INSTALLATION/INSPECTION REPORT FORM

SH. 1/2
INSPECTION ITEM: Anode Groundbed PROJECT : TB2 THERMAL POWER PLANT
INS PLACE :
CUSTOMER : PVN
REPORT NO. :
TESTING DATE :
Testing Equipment Model Type Serial No. Calibration Date

CP SYSTEM GROUNDBED INSTALLATION AND PRE-COMMISSIONING RECORD SHEET


GBED TAG NO: DC OUTPUT RATING A
TRU TAG NO: A V

LOCATION: KP +

INSTALLATION SKETCH: SEE REVERSE OF THIS SHEET SHEET OF


INSTALLATION CHECKLIST: tick as appropriate DATE / /
1 SIZE , TYPE AND QUANTITY OF ANODES CORRECT YES NO
2 TOTAL DESIGN ANODE DEPTH m
3 TOTAL ACTUAL ANODE DEPTH m
4 DESIGN ANODE/ANODE SPACING m
5 ACTUAL ANODE/ANODE SPACING m
6 ALL ANODE CABLES FREE OF DEFECTS YES NO
7 ALL ANODE CABLES LABELED CORRECTLY YES NO
8 ALL ANODE CABLE HEADER SPLICE TERMINATIONS SECURE AND SEALED YES NO
9 ALL ANODE/CABLE CONNECTIONS ELECTRICALLY CONTINUOUS YES NO
10 ALL CABLE ENTRIES CORRECTLY GLANDED YES NO
INSTALLATION TEST
FOR SOIL RESISTANCE AT DRILLED DEPTH SEE FORM FORM QA-IST-GB-002-REV 0
11 INDIVIDUAL ANODE INSTALLATIONS DATE / /
ANODE ANODE/CABLE DEPTH OF ANODE SEPERATION FROM PIPE CABLE ANODE POTENTIAL
CONTINUITY INSTALLATION (m) (m) SPLICED -v (CSE)

1
2
3
4
5
6
12 TOTAL COLLECTIVE GROUNDBED RESISTANCE TO REMOTE EARTH

13 COMMENTS