-TOTAL

MATERIALES
2001 Agua Lt 240.00 $ 11
2002 Cemento Porhand Gris kg 317.00 $ 574
2003 Arena de Peña m³ 1.32 $ 42,570
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
SUB-TOTAL

MANO DE OBRA
16001 Ayudante de Albañileria hh 4.00 $ 4,955
#N/A
SUB-TOTAL

OBSERVACIONES:
Vr. TOTAL

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Mortero para Pega Dosif 1:6
HOJA No 7 DE
ITEM: 5.00
UNIDAD: m³

MAQUINARIA Y EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT.
#N/A
#N/A
#N/A
#N/A
#N/A
SUB-TOTAL

MATERIALES
2001 Agua Lt 235.00 $ 11
2002 Cemento Porhand Gris kg 274.00 $ 574
2003 Arena de Peña m³ 1.32 $ 42,570
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
SUB-TOTAL

MANO DE OBRA
16001 Ayudante de Albañileria hh 4.00 $ 4,955
#N/A
SUB-TOTAL

OBSERVACIONES:
Vr. TOTAL

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Mortero para Pega Dosif 1:8
HOJA No 3 DE
ITEM: 6.00
UNIDAD: m³

MAQUINARIA Y EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT.
#N/A
#N/A
#N/A
#N/A
#N/A
SUB-TOTAL

MATERIALES
2001 Agua Lt 227.00 $ 11
2002 Cemento Porhand Gris kg 200.00 $ 574
2003 Arena de Peña m³ 1.25 $ 42,570
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
SUB-TOTAL

MANO DE OBRA
16001 Ayudante de Albañileria hh 4.00 $ 4,955
#N/A
SUB-TOTAL

OBSERVACIONES:
Vr. TOTAL

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Mortero para Pega Dosif 1:10
HOJA No 9 DE
ITEM: 7.00
UNIDAD: m³

MAQUINARIA Y EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT.
#N/A
#N/A
#N/A
#N/A
#N/A
SUB-TOTAL

MATERIALES
2001 Agua Lt 230.00 $ 11
2002 Cemento Porhand Gris kg 174.00 $ 574
2003 Arena de Peña m³ 1.38 $ 42,570
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
SUB-TOTAL
MANO DE OBRA
16001 Ayudante de Albañileria hh 4.00 $ 4,955
#N/A
SUB-TOTAL

OBSERVACIONES:
Vr. TOTAL
MEMORIA GRAFICA

Vr. PARCIAL
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

1
$ 2,948
$ 358,875
$ 41,293
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

$ 19,820
#N/A
#N/A

#N/A

MEMORIA GRAFICA
Vr. PARCIAL
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

2
$ 2,772
$ 258,390
$ 46,401
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

$ 19,820
#N/A
#N/A

#N/A

MEMORIA GRAFICA
Vr. PARCIAL
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

3
$ 2,640
$ 219,344
$ 54,490
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

$ 19,820
#N/A
#N/A

#N/A

MEMORIA GRAFICA

Vr. PARCIAL
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

4
$ 2,640
$ 182,021
$ 56,192
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

$ 19,820
#N/A
#N/A

#N/A

MEMORIA GRAFICA

Vr. PARCIAL
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

5
$ 2,585
$
$
157,331
56,192
#N/A
#N/A
#N/A
#N/A
5
#N/A
#N/A
#N/A
#N/A
#N/A

$ 19,820
#N/A
#N/A

#N/A

MEMORIA GRAFICA

Vr. PARCIAL
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

6
$ 2,497
$ 114,840
$ 53,213
#N/A
#N/A
#N/A
#N/A
6
#N/A
#N/A
#N/A
#N/A
#N/A

$ 19,820
#N/A
#N/A

#N/A

MEMORIA GRAFICA

Vr. PARCIAL
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

7
$ 2,530
$ 99,911
$ 58,747
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
$ 19,820
#N/A
#N/A

#N/A
ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Concreto 3000PSI mezclado en Obra
HOJA No 1 DE
ITEM: 1.00
UNIDAD: m³

