Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Valor
Valor
FECHA: FECHA: (D) IGV [18% of (C)] 0.00 + 0.00 = 0.00 = (11,209.05)
CONTROL DE PROYECTOS GERENTE DE INFRAESTRUCTURA (E) TOTAL (C+D) 0.00 + 0.00 = 0.00 = (73,481.54)
FECHA: FECHA: (H) MONTO A PAGAR (E+F+G) 0.00 + 0.00 = 0.00 = (69,072.65)