MAQUINARIA Y EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
SUB-TOTAL #N/A

MATERIALES

1
2001 Agua Lt 229.50 $ 11 $ 2,525
2002 Cemento Porhand Gris kg 425.00 $ 574 $ 244,035
2016 Arena de Rio m³ 0.67 $ 92,235 $ 61,797
2017 Gravilla de Rio m³ 0.67 $ 92,235 $ 61,797
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16001 Ayudante de Albañileria hh 2.00 $ 4,955 $ 9,910
16002 Oficial de Albañileria hh 0.50 $ 7,020 $ 3,510
SUB-TOTAL $ 13,420

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Concreto 2500PSI mezclado en Obra
HOJA No 1 DE
ITEM: 2.00
UNIDAD: m³

MAQUINARIA Y EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
SUB-TOTAL #N/A

MATERIALES

2
2001 Agua Lt 210.00 $ 11 $ 2,310
2002 Cemento Porhand Gris kg 350.00 $ 574 $ 200,970
2016 Arena de Rio m³ 0.56 $ 92,235 $ 51,190
2017 Gravilla de Rio m³ 0.84 $ 92,235 $ 77,016
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16001 Ayudante de Albañileria hh 2.00 $ 4,955 $ 9,910
16002 Oficial de Albañileria hh 0.50 $ 7,020 $ 3,510
SUB-TOTAL $ 13,420

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Concreto 2000PSI mezclado en Obra
HOJA No 3 DE
ITEM: 3.00
UNIDAD: m³

MAQUINARIA Y EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
SUB-TOTAL #N/A

MATERIALES

3
2001 Agua Lt 204.00 $ 11 $ 2,244
2002 Cemento Porhand Gris kg 300.00 $ 574 $ 172,260
2016 Arena de Rio m³ 0.48 $ 92,235 $ 43,812
2017 Gravilla de Rio m³ 0.95 $ 92,235 $ 87,623
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16001 Ayudante de Albañileria hh 2.00 $ 4,955 $ 9,910
16002 Oficial de Albañileria hh 0.50 $ 7,020 $ 3,510
SUB-TOTAL $ 13,420

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Concreto 1500PSI mezclado en Obra
HOJA No 1 DE
ITEM: 4.00
UNIDAD: m³

MAQUINARIA Y EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
SUB-TOTAL #N/A

MATERIALES

4
2001 Agua Lt 192.00 $ 11 $ 2,112
2002 Cemento Porhand Gris kg 200.00 $ 574 $ 114,840
2016 Arena de Rio m³ 0.50 $ 92,235 $ 46,118
2017 Gravilla de Rio m³ 1.00 $ 92,235 $ 92,235
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16001 Ayudante de Albañileria hh 2.00 $ 4,955 $ 9,910
16002 Oficial de Albañileria hh 0.50 $ 7,020 $ 3,510
SUB-TOTAL $ 13,420

OBSERVACIONES:
Vr. TOTAL #N/A

ANALISIS DE PRECIOS UNITARIOS

MEMORIA GRAFICA
FECHA:
ACTIV: Concreto 1000PSI mezclado en Obra
HOJA No 5 DE
ITEM: 5.00
UNIDAD: m³

MAQUINARIA Y EQUIPO
COD. DESCRIPCION UNID. CANT. Vr. UNIT. Vr. PARCIAL
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
SUB-TOTAL #N/A

MATERIALES

5
2001 Agua Lt 185.00 $ 11 $ 2,035
2002 Cemento Porhand Gris kg 175.00 $ 574 $ 100,485
2016 Arena de Rio m³ 0.56 $ 92,235 $ 51,190
2017 Gravilla de Rio m³ 0.98 $ 92,235 $ 89,929
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
SUB-TOTAL #N/A

MANO DE OBRA
16001 Ayudante de Albañileria hh 2.00 $ 4,955 $ 9,910
16002 Oficial de Albañileria hh 0.50 $ 7,020 $ 3,510
SUB-TOTAL $ 13,420

OBSERVACIONES:
Vr. TOTAL #N/A

También podría gustarte